HomeMy WebLinkAbout20050323Amended Application.pdfBARTON L. KLINE ISB #1526
MONICA B. MOEN ISB #5734
Idaho Power Company
O. Box 70
Boise, Idaho 83707
Phone: (208) 388-2682
FAX: (208) 388-6936
Attorneys for Idaho Power Company
Ff'f\
~ ., '- .. \"
t -
,. ....
(71L t D
--
"-.0
""'1..
.. "
.. L
...
(ull;:, ;'fliR 2/ 'M
'~'- ""',. '. .
I' : 7 /":i'.
:. -,
; Li L j L j i f~.) C u l'1 ("1/ S S
1221 West Idaho Street
Boise, Idaho 83702
BEFORE THE IDAHO PUBLIC UTILITIES COMMISSION
IN THE MATTER OF THE APPLICATION
OF IDAHO POWER COMPANY FOR
AUTHORITY TO INCREASE ITS RATES
AND CHARGES FOR ELECTRIC SERVICE
DUE TO THE INCLUSION OF THE BENNETT
MOUNTAIN PROJECT INVESTMENT IN REVENUE REQUIREMENT
CASE NO. IPC-05-
AMENDED APPLICATION
On March 2, 2005, Idaho Power filed an Application with the Idaho Public
Utilities Commission ("Commission
).
requesting an Order approving revised schedules of
rates and charges for electric service in the State of Idaho to become effective June 1
2005 for service to customers provided on and after that date. As stated in the
Application and the direct testimony of Gregory W. Said filed with the March 2 2005
Application , the requested change in rates is a direct result of the Company s need to
include its investment in the Bennett Mountain Power Plant in its rates. Since the
Company filed the Application on March 2, 2005 , it has been determined that it is
appropriate to use the combined statutory federal and state income tax rate of 39.
AMENDED APPLICATION, Page
percent approved by the Commission in Order No. 29601 rather than the average 30.
percent combined federal and state income tax rate that was used to compute the
revenue requirement requested in the March 2, 2005 Application. This change in income
tax rates requires that the Company amend its Application to reflect the impact of this
change on the Company s revenue requirement. The net result of this change is a
reduction in the Company s revenue requirement attributable to the Bennett Mountain
Power Plant Project and a reduction in the uniform percentage rate increase requested by
the Company in the March 2 2005 Application. In support of this Amended Application
Idaho Power Company represents as follows:
Idaho Power Company, hereinafter sometimes referred to as "Applicant" or
Company," is an Idaho corporation whose principal place of business is 1221 West
Idaho Street, Boise , Idaho.
II.
Applicant is a public utility supplying electric service in southern Idaho and
eastern Oregon. In Idaho, Applicant is subject to the jurisdiction of this Commission and
in Oregon , is subject to the jurisdiction of the Public Utility Commission of Oregon.
addition , the Company is subject to the jurisdiction of the Federal Energy Regulatory
Commission. In conducting its business, Applicant operates an interconnected and
integrated system. In addition to supplying electric service to the public, Applicant
supplies electricity at retail to certain special contract customers and makes wholesale
sales of electricity to other electric utilities.
AMENDED APPLICATION , Page 2
III.
Attachment No.1 to the March 2 , 2005 Application is a copy of Applicant's
current IPUC No. 27, Tariff No.1 01 , containing the tariff sheets that specify the rates
under which retail electric service is provided to Applicant's customers in the State of
Idaho. This Attachment remains unchanged and in included herein by reference.
IV.
The Attachment No.2 to the March 2 , 2005 Application has been amended
to show Applicant's proposed new IPUC No. 27, Tariff No.1 01 , which contains the tariff
sheets specifying the proposed rates for providing retail electric service to Applicant'
customers in the State of Idaho. The enclosed Amended Attachment No.2 is identified
as Amended Attachment No.
The Attachment No.3 to the March 2 , 2005 Application has been amended
to show proposed changes in rates and charges by striking over proposed deletions to
existing tariff sheets and highlighting or underlining proposed additions or amendments to
the proposed tariff sheets. The enclosed Amended Attachment No.3 is identified as
Amended Attachment No.
VI.
The Attachment No.4 to the March 2 2005 Application has been amended
to show a comparison of revenues from the various tariff customers and special contract
customers under Applicant's existing rates and charges with the corresponding proposed
new revenue levels resulting from the proposed rates shown on Amended Attachment
No.2 based upon normalized energy sales reflected in Commission Order No. 29505
AMENDED APPLICATION, Page 3
issued in Case No. IPC-03-13 on May 25 2004, and Commission Order No. 29547
issued in Case No. I PC-03-13 on July 13, 2004. The enclosed Amended Attachment
No.4 is identified as Amended Attachment No.
VII.
The Company has special contracts with J.R. Simplot Company for its
facility near Pocatello, Idaho; with the United States Department of Energy for its facility
located in Eastern Idaho at what is known as the LN.L.; and with Micron Technology, Inc.
for its facility located in Boise , Idaho. The special contracts provide that Commission
ratemaking standards are applicable to these contracts. Accordingly, the Company
Amended Attachment No.2 reflects an increase of 1.84 percent to the charges for
service provided under these contracts rather than the 2.6 percent increase described in
the March 2, 2005 Application.
VIII.
This Amended Application , together with Amended Attachments Nos. 2 , 3
and 4, are filed with this Commission to be kept open for public inspection as required by
law, and the same fully states the changes to be made in the rate schedules and contract
rates now in force. The new electric rate schedules and contract rates contained in
Amended Attachment No.2 are requested to become effective June 1 , 2005 for services
provided on and after that date , unless otherwise ordered by this Commission, and, when
effective, will supersede and cancel the present electric rate schedules and contract rates
now in existence.
AMENDED APPLICATION , Page 4
IX.
As noted in the Applicant's March 2 , 2005 Application , since the last general
revenue requirement proceeding was completed with the issuance of Order No. 29601 in
Case No. I PC-03-, the Company has added investment in the Bennett Mountain
natural gas-fired generation facility located near the city of Mountain Home, Idaho. LC. 9
61-502A provides that plant cannot be included in rate base until it is used to provide
utility service. As a result, none of this investment was included in determining the
revenue requirement of the Company in Order Nos. 29505 and 29547 in Case No. IPC-
03-13. Now that the investment in Bennett Mountain is being used to provide electric
service , it is not just and reasonable to require the Applicant to continue to absorb the
additional costs of this generating facility.
The investment in the Bennett Mountain Project for purposes of determining
the Company s additional revenue requirement is $58 022 983. Using the Company
overall rate-of-return of 7.852 percent, as authorized by the Commission in Order No.
29505 , and including depreciation and the revised tax rates, an additional revenue
requirement of $9,402 996 is specified in this Amended Application. This $9,402 996
revenue requirement is a reduction of $4 079,150 from the $13 482 146 revenue
requirement requested in the March 2, 2005 Application.
XI.
Since the Company has recently implemented significant rate structure
changes and because the percentage increase being requested is small, the Applicant
proposes a uniform percentage increase of 1.84 percent to all existing customer classes
AMENDED APPLICATION , Page 5
and a uniform percentage increase of 1.84 percent to all existing special contract
customers , effective June 1 2005, for service provided on and after that date. This 1.
percentage amount requested in this Amended Application represents a reduction of 0.
percent from the 2.6 percent uniform percentage increase requested in the March 2 , 2005
Application.
XII.
Simultaneously with the filing of this Amended Application , Applicant has
filed testimony supplementing the testimony and exhibits of Gregory W. Said filed on
March 2 2005. Mr. Said's supplemental testimony more fully describes the amended
request of the Company.
XIII.
This Amended Application has been and will be brought to the attention of
Applicant's affected customers by means of news releases to news media in the area
served by Applicant, by bill stuffers and , in some instances, by means of personal contact
with some customers. In addition , a copy of Idaho Power Company s Application
Amended Application , direct testimony, exhibits and supplemental testimony and exhibits
will be kept open for public inspection at Applicant's offices in the State of Idaho. The
above procedures are deemed by Applicant to satisfy the Rules of Practice and
Procedure of this Commission but Applicant will, in the alternative , bring said Amended
Application to the attention of Applicant's affected customers through any other means
directed by this Commission.
AMENDED APPLICATION , Page 6
XIV.
Communications with reference to this Amended Application should be
sent to the following:
Barton L. Kline
Monica B. Moen
Idaho Power Company
O. Box 70
Boise, I D 83707
bk)ine (C1J idabopower.com
mmoen (g) idabopower.com
Gregory W. Said
John R. Gale
Idaho Power Company
O. Box 70
Boise, I D 83707
WHEREFORE, Applicant respectfully requests that the amended new
electric rate schedules and special contract rates set out in Amended Attachments
Nos. 2 , 3 and 4 be approved to become effective on June 1 2005 , for electric service
provided on and after that date, and that the effective date for Applicant's proposed ~ates
not be suspended and that the Commission authorize a uniform percentage increase of
84 percent to all existing customer classes and special contract customers for service
provided on and after June 1 , 2005.
DATED at Boise , Idaho, this 22nd day of March, 2005.
BARTON L. KLINE
Attorney for Idaho Power Company
AMENDED APPLICATION , Page 7
BARTON L. KLINE, the attorney of record for Applicant, hereby states that
the Applicant is prepared to present its case in support of its Amended Application.
c-------.
BARTON L. KLINE
AMENDED APPLICATION , Page 8
TT A CHMENT
I.P.C. No. 27 Tariff No. 101
First Revised Sheet No. 1-
Cancels
Oriainal Sheet No. 1-
Idaho Power Company
SCHEDULE
RESIDENTIAL SERVICE
(Continued)
RESIDENTIAL SPACE HEATING
All space heating equipment to be served by the Company s system shall be single phase
equipment approved by Underwriters' Laboratories , Inc., and the equipment and its installation shall
conform to all National, State and Municipal Codes and to the following:
Individual resistance-type units for space heating larger than 1 650 watts shall be designed to
operate at 240 or 208 volts , and no single unit shall be larger than 6 kW. Heating units of two kWor
larger shall be controlled by approved thermostatic devices. When a group of heating units, with a total
capacity of more than 6 kW, is to be actuated by a single thermostat, the controlling switch shall be so
designed that not more than 6 kW can be switched on or off at anyone time. Supplemental resistance-
type heaters , that may be used with a heat exchanger, shall comply with the specifications listed above
for such units.
SUMMER AND NON-SUMMER SEASONS
The summer season begins on June 1 of each year and ends on August 31 of each year. The
non-summer season begins on September 1 of each year and ends on May 31 of each year.
MONTHLY CHARGE
The Monthly Charge is the sum of the Service Charge, the Energy Charge, and the Power Cost
Adjustment at the following rates:
Summer Non-summer
Service Charge, per month $3.$3.
Energy Charge, per kWh
300 kWh
Over 300 kWh
Power Cost Adjustment*, per kWh
0863~
7253~
6039~
0863~
5. 0863~
6039~
This Power Cost Adjustment is computed as provided in Schedule 55.
Minimum Charae
The monthly Minimum Charge shall be the sum of the Service Charge, the Energy Charge, and
the Power Cost Adjustment.
PAYMENT
The monthly bill rendered for service supplied hereunder is payable upon receipt, and becomes
past due 15 days from the date on which rendered.
IDAHO
Issued Per IPUC Order No. 29547
Effective - July 28 , 2004
Issued by IDAHO POWER COMPANY
John R. Gale, Vice President, Regulatory Affairs
1221 West Idaho Street, Boise, Idaho
I.P.C. No. 27 Tariff No. 101
First Revised Sheet No. 7-
Cancels
Oriainal Sheet No.7 -
Idaho Power Company
SCHEDULE 7
SMALL GENERAL SERVICE
(Continued)
MONTHLY CHARGE
The Monthly Charge is the sum of the Service Charge the Energy Charge, and the Power Cost
Adjustment at the following rates:
Summer Non-summer
Service Charge , per month $3.$3.
Energy Charge , per kWh
300 kWh
Over 300 kWh
Power Cost Adjustment*, per kWh
1177~
8915~
5761 ~
1177~
1177~
5761 ~
This Power Cost Adjustment is computed as provided in Schedule 55.
Minimum Charae
The monthly Minimum Charge shall be the sum of the Service Charge, the Energy Charge, and
the Power Cost Adjustment.
PAYMENT
The monthly bill rendered for service supplied hereunder is payable upon receipt, and becomes
past due 15 days from the date on which rendered.
IDAHO
Issued Per IPUC Order No. 29547
Effective - July 28, 2004
Issued by IDAHO POWER COMPANY
John R. Gale , Vice President, Regulatory Affairs
1221 West Idaho Street, Boise, Idaho
I.P.C. No. 27 Tariff No. 101
First Revised Sheet No. 9-
Cancels
Oriainal Sheet No. 9-
Idaho Power Company
SCHEDULE 9
LARGE GENERAL SERVICE
(Continued)
SECONDARY SERVICE Summer Non-summer
Service Charge, per month $5.$5.
Basic Charge, per kW of
Basic Load Capacity $0.$0.
Demand Charge, per kWof
Billing Demand
Energy Charge, per kWh
$3.
9062~
$2.
5926~
Power Cost Adjustment*, per kWh 6039~6039~
This Power Cost Adjustment is computed as provided in Schedule 55.
Facilities Charae
None.
Minimum Charae
The monthly Minimum Charge shall be the sum of the Service Charge, the Basic Charge , the
Demand Charge, the Energy Charge, and the Power Cost Adjustment.
PRIMARY SERVICE Summer Non-summer
Service Charge, per month $125.$125.
Basic Charge , per kW of
Basic Load Capacity $0.$0.
Demand Charge , per kW of
Billing Demand
Energy Charge , per kWh
$3.
5464~
$2.
Power Cost Adjustment*, per kWh 6039~
2825~
O. 6039~
This Power Cost Adjustment is computed as provided in Schedule 55.
Facilities Charae The Company s investment in Company-owned Facilities Beyond the Point of
Delivery times 1.7 percent.
IDAHO
Issued Per IPUC Order No. 29547
Effective - July 28 , 2004
Issued by IDAHO POWER COMPANY
John R. Gale, Vice President, Regulatory Affairs
1221 West Idaho Street, Boise, Idaho
I.P .C. No. 27 Tariff No.1 01
First Revised Sheet No. 9-
Cancels
Oriainal Sheet No. 9-
Idaho Power Company
SCHEDULE 9
LARGE GENERAL SERVICE
(Continued)
Minimum Charae.The monthly Minimum Charge shall be the sum of the Service Charge , the
Basic Charge, the Demand Charge, the Energy Charge , the Power Cost Adjustment, and the
Facilities Charge.
