Loading...
HomeMy WebLinkAbout20080213order_no_30480_errata.pdfOffice of the Secretary Service Date February 13, 2008 BEFORE THE IDAHO PUBLIC UTILITIES COMMISSION IN THE MATTER OF IDAHO POWER COMPANY'S PETITION TO MODIFY THE METHODOLOGY FOR DETERMINING FUEL COSTS USED TO ESTABLISH PUBLISHED RATES FOR PURPA QUALIFYING FACILITIES ERRATA TO ORDER NO. 30480 CASE NO. IPC-07- The Commission Staff has discovered an error in one of the generic input variables used to compute the avoided cost rates contained in Order No. 30480, issued on December 28 2007. In Order No. 30480 the Commission adopted the September 11 , 2007 natural gas price forecast of the Northwest Power and Conservation Council (NWPCC), and modified the method used to incorporate the gas price forecast such that all years of the forecast are used " is." The natural gas prices provided in the Council's forecast are real prices, but nominal prices are needed for the avoided cost computations. A general inflation rate is used in the avoided cost spreadsheet to convert the forecast prices from real to nominal. A general inflation rate of 2. was accepted by the Commission in the underlying methodology (Case No. GNR-02-, Order No. 29124, p. 12), consequently, the same general inflation rate should have been used to derive the rates in Order No. 30480. Instead, a general inflation rate of 2.1 % was erroneously used. Attached to this Erratum are corrected avoided cost rates that replace the rates contained in Order No. 30480. ERRATA TO ORDER NO. 30480 DONE by Order ofthe Idaho Public Utilities Commission at Boise, Idaho this /3# day of February 2008. ~~~FO~, P SIDENT ~'L MARSHA H. SMITH, COMMISSIONER ATTEST: C mmission Secretary bls/O:IPC-07-15 _sw _Errata ERRATA TO ORDER NO. 30480 AVISTA AVOIDED COST RATES FOR FUELED PROJECTS SMALLER THAN TEN MEGAWATTS January 1, 2008 $/MWh ON-LINE YEAR CONTRACT NON-LEVELIZED 2008 2009 2010 2011 2012 2013 YEAR RATES 15.15.16.16.41 16.17.2008 15. 15.15.16.16.16.17.2009 15. 15.16.16.16.17.17.2010 16. 15.16.16.16.17.17.2011 16.41 15.16.16.17.17.17.2012 16. 16.16.16.17.17.18.2013 17. 16.16.17.17.45 17.18.2014 17. 16.45 16.17.17.18.18.43 2015 17. 16.16.17.17.18.18.2016 18. 16.17.17.17.18.18.2017 18. 16.17.17.18.18.49 18.2018 19. 17.17.41 17.18.18.19.2019 19. 17.17.17.18.18.19.2020 20. 17.17.18.18.18.19.2021 20. 17.41 17.18.18.19.19.2022 21. 17.17.18.18.19.19.2023 21. 17.18.18.48 18.19.19.2024 22. 17.18.18.19.19.47 19.2025 22. 17.18.18.19.19.20.2026 23. 17.18.41 18.19.19.20.2027 23. 2028 24. 2029 24. 2030 25. 2031 25. 2032 26. 2033 27. EFFECTIVE DATE ADJUSTABLE COMPONENT 1/1/2008 52. The total avoided cost rate in each year is the sum of the adjustable component and the fixed component from either of the tables above. Example 1. A 20-year levelized contract with a 2008 on-line date would receive the following rates: Years Rate 17.99 + 52. 17.99 + Adjustable component in each year Example 2. A 4-year non-Ievelized contract with a 2008 on-line date would receive the following rates: Years Rate 15.33 + 52. 15.68 + Adjustable component in year 2009 16.04 + Adjustable component in year 2010 16.41 + Adjustable component in year 2011 Note: The rates shown in this table have been computed using the Northwest Power and Conservation Council's September 11 , 2007 Fuel Price Forecast. (See Order No. 30480). ERRATA TO ORDER NO. 30480 APPENDIX A (A vista) CASE NO. IPC-07- PAGE 1 OF 2 AVISTA AVOIDED COST RATES FOR NON-FUELED PROJECTS SMALLER THAN TEN MEGAWATTS January 1, 2008 $/MWh ON-LINE YEAR CONTRACT NON-LEVELIZED 2008 2009 2010 2011 2012 2013 YEAR RATES 67.65.63.42 60.60.61.2008 67. 