Loading...
HomeMy WebLinkAboutFinal Approved Tariff Schedule 23.pdfIdaho Power Company First Revised Sheet No. 23- Cancels Oriqinal Sheet No. 23-LP.C. No. 28 Tariff No. 101 SCHEDULE 23 IRRIGATION PEAK REWARDS PROGRAM (OPTIONAL) PURPOSE The Irrigation Peak Rewards Program (the Program) is an optional , supplemental service that permits participating agricultural irrigation Customers taking service under Schedule 24 to allow the Company to turn off specific irrigation equipment on a regular, pre-scheduled basis with the use of an electronic timer switch (Timer). In exchange for allowing the Company to turn off specified irrigation equipment, participating Customers will receive a monthly Demand Credit paid on the basis of the Customer s monthly Billing Demand , at the Customer s metered service point (Metered Service Point). AVAilABILITY Service under this schedule is available on an optional basis to Customers with a Metered Service Point or Points receiving service under Schedule 24 where the Metered Service Point serves a water pumping or water delivery system used to irrigate agricultural crops or pasturage. To be eligible for participation in this Program a Metered Service Point must provide electric service to irrigation pumps with at least 75 cumulative horsepower. If a Metered Service Point provides electricity to more than one irrigation pump, each pump will be scheduled for service interruption on the same weekday cycle. The Company shall have the right to select and reject Program participants at its sole discretion based on criteria the Company considers necessary to ensure the effective operation of the Program. Selection criteria may include, but will not be limited to, Billing Demand, location, pump horsepower pumping system configuration, or electric system configuration. Past program participation does not ensure selection into the Program in future years. Participation may be limited based upon the availability of Program equipment and funding. Each eligible Customer who chooses to take service under this optional schedule is required to enter into a Uniform Irrigation Peak Rewards Service Application/Agreement (Agreement) with the Company prior to being served under this schedule. The Agreement will grant the Company or its representative permission , on reasonable notice, to enter the Customer s property to install a Timer or Timers on the electrical panel servicing the irrigation equipment associated with the Metered Service Points that are enrolled in this Program and to allow the Company or its representative reasonable access to the Timer following its installation. TERM OF AGREEMENT AND TERMINATION Customers shall be required to execute a new Agreement annually. The term of the Agreement as it applies to each Metered Service Point accepted for participation, shall commence on the date the Agreement is signed by both the Customer and the Company and shall terminate on December 31 of each calendar year unless otherwise terminated as follows:1. A Customer may terminate the participation of a Metered Service Point without penalty by notifying the Company or its representative before the Timer has been installed on the Metered Service Point (Early Termination). IDAHO Issued - September 18, 2006 Effective - eeJtB~!!Ir 18 , 200e.- Issued by IDAHO POWER COMPANY John R. Gale , Vice President, Regulatory Affairs 1221 West Idaho Street, Boise , Idaho IDAHO PUBLIC UTILITIES COMMISSION Approved Effective Nov. 30, 2006 Nov. 30, 2006 Per ON 30194 Jean D. Jewell Secretary Idaho Power Company First Revised Sheet No. 23- Cancels Oriqinal Sheet No. 23-LP.C. No. 28 Tariff No. 101 SCHEDULE 23 IRRIGATION PEAK REWARDS PROGRAM (OPTIONAL) (Continued) TERM OF AGREEMENT AND TERMINATION (Continued)2. A Customer who terminates the participation of a Metered Service Point anytime between June 1 and August 31 of each calendar year and who does not satisfy the provisions of item 1 above shall pay the Company the sum of $100., which sum will be included on the Customer s monthly bill following termination of participation. The Customer s Demand Credit shall be prorated for the number of days in that month the Customer satisfactorily participated in the Program.3. If there is evidence of alteration, tampering, or otherwise interfering with the Company ability to initiate a load reduction event at a Metered Service Point, the Agreement as it applies to that Metered Service Point will be automatically terminated. In addition , the Customer will be subject to each of the following:a. The Customer will be required to reimburse the Company for the cost replacement or repair of the Timer, including labor and other related costs.b. A termination fee in the sum of $100.00 will be applied to the Customer s monthly bill following the termination of participation.c. The Company will reverse any and all Demand Credits applied to the Customer monthly bill(s) for the Metered Service Point as a result of the Customer s participation in the Program during the current year. Note: A service disconnection for any reason does not terminate the Agreement. PROGRAM DESCRIPTION Timer Installation and Service . The Company or its representative will install a Timer or Timers on the Customer s electrical panel controlling the irrigation equipment at the Metered Service Point enrolled in the Program. The Company or its representative will set the Timer or Timers to interrupt specified irrigation equipment on a designated weekday or designated weekdays according to the Option selected by the Customer. Each Timer will be set to interrupt electric service over a four-hour period between 4:00 P.M. and 8:00 P.M. on the designated weekday or weekdays during the months of June, July and August in accordance with the Option selected by the Customer. Option Demand Credit One weekday, 4:00 P.M. to 8:00 P.