TRANSMISSION SERVICE Summer Non-summer
Service Charge , per month $125.$125.
Basic Charge , per kWof
Basic Load Capacity $0.43 $0.43
Demand Charge, per kW of
Billing Demand $3.$2.
Power Cost Adjustment*
2 .4897 ~
O. 6039~
2414~
6039~
Energy Charge, per kWh
This Power Cost Adjustment is computed as provided in Schedule 55.
Facilities Charae
The Company s investment in Company-owned Facilities Beyond the Point of Delivery times 1.
percent.
Minimum Charae
The monthly Minimum Charge shall be the sum of the Service Charge , the Basic Charge, the
Demand Charge, the Energy Charge, the Power Cost Adjustment, and the Facilities Charge.
PAYMENT
The monthly bill rendered for service supplied hereunder is payable upon receipt, and becomes
past due 15 days from the date on which rendered.
IDAHO
Issued Per IPUC Order No. 29547
Effective - July 28, 2004
Issued by IDAHO POWER COMPANY
John R. Gale , Vice President, Regulatory Affairs
1221 West Idaho Street, Boise, Idaho
Idaho Power Company
I.P.C. No. 27 Tariff No. 101
NEW FACILITIES
First Revised Sheet No. 15-
Cancels
Oriainal Sheet No. 15-
SCHEDULE 15
DUSK TO DAWN CUSTOMER
LIGHTING
(Continued)
Where facilities of the Company are not presently available for a lamp installation which will
provide satisfactory lighting service for the Customer s Premises , the Company may install overhead or
underground secondary service facilities, including secondary conductor, poles , anchors, etc., a
distance not to exceed 300 feet to supply the desired service , all in accordance with the charges
specified below.
MONTHLY CHARGES
Monthly per unit charges on existing facilities:
AREA LIGHTING
High Pressure
Sodium Vapor
1 00 Watt
200 Watt
400 Watt
FLOOD LIGHTING
High Pressure
Sodium Vapor
200 Watt
400 Watt
Metal Halide
400 Watt
000 Watt
Average
Lumens
550
800
000
Average
Lumens
800
000
800
000
Base
Rate
$ 5.
$ 9.
$14.
Base
Rate
$11 .
$16.
$18.44
$33.
Power Cost
Adiustment*
$0.205360
$0.41 0652
$0.827343
Power Cost
Adiustment*
$0.410652
$0.827343
$0.827343
$2.065338
This Power Cost Adjustment is computed as provided in Schedule 55.
2. For New Facilities Installed Before June 1 2004 The Monthly Charge for New Facilities
installed prior to June 1 , 2004 , such as overhead secondary conductor, poles, anchors , etc., shall be
75 percent of the estimated installed cost thereof.
3. For New Facilities Installed On or After June 1. 2004: The non-refundable charge for
New Facilities to be installed, such as underground service , overhead secondary conductor , poles
anchors , etc., shall be equal to the work order cost.
PAYMENT
The monthly bill for service supplied hereunder is payable upon receipt, and becomes past due
15 days from the date on which rendered.
IDAHO
Issued Per IPUC Order No. 29547
Effective - July 28, 2004
Issued by IDAHO POWER COMPANY
John R. Gale , Vice President, Regulatory Affairs
1221 West Idaho Street, Boise, Idaho
I.P.C. No. 27. Tariff No. 101
Second Revised Sheet No. 19-4
Cancels
First Revised Sheet No. 19-4
Idaho Power Company
SCHEDULE 19
LARGE POWER SERVICE
(Continued)
MONTHLY CHARGE (Continued)
SECONDARY SERVICE Summer Non-summer
Service Charge , per month $5.$5.
Basic Charge , per kW of
Basic Load Capacity $0.$0.
Demand Charge, per kW of
Billing Demand $2.$2.
On-Peak Demand Charge , per kW of
On-Peak Billing Demand $0.n/a
Energy Charge , per kWh
On-Peak
Mid-Peak
Off-Peak
Power Cost Adjustment*, per kWh
3. 0335~
8822~
6863~
5731 ~
n/a
5932~
2.4761 ~
5731~
This Power Cost Adjustment is computed as provided in Schedule 55.
Facilities Charae
None.
Minimum Charae
The monthly Minimum Charge shall be the sum of the Service Charge , the Basic Charge , the
Demand Charge , the On-Peak Demand Charge , the Energy Charge and the Power Cost
Adjustment.
IDAHO
Issued - October 29, 2004
Effective - December 1 , 2004
Advice No. 04-
Issued by IDAHO POWER COMPANY
John R. Gale, Vice President, Regulatory Affairs
1221 West Idaho Street, Boise , ID
I.P.C. No. 27. Tariff No. 101
Second Revised Sheet No. 19-
Cancels
First Revised Sheet No. 19-
Idaho Power Company
SCHEDULE 19
LARGE POWER SERVICE
(Continued)
MONTHLY CHARGE (Continued)
PRIMARY SERVICE
Basic Charge, per kWof
Basic Load Capacity
Summer Non-summer
$125.$125.
$0.$0.
Service Charge , per month
Demand Charge , per kWof
Billing Demand
$2.$2.
On-Peak Demand Charge , per kW of
On-Peak Billing Demand $0.n/a
Energy Charge, per kWh
On-Peak
Mid-Peak
Off-Peak
Power Cost Adjustment*, per kWh
2. 5860~
3342~
1755~
5731 ~
n/a
1117~
0147~
5731 ~
This Power Cost Adjustment is computed as provided in Schedule 55.
Facilities Charae
The Company s investment in Company-owned Facilities Beyond the Point of Delivery times 1.
percent.
Minimum Charae
The monthly Minimum Charge shall be the sum of the Service Charge, the Basic Charge, the
Demand Charge , the On-Peak Demand Charge the Energy Charge, the Power Cost
Adjustment, and the Facilities Charge.
IDAHO
Issued - October 29, 2004
Effective - December 1 , 2004
Advice No. 04-
Issued by IDAHO POWER COMPANY
John R. Gale , Vice President, Regulatory Affairs
1221 West Idaho Street, Boise , 10
I.P.C. No. 27. Tariff No. 101
Second Revised Sheet No. 19-
Cancels
First Revised Sheet No. 19-
Idaho Power Company
SCHEDULE 19
LARGE POWER SERVICE
(Continued)
MONTHLY CHARGE (Continued)
Summer Non-summerTRANSMISSION SERVICE
Service Charge , per month $125.$125.
Basic Charge, per kWof
Basic Load Capacity $0.40 $0.40
Demand Charge , per kW of
Billing Demand $2.$2.
On-Peak Demand Charge , per kWof
On-Peak Billing Demand $0.n/a
Energy Charge , per kWh
On-Peak
Mid-Peak
Off-Peak
Power Cost Adjustment*, per kWh
5504~
3019~
1455~
5731 ~
n/a
0782~
9827~
5731~
This Power Cost Adjustment is computed as provided in Schedule 55.
Facilities Charae
The Company s investment in Company-owned Facilities Beyond the Point of Delivery times 1.percent.
Minimum Charae
The monthly Minimum Charge shall be the sum of the Service Charge, the Basic Charge, the
Demand Charge, the On-Peak Demand Charge, the Energy Charge, the Power Cost
Adjustment, and the Facilities Charge.
PAYMENT
The monthly bill for service supplied hereunder is payable upon receipt , and becomes past due
15 days from the date on which rendered.
IDAHO
Issued - October 29 2004
Effective - December 1 , 2004
Advice No. 04-
Issued by IDAHO POWER COMPANY
John R. Gale, Vice President, Regulatory Affairs
1221 West Idaho Street, Boise, ID
Idaho Power Company First Revised Sheet No. 24-
Cancels
Oriainal Sheet No. 24-C. No. 27 Tariff No. 101
SCHEDULE 24
AGRICULTURAL IRRIGATION
SERVICE
(Continued)
POWER FACTOR ADJUSTMENT
Where the Customer s Power Factor is less than 85 percent , as determined by measurement
under actual load conditions, the Company may adjust the kW measured to determine the Billing
Demand by multiplying the measured kW by 85 percent and dividing by the actual Power Factor.
Effective November 1 , 2004 where the Customer s Power Factor is less than 90 percent, as
determined by measurement under actual load conditions , the Company may adjust the kW measured
to determine the Billing Demand by multiplying the measured kW by 90 percent and dividing by the
actual Power Factor.
MONTHLY CHARGE
The Monthly Charge is the sum of the Service , the Demand, the Energy, the Power Cost
Adjustment, and the Facilities Charges at the following rates.
SECONDARY SERVICE In-Season Out-of-Season
Service Charge, per month $12.$3.
Demand Charge, per kWof
Billing Demand
Energy Charge , per kWh
$4.
2618~
$0.
2618~
Power Cost Adjustment*, per kWh O. 5054~5054~
This Power Cost Adjustment is computed as provided in Schedule 55.
Facilities Charae
None.
Minimum Charae
The monthly Minimum Charge shall be the sum of the Service Charge, the Demand Charge, the
Energy Charge, and the Power Cost Adjustment.
IDAHO
Issued Per IPUC Order No. 29547
Effective - July 28 , 2004
Issued by IDAHO POWER COMPANY
John R. Gale, Vice President, Regulatory Affairs
1221 West Idaho Street, Boise , Idaho
I.P.C. No. 27 , Tariff No. 101
Second Revised Sheet No. 24-4
Cancels
First Revised Sheet No. 24-
Idaho Power Company
SCHEDULE 24
AGRICULTURAL IRRIGATION
SERVICE
(Continued)
MONTHLY CHARGE (Continued)
TRANSMISSION SERVICE In-Season Out -of-Season
Service Charge, per month $12.$3.
Demand Charge , per kW of
Billing Demand
Energy Charge, per kWh
$3.
028~
$0.
1028~
Power Cost Adjustment*, per kWh 5054~O. 5054~
This Power Cost Adjustment is computed as provided in Schedule 55.
Facilities Charae
The Company s investment in Company-owned Facilities Beyond the Point of Delivery times 1.
percent.
Minimum Charae
The monthly Minimum Charge shall be the sum of the Service Charge , the Demand Charge , the
Energy Charge, the Power Cost Adjustment, and the Facilities Charge.
PAYMENT
All monthly billings for Electric Service supplied hereunder are payable upon receipt , and
become past due 15 days from the date on which rendered. (For any agency or taxing district which
has notified the Company in writing that it falls within the provisions of Idaho Code 9 67-2302, the past
due date will reflect the 60 day payment period provided by Idaho Code 9 67-2302.
Deposit.A deposit payment for irrigation Customers is required under the following conditions:
Existina Customers
a. Tier Deposit.Customers who have two or more reminder notices fo~
nonpayment of Electric Service during a 12-month period , or who have had service terminated
for non-payment, or were required to pay a Tier 2 Deposit for the previous Irrigation Season , will
be required to pay a Tier 1 Deposit, or provide a guarantee of payment from a bank or financial
institution acceptable to the Company. A Tier 1 Deposit does not apply to Customers who have
an outstanding balance on December 31 of over $1 000.00 (See Tier 2 Deposit). A reminder
notice is issued approximately 45 days after the bill issue date if the balance owing for Electric
Service totals $100 or more or approximately 105 days after the bill issue date for Customers
meeting the provisions of Idaho Code 9 67-2302. The deposit for a specific installation is
computed as follows:
IDAHO
Issued - September 17, 2004
Effective - October 18, 2004
Issued by IDAHO POWER COMPANY
John R. Gale, Vice President, Regulatory Affairs
1221 West Idaho Street, Boise , Idaho
Idaho Power Company First Revised Sheet No. 25-
Cancels
Oriainal Sheet No. 25-C. No. 27 Tariff No. 101
SCHEDULE 25
AGRICULTURAL IRRIGATION
SERVICE - TIME-OF-USE PILOT
PROGRAM (OPTIO~
(Continued)
NO NEW SERVICE
MONTHLY CHARGE
I The Monthly Charge is the sum of the Service , the TOU Metering, the Demand, the Energy, and
the Power Cost Adjustment Charges at the following rates.
TOU Metering Charge , per month
In-Season Out-of-Season
$12.$3.
$3.n/a
SECONDARY SERVICE
Service Charge, per month
Demand Charge , per kW of
Billing Demand
Energy Charge , per kWh
$4.$0.
IN-SEASON
On-Peak
Mid-Peak
Off-Peak
OUT -OF-SEASON
9178~n/a
3816~n/a
6907~n/a
n/a 3816~
5054~5054~Power Cost Adjustment*, per kWh
This Power Cost Adjustment is computed as provided in Schedule 55.
Minimum Charae . The monthly Minimum Charge shall be the sum of the Service Charge, the
TOU Metering Charge, the Demand Charge, the Energy Charge , and the Power Cost
Adjustment.
IDAHO
Issued Per IPUC Order No. 29547
Effective - July 28,2004
Issued by IDAHO POWER COMPANY
John R. Gale , Vice President, Regulatory Affairs
1221 West Idaho Street, Boise, Idaho
I.P.C. No. 27 Tariff No. 101
First Revised Sheet No. 40-
Cancels
Oriainal Sheet No. 40-
Idaho Power Company
SCHEDULE 40
UNMETERED GENERAL SERVICE
(Continued)
MONTHLY CHARGE
The average monthly kWh of energy usage shall be estimated by the Company, based on the
Customer s electric equipment and one-twelfth of the annual hours of operation thereof. Since the
service provided is unmetered , failure of the Customer s equipment will not be reason for a reduction in
the Monthly Charge. The Monthly Charge shall be computed at the following rate:
Power Cost Adjustment*, per kWh
1713~
O. 6039~
Energy Charge, per kWh
Minimum Charge , per month $1.
This Power Cost Adjustment is computed as provided in Schedule 55.
Minimum Charae The monthly Minimum Charge shall be the sum of the Minimum Charge, the
Energy Charge , and the Power Cost Adjustment.
PAYMENT
The monthly bill rendered for service supplied hereunder is payable upon receipt, and becomes
past due 15 days from the date on which rendered.
IDAHO
Issued Per IPUC Order No. 29547
Effective - July 28, 2004
Issued by IDAHO POWER COMPANY
John R. Gale , Vice President, Regulatory Affairs
1221 West Idaho Street, Boise , Idaho
I.P.C. No. 27, Tariff No.1 01
Second Revised Sheet No. 41-
Cancels
First Revised Sheet No. 41-
Idaho Power Company
SCHEDULE 41
STREET LIGHTING SERVICE
(Continued)
A" - OVERHEAD LIGHTING - COMPANY-OWNED SYSTEM (Continued)
Customers whose usage of the Company s system results in the potential or actual variation in
energy usage, such as through , but not limited to, the use of wired outlets or useable plug-ins , are
required to have metered service under this schedule.