66.64.62.60.60.61.2009 65. 65.63.61.60.61.62.2010 63.42 64.62.61.61.61.63.2011 60. 64.62.61.61.62.64.2012 60. 63.62.48 61.62.63.65.2013 61. 63.47 62.62.42 62.64.66.2014 61. 63.62.63.63.65.67.2015 63. 63.63.44 63.64.66.68.2016 66.49 64.63.64.65.66.69.2017 68. 64.64.65.66.67.69.2018 71. 65.65.65.66.68.70.2019 74. 65.65.66.67.69.71.2020 76. 66.66.41 67.68.48 70.72.52 2021 79. 66.67.67.69.71.73.2022 82. 67.67.68.69.71.74.2023 85. 67.68.69.70.72.75.2024 88. 68.68.69.71.45 73.46 75.2025 91. 68.69.70.72.74.76.2026 94. 69.70.71.72.86 74.77.2027 97. 2028 101.46 2029 105. 2030 109. 2031 112. 2032 116. 2033 121. Note: The rates shown in this table have been computed using the Northwest Power and Conservation Council's September 11 , 2007 Fuel Price Forecast. (See Order No. 30480). ERRATA TO ORDER NO. 30480 APPENDIX A (Avista) CASE NO. IPC-07- PAGE 2 OF 2 IDAHO POWER COMPANY AVOIDED COST RATES FOR FUELED PROJECTS SMALLER THAN TEN MEGAWATTS January 2008 $/MWh ON-LINE YEAR CONTRACT NON-LEVELIZED 2008 2009 2010 2011 2012 2013 YEAR RATES 14.14.14.15.15.15.2008 14. 14.40 14.15.15.43 15.16.2009 14. 14.14.15.15.15.16.2010 14. 14.15.15.40 15.16.16.2011 15. 14.15.15.15.16.29 16.2012 15. 15.15.15.16.16.46 16.2013 15. 15.15.15.16.16.17.2014 16. 15.15.16.16.40 16.17.2015 16. 15.46 15.16.16.16.17.2016 17. 15.15.16.16.17.17.2017 17. 15.16.16.48 16.17.17.2018 17. 15.16.16.17.17.40 17.2019 18. 16.16.16.17.17.17.2020 18. 16.16.16.17.17.18.2021 19. 16.16.17.17.44 17.18.2022 19. 16.40 16.17.17.17.18.40 2023 20. 16.16.17.17.18.18.2024 20. 16.17.17.43 17.18.18.2025 21. 16.17.17.17.18.18.2026 21. 16.17.17.18.18.18.2027 22. 2028 22. 2029 23. 2030 23. 2031 24. 2032 24. 2033 25. EFFECTIVE DATE ADJUSTABLE COMPONENT 1/1/2008 52. The total avoided cost rate in each year is the sum of the adjustable component and the fixed component from either of the tables above. Example 1. A 20-year levelized contract with a 2008 on-line date would receive the following rates: Years Rate 16.89 + 52. 16.89 + Adjustable component in each year Example 2. A 4-year non-Ievelized contract with a 2008 on-line date would receive the following rates: Years Rate 14.24 + 52. 14.57 + Adjustable component in year 2009 14.91 + Adjustable component in year 2010 15.26 + Adjustable component in year 2011 Note: The rates shown in this table have been computed using the Northwest Power and Conservation Council's September 11 , 2007 Fuel Price Forecast. (See Order No. 30480). ERRATA TO ORDER NO. 30480 APPENDIX B (Idaho Power) CASE NO. IPC-07- PAGE 1 OF 2 IDAHO POWER COMPANY AVOIDED COST RATES FOR NON-FUELED PROJECTS SMALLER THAN TEN MEGAWATTS January 1, 2008 $/MWh ON-LINE YEAR CONTRACT NON-LEVELIZED 2008 2009 2010 2011 2012 2013 YEAR RATES 66.64.62.59.59.60.2008 66. 65.63.61.59.59.60.2009 64. 64.62.60.59.59.61.2010 62. 63.61.60.41 59.60.61.2011 59. 62.61.40 60.44 60.61.62.2012 59. 62.48 61.60.61.62.63.2013 60. 62.61.44 61.61.63.65.2014 60. 62.61.61.62.64.66.2015 62. 62.62.62.63.44 64.66.2016 65. 62.62.63.64.65.67.2017 67. 63.63.46 64.65.66.68.2018 70. 63.64.64.65.67.69.2019 72. 64.42 64.65.66.68.70.2020 75. 64.65.43 66.67.69.46 71.2021 78. 65.66.67.68.43 70.72.59 2022 80. 66.66.67.69.71.73.2023 83. 66.67.47 68.70.72.74.40 2024 86. 67.41 68.69.70.72.75.2025 89. 