$2.01 per kW of Demand Two weekdays , 4:00 P.M. to 8:00 P.$3.36 per kW of Demand Three weekdays, 4:00 P.M. to 8:00 P.$4.36 per kW of Demand IDAHO Issued - September 18, 2006 Effective - 'E)ctobcr 18 , 2006 Issued by IDAHO POWER COMPANY John R. Gale, Vice President, Regulatory Affairs 1221 West Idaho Street, Boise, Idaho IDAHO PUBLIC UTILITIES COMMISSION Approved Effective Nov. 30, 2006 Nov. 30, 2006 Per ON 30194 Jean D. Jewell Secretary Idaho Power Company LP.C. No. 28 Tariff No. 101 First Revised Sheet No. 23- Cancels Oriqinal Sheet No. 23- SCHEDULE 23 IRRIGATION PEAK REWARDS PROGRAM (OPTIONAL) (Continued) PROGRAM DESCRIPTION (Continued) Demand Credit.The Demand Credit is based upon the monthly Billing Demand at a Metered Service Point enrolled in the Program. The monthly Billing Demand will be multiplied by the corresponding Demand Credit for the Option selected by the Customer. This amount will then be prorated for the number of days during the months of June , July or August that fall in the Customer billing cycle. The Demand Credit will be included on the Customer s monthly bill. The Demand Credit applies to the Billing Demand for the calendar months of June , July and August of each calendar year. Interruption Schedule . The Company will set each Timer to interrupt service during the weekday hours of 4:00 P.M. to 8:00 P.M. Mountain Daylight Savings Time. Each Metered Service Point's Timer will be set to interrupt service on one , two or three regularly scheduled weekdays per week for each week of the months of June , July and August in accordance with the Option selected by the Customer. The Company retains the sole right to select the load reduction weekday(s) for each Metered Service Point. Mass memory meters will be installed on a sample of the participants' Metered Service Points for Program monitoring and evaluation purposes. The sample of Metered Service Points selected for monitoring and evaluation will be chosen at the Company s sole discretion. Request to Chanqe Options. A Customer who elects to change Options to reduce the number of days of interruption of a Metered Service Point on or after June 1 of each calendar year shall pay the Company the sum of $100., which sum will be included on the Customer s monthly bill following the implementation of the requested change. The Customer s Demand Credit shall be prorated for each Program Option based upon the number of days in that month the Customer participated under each Option. The Company will not accept any requests to change Options to increase the number of days of interruption on or after June 1 of each calendar year. Notification of Proqram Acceptance.An interested Customer must sign and return to the Company an Agreement specifying the Metered Service Point(s) to be included in the Program. If a Customer is selected for participation in the Program, the Company will return a signed Agreement to the Customer specifying which Metered Service Point(s) are accepted into the Program. Notification of acceptance into the Program will be mailed to participants. Installation Fee.A Customer will be assessed an Installation Fee of $250.00 each time a Timer is installed on an eligible Metered Service Point that provides electric service to irrigation pumps with between 75 and 99 cumulative horsepower. The Installation Fee is non-refundable except when a Customer elects for Early Termination of the Program. An Installation Fee will not be assessed when a Timer is installed on an eligible Metered Service Point that provides electric service to irrigation pumps with 100 cumulative horsepower and greater. IDAHO Issued - September 18 , 2006 Effective - b~. 18, foM Issued by IDAHO POWER COMPANY John R. Gale, Vice President, Regulatory Affairs 1221 West Idaho Street, Boise , Idaho IDAHO PUBLIC UTILITIES COMMISSION Approved Effective Nov. 30, 2006 Nov. 30, 2006 Per ON 30194 Jean D. Jewell Secretary Idaho Power Company LP.C. No. 28 Tariff No. 101 SPECIAL CONDITIONS First Revised Sheet No. 23- Cancels Oriqinal Sheet No. 23- SCHEDULE 23 IRRIGATION PEAK REWARDS PROGRAM (OPTIONAL) (Continued) The provisions of this schedule do not apply for any time period that the Company interrupts the Customer s load for a system emergency or any other time that a Customer s service is interrupted by events outside the control of the Company. The provisions of this schedule will not affect the calculation or rate of the regular Service , Energy or Demand Charges associated with a Customer standard service schedule. IDAHO Issued - September 