ACCELERATED REPLACEMENT OF EXISTING FIXTURES
In the event a Customer requests the Company perform an accelerated replacement of existing
fixtures with the cut-off fixture, the following charges will apply:
1. The actual labor, time , and mileage costs incurred by the Company for the removal of
the existing street lighting fixtures.
$65.00 per fixture removed from service.
The total charges identified in 1 and 2 above must be paid prior to the beginning of the fixture
replacement and are non-refundable. The accelerated replacement will be performed by the Company
during the regularly scheduled working hours of the Company and on the Company s schedule.
MONTHLY CHARGES
Non-Metered Service , per lamp
High Pressure
Sodium Vapor
70 Watt
1 00 Watt
250 Watt
400 Watt
Average
Lumens
540
550
750
000
Base
Rate
$ 6.
$ 5.
$ 7.
$ 9.
Power Cost
Adiustment*
$0.144936
$0.247599
$0.628056
$1.002474
Metered Service
Lamp Charge , per lamp
70 Watt
00 Watt
250 Watt
400 Watt
Meter Charge, per meter
Energy Charge, per kWh
$5.
$4.
$4.
$5.
$8.
Power Cost Adjustment*, per kWh
3257 ~
6039~
This Power Cost Adjustment is computed as provided in Schedule 55.
IDAHO
Issued - December 17 , 2004
Effective - January 17, 2005
Advice No. 04-
Issued by IDAHO POWER COMPANY
John R. Gale , Vice President, Regulatory Affairs
1221 West Idaho Street, Boise , Idaho
I.P.C. No. 27 Tariff No. 101
First Revised Sheet No. 41-
Cancels
Oriainal Sheet No. 41-
Idaho Power Company
SCHEDULE 41
STREET LIGHTING SERVICE
(Continued)
ADDITIONAL MONTHLY RATE
For Company-owned poles installed after October 5, 1964 required to be used for street lighting
only:
Charae
Wood pole , per pole
Steel pole, per pole
$1.
$6.
Facilities Charaes
Customers assessed a monthly facilities charge prior to June 1 , 2004 for the installation of
underground circuits will continue to be assessed a monthly facilities charge equal to 1.
percent of the estimated cost difference between overhead and underground circuits.
B" - CUSTOMER-OWNED SYSTEM
The Customer lighting system , including posts or standards , fixtures , initial installation
lamps and underground cables with suitable terminals for connection to the Company s distribution
system, is installed and owned by the Customer.
Service supplied by the Company includes operation of the system , energy, lamp renewals
cleaning of glassware, and replacement of defective photocells which are standard to the Company-
owned street light units. Service does not include the labor or material cost of replacing cables
standards, broken glassware or fixtures , or painting or refinishing of metal poles.
Customer-owned systems constructed , operated, or modified in such a way as to allow for the
potential or actual variation in energy usage , such as through , but not limited to, the use of wired outlets
or useable plug-ins, are required to be metered in order to record actual energy usage.
MONTHLY CHARGES
Non-Metered Service , per lamp
High Pressure
Sodium Vapor
70 Watt
1 00 Watt
250 Watt
400 Watt
Average
Lumens
5,450
550
750
000
Base
Rate
$2.
$3.
$5.
$7.
Power Cost
Adiustment*
$0. 1751 31
$0.247599
$0.628056
$1.002474
IDAHO
Issued Per IPUC Order No. 29547
Effective - July 28, 2004
Issued by IDAHO POWER COMPANY
John R. Gale, Vice President , Regulatory Affairs
1221 West Idaho Street, Boise , Idaho
I.P.C. No. 27 Tariff No.1 01
First Revised Sheet No. 41-
Cancels
Oriainal Sheet No. 41-4
Idaho Power Company
SCHEDULE 41
STREET LIGHTING SERVICE
(Continued)
MONTHLY CHARGES (Continued)
Metered Service
Lamp Charge , per lamp
High Pressure Sodium Vapor
70 Watt
1 00 Watt
250 Watt
400 Watt
$1.
$1.
$1.
$1.
Meter Charge , per meter $8.
Power Cost Adjustment*, per kWh
3257~
6039~
Energy Charge , per kWh
This Power Cost Adjustment is computed as provided in Schedule 55.
PAYMENT
The monthly bill rendered for service supplied hereunder is payable upon receipt, and becomes
past due 15 days from the date on which rendered.
IDAHO
Issued Per IPUC Order No. 29547
Effective - July 28, 2004
Issued by IDAHO POWER COMPANY
John R. Gale, Vice President , Regulatory Affairs
1221 West Idaho Street, Boise, Idaho
I.P.C. No. 27 Tariff No. 101
First Revised Sheet No. 41-
Cancels
Oriainal Sheet No. 41-
Idaho Power Company
SCHEDULE 41
STREET LIGHTING SERVICE
(Continued)
NO NEW SERVICE
Customers whose usage of the Company s system results in the potential or actual variation in
energy usage, such as through , but not limited to , the use of wired outlets or useable plug-ins, are
required to have metered service under this schedule.
ACCELERATED REPLACEMENT OF EXISTING FIXTURES
In the event a Customer requests the Company perform an accelerated replacement of existing
fixtures with the cut-off fixture , the following charges will apply:
1. The actual labor, time, and mileage costs incurred by the Company for the removal of
the existing street lighting fixtures.
$65.00 per fixture removed from service.
The total charges identified in 1 and 2 above must be paid prior to the beginning of the fixture
replacement and are non-refundable. The accelerated replacement will be performed by the Company
during the regularly scheduled working hours of the Company and on the Company s schedule.
MONTHLY CHARGES
Non-Metered Service, per lamp
High Pressure
Sodium Vapor
Average
Lumens
Base
Rate
Power Cost
Adiustment*
200 Watt 800 $ 6.$0.483120
Metered Service
Lamp Charge, per lamp
High Pressure Sodium Vapor
200 Watt
Meter Charge , per meter
$4.
$8.
IDAHO
Issued Per IPUC Order No. 29547
Effective - July 28 , 2004
Issued by IDAHO POWER COMPANY
John R. Gale , Vice President, Regulatory Affairs
1221 West Idaho Street , Boise, Idaho
Idaho Power Company First Revised Sheet No. 41-
Cancels
Oriainal Sheet No. 41-L.P C. No. 27 Tariff No. 101
SCHEDULE 41
STREET LIGHTING SERVICE
(Continued)
NO NEW SERVICE
MONTHLY CHARGES (Continued)
Power Cost Adjustment*, per kWh
3257 ~
6039~
Energy Charge , per kWh
This Power Cost Adjustment is computed as provided in Schedule 55.
ADDITIONAL MONTHLY RATE
For Company-owned poles installed after October 5 , 1964 required to be used for street lighting
only.
Wood Pole , per pole
Steel Pole, per pole
$1.
$6.
Facilities Charaes
Customers assessed a monthly facilities charge prior to June 1 , 2004 for the installation of
underground circuits will continue to be assessed a monthly facilities charge equal to 1.
percent of the estimated cost difference between overhead and underground circuits.
B" - ORNAMENTAL LIGHTING - CUSTOMER-OWNED SYSTEM
The Customer lighting system, including posts or standards, fixtures, initial installation
lamps and underground cables with suitable terminals for connection to the Company s distribution
system, is installed and owned by the Customer.
Service supplied by the Company includes operation of the system , energy, lamp renewals
cleaning of glassware, and replacement of defective photocells which are standard to the Company-
owned street light units. Service does not include the labor or material cost of replacing cables
standards, broken glassware or fixtures, or painting or refinishing of metal poles.
Customer-owned systems constructed , operated, or modified in such a way as to allow for the
potential or actual variation in energy usage, such as through , but not limited to, the use of wired outlets
or useable plug-ins, are required to be metered in order to record actual energy usage.
IDAHO
Issued Per IPUC Order No. 29547
Effective - July 28, 2004
Issued by IDAHO POWER COMPANY
John R. Gale, Vice President, Regulatory Affairs
1221 West Idaho Street, Bois., Idaho
I.P.C. No. 27 Tariff No. 101
First Revised Sheet No. 41-
Cancels
Oriainal Sheet No. 41-
Idaho Power Company
SCHEDULE 41
STREET LIGHTING SERVICE
(Continued)
NO NEW SERVICE
MONTHLY CHARGES
Non-Metered Service , per lamp
Incandescent
Average
Lumens
500
Base
Rate
$ 2.
Power Cost
Adiustment*
$0.398574
Mercurv Vapor
175 Watt
400 Watt
000 Watt
654
125
000
$ 4.
$ 7.
$13.
$0.422730
$0.984357
$2.343132
High Pressure
Sodium Vapor
200 Watt 800 $ 4.41 $0.483120
Metered Service
Lamp Charge, per lamp
Incandescent 2 500 Lumen $1.
Mercury Vapor
175 Watt
400 Watt
1 ,000 Watt
High Pressure Sodium Vapor
$1.
$1.
$2.47
200 Watt $1.
Energy Charge, per kWh
$8.
3257~
Meter Charge, per meter
Power Cost Adjustment*, per kWh 6039~
This Power Cost Adjustment is computed as provided in Schedule 55.
IDAHO
Issued Per IPUC Order No. 29547
Effective - July 28 , 2004
Issued by IDAHO POWER COMPANY
John R. Gale, Vice President, Regulatory Affairs
1221 West Idaho Street, Boise, Idaho
Idaho Power Company First Revised Sheet No. 42-
Cancels
Oriainal Sheet No. 42-C. o. 27 Tariff No. 101
SCHEDULE 42
TRAFFIC CONTROL SIGNAL
LIGHTING SERVICE
APPLICABILITY
Service under this schedule is applicable to Electric Service required for the operation of traffic
control signal lights within the State of Idaho. Traffic control signal lamps are mounted on posts or
standards by means of brackets , mast arms , or cable.
CHARACTER OF SERVICE
The traffic control signal fixtures, including posts or standards, brackets mast arm , cable
lamps , control mechanisms, fixtures, service cable, and conduit to the point of, and with suitable
terminals for, connection to the Company's underground or overhead distribution system, are installed
owned, maintained and operated by the Customer. Service is limited to the supply of energy only for
the operation of traffic control signal lights.
The installation of a meter to record actual energy consumption is required for all new traffic
control signal lighting systems installed on or after June 1 , 2004. For traffic control signal lighting
systems installed prior to June 1 , 2004 a meter may be installed to record actual usage upon the
mutual consent of the Customer and the Company.
MONTHLY CHARGES
The monthly kWh of energy usage shall be either the amount estimated by the Company based
on the number and size of lamps burning simultaneously in each signal and the average number of
hours per day the signal is operated , or the actual meter reading as applicable.
Power Cost Adjustment*, per kWh
208~
6039~
Energy Charge, per kWh
This Power Cost Adjustment is computed as provided in Schedule 55.
PAYMENT
The monthly bill rendered for service supplied hereunder is payable upon receipt, and becomes
past due 15 days from the date on which rendered.
IDAHO
Issued Per IPUC Order No. 29547
Effective - July 28, 2004
Issued by IDAHO POWER COMPANY
John R. Gale, Vice President, Regulatory Affairs
1221 West Idaho Street, Boise , Idaho
I.P.C. No. 27 Tariff No. 101
First Revised Sheet No. 26-
Cance~s
Oriainal Sheet No. 26-
Idaho Power Company
SCHEDULE 26
IDAHO POWER COMPANY
ELECTRIC SERVICE RATE
FOR
MICRON TECHNOLOGY, INC
BOISE, IDAHO
SPECIAL CONTRACT DATED SEPTEMBER 1, 1995
MONTHLY CONTRACT DEMAND CHARGE
$1.58 PER kW OF Scheduled Contract Demand
SCHEDULED MONTHLY CONTRACT DEMAND
The Scheduled Monthly Contract Demand is 0 - 140 000 kW as per the contract with one year
written notification.
MONTHLY BILLING DEMAND CHARGE
$6.43 per kW of Billing Demand but not less than Scheduled Minimum Monthly Billing Demand.
MINIMUM MONTHLY BILLING DEMAND
The Minimum Monthly Billing Demand will be 25 000 kilowatts.
DAILY EXCESS DEMAND CHARGE
$0.204 per each kW over the Contract Demand.
The Daily Excess Demand Charge is applicable beginning January 1997 or once the Contract
Demand reaches 100 000 kW, which ever comes first.
MONTHLY ENERGY CHARGE
3111~ per kWh
POWER COST ADJUSTMENT*
6039~, per kWh
This Power Cost Adjustment is computed as provided in Schedule 55.
MONTHLY 0 & M CHARGES
Zero percent of total cost of Substation Facilities.
IDAHO
Issued Per IPUC Order No. 29547
Effective - July 28, 2004
Issued by IDAHO POWER COMPANY
John R. Gale, Vice President, Regulatory Affairs
1221 West Idaho Street, Boise , Idaho
I.P.C. No. 27 , Tariff No. 101
Second Revised Sheet No. 29-
Cancels
First Revised Sheet No. 29-
Idaho Power Company
SCHEDULE 29
IDAHO POWER COMPANY
ELECTRIC SERVICE RATE
J. R. SIMPLOT COMPANY
POCA TELLO, IDAHO
SPECIAL CONTRACT DATED JUNE 29, 2004
MONTHLY CHARGES
Contract Demand Charae
$1.45 per kW of Contract Demand
Demand Charae
$4.97 per kW of Billing Demand but no less than the Contract Demand less 5 000 kW
Daily Excess Demand Charae
$0.204 per each kW over the Contract Demand
Eneray Charae
3173~ per kWh
Power Cost Adiustment
6039~ per kWh
This Power Cost Adjustment is computed as provided in Schedule 55.
Monthly Facilities Charae
70/0 of the Company s investment in Distribution Facilities
IDAHO
Issued - September 7 , 2004
Fffpr.tivp - Seotember 2. 2004
Issued by IDAHO POWER COMPANY
John R. Gale, Vice President, Regulatory Affairs
1221 West Idaho St, Boise, Idaho
Idaho Power Company First Revised Sheet No. 30-
Cancels
Oriainal Sheet No. 30-C. No. 27 Tariff No. 101
SCHEDULE 30
IDAHO POWER COMPANY
ELECTRIC SERVICE RATE
FOR
UNITED STATES DEPARTMENT OF ENERGY
IDAHO OPERATIONS OFFICE
SPECIAL CONTRACT DATED MAY 16, 2000
CONTRACT NO. GS-OOP-99-BSD-0124
AVAILABILITY
This schedule is available for firm retail service of electric power and energy delivered for the
operations of the Department of Energy s facilities located at the Idaho National Engineering Laboratory
site , as provided in the Contract for Electric Service between the parties.
