HomeMy WebLinkAbout20051107notice of application.pdfOffice of the Secretary
Service Date
November 7, 2005
BEFORE THE IDAHO PUBLIC UTILITIES COMMISSION
IN THE MATTER OF THE APPLICATION
OF IDAHO POWER COMPANY FOR CASE NO. IPC-O5-
APPROVAL OF A FIRM ENERGY SALES
AGREEMENT FOR THE SALE AND NOTICE OF APPLICATION
PURCHASE OF ELECTRIC ENERGY
BETWEEN IDAHO POWER COMPANY NOTICE OF
AND MILNER DAM WIND PARK LLC MODIFIED PROCEDURE
NOTICE OF
COMMENT/PROTEST
DEADLINE
YOU ARE HEREBY NOTIFIED that on October 20, 2005, Idaho Power Company
(Idaho Power; Company) filed an Application with the Idaho Public Utilities Commission
(Commission) requesting approval of a 20-year Firm Energy Sales Agreement (Agreement)
between Idaho Power and Milner Dam Wind Park LLC (Milner Dam) dated October 14, 2005.
Under the Agreement, Milner Dam will sell and Idaho Power will purchase electric energy
generated by Milner Dam, a project located approximately 2 000 yards west of the Milner Dam
in Cassia County, Idaho , in an area more particularly described as Sections 25 , 26 and 35
Township 10 S , Range 20 E, Boise Meridian, Cassia County, Idaho. The project will consist of
twelve (12) 1.5 MW GE wind turbines. The nameplate rating ofthe project is 18.0 MW. Under
normal and/or average conditions, the project will not exceed 10 aMW on a monthly basis.
energy in excess of this amount (Inadvertent Energy) is accidentally generated, Idaho Power will
accept Inadvertent Energy that does not exceed the 19.2 MW Maximum Capacity Amount, but
will not purchase or pay for it. Agreement ~ 7.3.2; Appendix B-
The Milner Dam project will be a qualified small power production facility (QF)
under the applicable provisions of the Public Utility Regulatory Policies Act of 1978 (PURP A).
As represented by Idaho Power, the Agreement comports with the terms and conditions of
Commission Order No. 29632 (Us. Geothermal et al v. Idaho Power), avoided cost Order No.
29646 and Commission Order Nos. 29839, 29851 and 29872 in Case No. IPC-05-22. The
Agreement is for a 20-year term and contains the non-Ievelized published avoided cost rates set
forth in Order No. 29646.
NOTICE OF APPLICATION
NOTICE OF MODIFIED PROCEDURE
NOTICES OF COMMENT/PROTEST DEADLINE
In interlocutory Order No. 29839 issued in Case No. IPC-05-22 the Commission
reduced the size cap for QF wind generation facilities entitled to receive the published avoided
cost rates from 10 aMW to 100 kW. In its Order, the Commission further identified several
criteria that it would consider to determine whether a particular QF wind generation facility in
the negotiation queue was sufficiently mature so as to justify "grandfathering" the project to
entitlement to the published rates. These criteria are as follows:
(I) Submittal of a signed power purchase agreement to the utility, or(2) Submittal to the utility of a completed Application for Interconnection
Study and payment of fee.
In addition to a finding of existence of one or both of the preceding threshold
criteria, the QF must also be able to demonstrate other indicia of substantial
progress and project maturity, e.
(I) A wind study demonstrating a viable site for the project
(2) A signed contract for wind turbines(3) Arranged financing for the project, and/or(4) Related progress on the facility permitting and licensing path.
Order No. 29839, p. 10, August 4, 2005; final Order No. 29851. In reconsideration Order No.
29872 issued on September 21 , 2005 in the same case, the Commission reaffirmed the
grandfathering criteria and changed the "grandfathering" eligibility deadline from the previously-
ordered July 1 2005 , to August 4 2005 , the date of interlocutory Order No. 29839.