18, 2006 Effective - Oc.tOt..CI 16, .20Qe, Issued by IDAHO POWER COMPANY John R. Gale, Vice President, Regulatory Affairs 1221 West Idaho Street, Boise, Idaho IDAHO PUBLIC UTILITIES COMMISSION Approved Effective Nov. 30, 2006 Nov. 30, 2006 Per ON 30194 Jean D. Jewell Secretary Idaho Power Company I.P.C. No. 28 Tariff No. 101 First Revised Sheet No. 23- Cancels Oriqinal Sheet No. 23- SCHEDULE 23 IRRIGATION PEAK REWARDS PROGRAM (OPTIONAL) (Continued) Uniform Irriqation Peak Rewards Service Application/Aqreement THIS AGREEMENT Made this day of between Customer, whose billing address is and IDAHO POWER COMPANY, a corporation with its principal office located at 1221 West Idaho Street, Boise, Idaho, hereinafter called Company. This Agreement shall expire without notice on December 31 This Agreement is for the Metered Service Point(s) identified on the attached worksheet (Worksheet): hereinafter called The Customer designates the following person as the Customer s authorized contact: Authorized Contact: Phone: Fax: Email: Cell Phone: NOW, THEREFORE, The Parties agree as follows:1. The Uniform Irrigation Peak Rewards Service Application/Agreement must be signed by the Customer and the Customer must be the person who is responsible for paying bills for retail electric service provided by the Company at the Metered Service Point(s) identified on the Worksheet.2. The Customer understands that the information concerning the Metered Service Point(s) on the Worksheet is based on the best information currently available to the Company. The Demand Credit amounts are estimates based on the previous year s Billing Demands for the Metered Service Point(s) specified on the Worksheet. Customers without sufficient usage history will be provided an estimated Demand Credit based on the stated cumulative horsepower at the Metered Service Point. The Demand Credit estimates are provided for illustration purposes. The Customer agrees to specify which Metered Service Point(s) listed on the Worksheet the Customer wishes to enroll in the Program and the interruption Option selected for each specified Metered Service Point.3. From time to time during the term of this Agreement and with prior reasonable notice from the Company, the Customer shall permit the Company or its representative to enter the Customer s property on which the enrolled Metered Service Point(s) are located to permit the Company or its representative to install , service , maintain and/or remove Timer(s) on the electrical panel that services the Customer s irrigation equipment. The Timer(s) may remain in place on the Customer property upon termination of the Agreement unless the Customer specifically requests removal. IDAHO Issued - September 18, 2006 Effective - bcF 1 0, 2006 Issued by IDAHO POWER COMPANY John R. Gale , Vice President, Regulatory Affairs 1221 West Idaho Street, Boise , Idaho IDAHO PUBLIC UTILITIES COMMISSION Approved Effective Nov. 30, 2006 Nov. 30, 2006 Per ON 30194 Jean D. Jewell Secretary Idaho Power Company First Revised Sheet No. 23- Cancels Oriqinal Sheet No. 23-I.P.C. No. 28 Tariff No. 101 SCHEDULE 23 IRRIGATION PEAK REWARDS PROGRAM (OPTIONAL) (Continued) Uniform Irriqation Peak Rewards Service Application/ Aqreement (Continued) 4. The Customer understands and acknowledges that by participating in the Program , the Company shall , at its sole discretion , have the ability to interrupt the specified irrigation equipment at the Metered Service Point(s) enrolled in the Program on the regularly scheduled weekday or weekdays for the hours of 4:00 P.M. to 8:00 P.M. Mountain Daylight Savings Time. The Company retains the sole right to select the load reduction weekday(s) for each Metered Service Point. The Customer also understands and acknowledges that if a Metered Service Point provides electricity to more than one irrigation pump, each pump will be scheduled for service interruption on the same weekday cycle. 5. The Customer shall be required to pay an Installation Fee of $250.00 when a Timer is installed on an eligible Metered Service Point providing electric service to irrigation pumps with between 75 and 99 cumulative horsepower. The Installation Fee is non-refundable except when a Customer elects for Early Termination of the Program.6. For the Customer s satisfactory participation in the Program, the Company agrees to pay the Customer the Demand Credit corresponding to the Option selected by the Customer. The Demand Credit is based upon the Billing Demand for the Metered Service Point(s) specified on the Worksheet for the three calendar months of June, July and August of each year. The Demand Credit will be paid in the form of a credit on the Customer s monthly bill. The Demand Credit may be prorated for the months of June, July and August depending on the Customer s billing cycle.7. If the Customer terminates this Agreement anytime between June 1 and August 31 of the current calendar year while the Metered Service Point(s) are still connected for service and has not elected Early Termination of the Program, the Customer agrees to pay the Company the sum of $100. which sum will be included on the Customer s monthly bill. The Customer s Demand