MONTHLY CHARGE
The monthly charge for electric service shall be the sum of the Demand and Energy Charges
determined at the following rates:
Demand Charge, per kW of
Billing Demand
Energy Charge, per kWh
$5.
1.4122~
Power Cost Adjustment*, per kWh 6039~
This Power Cost Adjustment is computed as provided in Schedule 55.
SPECIAL CONDITIONS
1. Billina Demand. The Billing Demand shall be the average kW supplied during the 30-
minute period of maximum use during the month.2. Power Factor Adjustment. When the Power Factor is less than 95 percent during the
30-minute period of maximum load for the month, Company may adjust the measured Demand to
determine the Billing Demand by multiplying the measured kW of Demand by 0.95 and dividing by the
actual Power Factor.
IDAHO
Issued Per IPUC Order No. 29547
Effective - July 28 2004
Issued by IDAHO POWER COMPANY
John R. Gale, Vice President, Regulatory Affairs
1221 West Idaho Street, Boise , Idaho
AMENDED ATTACHMENT 2
I.P.C. No. 27 Tariff No. 101
First Revised Sheet No. 1-
Cancels
Oriainal Sheet No. 1-
Idaho Power Company
SCHEDULE
RESIDENTIAL SERVICE
(Continued)
RESIDENTIAL SPACE HEATING
All space heating equipment to be served by the Company s system shall be single phase
equipment approved by Underwriters' Laboratories , Inc., and the equipment and its installation shall
conform to all National, State and Municipal Codes and to the following:
Individual resistance-type units for space heating larger than 1 650 watts shall be designed to
operate at 240 or 208 volts, and no single unit shall be larger than 6 kW. Heating units of two kW or
larger shall be controlled by approved thermostatic devices. When a group of heating units, with a total
capacity of more than 6 kW, is to be actuated by a single thermostat, the controlling switch shall be so
designed that not more than 6 kW can be switched on or off at anyone time. Supplemental resistance-
type heaters, that may be used with a heat exchanger, shall comply with the specifications listed above
for such units.
SUMMER AND NON-SUMMER SEASONS
The summer season begins on June 1 of each year and ends on August 31 of each year. The
non-summer season begins on September 1 of each year and ends on May 31 of each year.
MONTHLY CHARGE
The Monthly Charge is the sum of the Service Charge , the Energy Charge , and the Power Cost
Adjustment at the following rates:
Summer Non-summer
Service Charge, per month $3.$3.
Energy Charge , per kWh
300 kWh
Over 300 kWh
Power Cost Adjustment*, per kWh
1853~
8367~
6039~
1853~
1853~
O. 6039~
This Power Cost Adjustment is computed as provided in Schedule 55.
Minimum Charae
The monthly Minimum Charge shall be the sum of the Service Charge, the Energy Charge , and
the Power Cost Adjustment.
PAYMENT
The monthly bill rendered for service supplied hereunder is payable upon receipt, and becomes
past due 15 days from the date on which rendered.
IDAHO
Issued - March 22 , 2005
Effective June 1 , 2005
Issued by IDAHO POWER COMPANY
John R. Gale, Vice President, Regulatory Affairs
1221 West Idaho Street, Boise , Idaho
I.P.C. No. 27 Tariff No. 101
First Revised Sheet No. 7-
Cancels
Oriainal Sheet No.7 -
Idaho Power Company
SCHEDULE 7
SMALL GENERAL SERVICE
(Continued)
MONTHLY CHARGE
The Monthly Charge is the sum of the Service Charge the Energy Charge , and the Power Cost
Adjustment at the following rates:
Summer Non-summer
Service Charge , per month $3.$3.
Energy Charge , per kWh
300 kWh
Over 300 kWh
Power Cost Adjustment*, per kWh
2375~
7 . 0264~
5761 ~
2375~
2375~
5761 ~
This Power Cost Adjustment is computed as provided in Schedule 55.
Minimum Charae
The monthly Minimum Charge shall be the sum of the Service Charge , the Energy Charge , and
the Power Cost Adjustment.
PAYMENT
The monthly bill rendered for service supplied hereunder is payable upon receipt, and becomes
past due 15 days from the date on which rendered.
IDAHO
~ssued - March 22, 2005
Effective June 1 , 2005
Issued by IDAHO POWER COMPANY
John R. Gale , Vice President, Regulatory Affairs
1221 West Idaho Street, Boise, Idaho
Idaho Power Company First Revised Sheet No. 9-
Cancels
Oriainal Sheet No. 9-C. No. 27 Tariff No. 101
SCHEDULE 9
LARGE GENERAL SERVICE
(Continued)
SECONDARY SERVICE Summer Non-summer
Service Charge, per month $5.$5.
Basic Charge, per kWof
Basic Load Capacity $0.$0.
Demand Charge, per kW of
Billing Demand
Power Cost Adjustment*, per kWh
9627~
6039~
$2.
6430~
$3.
Energy Charge, per kWh
6039~
This Power Cost Adjustment is computed as provided in Schedule 55.
Facilities Charae
None,
Minimum Charge
The monthly Minimum Charge shall be the sum of the Service Charge, the Basic Charge, the
Demand Charge , the Energy Charge , and the Power Cost Adjustment.
PRIMARY SERVICE Summer Non-summer
Service Charge , per month $125.$125.
Basic Charge , per kWof
Basic Load Capacity $0.$0.
Demand Charge , per kW of
Billing Demand
Energy Charge, per kWh
$3.
5959~
$2.
3269~
Power Cost Adjustment*, per kWh 6039~6039~
This Power Cost Adjustment is computed as provided in Schedule 55.
Facilities Charae The Company s investment in Company-owned Facilities Beyond the Point of
Delivery times 1.7 percent.
IDAHO
Issued - March 22, 2005
Effective June 1 2005
Issued by IDAHO POWER COMPANY
John R. Gale, Vice President, Regulatory Affairs
1221 West Idaho Street, Boise, Idaho
I.P.C. No. 27 Tariff No. 101
First Revised Sheet No. 9-
Cance~s
Oriainal Sheet No. 9-4
Idaho Power Company
SCHEDULE 9
LARGE GENERAL SERVICE
(Continued)
Minimum Charae. The monthly Minimum Charge shall be the sum of the Service Charge , the
Basic Charge, the Demand Charge, the Energy Charge, the Power Cost Adjustment, and the
Facilities Charge.
TRANSMISSION SERVICE Summer Non-summer
Service Charge, per month $125.$125.
Basic Charge, per kWof
Basic Load Capacity $0.43 $0.43
Demand Charge, per kW of
Billing Demand
Power Cost Adjustment*
5381 ~-
6039~
$2.
2850~
$3.
Energy Charge, per kWh
O. 6039~
This Power Cost Adjustment is computed as provided in Schedule 55.
Facilities Charae
The Company s investment in Company-owned Facilities Beyond the Point of Delivery times 1.
percent.
Minimum Charae
The monthly Minimum Charge shall be the sum of the Service Charge , the Basic Charge , the
Demand Charge, the Energy Charge , the Power Cost Adjustment, and the Facilities Charge.
PAYMENT
The monthly bill rendered for service supplied hereunder is payable upon receipt, and becomes
past due 15 days from the date on which rendered.
IDAHO
Issued - March 22 2005
Effective June 1 , 2005
Issued by IDAHO POWER COMPANY
John R. Gale, Vice President, Regulatory Affairs
1221 West Idaho Street, Boise, Idaho
Idaho Power Company
C. No. 27 Tariff No. 101
First Revised Sheet No. 15-
Cancels
Oriainal Sheet No. 15-
SCHEDULE 15
DUSK TO DAWN CUSTOMER
LIGHTING
(Continued)
NEW FACILITIES
Where facilities of the Company are not presently available for a lamp installation which will
provide satisfactory lighting service for the Customer s Premises , the Company may install overhead or
underground secondary service facilities , including secondary conductor, poles, anchors , etc., a
distance not to exceed 300 feet to supply the desired service , all in accordance with the charges
specified below.
MONTHLY CHARGES
Monthly per unit charges on existing facilities:
AREA LIGHTING
High Pressure Average
Sodium Vapor Lumens
1 00 Watt 550
200 Watt 800
400 Watt 000
FLOOD LIGHTING
High Pressure Average
Sodium Vapor Lumens
200 Watt 800
400 Watt 000
Metal Halide
400 Watt 800
000 Watt 000
Base
Rate
$ 5.
$ 9.
$14.
Power Cost
Adiustment*
$0.205360
$0.41 0652
$0.827343
Base
Rate
$11.
$16.
Power Cost
Adiustment*
$0.410652
$0.827343
$18.
$34.
$0.827343
$2.065338
This Power Cost Adjustment is computed as provided in Schedule 55.
2. For New Facilities Installed Before June 1. 2004 The Monthly Charge for New Facilities
installed prior to June 1 , 2004, such as overhead secondary conductor, poles, anchors, etc., shall be
75 percent of the estimated installed cost thereof.
3. For New Facilities Installed On or After June 1, 2004: The non-refundable charge for
New Facilities to be installed, such as underground service, overhead secondary conductor, poles
anchors , etc., shall be equal to the work order cost.
PAYMENT
The monthly bill for service supplied hereunder is payable upon receipt, and becomes past due
15 days from the date on which rendered
IDAHO
Issued - March 22 2005
Effective June 1 2005
Issued by IDAHO POWER COMPANY
John R. Gale, Vice President, Regulatory Affairs
1221 West Idaho Street, Boise, Idaho
I.P .C. No. 27, Tariff No.1 01
Second Revised Sheet No. 19-
Cancels
First Revised Sheet No. 19-4
Idaho Power Company
SCHEDULE 19
LARGE POWER SERVICE
(Continued)
MONTHLY CHARGE (Continued)
SECONDARY SERVICE Summer Non-summer
Service Charge, per month $5.$5.
Basic Charge, per kW of
Basic Load Capacity $0.$0.
Demand Charge, per kW of
Billing Demand $2.$2.
On-Peak Demand Charge , per kW of
On-Peak Billing Demand $0.n/a
Energy Charge, per kWh
On-Peak
Mid-Peak
Off-Peak
Power Cost Adjustment*, per kWh
0870~
9328~
7331 ~
5731 ~
n/a
6382~
5188~
5731~
This Power Cost Adjustment is computed as provided in Schedule 55.
Facilities Charae
None.
Minimum Charge
The monthly Minimum Charge shall be the sum of the Service Charge , the Basic Charge, the
Demand Charge , the On-Peak Demand Charge , the Energy Charge and the Power Cost
Adjustment.
IDAHO
Issued - March 22, 2005
Effective June 1 , 2005
Issued by IDAHO POWER COMPANY
John R. Gale, Vice President, Regulatory Affairs
1221 West Idaho Street, Boise, Idaho
I.P.C. No. 27, Tariff No. 101
Second Revised Sheet No. 19-
Cancels
First Revised Sheet No. 19-
Idaho Power Company
SCHEDULE 19
LARGE POWER SERVICE
(Continued)
MONTHLY CHARGE (Continued)
PRIMARY SERVICE
Basic Charge , per kWof
Basic Load Capacity
Summer Non-summer
$125.$125.
$0.$0.
Service Charge, per month
Demand Charge, per kW of
Billing Demand
$2.$2.
On-Peak Demand Charge, per kW of
On-Peak Billing Demand $0.n/a
Energy Charge , per kWh
On-Peak
Mid-Peak
Off-Peak
Power Cost Adjustment*, per kWh
6363~
3796~
2178~
5731~
n/a
1528~
0539~
5731 ~
This Power Cost Adjustment is computed as provided in Schedule 55.
Facilities Charae
The Company s investment in Company-owned Facilities Beyond the Point of Delivery times 1.
percent.
Minimum Charae
The monthly Minimum Charge shall be the sum of the Service Charge , the Basic Charge, the
Demand Charge , the On-Peak Demand Charge the Energy Charge, the Power Cost
Adjustment, and the Facilities Charge.
IDAHO
Issued - March 22 , 2005
Effective June 1 , 2005
Issued by IDAHO POWER COMPANY
John R. Gale , Vice President, Regu~atory Affairs
1221 West Idaho Street, Boise, Idaho
I.P.C. No. 27, Tariff No. 101
Second Revised Sheet No. 19-
Cancels
First Revised Sheet No. 19-
Idaho Power Company
SCHEDULE 19
LARGE POWER SERVICE
(Continued)
MONTHLY CHARGE (Continued)
TRANSMISSION SERVICE Summer Non-summer
Service Charge, per month $125.$125.
Basic Charge, per kW of
Basic Load Capacity $0.40 $0.40
Demand Charge, per kWof
Billing Demand $2.$2.
On-Peak Demand Charge, per kWof
On-Peak Billing Demand $0.n/a
Energy Charge , per kWh
On-Peak
Mid-Peak
Off-Peak
Power Cost Adjustment*, per kWh
2. 6000~
3467~
1872~
5731~
n/a
1186~
0213~
5731 ~
This Power Cost Adjustment is computed as provided in Schedule 55.
Facilities Charae
The Company s investment in Company-owned Facilities Beyond the Point of Delivery times 1.percent.
Minimum Charae
The monthly Minimum Charge shall be the sum of the Service Charge, the Basic Charge, the
Demand Charge , the On-Peak Demand Charge , the Energy Charge, the Power Cost
Adjustment , and the Facilities Charge.
PAYMENT
The monthly bill for service supplied hereunder is payable upon receipt, and becomes past due
15 days from the date on which rendered.
IDAHO
Issued - March 22, 2005
Effective June 1 2005
Issued by IDAHO POWER COMPANY
John R. Gale, Vice President, Regulatory Affairs
1221 West Idaho Street, Boise, Idaho
Idaho Power Company
I.P.C. No. 27 Tariff No. 101
First Revised Sheet No. 24-
Cancels
Oriainal Sheet No. 24-
SCHEDULE 24
AGRICULTURAL IRRIGATION
SERVICE
(Continued)
POWER FACTOR ADJUSTMENT
Where the Customer s Power Factor is less than 85 percent, as determined by measurement
under actual load conditions, the Company may adjust the kW measured to determine the Billing
Demand by multiplying the measured kW by 85 percent and dividing by the actual Power Factor.
Effective November 1 , 2004 where the Customer s Power Factor is less than 90 percent, as
determined by measurement under actual load conditions, the Company may adjust the kW measured
to determine the Billing Demand by multiplying the measured kW by 90 percent and dividing by the
actual Power Factor.
