Loading...
HomeMy WebLinkAbout20080826Decision Memo.pdfDECISION MEMORAUM TO:COMMSSIONER REDFORD COMMSSIONER SMITH COMMSSIONER KEMPTON COMMSSION SECRETARY LEGAL WORKNG FILE FROM:NANCY HYTON DATE:AUGUST 22, 2008 RE:FORM COMPLAINT OF JONATHA GIBBS On August 14,2008, the Commission received a "formal" complait from Jonathan Gibbs against Idaho Power Company. The customer had Idaho Power install new underground servce to a cabin in a new subdivision in New Meadows. The initial quote provided by Idaho Power for the installation included a provision for $4,000 in extra costs if the Company encounters "unusual" trenchig conditions. As noted below, the Company's trenching contractor ran into "rock conditions" and charged Mr. Gibbs accordingly. In his informal complait, Mr. Gibbs claims that diggig through rock is not unusual conditions. Jonathan Gibbs was unsatisfied with the outcome of the informal procedures to resolve his complaint and has filed this formal complaint. BACKGROUND The customer paid $6,383 in advance of constrction. The quote included $4,000 if the Company experienced unusual conditions. Idaho Power charges in Rule H are based on average costs encountered in "normal" conditions. If "unusual" conditions are not encountered, the customer is refuded the amount included in the quote. As part ofthe cost quote (Attachment A), the customer signed an Unusual Conditions Acknowledgement on May 20,2008. Par of the document states that "These conditions may include but are not limited to ... rock digging." Idaho Power used an outside contractor for the trenchig. The total lengt of the trench was 180 feet, which included 160 feet of rocky trench at $24.49 per foot. The total charge for the unusual conditions was $3,918.40. Mr. Gibbs was refuded the balance of$81.60. Mr. Gibbs DECISION MEMORAUM - 1 -AUGUST 22, 2008 does not agree with the amount of the refud. He contends that digging though rock is not unusual for that area. Furermore, he maitains that he was not offered the option to trench himself and that if he had used his own contractor, the charge would have been substantially less, approximately $1,500. STAFF RECOMMNDATION Jonathan Gibbs was not satisfied with the outcome of the inormal complaint. Consequently, he filed a formal complaint. (Attchment B) See Rules 23, 25 and 54, IDAPA 31.01.01.023, .024 and .054. Sta recommends that the Commission issue a Sumons to Idaho Power Company and directs the Company to file a response to the issues raised in the còmplait. COMMISSION DECISION Does the Commission wish to accept Jonath Gibbs' formal complaint? Does the Commission wish to issue a Summons? '-1 rl /, , /-r7/~ Nancy Hylton í:ConsmlJonatan Gibbs fonnal complaint DECISION MEMORADUM - 2-AUGUST 22, 2008 07/28/2008 14: 53 2083523955 JONATHAN GIBBS PAGE 03/05 !N11W~PORt' An IUACORP CQmpany CUSTOMER COST QUOTE IDAHO Customer or Proje Name: GIBBS. JONATHAN-URD LINE EXT FROM $ECTER DD4 TO NE Prepaid Fee Design Number: 0000071192 Credit 1. L.ine In:stllllitionlUpgrade COIbi 2. Company Betterment 3. Une Installaton Allonces a. CU$tomer cash Allowance b. Terminal Facllilles Allownce C. Salvage TtOable. Creit 61s1 Wo, Orer #: 27284188 Debl\ 4,840J Totals 4. Line Installation Credit (Cusromor Pl'öod1l'ch) 5. VGSmd Inmre Woi Order fl e. BanI( Letter of Credit (for Unusual ConditioJl OYr $1 0.000) 7. Unusu;il ConditIons I 01 CC (Umited to 5 yers or" additIonai applicats) I I ~8CO. 1591 o I 01 i 01 1.83 8. Net Construction Cost 9. Net Vuted OR Refundable ,Construction