68.68.70.71.73.76.2026 92. 68.69.70.72.45 74.77.2027 96. 2028 99. 2029 103. 2030 107. 2031 111. 2032 115. 2033 119. Note: The rates shown in this table have been computed using the Northwest Power and Conservation Council's September 11 , 2007 Fuel Price Forecast. (See Order No. 30480). ERRATA TO ORDER NO. 30480 APPENDIX B (Idaho Power) CASE NO. IPC-07- PAGE 2 OF 2 PACIFICORP AVOIDED COST RATES FOR FUELED PROJECTS SMALLER THAN TEN MEGAWATTS January 2008 $/MWh ON-LINE YEAR CONTRACT NON-LEVELIZED 2008 2009 2010 2011 2012 2013 YEAR RATES 14.15.15.15.16.16.49 2008 14. 14.15.15.15.16.16.2009 15. 15.15.15.16.16.47 16.2010 15. 15.15.15.16.16.17.2011 15. 15.15.16.16.43 16.17.2012 16. 15.15.16.16.16.17.2013 16.49 15.16.16.16.17.17.2014 16. 15.16.16.16.17.17.2015 17. 15.16.16.17.17.48 17.2016 17. 16.16.47 16.17.17.18.2017 18. 16.16.16.17.17.18.2018 18.48 16.16.17.17.17.18.2019 18. 16.16.17.17.18.18.2020 19. 16.17.17.42 17.18.18.2021 19. 16.17.17.17.18.18.2022 20. 16.17.17.18.18.18.2023 20. 17.17.42 17.18.18.19.2024 21. 17.17.17.18.18.19.2025 21. 17.17.18.18.49 18.19.2026 22. 17.17.18.18.19.19.49 2027 22. 2028 23. 2029 23. 2030 24. 2031 24. 2032 25.49 2033 26. EFFECTIVE DATE ADJUSTABLE COMPONENT 1/1/2008 52. The total avoided cost rate in each year is the sum of the adjustable component and the fixed component from either of the tables above. Example 1. A 20-year levelized contract with a 2008 on-line date would receive the following rates: Years Rate 17.38 + 52. 17.38 + Adjustable component in each year Example 2. A 4-year non-Ievelized contract with a 2008 on-line date would receive the following rates: Years Rate 14.71 + 52. 15.05 + Adjustable component in year 2009 15.39 + Adjustable component in year 2010 15.75 + Adjustable component in year 2011 Notes: (1) The rates shown in this table have been computed using the Northwest Power and Conservation Council's September 11 2007 Fuel Price Forecast. (See Order No. 30480). (2) The rates shown in this table have been computed using the weighted average cost of capital from PacifiCorp s most recent general rate case. (See Order No. 30482). ERRATA TO ORDER NO. 30480 APPENDIX C (PacifiCorp) CASE NO. IPC-07- PAGE 1 OF 2 PACIFICORP AVOIDED COST RATES FOR NON-FUELED PROJECTS SMALLER THAN TEN MEGAWATTS January 1,2008 $/MWh ON-LINE YEAR CONTRACT NON-LEVELIZED 2008 2009 2010 2011 2012 2013 YEAR RATES 67.65.62.60.59.60.2008 67. 66.64.61.60.60.60.2009 65. 65.62.61.60.60.43 61.2010 62. 64.62.60.60.61.62.2011 60. 63.61.60.60.61.63.47 2012 59. 62.61.61.61.62.64.2013 60. 62.61.61.62.63.65.2014 61. 62.62.62.63.64.66.2015 63. 63.62.63.63.65.48 67.48 2016 65. 63.40 63.63.64.66.68.43 2017 68. 63.63.64.65.67.69.2018 71. 64.64.65.66.41 68.70.2019 73. 64.65.65.67.69.71.2020 76. 65.46 65.66.68.69.72.2021 78. 66.66.67.46 68.70.73.2022 81.46 66.67.68.69.71.73.2023 84. 67.67.68.70.42 72.42 74.2024 87. 67.68.69.71.73.75.2025 90. 68.42 69.70.71.74.76.48 2026 93.47 69.69.71.72.74.77.32 2027 96. 2028 100. 2029 104. 2030 108. 2031 111. 2032 115. 2033 120. Notes: (1) The rates shown in this table have been computed using the Northwest Power and Conservation Council's September 11 2007 Fuel Price Forecast. (See Order No. 30480). (2) The rates shown in this table have been computed using the weighted average cost of capital from PacifiCorp s most recent general rate case. (See Order No. 30482). ERRATA TO ORDER NO. 30480 APPENDIX C (PacifiCorp) CASE NO. IPC-07- PAGE 2 OF 2