MONTHLY CHARGE
The Monthly Charge is the sum of the Service , the Demand , the Energy, the Power Cost
Adjustment, and the Facilities Charges at the following rates.
SECONDARY SERVICE In-Season Out -of-Season
Service Charge, per month $12.$3.
Demand Charge, per kW of
Billing Demand
Energy Charge, per kWh
$4.
3239~
$0.
3239~
Power Cost Adjustment*, per kWh 5054~5054~
This Power Cost Adjustment is computed as provided in Schedule 55.
Facilities Charge
None.
Minimum Charae
The monthly Minimum Charge shall be the sum of the Service Charge , the Demand Charge , the
Energy Charge, and the Power Cost Adjustment.
IDAHO
Issued - March 22 2005
Effective June 1 , 2005
Issued by IDAHO POWER COMPANY
John R. Gale, Vice President, Regulatory Affairs
1221 West Idaho Street, Boise, Idaho
Idaho Power Company
I.P.C. No. 27 Tariff No. 101
First Revised Sheet No. 24-
Cancels
Oriainal Sheet No. 24-4
SCHEDULE 24
AGRICULTURAL IRRIGATION
SERVICE
(Continued)
MONTHLY CHARGE (Continued)
TRANSMISSION SERVICE In-Season Out-of-Season
Service Charge , per month $12.$3.
Demand Charge , per kW of
Billing Demand
Energy Charge , per kWh
$3.
1632~
$0.
1632~
Power Cost Adjustment*, per kWh 5054~5054~
This Power Cost Adjustment is computed as provided in Schedule 55.
Facilities Charae
The Company s investment in Company-owned Facilities Beyond the Point of Delivery times 1.
percent.
Minimum Charae
The monthly Minimum Charge shall be the sum of the Service Charge , the Demand Charge, the
Energy Charge, the Power Cost Adjustment, and the Facilities Charge.
PAYMENT
All monthly billings for Electric Service supplied hereunder are payable upon receipt, and
become past due 15 days from the date on which rendered. (For any agency or taxing district which
has notified the Company in writing that it falls within the provisions of Idaho Code 9 67-2302, the past
due date will reflect the 60 day payment period provided by Idaho Code 9 67-2302.
Deposit.A deposit payment for irrigation Customers is required under the following conditions:
Existina Customers
a. Tier Deposit.Customers who have two or more reminder notices for
nonpayment of Electric Service during a 12-month period, or who have had service terminated
for non-payment, or were required to pay a Tier 2 Deposit for the previous Irrigation Season, will
be required to pay a Tier 1 Deposit, or provide a guarantee of payment from a bank or financial
institution acceptable to the Company. A Tier 1 Deposit does not apply to Customers who have
an outstanding balance on December 31 of over $1 000.00 (See Tier 2 Deposit). A reminder
notice is issued approximately 45 days after the bill issue date if the balance owing for Electric
Service totals $100 or more or approximately 105 days after the bill issue date for Customers
meeting the provisions of Idaho Code 9 67-2302. The deposit for a specific installation is
computed as follows:
IDAHO
Issued - March 22 2005
Effective June 1 2005
Issued by IDAHO POWER COMPANY
John R. Gale, Vice President, Regulatory Affairs
1221 West Idaho Street, Boise, Idaho
I.P.C. No. 27 Tariff No. 101
First Revised Sheet No. 25-
Cancels
Original Sheet No. 25-
Idaho Power Company
SCHEDULE 25
AGRICULTURAL IRRIGATION
SERVICE - TIME-OF-USE PILOT
PROGRAM (OPTIONALl
(Continued)
NO NEW SERVICE
MONTHLY CHARGE
The Monthly Charge is the sum of the Service , the TOU Metering, the Demand, the Energy, and
the Power Cost Adjustment Charges at the following rates.
SECONDARY SERVICE
TOU Metering Charge , per month
In-Season Out -of-Season
$12.$3.
$3.n/a
Service Charge, per month
Demand Charge, per kW of
Billing Demand
Energy Charge, per kWh
$4.$0.
IN-SEASON
On-Peak
Mid-Peak
Off-Peak
OUT -OF-SEASON
0329~n/a
3.4474~n/a
1 . 7236~n/a
n/a 3.4384~
5054~5054~Power Cost Adjustment*, per kWh
This Power Cost Adjustment is computed as provided in Schedule 55.
Minimum Charae . The monthly Minimum Charge shall be the sum of the Service Charge, the
TOU Metering Charge, the Demand Charge, the Energy Charge, and the Power Cost
Adjustment.
IDAHO
Issued - March 22 2005
Effective June 2005
Issued by IDAHO POWER COMPANY
John R. Gale , Vice President, Regulatory Affairs
1221 West Idaho Street, Boise, Idaho
I.P.C. No. 27 Tariff No. 101
First Revised Sheet No. 40-
Cancels
Oriainal Sheet No. 40-
Idaho Power Company
SCHEDULE 40
UNMETERED GENERAL SERVICE
(Continued)
MONTHLY CHARGE
The average monthly kWh of energy usage shall be estimated by the Company, based on the
Customer s electric equipment and one-twelfth of the annual hours of operation thereof. Since the
service provided is unmetered, failure of the Customer s equipment will not be reason for a reduction in
the Monthly Charge. The Monthly Charge shall be computed at the following rate:
Energy Charge , per kWh
Power Cost Adjustment*, per kWh
2669~
O. 6039~
Minimum Charge, per month $1.
This Power Cost Adjustment is computed as provided in Schedule 55.
Minimum Charae The monthly Minimum Charge shall be the sum of the Minimum Charge , the
Energy Charge , and the Power Cost Adjustment.
PAYMENT
The monthly bill rendered for service supplied hereunder is payable upon receipt, and becomes
past due 15 days from the date on which rendered.
IDAHO
Issued - March 22 , 2005
Effective June 1 , 2005
Issued by IDAHO POWER COMPANY
John R. Gale, Vice President, Regulatory Affairs
1221 West Idaho Street, Boise , Idaho
I.P.C. No. 27, Tariff No. 101
Second Revised Sheet No. 41-
Cancels
First Revised Sheet No. 41-
Idaho Power Company
SCHEDULE 41
STREET LIGHTING SERVICE
(Continued)
A" - OVERHEAD LIGHTING - COMPANY-OWNED SYSTEM (Continued)
Customers whose usage of the Company s system results in the potential or actual variation in
energy usage , such as through, but not limited to , the use of wired outlets or useable plug-ins, are
required to have metered service under this schedule.
ACCELERATED REPLACEMENT OF EXISTING FIXTURES
In the event a Customer requests the Company perform an accelerated replacement of existing
fixtures with the cut-off fixture, the following charges will apply:
1. The actual labor, time , and mileage costs incurred by the Company for the removal of
the existing street lighting fixtures.
$65.00 per fixture removed from service.
The total charges identified in 1 and 2 above must be paid prior to the beginning of the fixture
replacement and are non-refundable. The accelerated replacement will be performed by the Company
during the regularly scheduled working hours of the Company and on the Company s schedule.
MONTHLY CHARGES
Non-Metered Service, per lamp
High Pressure
Sodium Vapor
70 Watt
00 Watt
250 Watt
400 Watt
Average
Lumens
540
550
750
000
Base
Rate
$ 6.
$ 6.
$ 7.
$ 10.
Power Cost
Adiustment*
$0.144936
$0.247599
$0.628056
$1.002474
Metered Service
Lamp Charge, per lamp
70 Watt
1 00 Watt
250 Watt
400 Watt
Meter Charge , per meter
Energy Charge , per kWh
$5.
$4.
$4.
$5.
$8.
Power Cost Adjustment*, per kWh
4 .4099~
6039~
This Power Cost Adjustment is computed as provided in Schedule 55.
IDAHO
Issued - March 22 2005
Effective June 1 , 2005
Issued by IDAHO POWER COMPANY
John R. Gale, Vice President, Regulatory Affairs
1221 West Idaho Street, Boise, Idaho
I.P.C. No. 27 Tariff No. 101
First Revised Sheet No. 41-
Cancels
Oriainal Sheet No. 41-
Idaho Power Company
SCHEDULE 41
STREET LIGHTING SERVICE
(Continued)
ADDITIONAL MONTHLY RATE
For Company-owned poles installed after October 5, 1964 required to be used for street lighting
only:
Charae
Wood pole, per pole
Steel pole , per pole
$1.
$6.
Facilities Charaes
Customers assessed a monthly facilities charge prior to June 1 , 2004 for the installation of
underground circuits will continue to be assessed a monthly facilities charge equal to 1.
percent of the estimated cost difference between overhead and underground circuits.
B" - CUSTOMER-OWNED SYSTEM
The Customer lighting system , including posts or standards , fixtures, initial installation
lamps and underground cables with suitable terminals for connection to the Company s distribution
system, is installed and owned by the Customer.
Service supplied by the Company includes operation of the system , energy, lamp renewals
cleaning of glassware, and replacement of defective photocells which are standard to the Company-
owned street light units. Service does not include the labor or material cost of replacing cables
standards , broken glassware or fixtures , or painting or refinishing of metal poles.
Customer-owned systems constructed , operated , or modified in such a way ~s to allow for the
potential or actual variation in energy usage, such as through, but not limited to, the use of wired outlets
or useable plug-ins, are required to be metered in order to record actual energy usage.
MONTHLY CHARGES
Non-Metered Service , per lamp
High Pressure
Sodium Vapor
70 Watt
1 00 Watt
250 Watt
400 Watt
Average
Lumens
450
550
750
000
Base
Rate
$2.
$3.
$5.
$7.47
Power Cost
Adiustment*
$0.175131
$0.247599
$0.628056
$1.002474
IDAHO
Issued - March 22 , 2005
Effective June 1 , 2005
Issued by IDAHO POWER COMPANY
John R. Gale, Vice President, Regulatory Affairs
1221 West Idaho Street, Boise, Idaho
I.P.C. No. 27 Tariff No. 101
First Revised Sheet No. 41-
Cancels
Oriainal Sheet No. 41-
Idaho Power Company
SCHEDULE 41
STREET LIGHTING SERVICE
(Continued)
MONTHLY CHARGES (Continued)
Metered Service
Lamp Charge , per lamp
High Pressure Sodium Vapor
70 Watt
1 00 Watt
250 Watt
400 Watt
$1.
$1.
$1.
$1.
Meter Charge, per meter $8.
Power Cost Adjustment*, per kWh
4.4099~
6039~
Energy Charge, per kWh
This Power Cost Adjustment is computed as provided in Schedule 55.
PAYMENT
- The monthly bill rendered for service supplied hereunder is payable upon receipt, and becomes
past due 15 days from the date on which rendered.
IDAHO
Issued - March 22 2005
Effective June 1 , 2005
Issued by IDAHO POWER COMPANY
John R. Gale, Vice President, Regulatory Affairs
1221 West Idaho Street, Boise, Idaho
I.P.C. No. 27 Tariff No. 101
First Revised Sheet No. 41-
Cancels
Oriainal Sheet No. 41-
Idaho Power Company
SCHEDULE 41
STREET LIGHTING SERVICE
(Continued)
NO NEW SERVICE
Customers whose usage of the Company s system results in the potential or actual variation in
energy usage, such as through , but not limited to, the use of wired outlets or useable plug-ins, are
required to have metered service under this schedule.
ACCELERATED REPLACEMENT OF EXISTING FIXTURES
In the event a Customer requests the Company perform an accelerated replacement of existing
fixtures with the cut-off fixture, the following charges will apply:
1. The actual labor, time , and mileage costs incurred by the Company for the removal of
the existing street lighting fixtures.
$65.00 per fixture removed from service.
The total charges identified in 1 and 2 above must be paid prior to the beginning of the fixture
replacement and are non-refundable. The accelerated replacement will be performed by the Company
during the regularly scheduled working hours of the Company and on the Company s schedule.
MONTHLY CHARGES
Non-Metered Service, per lamp
High Pressure
Sodium Vapor
Average
Lumens
Base
Rate
Power Cost
Adiustment*
200 Watt 800 $ 7.$0.483120
Metered Service
Lamp Charge, per lamp
High Pressure Sodium Vapor
200 Watt $4.
Meter Charge , per meter $8.
IDAHO
Issued - March 22, 2005
Effective June 1 , 2005
Issued by IDAHO POWER COMPANY
John R. Gale, Vice President, Regulatory Affairs
1221 West Idaho Street, Boise, Idaho
Idaho Power Company First Revised Sheet No. 41-
Cancels
Original Sheet No. 41-C. No. 27 Tariff No. 101
SCHEDULE 41
STREET LIGHTING SERVICE
(Continued)
NO NEW SERVICE
MONTHLY CHARGES (Continued)
Power Cost Adjustment*, per kWh
4 .4099~
6039~
Energy Charge, per kWh
This Power Cost Adjustment is computed as provided in Schedule 55.
ADDITIONAL MONTHLY RATE
For Company-owned poles installed after October 5 , 1964 required to be used for street lighting
only.
Wood Pole, per pole
Steel Pole , per pole
$1.
$6.
Facilities Charaes
Customers assessed a monthly facilities charge prior to June 1 , 2004 for the installation of
underground circuits will continue to be assessed a monthly facilities charge equal to 1.
percent of the estimated cost difference between overhead and underground circuits.
B" - ORNAMENTAL LIGHTING - CUSTOMER-OWNED SYSTEM
The Customer lighting system , including posts or standards, fixtures , initial installation
lamps and underground cables with suitable terminals for connection to the Company s distribution
system, is installed and owned by the Customer.
Service supplied by the Company includes operation of the system , energy, lamp renewals
cleaning of glassware , and replacement of defective photocells which are standard to the Company-
owned street light units. Service does not include the labor or material cost of replacing cables
standards , broken glassware or fixtures, or painting or refinishing of metal poles.
Customer-owned systems constructed, operated, or modified in such a way as to allow for the
potential or actual variation in energy usage , such as through , but not limited to, the use of wired outlets
or useable plug-ins, are required to be metered in order to record actual energy usage.
IDAHO
Issued - March 22, 2005
Effective June 1 , 2005
Issued by IDAHO POWER COMPANY
John R. Gale, Vice President, Regulatory Affairs
1221 West Idaho Street, Boise , Idaho
Idaho Power Company
I.P.C. No. 27 Tariff No. 101
MONTHLY CHARGES
First Revised Sheet No. 41-
Cancels
Oriainal Sheet No. 41-
SCHEDULE 41
STREET LIGHTING SERVICE
(Continued)
Non-Metered Service, per lamp
Incandescent
Mercury Vapor
175 Watt
400 Watt
000 Watt
High Pressure
Sodium Vapor
200 Watt
Metered Service
Lamp Charge, per lamp
Average
Lumens
500
654
125
000
800
Incandescent 2 500 Lumen
Mercury Vapor
175 Watt
400 Watt
000 Watt
High Pressure Sodium Vapor
200 Watt
Meter Charge , per meter
Energy Charge , per kWh
NO NEW SERVICE
Power Cost Adjustment*, per kWh
Base
Rate
$ 2.