Cost 10. Constrction Cost Not Avallablo for Vesting or Round 11. RIght of Way Permits (NSl' 14 BiI¡;blé englnééring Charges (NSR) (11 Hrs (g $50 pe Hr) 5,8331 4,0001 1,831 01 5501 01 01 01 : : ql 01 5501 13. UndergfQ';nd Servi~e Cilrge (NSR) 14. Relocation or Removl ChIrg (NSR) a. Relocation or removl with ne load. (412) b. RelocUon or removal with NO new load (415) c. Non-Taxable Salvage Credit on Relocon or Remval 15. Oter Charga is. r:eedèl Chargo 17. Sub.Total Non.Refundable Charges 01 1lt Englnoorlng Feo 19. Right o'Way Pormit (NSR) 20. Tempor;ry Service Charge (NSR) 21. Total Priipaid Cusomiir Charges L ',:,", ,Wi., "', '...'''1,:::; :::,:;:.i::;::~i':;;i ()~;;G4Ü\;~fi i '"V,"" ."t" '~¡,'91.. r,:~.:,w:~.,:,~~...:~~: $3,007/ $fI,3G1 $8,383J id 22. IdahoPowør Co. ContributIon & Bank Lottr of erolt 23; Totl Work Order Charges 24. Total Customer Paymnt Due (lne a + Un 17) No1B: ~ Ths wr quotation shall be binding on the Company for a perod of t;iÌd d&y (l) frm the da bé0w indicated. Subject to changes in Infon proded by the Customer or Changes in th Companys abilit to obtan satisfa righisf-way orto coply wi govermetal regulatlns, Incuding but not limlieci to tne rules, reUlaiions, and larl oune fdatio Public Utilities Comssion. Th Customer must make payment of th Quote amunt not les than thirt (30) days prior to the start of cotructon. but the Company does not reent that constrçlon will commen within gO days of I't of pamlt. The start of COstrlon WILL be subjec to the Comnys abilit to obtaIn the nesary lallr, matenais and equipment.l'ulItomer Signature Ds,0. . .~ -.? f Á , ..-:%¿: - b Z' IPC Reprentie Attchment A Decision Memorandum Hylton, N. 8/22/08 Page 1 of 4 0l/28/2008 14: 53 2083523955 JONATHAN GIBBS PAGE 05/05 Ciwmer or Project Name: GIBBS, JONATHAN.URD LINE EXT FROM SECTER DD4 TO HE Deigrí Numbr: 000071192 Work Order #: 27284188 Brl.1"1l~~ Unusual Conditions Acknowledgement Unusual Conditions are constrction conditions not normally encountered. These conditions mayinclude, but are not limited to: frost, landscape replacement, road compacon, pavement replacement, chip-sealing, rock diggig~ borig, nonstandard facilties or constrction practces, and other than 'ãvailable voltage requiements. I have read arid understand the above definition of Unusual Conditions as set forth in Idaho Power Company's Line Installation tariff; Rule H. I further understand that Idaho Power Company will determine the type and extent of the Unusual Conditions encountered. Unusual Conditions charged for on the Customer Cost Quote sheet, but not encountered, wil be refunded to the Customer by Idaho Power Company after the completion of construction. Signed:~øZ y:~ ~. . .. Cusliir Sigature Date:.5-.z~.. cJff Ãttachment A Decision Memorandum Hylton, N. 8/22/08 Page 2 of 4 01128/2008 14: 53 2083523955 JONATHAN GIBBS PAGE 04/05 . '\ !!DU~~ An IDACORP caminv Idaho Power Company Servce Request hge;1 Date '/lllOB S~L"Li: ReudtNuwber 0049395 . GIBBS, JONATIA.N-UR LIN txl' FROM SECT DD4 TO NEW FM Work Order Number: in84188 Reques Type; lts RatSch: 1 Reply.By: Feeer NWMS41A Sercc 1,cation: ~ MEADow ID 836M Reqd in ScriceDate:l0/17ll007 Planing CenterlTcan: MC CALL Eng Hours: 0011 Eng fcc: Amunt (Att 98): $*.00 Eng Fe. ,Aunt ( Att 16): Eng Fee Scrvce Agemnt No: Eng Feii Servce Agt Da~; Customc:rNo; 111"444?i CODtatt ))mil: iSZR JONA'l GI.llS 950:i SCORPIO ST" BOIS ID 33709 3Q-318941i6 CU JONA'I GIBBS ,SO SCORPIO ST" BOlSl m 337O 36i-~(íI8'-412 irco FUNT 6379 " Attut lutonntln RESCOM Serce