Re:Case No. IPC-05-
Typographical Error in U.S. Geothermal - Idaho Power
Firm Energy Sales Agreement
Dear Conley:
Scott Woodbury called to advise me that in Section 1.8 on page 2 of the U.
Geothermal Firm Energy Sales Agreement there is a citation to Commission Order No. 29214. That
order is not applicable to this Agreement. It appears that a typographical error has occurred and the
correct citation should be to Commission Order No. 29632.
As such, Section 1.8 should be corrected to read as follows:
Initial Ca aci Determination" -- The process by which Idaho
Power confirms that under normal or average design conditions
the Facility will generate at no more than 10 average MW per
month and is therefore eligible to be paid the published rates in
accordance with Commission Order No. 29632.
With your permission , I will send a revised page 2 containing the corrected
Section 1.8 to the Commission Secretary and request that she replace the page 2 containing the
erroneous Commission order citation with the enclosed corrected page 2.
If you concur with the above-described course of action, please send me an e-mail to
confirm your concurrence and copy Scott Woodbury at the same time.
Sorry for the inconvenience.
Barton L. Kline
BLK:jb
Scott Woodbury, IPUC
Randy Allphin, Idaho Power
Monica Moen , Idaho Power
Daniel Kunz, U.S. Geothermal
Telephone (208) 388-2682, Fax (208) 388-6936, E-mail BKlinefWidahopower.com
1.6
1.7
Ratings directly providing motive force for individual generation units must equal the generator
rating of the individual generation unites) as specified in Appendix B. The Geothermal
Production Well Contribution Ratings will be as specified in Appendix B or as may be adjusted
in accordance with paragraph 14.4 of this Agreement.
Inadvertent Energy Electric energy Seller does not intend to generate. Inadvertent energy is
more particularly described in paragraph 7.3 of this Agreement.
Interconnection Facilities" - All facilities required to be installed to interconnect and deliver
energy from the Facility to the Transmitting Entity s system including, but not limited to,
connection , switching, metering, relaying, communications and safety equipment.
1.8 Initial Capacity Determination - The process by which Idaho Power confirms that under
normal or average design conditions the Facility will generate at no more than 10 average MW
per month and is therefore eligible to be paid the published rates in accordance with Commission
Order No. 29632.
1.9 Losses - The loss of electrical energy expressed in kilowatt hours (kWh) occurring as a result
of the transformation and transmission of energy between the point where the Facility s energy is
actually delivered to the Transmitting Entity (measured by either the Idaho Power or the
Transmitting Entity s Metering Equipment) and the Point of Delivery on the Idaho Power
electrical system. The loss calculation formula will be as specified in Appendix B of this
Agreement.
1.10 Market Energy Cost - Eighty-five percent (85%) of the weighted average of the daily on-peak
and off-peak Dow Jones Mid-Columbia Index (Dow Jones Mid-C Index) prices for non-firm
energy. If the Dow Jones Mid-Columbia Index price is discontinued by the reporting agency,
both Parties will mutually agree upon a replacement index, which is similar to the Dow Jones
Mid-Columbia Index. The selected replacement index will be consistent with other similar
agreements and a commonly used index by the electrical industry.
1.11 Material Breach"- A Default (paragraph 22.1) subject to paragraph 22.