$ 4.
$ 7.
$13.
$ 4.
$1.
$1.
$1.
$2.
$1.
$8.
4 .4099~
6039~
Power Cost
Adiustment*
$0.398574
$0.422730
$0.984357
$2.343132
$0.483120
This Power Cost Adjustment is computed as provided in Schedule 55.
IDAHO
Issued - March 22, 2005
Effective June 1 , 2005
Issued by IDAHO POWER COMPANY
John R. Gale, Vice President, Regulatory Affairs
1221 West Idaho Street, Boise, Idaho
I.P.C. No. 27 Tariff No. 101
First Revised Sheet No. 42-
Cancels
Oriainal Sheet No. 42-
Idaho Power Company
SCHEDULE 42
TRAFFIC CONTROL SIGNAL
LIGHTING SERVICE
APPLICABILITY
Service under this schedule is applicable to Electric Service required for the operation of traffic
control signal lights within the State of Idaho. Traffic control signal lamps are mounted on posts or
standards by means of brackets , mast arms , or cable.
CHARACTER OF SERVICE
The traffic control signal fixtures, including posts or standards , brackets mast arm , cable
lamps, control mechanisms . fixtures , service cable , and conduit to the point of, and with suitable
terminals for, connection to the Company s underground or overhead distribution system, are installed
owned, maintained and operated by the Customer. Service is limited to the supply of energy only for
the operation of traffic control signal lights.
The installation of a meter to record actual energy consumption is required for all new traffic
control signal lighting systems installed on or after June 1 , 2004. For traffic control signal lighting
systems installed prior to June 1 , 2004 a meter may be installed to record actual usage upon the
mutual consent of the Customer and the Company.
MONTHLY CHARGES
The monthly kWh of energy usage shall be either the amount estimated by the Company based
on the number and size of lamps burning simultaneously in each signal and the average number of
hours per day the signal is operated, or the actual meter reading as applicable.
Energy Charge, per kWh
Power Cost Adjustment*, per kWh
3. 265~
6039~
This Power Cost Adjustment is computed as provided in Schedule 55.
PAYMENT
The monthly bill rendered for service supplied hereunder is payable upon receipt, and becomes
past due 15 days from the date on which rendered.
IDAHO
Issued - March 22, 2005
Effective June 1 , 2005
Issued by IDAHO POWER COMPANY
John R. Gale , Vice President, Regulatory Affairs
1221 West Idaho Street, Boise, Idaho
I.P.C. No. 27 Tariff No. 101
First Revised Sheet No. 26-
Cancels
Oriainal Sheet No. 26-
Idaho Power Company
SCHEDULE 26
IDAHO POWER COMPANY
ELECTRIC SERVICE RATE
FOR
MICRON TECHNOLOGY. INC
BOISE. IDAHO
SPECIAL CONTRACT DATED SEPTEMBER 1. 1995
MONTHLY CONTRACT DEMAND CHARGE
$1.61 PER kW OF Scheduled Contract Demand
SCHEDULED MONTHLY CONTRACT DEMAND
The Scheduled Monthly Contract Demand is 0 - 140 000 kW as per the contract with one year
written notification.
MONTHLY BILLING DEMAND CHARGE
$6.54 per kW of Billing Demand but not less than Scheduled Minimum Monthly Billing Demand.
MINIMUM MONTHLY BILLING DEMAND
The Minimum Monthly Billing Demand will be 25 000 kilowatts.
DAILY EXCESS DEMAND CHARGE
$0.204 per each kW over the Contract Demand.
The Daily Excess Demand Charge is applicable beginning January 1997 or once the Contract
Demand reaches 100 000 kW, which ever comes first.
MONTHLY ENERGY CHARGE
3366~ per kWh
POWER COST ADJUSTMENT*
6039~, per kWh
This Power Cost Adjustment is computed as provided in Schedule 55.
MONTHLY 0 & M CHARGES
Zero percent of total cost of Substation Facilities.
IDAHO
Issued - March 22 2005
Effective June 1 , 2005
Issued by IDAHO POWER COMPANY
John R. Gale, Vice President, Regulatory Affairs
1221 West Idaho Street, Boise, Idaho
I.P.C. No. 27. Tariff No. 101
Second Revised Sheet No. 29-
Cancels
First Revised Sheet No. 29-
Idaho Power Company
SCHEDULE 29
IDAHO POWER COMPANY
ELECTRIC SERVICE RATE
J. R. SIMPLOT COMPANY
POCA TELLO, IDAHO
SPECIAL CONTRACT DATED JUNE 29. 2004
MONTHLY CHARGES
Contract Demand Charae
$1.48 per kW of Contract Demand
Demand Charae
$5.05 per kW of Billing Demand but no less than the Contract Demand less 5 000 kW
Daily Excess Demand Charae
$0.204 per each kW over the Contract Demand
Eneray Charae
3429~ per kWh
Power Cost Adiustment
6039~ per kWh
This Power Cost Adjustment is computed as provided in Schedule 55.
Monthly Facilities Charae
70/0 of the Company s investment in Distribution Facilities
IDAHO
Issued - March 22 2005
Effective June 2005
Issued by IDAHO POWER COMPANY
John R. Gale, Vice President, Regulatory Affairs
1221 West Idaho Street, Boise, Idaho
I.P.C. No. 27 Tariff No.1 01
First Revised Sheet No. 30-
Cancels
Oriainal Sheet No. 30-
Idaho Power Company
SCHEDULE 30
IDAHO POWER COMPANY
ELECTRIC SERVICE RATE
FOR
UNITED STATES DEPARTMENT OF ENERGY
IDAHO OPERATIONS OFFICE
SPECIAL CONTRACT DATED MAY 16. 2000
CONTRACT NO. GS-OOP-99-BSD-0124
AVAILABILITY
This schedule is available for firm retail service of electric power and energy delivered for the
operations of the Department of Energy s facilities located at the Idaho National Engineering Laboratory
site , as provided in the Contract for Electric Service between the parties.
MONTHLY CHARGE
The monthly charge for electric service shall be the sum of the Demand and Energy Charges
determined at the following rates:
Demand Charge, per kW of
Billing Demand $5.46
Energy Charge, per kWh
Power Cost Adjustment*, per kWh
.4397 ~
6039~
This Power Cost Adjustment is computed as provided in Schedule 55.
SPECIAL CONDITIONS
1. Billina Demand . The Billing Demand shall be the average kW supplied during the 30-
minute period of maximum use during the month.2. Power Factor Adjustment. When the Power Factor is less than 95 percent during the
30-minute period of maximum load for the month, Company may adjust the measured .Demand to
determine the Billing Demand by multiplying the measured kW of Demand by 0.95 and dividing by the
actual Power Factor.
IDAHO
Issued - March 22, 2005
Effective June 1 , 2005
Issued by IDAHO POWER COMPANY
John R. Gale, Vice President, Regulatory Affairs
1221 West Idaho Street, Boise, Idaho
AMENDED ATTACHMENT 3
I.P.C. No. 27 Tariff No. 101
First Revised Sheet No. 1-
Cancels
Oriainal Sheet No. 1-
Idaho Power Company
SCHEDULE
RESIDENTIAL SERVICE
(Continued)
RESIDENTIAL SPACE HEATING
All space heating equipment to be served by the Company s system shall be single phase
equipment approved by Underwriters' Laboratories , Inc., and the equipment and its installation shall
conform to all National , State and Municipal Codes and to the following:
Individual resistance-type units for space heating larger than 1 650 watts shall be designed to
operate at 240 or 208 volts , and no single unit shall be larger than 6 kW. Heating units of two kW or
larger shall be controlled by approved thermostatic devices. When a group of heating units, with a total
capacity of more than 6 kW, is to be actuated by a single thermostat, the controlling switch shall be so
designed that not more than 6 kW can be switched on or off at anyone time. Supplemental resistance-
type heaters, that may be used with a heat exchanger, shall comply with the specifications listed above
for such units.
SUMMER AND NON-SUMMER SEASONS
The summer season begins on June 1 of each year and ends on August 31 of each year. The
non-summer season begins on September 1 of each year and ends on May 31 of each year.
MONTHLY CHARGE
The Monthly Charge is the sum of the Service Charge, the Energy Charge, and the Power Cost
Adjustment at the following rates:
Summer Non-summer
Service Charge, per month $3.$3.
Energy Charge, per kWh
300 kWh
Over 300 kWh
Power Cost Adjustment*, per kWh
08635.1853
5. 72535.8367
6039~
08635.1853
08635.1853
6039~
This Power Cost Adjustment is computed as provided in Schedule 55.
Minimum Charqe
The monthly Minimum Charge shall be the sum of the Service Charge, the Energy Charge, and
the Power Cost Adjustment.
PAYMENT
The monthly bill rendered for service supplied hereunder is payable upon receipt, and becomes
past due 15 days from the date on which rendered.
I.P.C. No. 27 Tariff No. 101
First Revised Sheet No. 7-
Cancels
OriQinal Sheet No.7 -
Idaho Power Company
SCHEDULE 7
SMALL GENERAL SERVICE
(Continued)
MONTHLY CHARGE
The Monthly Charge is the sum of the Service Charge the Energy Charge, and the Power Cost
Adjustment at the following rates:
Summer Non-summer
Service Charge , per month $3.$3.
Energy Charge, per kWh
300 kWh
Over 300 kWh
Power Cost Adjustment*, per kWh
11776.2375
89157 .0264
5761 ~
11776.2375
11776.2375
5761~
This Power Cost Adjustment is computed as provided in Schedule 55.
Minimum CharQe
The monthly Minimum Charge shall be the sum of the Service Charge, the Energy Charge, and
the Power Cost Adjustment.
PAYMENT
The monthly bill rendered for service supplied hereunder is payable upon receipt, and becomes
past due 15 days from the date on which rendered.
I.P.C. No. 27 Tariff No. 101
First Revised Sheet No. 9-
Cancels
OriQinal Sheet No. 9-
Idaho Power Company
SCHEDULE 9
LARGE GENERAL SERVICE
(Continued)
Summer Non-summerSECONDARY SERVICE
Service Charge, per month $5.$5.
Basic Charge, per kW of
Basic Load Capacity $0.$0.
Demand Charge, per kW of
Billing Demand
Power Cost Adjustment*, per kWh
~3.~2.
9062 9627 ~5926 6430~
6039~6039~
Energy Charge, per kWh
This Power Cost Adjustment is computed as provided in Schedule 55.
Facilities CharQe
None.
Minimum Charae
The monthly Minimum Charge shall be the sum of the Service Charge, the Basic Charge, the
Demand Charge, the Energy Charge, and the Power Cost Adjustment.
PRIMARY SERVICE Summer Non-summer
Service Charge, per month $125.$125.
Basic Charge, per kW of
Basic Load Capacity $0.$0.
Demand Charge, per kW of
Billing Demand
Power Cost Adjustment*, per kWh
~3.~2.
5"'6"'5959~2825 3269~
6039~6039~
Energy Charge, per kWh
This Power Cost Adjustment is computed as provided in Schedule 55.
Facilities CharQe. The Company s investment in Company-owned Facilities Beyond the Point of
Delivery times 1.7 percent.
I.P.C. No. 27 Tariff No. 101
First Revised Sheet No. 9-
Cancels
OriQinal Sheet No. 9-
Idaho Power Company
SCHEDULE 9
LARGE GENERAL SERVICE
(Continued)
Minimum Charae. The monthly Minimum Charge shall be the sum of the Service Charge, the
Basic Charge, the Demand Charge, the Energy Charge, the Power Cost Adjustment, and the
Facilities Charge.
TRANSMISSION SERVICE Summer Non-summer
Service Charge , per month $125.$125.
Basic Charge, per kW of
Basic Load Capacity $0.43 $0.43
Demand Charge, per kW of
Billing Demand
Power Cost Adjustment*
~3.~2.
4 897 5381 ~241 2850~
6039~6039~
Energy Charge, per kWh
This Power Cost Adjustment is computed as provided in Schedule 55.
Facilities Charae
The Company s investment in Company-owned Facilities Beyond the Point of Delivery times 1.
percent.
Minimum Charae
The monthly Minimum Charge shall be the sum of the Service Charge, the Basic Charge, the
Demand Charge, the Energy Charge , the Power Cost Adjustment, and the Facilities Charge.
PAYMENT
The monthly bill rendered for service supplied hereunder is payable upon receipt, and becomes
past due 15 days from the date on which rendered.
Idaho Power Company
I.P .C. No. 27 Tariff No.1 01
NEW FACILITIES
First Revised Sheet No. 15-
Cancels
Oriainal Sheet No. 15-
SCHEDULE 15
DUSK TO DAWN CUSTOMER
LIGHTING
(Continued)
Where facilities of the Company are not presently available for a lamp installation which will
provide satisfactory lighting service for the Customer s Premises, the Company may install overhead or
underground secondary service facilities, including secondary conductor, poles, anchors, etc., a
distance not to exceed 300 feet to supply the desired service, all in accordance with the charges
specified below.
MONTHLY CHARGES
Monthly per unit charges on existing facilities:
AREA LIGHTING
High Pressure
Sodium Vapor
100 Watt
200 Watt
400 Watt
FLOOD LIGHTING
High Pressure
Sodium Vapor
200 Watt
400 Watt
Metal Halide
400 Watt
1000 Watt
Average
Lumens
550
800
000
Average
Lumens
19,800
45,000
800
000
Base
Rate
5 .
9AG9.
$14.14.
Power Cost
Adiustment*
$0.205360
$0.410652
$0.827343
Base
Rate
$11.0611.
$16.16.
Power Cost
Adiustment*
$0.41 0652
$0.827343
$18:1'118.
$33.34.
$0.827343
$2.065338
This Power Cost Adjustment is computed as provided in Schedule 55.
2. For New Facilities Installed Before June 1,2004 : The Monthly Charge for New Facilities
installed prior to June 1 , 2004, such as overhead secondary conductor, poles, anchors, etc., shall be
75 percent of the estimated installed cost thereof.