Considering and weighing all of the Commission-identified criteria, Idaho Power
believes that the Milner Dam project is sufficiently far enough along the development path that it
should be "grandfathered" to the published rates. Milner Dam has selected November 2006 as
the scheduled first energy date and May 2007 as the scheduled operation date.
As reflected in Agreement Section 24, the Agreement will not become effective until
the Commission has approved all the Agreement's terms and conditions and declares that all
payments that Idaho Power makes to Milner Dam for purchases of energy will be allowed as
prudently incurred expenses for ratemaking purposes.
YOU ARE FURTHER NOTIFIED that the Commission has reviewed the filings of
record in Case No. IPC-05-30. The Commission has preliminarily found that the public
interest in this matter may not require a hearing to consider the issues presented and that issues
raised by the Company s filing may be processed under Modified Procedure , by written
NOTICE OF APPLICATION
NOTICE OF MODIFIED PROCEDURE
NOTICES OF COMMENT/PROTEST DEADLINE
submission rather than by hearing.
31.01.01.201-204.
Reference Commission s Rules of Procedure, IDAPA
YOU ARE FURTHER NOTIFIED that the deadline for filing written comments or
protests with respect to Idaho Power s Application and the use of Modified Procedure in Case
No. IPC-05-30 is Monday, November 28, 2005.
YOU ARE FURTHER NOTIFIED that if no written comments or protests are
received within the deadline, the Commission may consider the matter on its merits and may
enter its Order without a formal hearing. If comments or protests are filed within the deadline
the Commission will consider them and in its discretion may set the matter for hearing or may
decide the matter and issue its Order based on the written positions before it. Reference IDAP
31.01.01.204.
YOU ARE FURTHER NOTIFIED that written comments concerning Case
No. IPC-05-30 should be mailed to the Commission and the Company at the addresses
reflected below.
Commission Secretary
Idaho Public Utilities Commission
PO Box 83720
Boise, ID 83720-0074
Street Address for Express Mail:
Monica B. Moen, Attorney II
Barton L. Kline, Senior Attorney
Idaho Power Company
PO Box 70
Boise, ID 83707-0070
Mail: mmoen~idahopower.com
bkline~idahopower .com
472 W. Washington Street
Boise, ID 83702-5983 Randy C. Allphin, Contract Administrator
Idaho Power Company
PO Box 70
Boise, ID 83707-0070
E-mail: rallphin~idahopower.com
Street Address for Express Mail:
1221 W. Idaho Street
Boise, ID 83702
All comments should contain the case caption and case number shown on the first page of this
document.Persons desiring to submit comments via e-mail may do so by accessing the
Commission s home page located at www.puc.idaho.gov. Click the "Comments and Questions
icon, and complete the comment form, using the case number as it appears on the front of this
NOTICE OF APPLICATION
NOTICE OF MODIFIED PROCEDURE
NOTICES OF COMMENT/PROTEST DEADLINE
document. These comments must also be sent to Idaho Power at the e-mail addresses listed
above.
YOU ARE FURTHER NOTIFIED that if no written comments or protests are
received within the time limit set, the Commission will consider this matter on its merits and
enter its Order without a formal hearing. If written comments are received within the time limit
set, the Commission will consider them and, in its discretion, may set the same for formal
hearing.
YOU ARE FURTHER NOTIFIED that the Application in Case No. IPC-05-
may be viewed at www.puc.idaho.gov by clicking on "File Room" and "Electric Cases " or can
be viewed during regular business hours at the Idaho Public Utilities Commission, 472 W.
Washington Street, Boise, Idaho and at the general business office of Idaho Power Company,
1221 West Idaho Street, Boise, Idaho.
DATED at Boise, Idaho this 7r. day of November 2005.
bls/N :IPC-05-30 _
NOTICE OF APPLICATION
NOTICE OF MODIFIED PROCEDURE
NOTICES OF COMMENT/PROTEST DEADLINE