Voltage: No. Of Phass; KW Motor Load Lages Motor: 1 Phae KW Dem: :l Phae K.W Demd: Connec KWLolid: 25 Ctin~ia1Dtposit Amunt: No. of Metlls: i Mtr.Lo: CtLoc: Pr OIIlG: UG Servce OHlG: UG Srv. Ow: Pil Amp Size: ZOo ~ NE PRIY LIN EXTENION FROM EXTIG SEcrER TO NEW PADMOUN TRFORMR AN UNERGROUN EAEM IS NEED FROM CUTOME TO ACCOMPUSH LIN EXTON UNERGROUN SERVICE CHGES IS NOT INCLUDED IN THS WORK ORDER CUSTOM TO PROVipE 3" CONPinT FOR Ft UNERGROUN SERVICE. ¡peO WlL BE PIGGlNGALONG EDE OF CUSTOME DRIWAY, BUT DiuviWA Y IS NOT TH YET, SO NO PROVISIONS TO REAI DRIWAY is IN THS WORK ORDER. I understand that the inoimation provided above is accur to the best of-my knowledge. 'Chage to load; voltae; location; et. nm rest in additional engeering chares. . 2~(~ MP f~¡l~2/14-Ç1ient Sig~ture Date ~ Façilty Rep. Signnie S/it./g i I Date Attachment A Decision Memorandumil Hylton, N. R/22/08 Pai;æ 3 of 4 07/28/2008 14: 53 '_ 'i- "~11l· POR. An IOAcòlip C;OI"~$"V Project Name: 2083523955 JONATHAN GIBBS PAGE 05/05 Memorandum of Understanding New Residence Work Order Number: 27284188 The quoted price and credits include these requirements for trench baokfill and compaction and the final grade. 1. Standard Compaction 2. High (or 95%) Compaction 3. Final Grade OLiL. 040 (8/ Standard compaction is required in all areas that do not reuire high compaction. For standard compaction, backfil with tte native soil and "wheel-roll" the trench. Ifthe soil is "loamy" or does not compact well, the spoils must be hauled off and replaced with 3/4" road mix up to 12" of the surfce. Use native backfill for the top 12" of the trench. J 200 I Standard compaction fotage Note: The grantor-of the riht-of-way may require high compaction in areas that are not under a paved surface or rod but stil within the right-ot-way. High compacton is required in areas where the trench wil be under; · A roadway, alley. driveway, orparking lot (whether paved or unpaved). . A paved surface. r + Where the grantor of the right-of-way reuires high compacton. For high compacton, backfll the trench in 12" lifs with 3/4" road mix or "pit run" ànd compact each lift with a "wacket' or other similar compaction device. Native soil is not acceptable as a bacKfll material for high compacton and must be hauled off. i I High compaction footage We understand that as of the above name project will beready for facilties to be installed by Idaho Power. - All roadways and cable routes must have all grading and subgraing completed by this date. The project must be properly referenced and have grade stakes installed as might be necessary to establish proper elevations and burial depths for Idaho Power facilties. (MTR lYPE, OH OR UGSRV, ETC.) (PLEASE CHECK) The customer will be responsible for the total cost of any needed relocation, repair, or damage to Idaho Power facilties that results frm any subsequent changes in property lines, lot lines, elevations, grades, excavations. or profiles causing improper locations or burial depths of above-round equipment, below-ground equipment, cable, or conduit. This Memorandum of Understanding is accepted by: '\-i'~~~c ~"$ Signature S;KØLP8Dare i~Idaho Power Representaive's Signature slr~/i Date I / Attachment A Decision Memorandum Hylton, N. 8/22/08 Page 4 of 4 '6¡t1 Ne-V'''i August 12,2008 '4 l'~._, PUC Secretar and Commission PUC Po Box 83720 Boise, Id 83720-0074 .AUG l4 ~l4 B: 10f-.