3. For New Facilities Installed On or After June 1, 2004: The non-refundable charge for
New Facilities to be installed, such as underground service, overhead secondary conductor, poles
anchors, etc., shall be equal to the work order cost
PAYMENT
The monthly bill for service supplied hereunder is payable upon receipt, and becomes past due
15 days from the date on which rendered
I.P.C. No. 27, Tariff No. 101
Second Revised Sheet No.g.4
Cancels
First Revised Sheet No. 19-
Idaho Power Company
SCHEDULE 19
LARGE POWER SERVICE
(Continued)
MONTHLY CHARGE (Continued)
SECONDARY SERVICE Summer Non-summer
Service Charge , per month $5.$5.
Basic Charge, per kW of
Basic Load Capacity $0.$0.
Demand Charge , per kW of
Billing Demand ~2.~2.
On-Peak Demand Charge, per kW of
On-Peak Billing Demand $Q.:3e0. 37 n/a
Energy Charge, per kWh
0 n-Peak
Mid-Peak
Off-Peak
Power Cost Adjustment*, per kWh
03353.0870
88222.9328
68632.7331
5731~
n/a
59322.6382
-17612.5188
5731~
This Power Cost Adjustment is computed as provided in Schedule 55.
Facilities Charqe
None.
Minimum Charae
The monthly Minimum Charge shall be the sum of the Service Charge, the Basic Charge, the
Demand Charge, the On-Peak Demand Charge, the Energy Charge and the Power Cost
Adjustment.
Idaho Power Company
I.P.C. No. 27, Tariff No. 101
MONTHLY CHARGE (Continued)
PRIMARY SERVICE
Service Charge, per month
Basic Charge, per kW of
Basic Load Capacity
Demand Charge, per kW of
Billing Demand
Second Revised Sheet No. 19-5
Cancels
First Revised Sheet No. 19-
SCHEDULE 19
LARGE POWER SERVICE
(Continued)
On-Peak Demand Charge, per kW of
On-Peak Billing Demand
Energy Charge, per kWh
On-Peak
Mid-Peak
Off-Peak
Power Cost Adjustment*, per kWh
Summer Non-summer
$125.$125.
$0.$0.
~2.~2.
~0.n/a
58602.6363
33422.3796
17552.2178
5731~
n/a
11172.1528
01472.0539
5731~
This Power Cost Adjustment is computed as provided in Schedule 55.
Facilities Charqe
The Company s investment in Company-owned Facilities Beyond the Point of Delivery times 1.
percent.
Minimum Charqe
The monthly Minimum Charge shall be the sum of the Service Charge, the Basic Charge, the
Demand Charge, the On-Peak Demand Charge the Energy Charge, the Power Cost
Adjustment, and the Facilities Charge.
I.P.C. No. 27. Tariff No. 101
Second Revised Sheet No.1 9-
Cancels
First Revised Sheet No. 19-
Idaho Power Company
SCHEDULE 19
LARGE POWER SERVICE
(Continued)
MONTHLY CHARGE (Continued)
TRANSMISSION SERVICE Summer Non-summer
Service Charge, per month $125.$125.
Basic Charge, per kW of
Basic Load Capacity $0.40 $0.40
Demand Charge, per kW of
Billing Demand ~2.~2.
On-Peak Demand Charge, per kW of
On-Peak Billing Demand ~0.n/a , I
Energy Charge , per kWh
On-Peak
Mid-Peak
Off-Peak
Power Cost Adjustment*, per kWh
550'12.6000
30192.3467
1 '1552.1872
5731~
n/a
07822.1186
98272.0213
5731~
This Power Cost Adjustment is computed as provided in Schedule 55.
Facilities CharQe
The Company s investment in Company-owned Facilities Beyond the Point of Delivery times 1.
percent.
Minimum CharQe
The monthly Minimum Charge shall be t1e sum of the Service Charge, the Basic Charge, the
Demand Charge, the On-Peak Demand Charge, the Energy Charge, the Power Cost
Adjustment, and the Facilities Charge.
PAYMENT
The monthly bill for service supplied hereunder is payable upon receipt, and becomes past due
15 days from the date on which rendered.
I.P.C. No. 27 Tariff No. 101
First Revised Sheet No. 24-
Cancels
Oriainal Sheet No. 24-
Idaho Power Company
SCHEDULE 24
AGRICULTURAL IRRIGATION
SERVICE
(Continued)
. .
POWER FACTOR ADJUSTMENT
Where the Customer s Power Factor is less than 85 percent, as determined by measurement
under actual load conditions, the Company may adjust the kW measured to determine the Billing
Demand by multiplying the measured kW by 85 percent and dividing by the actual Power Factor.
Effective November 1, 2004 where the Customer s Power Factor is less than 90 percent, as
determined by measurement under actual load conditions, the Company may adjust the kW measured
to determine the Billing Demand by multiplying the measured kW by 90 percent and dividing by the
actual Power Factor.
MONTHLY CHARGE
The Monthly Charge is 1he sum of the Service, the Demand, the Energy, the Power Cost
Adjustment, and the Facilities Charges at the following rates.
SECONDARY SERVICE In-Season 0 ut -of-Season
Service Charge, per month $12.$3.
Demand Charge, per kW of
Billing Demand
Energy Charge, per kWh
Power Cost Adjustment*, per kWh
$-1 024.~0.
2618 3239~2618 3239~
5054~5054~
This Power Cost Adjustment is computed as provided in Schedule 55.
Facilities CharQe
None.
Minimum CharQe
The monthly Minimum Charge shall be the sum of the Service Charge, the Demand Charge, the
Energy Charge, and the Power Cost Adjustment.
I.P.No. 27 Tariff No. 101
First Revised Sheet No. 24-
Cancels
Oriainal Sheet No. 24-
Idaho Power Company
SCHEDULE 24
AGRICULTURAL IRRIGATION
SERVICE
(Continued)
MONTHLY CHARGE (Continued)
TRANSMISSION SERVICE In-Season Out-of-Season
Service Charge, per month $12.$3.
Demand Charge, per kW of
Billing Demand
Power Cost Adjustment*, per kWh
$&+83.$Q:.7a0 .
028 1632~1028 1632i
5054i 5054~
Energy Charge, per kWh
This Power Cost Adjustment is computed as provided in Schedule 55.
Facilities Charqe
The Company s investment in Company-owned Facilities Beyond the Point of Delivery times 1.
percent.
Minimum Charqe
The monthly Minimum Charge shall be the sum of the Service Charge, the Demand Charge, the
Energy Charge, the Power Cost Adjustment, and the Facilities Charge.
PAYMENT
All monthly billings for Electric Service supplied hereunder are payable upon receipt , and
become past due 15 days from the date on which rendered. (For any agency or taxing district which
has notified the Company in writing that it falls within the provisions of Idaho Code 9 67-2302 , the past
due date will reflect the 60 day payment period provided by Idaho Code 9 67-2302.
Deposit.A deposit payment for irrigation Customers is required under the following conditions:
Existina Customers
a. Tier 1 Deposit.Customers who have two or more reminder notices for
nonpayment of Electric Service during a 12-month period, or who have had service terminated
for non-payment, or were required to pay a Tier 2 Deposit for the previous Irrigation Season, will
be required to pay a Tier 1 Deposit, or provide a guarantee of payment from a bank or financial
institution acceptable to the Company. A Tier 1 Deposit does not apply to Customers who have
an outstanding balance on December 31 of over $1 000.00 (See Tier 2 Deposit). A reminder
notice is issued approximately 45 days after the bill issue date if the balance owing for Electric
Service totals $100 or more or approximately 105 days after the bill issue date for Customers
meeting the provisions of Idaho Code 9 67-2302. The deposit for a specific installation is
computed as follows:
I.P.C. No. 27 Tariff No. 101
First Revised Sheet No. 25-
Cancels
OriQinal Sheet No. 25-
Idaho Power Company
SCHEDULE 25
AGRICULTURAL IRRIGATION
SERVICE - TIME-OF-USE PILOT
PROGRAM (OPTIONAL)
(Continued)
NO NEW SERVICE
MONTHLY CHARGE
The Monthly Charge is the sum of the Service , the TOU Metering, the Demand, the Energy, and
the Power Cost Adjustment Charges at the following rates.
TOU Metering Charge, per month
In-Season Out-of-Season
$12.$3.
$3.n/a
SECONDARY SERVICE
Service Charge, per month
Demand Charge, per kW of
Billing Demand
Energy Charge, per kWh
$4.02-1.Q.;8Q0 .
IN-SEASON
0 n-Peak
Mid-Peak
Off-Peak
OUT -OF-SEASON
9178 0329~n/a
38163.44 7 4~n/a
6907 7236~n/a
n/a 38163.4384~
5054~5054~Power Cost Adjustment*, per kWh
This Power Cost Adjustment is computed as provided in Schedule 55.
Minimum Charae . The monthly Minimum Charge shall be the sum of the Service Charge, the
TOU Metering Charge, the Demand Charge, the Energy Charge, and the Power Cost
Adjustment.
I.P.C. No. 27 Tariff No. 101
First Revised Sheet No. 40-
Cancels
Oriainal Sheet No. 40-
Idaho Power Company
SCHEDULE 40
UNMETERED GENERAL SERVICE
(Continued)
MONTHLY CHARGE
The average monthly kWh of energy usage shall be estimated by the Company, based on the
Customer s electric equipment and one-twelfth of the annual hours of operation thereof. Since the
service provided is unmetered, failure of the Customer s equipment will not be reason for a reduction in
the Monthly Charge. The Monthly Charge shall be computed at the following rate:
Power Cost Adjustment*, per kWh
17135.2669
6039~
Energy Charge, per kWh
Minimum Charge, per month $1.
This Power Cost Adjustment is computed as provided in Schedule 55.
Minimum CharQe The monthly Minimum Charge shall be the sum of the Minimum Charge, the
Energy Charge, and the Power Cost Adjustment.
PAYMENT
The monthly bill rendered for service supplied hereunder is payable upon receipt, and becomes
past due 15 days from the date on which rendered.
I.P.C. No. 27. Tariff No. 101
Second Revised Sheet No. 41-
Cancels
First Revised Sheet No. 41-
Idaho Power Company
SCHEDULE 41
STREET LIGHTING SERVICE
(Continued)
An - OVERHEAD LIGHTING - COMPANY-OWNED SYSTEM (Continued)
Customers whose usage of the Company s system results in the potential or actual variation in
energy usage, such as through , but not limited to, the use of wired outlets or useable plug-ins, are
required to have metered service under this schedule.
ACCELERATED REPLACEMENT OF EXISTING FIXTURES
In the event a Customer requests the Company perform an accelerated replacement of existing
fixtures with the cut-off fixture, the following charges will apply:1. The actual labor, time, and mileage costs incurred by the Company for the removal of
the existing street lighting fixtures.
$65.00 per fixture removed from service.
The total charges identified in 1 and 2 above must be paid prior to the beginning of the fixture
replacement and are non-refundable. The accelerated replacement will be performed by the Company
during the regularly scheduled working hours of the Company and on the Company s schedule.
MONTHLY CHARGES
Non-Metered Service, per lamp
High Pressure
Sodium Vapor
70 Watt
100 Watt
250 Watt
400 Watt
Average
Lumens
540
550
750
45,000
Base
Rate~6. ~6.~7 .$~10.
Power Cost
Adiustment*
$0.144936
$0.247599
$0.628056
$1.002474
Metered Service
Lamp Charge, per lamp
70 Watt
100 Watt
250 Watt
400 Watt
Power Cost Adjustment*, per kWh
~5.
$4.854.
844.~5.
$8.
3257 4 .4099
6039~
Meter Charge, per meter
Energy Charge, per kWh
This Power Cost Adjustment is computed as provided in Schedule 55.
I.P.C. No. 27 Tariff No. 101
First Revised Sheet No. 41-
Cancels
Oriainal Sheet No. 41-
Idaho Power Company
SCHEDULE 41
STREET LIGHTING SERVICE
(Continued)
ADDITIONAL MONTHLY RATE
For Company-owned poles installed after October 5, 1964 required to be used for street lighting
only:CharQe
Wood pole, per pole
Steel pole, per pole
$1.
$6.
Facilities CharQes
Customers assessed a monthly facilities charge prior to June 1, 2004 for the installation of
underground circuits will continue to be assessed a monthly facilities charge equal to 1.
percent of the estimated cost difference between overhead and underground circuits.
B" - CUSTOMER-OWNED SYSTEM
The Customer lighting system, including posts or standards, fixtures, initial installation of
lamps and underground cables with suitable terminals for connection to the Company s distribution
system, is installed and owned by the Customer.
Service supplied by the Company includes operation of the system, energy, lamp renewals,
cleaning of glassware, and replacement of defective photocells which are standard to the Company-
owned street light units. Service does not include the labor or material cost of replacing cables,
standards, broken glassware or fixtures, or painting or refinishing of metal poles.
Customer-owned systems constructed, operated, or modified in such a way as to allow for the
potential or actual variation in energy usage, such as through, but not limited to, the use of wired outlets
or useable plug-ins, are required to be metered in order to record actual energy usage.
MONTHLY CHARGES
Non-Metered Service, per lamp
High Pressure
Sodium Vapor
70 Watt
100 Watt
250 Watt
400 Watt
Average
Lumens
5,450
550
750
000
Base
Rate~2.~3.~5.~7 .47
Power Cost
Adiustment*
$0.175131
$0.247599
$0.628056
$1.002474
I.P.C. No. 27 Tariff No. 101
First Revised Sheet No. 41-
Cancels
Oriainal Sheet No. 41-
Idaho Power Company
SCHEDULE 41
STREET LIGHTING SERVICE
(Continued)
MONTHLY CHARGES (Continued)
Metered Service
Lamp Charge, per lamp
High Pressure Sodium Vapor
70 Watt
100 Watt
250 Watt
400 Watt
Meter Charge, per meter
~1.~1.~1.~1.
$8.
Power Cost Adjustment*, per kWh
'1 .3257 '1.4099
6039~
Energy Charge, per kWh
This Power Cost Adjustment is computed as provided in Schedule 55.
PAYMENT
The monthly bill rendered for service supplied hereunder is payable upon receipt, and becomes
past due 15 days from the date on which rendered.
I.P.C. No. 27 Tariff No. 101
First Revised Sheet No. 41-
..
Cancels
OriQinal Sheet No. 41-
Idaho Power Company
SCHEDULE 41
STREET LIGHTING SERVICE
(Continued)
NO NEW SERVICE
Customers whose usage of the Company s system results in the potential or actual variation in
energy usage, such as through , but not limited to, the use of wired outlets or useable plug-ins, are
required to have metered service under this schedule.
