HomeMy WebLinkAbout20070102Decision memo.pdfDECISION MEMORANDUM
TO:COMMISSIONER KJELLANDER
COMMISSIONER SMITH
COMMISSIONER HANSEN
COMMISSION SECRETARY
COMMISSION STAFF
LEGAL
FROM:SCOTT WOODBURY
DATE:DECEMBER 28, 2006
SUBJECT:CASE NO. IPC-06-34 (Idaho Power)
FIRM ENERGY SALES AGREEMENT - HOT SPRINGS WINDFARM
LLC
On December 26, 2006, Idaho Power Company (Idaho Power; Company) filed an
Application with the Idaho Public Utilities Commission (Commission) requesting approval of a
20-year Firm Energy Sales Agreement between Idaho Power and Hot Springs Windfarm LLC
(Hot Springs) dated December 20, 2006 (Agreement).
Background
On August 4, 2005, the Idaho Public Utilities Commission (Commission) in Case
No. IPC-05-, Order No. 29839, reduced the eligibility cap for avoided cost published rates
for non-firm wind projects from 10 aMW to 100 kW, required individual negotiation for larger
wind qualifying facilities (QFs), and established criteria for assessing QF contract entitlement.
Reference Public Utility Regulatory Policies Act of 1978 (PURP A). By Commission Order No.
29872 the date for grandfathering eligibility was changed from July 1 , 2004, the Notice of
Petition date, to August 4, 2005, the date ofInterlocutory Order No. 29839.
Agreement
The Hot Springs facility will be located within Sections 25 , SE Quarter of 26, 34, 35
and 36 , Township 4 S , Range 8 E, and Sections 2 and 3 , Township 5 S, Range 8 E, Boise
Meridian, Elmore County, Idaho. Hot Springs warrants the facility will be a qualified small
power production facility (QF) under the applicable provisions of the Public Utility Regulatory
Policies Act of 1978 (PURP A). The facility will consist of 12 Vestas wind turbines with
DECISION MEMORANDUM
individual nameplate ratings of 1.65 MW for each unit, for a total facility nameplate generator
rating of 19.8 MW. The Agreement contains the non-levelized, published avoided cost rates set
forth in Order No. 29391. Under normal and/or average operating conditions, Hot Springs will
not generate more than 10 aMW on a monthly basis. Energy delivered in excess of this monthly
amount is Inadvertent Energy. Idaho Power will accept Inadvertent Energy that does not exceed
the Maximum Capacity Amount (20 MW) but will not purchase or pay for Inadvertent Energy.
Agreement ~ 7.
Based on Idaho Power Company s reVIew of the information provided by the
developer and in light of the procedure the Commission accepted in Cassia Wind Order No.
29954, Case No. IPC-05-, Idaho Power has determined that it would be reasonable to
grandfather the Hot Springs facility based on satisfaction of the following criteria identified by
the Commission in Order No. 29839, Case No. IPC-05-
Primary criteria:
Prior to August 5 , 2005, the developer had tendered a signed Firm Energy
Sales Agreement to Idaho Power for the facility. This satisfies one of the two
primary criteria for grandfathering.
Secondary criteria:
As of August 5 , 2005, the facility did not have a signed contract for turbines.
Idaho Power has reviewed the information provided by the developer and
determined that this developer believed that obtaining financing was the
highest priority on the critical path to project development and directed its
resources to that goal rather than turbine acquisition. As a result, prior to
August 4, 2005 , the developer had entered into binding commitments to
obtain financing. The Company has also confirmed that as of August 4
2005 , the facility had made substantial progress on the other secondary
criteria, except for acquisition of turbines. As in the case of Cassia Wind, the
developer has now obtained a firm commitment for turbines for the facility
and filed the necessary applications for interconnection to satisfy the second
primary criteria.
Idaho Power notes that there are three provisions the Commission should be aware of
in its consideration of the Agreement:
1. In the negotiations of this project, Idaho Power and Hot Springs agreed
that an on-line date of December 2007 is crucial to demonstrate that the
project was a viable project in August of2005. This Agreement contains
delay damage provisions that require the project pay Idaho Power
DECISION MEMORANDUM
damages if the project comes on-line after December 31 2007. The delay
damages will accrue for a period of up to 90 days.
2. The Agreement contains the methodology for computing shortfall energy
payments the Commission approved in the Firm Energy Sales Agreement
between Idaho Power and Fossil Gulch Wind Park, LLC (Case No. IPC-
04-, Order No. 29630) and recently approved for Magic Wind Park
in Order No. 30206 issued in Case No. IPC-06-26. Hot Springs has
voluntarily selected the Fossil Gulch Method. Use of the Fossil Gulch
methodology is a negotiated term of the Agreement and is mutually
acceptable to Idaho Power and Hot Springs.
3. The Agreement reflects the changes to Idaho Power s Schedule 72
(Uniform Interconnection Agreement) approved in Order No. 30179
issued on November 17, 2006 in Case No. IPC-06-18.
Hot Springs has selected March 31 , 2007 as the Scheduled First Energy Date and
December 31 , 2007 as the Scheduled Operation Date
Section 24 of the Agreement provides that the Agreement will not become effective
until the Commission has approved all of the Agreement's terms and conditions and declared
that all payments Idaho Power makes to Hot Springs for purchases of energy will be allowed as
prudently incurred expenses for ratemaking purposes.
COMMISSION DECISION
Staff recommends that the Application in Case No. IPC-06-34 be processed
pursuant to Modified Procedure, i., by written submission rather than by hearing. Reference
IDAPA 31.01.01.201-204. Does the Commission agree that Modified Procedure is appropriate?
Scott Woodbury
bls/M:IPC-O6-34 sw
DECISION MEMORANDUM