\tJ "' 1 iDt,;U11"1' ''1\' r: f.vIILIl.... I would like to appeal the charge made by Idaho Power for Unusual Conditions on the installation of the transformer at our home site at 3742 Van Dorn drve in New Meadows. I filed a complaint with Nancy at the PUC office and was told there was nothng she could do for me. A copy of tht letter is enclosed. I know you have regulated amounts that Idaho Power can charge for the installation of the transformers but it appears that they have a loophole in the regulations when it comes to Unusual Conditions. Nancy told me that I signed the unusual conditions form and it says that they determine the amount. They are the rate setter, judge and jury, no reguation and nobody to account to. I asked Idaho Power to give me the breakdown of the costs of the unusual conditions and all they told me was they had to dig though 160 feet of Solid Rock. I would like to see what they paid the ouside contractor for that job. It seems to me that they should have to accoun't to someone for charges they make to the public. I agree that I should be charged for legitimate charges that are encountered in my installation but they should not be arbitrar. Can they charge $4000, $6000, $10000, is there a limt? Thans for reviewing my complaint & appeal. ~/;k£l~ Jonathan Gibbs 9502 Scorpio Boise, Id 83709 Phone 208-362-3965 Attachment B Decision Memorandum Hylton, N. 8/22/08 Page 1 of 2 July 28, 2008 Nancy PUC PO Box 83720 Boise, Id 83720-0074 This is a complaint for the charge by Idaho Power for Unusual Conditions on our new home site at 3742 Van Dorm drive tLot 2 Van Dom Estates). We applied for a transformer for our new home which sets back in about 275 feet from the road where the power is available, so the transformer had to be located within 150 feet of our house. We contacted Flint McDaniel at the McCall Idaho Power offce and filled out the forms necessar to get the job done. When I came to the form on Unusua Conditions I asked Flmt if we could dig the trench to put the lme il ourselves and he told me no, that was par of Idaho Powers revenue business. When Idaho Power came. to put the transformer in, the work was done by an outside contractor. They stared digging about 9:30 and all the installation was completed by 5 :00 PM.. When you dig in New Meadows you hit fractured rock at about one foot six inches and everyone that works in the area is famliar with the conditions. The crew doing the digging had not brought their smaller backhoe bucket which according to the operator would have made the digging a little easier and quicker. They did encounter some solid rock in places which slowed them down somewhat. No hamer, blasting or additional equipment was needed to complete the job. My excavator (Mr.Thueson) was workig that same day and he indicated that ifhe had done the digging it would have, been about $1,500.00. He dug my 80 foot 4 feet deep water line from the house to the well in less than 2 hours. Idaho Power told me at the end of job I would get a detail of the Unusual Conditions charges and a refud of any unused deposit. Six weeks after completion I had not received anything from Idaho Power so I called the offce and was told that I would get a call from the McCall office. One week later afer no word I called again, then I stopped at the McCall office and was told my $81.00 check was in the maiL. I received the check but no explanation of the charges. . I expected a reasonable charge for Unusua Conditions, but $3,919.00 is not reasonable. Yours try, Jonathan Gibbs 9502 Scorpio Boise, Id 83709 Attaclient B Decision Memorandum Hylton, N. 8/22/08. Page 2 of 2