ACCELERATED REPLACEMENT OF EXISTING FIXTURES
In the event a Customer requests the Company perform an accelerated replacement of existing
fixtures with the cut-off fixture, the following charges will apply:1. The actual labor, time, and mileage costs incurred by the Company for the removal of
the existing street lighting fixtures.
$65.00 per fixture removed from service.
The total charges identified in 1 and 2 above must be paid prior to the beginning of the fixture
replacement and are non-refundable. The accelerated replacement will be performed by the Company
during the regularly scheduled working hours of the Company and on the Company s schedule.
MONTHLY CHARGES
Non- Metered Service, per lamp
High Pressure
Sodium Vapor
Average
Lumens
Base
Rate
Power Cost
Adiustment*
200 Watt 19,800 ~7.$0.483120
Metered Service
Lamp Charge, per lamp
High Pressure Sodium Vapor
200 Watt
Meter Charge, per meter
$11.721.
$8.
I.P.C. No. 27 Tariff No. 101
First Revised Sheet No. 41-
Cancels
Oriainal Sheet No. 41-
Idaho Power Company
SCHEDULE 41
STREET LIGHTING SERVICE
(Continued)
NO NEW SERVICE
MONTHLY CHARGES (Continued)
Power Cost Adjustment*, per kWh
3257 4 .4099
6039~
Energy Charge, per kWh
This Power Cost Adjustment is computed as provided in Schedule 55.
ADDITIONAL MONTHLY RATE
For Company-owned poles installed after October 5, 1964 required to be used for street lighting
only.
Wood Pole, per pole
Steel Pole, per pole
$1.
$6.
Facilities Charaes
Customers assessed a monthly facilities charge prior to June 1 , 2004 for the installation of
underground circuits will continue to be assessed a monthly facilities charge equal to 1.
percent of the estimated cost difference between overhead and underground circuits.
B" - ORNAMENTAL LIGHTING - CUSTOMER-OWNED SYSTEM
The Customer lighting system, including posts or standards, fixtures, initial installation of
lamps and underground cables with suitable terminals for connection to the Company s distribution
system, is installed and owned by the Customer.
Service supplied by the Company includes operation of the system, energy, lamp renewals
cleaning of glassware , and replacement of defective photocells which are standard to the Company-
owned street light units. Service does not include the labor or material cost of replacing cables
standards, broken glassware or fixtures, or painting or refinishing of metal poles.
Customer-owned systems constructed, operated, or modified in such a way as to allow for the
potential or actual variation in energy usage, such as through, but not limited to, the use of wired outlets
or useable plug-ins, are required to be metered in order to record actual energy usage.
Idaho Power Company
I.P.C. No. 27 Tariff No. 101
MONTHLY CHARGES
Non- Metered Service, per lamp
Incandescent
Average
Lumens
500
Mercury Vapor
175 Watt
400 Watt
1000 Watt
654
19,125
000
High Pressure
Sodium Vapor
200 Watt 19,800
Metered Service
Lamp Charge, per lamp
Incandescent 2,500 Lumen
Mercury Vapor
175 Watt
400 Watt
000 Watt
High Pressure Sodium Vapor
200 Watt
Meter Charge, per meter
Energy Charge, per kWh
Power Cost Adjustment*, per kWh
First Revised Sheet No. 41-
Cancels
Oriqinal Sheet No. 41-
SCHEDULE 41
STREET LIGHTING SERVICE
(Continued)
NO NEW SERVICE
Base
Rate~2.
~ .
85'1.~7 .
$13.13.
'11'1.
~1.
4-:991.
$4-:+3
$6472.
~1.
$8.
~ .
3257 '1.4099
6039~
Power Cost
Adiustment*
$0.398574
$0.422730
$0.984357
$2.343132
$0.483120
This Power Cost Adjustment is computed as provided in Schedule 55.
I.P.C. No. 27 Tariff No. 101
First Revised Sheet No. 42-
Cancels
Oriainal Sheet No. 42-
Idaho Power Company
SCHE DULE 42
TRAFFIC CONTROL SIGNAL
LIGHTING SERVICE
APPLICABILITY
Service under this schedule is applicable to Electric Service required for the operation of traffic
control signal lights within the State of Idaho. Traffic control signal lamps are mounted on posts or
standards by means of brackets, mast arms , or cable.
CHARACTER OF SERVICE
The traffic control signal fixtures, including posts or standards, brackets, mast arm, cable
lamps, control mechanisms, fixtures, service cable, and conduit to the lDint of, and with suitable
terminals for, connection to the Company s underground or overhead distribution system, are installed
owned, maintained and operated by the Customer. Service is limited to the supply of energy only for
the operation of traffic control signal lights.
The installation of a meter to record actual energy consumption is required for all new traffic
control signal lighting systems installed on or after June 1 , 2004. For traffic control signal lighting
systems installed prior to June 1 , 2004 a meter may be installed to record actual usage upon the
mutual consent of the Customer and the Company.
MONTHLY CHARGES
The monthly kWh of energy usage shall be either the amount estimated by the Company based
on the number and size of lamps burning simultaneously in each signal and the average number of
hours per day the signal is operated, or the actual meter reading as applicable.
Power Cost Adjustment*, per kWh
2083.265
(j;
6039~
Energy Charge, per kWh
This Power Cost Adjustment is computed as provided in Schedule 55.
PAYMENT
The monthly bill rendered for service supplied hereunder is payable upon receipt , and becomes
past due 15 days from the date on which rendered.
I.P.C. No. 27 Tariff No. 101
First Revised Sheet No. 26-
Cancels
OriQinal Sheet No. 26-
Idaho Power Company
SCHEDULE 26
IDAHO POWER COMPANY
ELECTRIC SERVICE RATE
FOR
MICRON TECHNOLOGY, INC
BOISE. IDAHO
SPECIAL CONTRACT DATED SEPTEMBER 1, 1995
MONTHLY CONTRACT DEMAND CHARGE
~1.PER kW OF Scheduled Contract Demand
SCHEDULED MONTHLY CONTRACT DEMAND
The Scheduled Monthly Contract Demand is 0 - 140,000 IW as per the contract with one year
written notification.
MONTHLY BILLING DEMAND CHARGE
$eAd6.per kW of Billing Demand but not less than Scheduled Minimum Monthly Billing
Demand.
MINIMUM MONTHLY BILLING DEMAND
The Minimum Monthly Billing Demand will be 25,000 kilowatts.
DAILY EXCESS DEMAND CHARGE
$0.204 per each kW over the Contract Demand.
The Daily Excess Demand Charge is applicable beginning January 1997 or once the Contract
Demand reaches 100,000 kW, which ever comes first.
MONTHLY ENERGY CHARGE
31111.3366~ per kWh
POWER COST ADJUSTMENT*
60391t, per kWh
This Power Cost Adjustment is computed as provided in Schedule 55.
MONTHLY 0 & M CHARGES
Zero percent of total cost of Substation Facilities.
I.P.C. No. 27, Tariff No. 101
Second Revised Sheet No. 29-1
Cancels
First Revised Sheet No. 29-
Idaho Power Company
SCHEDULE 29
IDAHO POWER COMPANY
ELECTRIC SERVICE RATE
J. R. SIMPLOT COMPANY
POCA TELLO, IDAHO
SPECIAL CONTRACT DATED JUNE 29, 2004
MONTHLY CHARGES
Contract Demand Charae
$4Aa 1 .48 per kW of Contract Demand
Demand CharQe
4-:-9+5.per kW of Billing Demand but no less than the Contract Demand less 5,000 kW
Daily Excess Demand CharQe
$0.204 per each kW over the Contract Demand
EnerQY Charae
31731.3429~ per kWh
Power Cost Adiustment
6039~ per kWh
This Power Cost Adjustment is computed as provided in Schedule 55.
Monthly Facilities Charae
7% of the Company s investment in Distribution Facilities
I.P.C. No. 27 Tariff No. 101
First Revised Sheet No. 30-
Cancels
OriQinal Sheet No. 30-
Idaho Power Company
SCHEDULE 30
IDAHO POWER COMPANY
ELECTRIC SERVICE RATE
FOR
UNITED STATES DEPARTMENT OF ENERGY
IDAHO OPERATIONS OFFICE
SPECIAL CONTRACT DATED MAY 16. 2000
CONTRACT NO. GS-OOP-99-BSD-0124
AVAILABILITY
This schedule is available for firm retail service of electric power and energy delivered for the
operations of the Department of Energy s facilities located at the Idaho National Engineering Laboratory
site, as provided in the Contract for Electric Service between the parties.
MONTHLY CHARGE
The monthly charge for electric service shall be the sum of the Demand and Energy Charges
determined at the following rates:
Demand Charge, per kW of
Billing Demand
Energy Charge, per kWh
~5.46
1.41221.4397
Power Cost Adjustment*, per kWh 6039~
This Power Cost Adjustment is computed as provided in Schedule 55.
SPECIAL CONDITIONS
1. BillinQ Demand. The Billing Demand shall be the average kW supplied during the 30-
minute period of maximum use during the month.2. Power Factor Adjustment. When the Power Factor is less than 95 percent during the
30-minute period of maximum load for the month , Company may adjust the measured Demand to
determine the Billing Demand by multiplying the measured kW of Demand by 0.95 and dividing by the
actual Power Factor.
AMENDED ATTACHMENT 4
Id
a
h
o
P
o
w
e
r
C
o
m
p
a
n
y
Su
m
m
a
r
y
o
f
R
e
v
e
n
u
e
I
m
p
a
c
t
St
a
t
e
o
f
I
d
a
h
o
No
r
m
a
l
i
z
e
d
1
2
-
Mo
n
t
h
T
e
s
t
Y
e
a
r
E
n
d
i
n
g
De
c
e
m
b
e
r
3
1
,
20
0
3
Be
n
n
e
t
t
M
o
u
n
t
a
i
n
C
a
s
e
N
o
.
I
P
C
-
OS
-
1
0
(
1
)
(2
)
(3
)
(4
)
(5
)
(6
)
(7
)
(8
)
Ra
t
e
20
0
3
A
v
g
.
20
0
3
S
a
l
e
s
07
/
2
8
/
0
4
06
/
0
1
/
0
5
Av
g
.
Li
n
e
Sc
h
.
Nu
m
b
e
r
o
f
No
r
m
a
l
i
z
e
d
Ba
s
e
Re
v
e
n
u
e
Ba
s
e
Mi
l
l
s
Pe
r
c
e
n
t
Ta
r
i
f
f
D
e
s
c
r
i
ti
o
n
No
.
Cu
s
t
o
m
e
r
s
(k
W
b
l
Re
v
e
n
u
e
Ad
j
u
s
t
m
e
n
t
s
Re
v
e
n
u
e
Pe
r
K
W
H
Ch
a
n
g
e
Un
i
f
o
r
m
T
a
r
i
f
f
R
a
t
e
s
:
Re
s
i
d
e
n
t
i
a
l
S
e
r
v
i
c
e
33
5
,
60
5
14
1
,
39
3
,
42
6
22
8
,
28
8
,
64
4
18
3
,
61
1
23
2
,
4
7
2
,
25
5
56
.
83
%
Sm
a
l
l
G
e
n
e
r
a
l
S
e
r
v
i
c
e
32
,
31
6
26
5
,
33
5
,
66
7
1
7
,
89
2
,
03
3
32
5
,
30
6
18
,
21
7
,
33
9
68
.
82
%
La
r
g
e
G
e
n
e
r
a
l
S
e
r
v
i
c
e
17
,
41
5
01
4
42
6
,
98
6
11
1
,
28
9
,
82
3
03
1
,
29
3
11
3
,
32
1
,
1
1
6
37
.
83
%
Du
s
k
t
o
D
a
w
n
Li
g
h
t
i
n
g
87
2
,
58
6
89
2
,
7
6
7
16
,
55
2
90
9
31
9
15
4
.
85
%
La
r
g
e
P
o
w
e
r
S
e
r
v
i
c
e
10
5
97
8
,
82
4
,
23
8
56
,
67
4
30
7
1,
0
3
0
,
20
9
57
,
7
0
4
51
6
29
.
82
%
Ag
r
i
c
u
l
t
u
r
a
l
I
r
r
i
g
a
t
i
o
n
S
e
r
v
i
c
e
13
,
51
7
62
0
,
93
0
,
93
1
69
,
17
8
,
27
4
30
1
,
00
8
70
,
47
9
,
28
2
43
.
4
8
88
%
Un
m
e
t
e
r
e
d
G
e
n
e
r
a
l
Se
r
v
22
4
16
,
05
4
94
2
82
6
,
01
7
15
,
34
9
84
1
,
3
6
6
52
.
4
86
%
St
r
e
e
t
L
i
g
h
t
i
n
g
42
0
17
,
87
8
,
74
2
1,
6
7
8
,
7
2
2
31
,
2
8
2
1,
7
1
0
,
00
4
95
.
86
%
Tr
a
f
f
i
c
C
o
n
t
r
o
l
L
i
g
h
t
i
n
g
38
4
21
8
29
3
81
1
34
9
29
9
1
6
0
31
.
82
%
1
1
To
t
a
l
U
n
i
f
o
r
m
Ta
r
i
f
f
s
40
1
,
6
6
0
11
,
0
7
0
,
10
1
,
7
3
6
48
7
,
01
4
,
39
8
93
9
,
95
9
49
5
,
95
4
,
35
7
44
.
84
%
Sp
e
c
i
a
l
C
o
n
t
r
a
c
t
s
:
Mi
c
r
o
n
63
6
,
96
7
,
67
0
15
,
88
5
,
37
0
29
4
,
34
4
16
,
17
9
,
7
1
4
25
.
4
0
85
%
J
R
S
i
m
p
l
o
t
'
"
18
6
,
68
4
,
66
5
34
0
,
05
0
80
,
06
4
42
0
,
11
4
23
.
84
%
DO
E
20
3
,
08
4
,
14
6
82
4
,
34
2
63
6
91
2
,
97
8
24
.
84
%
To
t
a
l
S
p
e
c
i
a
l
C
o
n
t
r
a
c
t
s
02
6
,
7
3
6
,
48
1
25
,
04
9
,
7
6
2
46
3
,
04
4
25
,
51
2
,
80
6
24
.
85
%
1 6
To
t
a
l
Id
a
h
o
R
e
t
a
i
l
S
a
l
e
s
40
1
,
66
3
12
,
09
6
,
83
8
,
21
7
51
2
,
06
4
,
16
0
9,
4
0
3
,
00
3
52
1
,
4
6
7
,
16
3
43
.
84
%
'"
Si
m
p
l
o
t
N
e
w
C
o
n
t
r
a
c
t
a
s
o
f
9
-