Credit for the month of termination shall be prorated for the number of days in that month that the Customer is a participant in good standing in the Program.8. If the Customer elects to change Options to reduce the number of days of interruption of a Metered Service Point on or after June 1 of each calendar year, the Customer agrees to pay the Company the sum of $100., which sum will be included on the Customer s monthly bill following the implementation of the requested change. The Customer s Demand Credit shall be prorated for each Program Option based upon the number of days in that month the Customer participated under each Option. The Company will not accept any requests to change Options to increase the number of days of interruption on or after June 1 of each calendar year. IDAHO Issued - September 18, 2006 Effective - 86t65er 13 , 280C Issued by IDAHO POWER COMPANY John R. Gale , Vice President, Regulatory Affairs 1221 West Idaho Street, Boise, Idaho IDAHO PUBLIC UTILITIES COMMISSION Approved Effective Nov. 30, 2006 Nov. 30, 2006 Per ON 30194 Jean D. Jewell Secretary Idaho Power Company I.P.C. No. 28 . Tariff No. 101 Ori inal Sheet No. 23- SCHEDULE 23 IRRIGATION PEAK REWARDS PROGRAM (OPTIONAL) (Continued) Uniform Irriqation Peak Rewards Service Appl ication/ Aqreement (Continued) 9. If there is evidence of alteration, tampering, or otherwise interfering with the Company ability to initiate a load reduction event at a Metered Service Point(s), the Agreement as it applies to that Metered Service Point will be automatically terminated. The Customer will also be required to reimburse the Company for all costs of replacement or repair of the Timer, including labor and other related costs pay the Company the sum of $100.00 which sum will be included on the Customer s monthly bill and the Company will reverse any Demand Credits applied to the Customer s monthly bill(s) for the Metered Service Point as a result of the Customer s participation in the Program during the current year. 10. The Company s Schedule 23 , any revisions to that schedule and/or any successor schedule are to be considered part of this Agreement. 11. This Agreement and the rates, terms and conditions of service set forth or incorporated herein and the respective rights and obligations of the Parties hereunder shall be subject to valid laws and to the regulatory authority and orders, rules and regulations of the Idaho Public Utilities Commission and such other administrative bodies having jurisdiction. 12. Nothing herein shall be construed as limiting the Idaho Public Utilities Commission from changing any terms, rates , charges, classification of service or any rules, regulations or conditions relating to service under this Agreement, or construed as affecting the right of the Company or the Customer to unilaterally make application to the Commission for any such change. 13. In any action at law or equity under this Agreement and upon which judgment is rendered the prevailing Party, as part of such judgment, shall be entitled to recover all costs, including reasonable attorneys fees, incurred on account of such action. 14. The Company retains the sole right to select and reject the participants to receive service under Schedule 23. The Company retains the sole right for its employees and its representatives to install or not install Timers on the Customer electrical panel at the time of installation depending on , but not limited to , safety, reliability, or other issues that may not be in the best interest of the Company, its employees or its representatives. 15. Under no circumstances shall the Company or any subsidiary, affiliates or parent Company be held liable to the Customer or any other party for damages or for any loss, whether direct indirect, consequential, incidental, punitive or exemplary resulting from the Program or from the Customer s participation in the Program. The Customer assumes all liability and agrees to indemnify and hold harmless the Company and its subsidiaries, affiliates and parent company for personal injury, including death, and for property damage caused by the Customer s decision to participate in the Program and to reduce loads. IDAHO Issued - September 18, 2006 Effective - 0e~Bcl 10, 2000 Issued by IDAHO POWER COMPANY John R. Gale, Vice President, Regulatory Affairs 1221 West Idaho Street, Boise, Idaho IDAHO PUBLIC UTILITIES COMMISSION Approved Effective Nov. 30, 2006 Nov. 30, 2006 Per ON 30194 Jean D. Jewell Secretary Idaho Power Company I.P.C. No. 28. Tariff No. 101 Ori inal Sheet No. 23- SCHEDULE 23 IRRIGATION PEAK REWARDS PROGRAM (OPTIONAL) (Continued) Uniform Irriqation Peak Rewards Service Appl ication/ Aqreement (Continued) The Company makes no warranty of merchantability or fitness for a particular purpose with respect to the Timer and any and all implied warranties are disclaimed. (Appropriate Signatures) IDAHO Issued - September 18 , 2006 Effective - 08t88~1 1 !t;..2M6 Issued by IDAHO POWER COMPANY John R. Gale, Vice President, Regulatory Affairs 1221 West Idaho Street, Boise , Idaho IDAHO PUBLIC UTILITIES COMMISSION Approved Effective Nov. 30, 2006 Nov. 30, 2006 Per ON 30194 Jean D. Jewell Secretary