Loading...
HomeMy WebLinkAbout20071101Modification to Agreement.pdft\ECE! / IDAHO ~POWERCID An IDACORP Company 2007 OCT 3 I Pi"it: October 31 , 2007 (fj,LiJ-IO PU:'Jj j(' , '--'- - U - . U II ; ('('i,\;1~3i"'~-., '-'V-~lifjl"il":hJ-". Randy C. Allphin Planning Administrator Tel: (208) 388-2614 rallphinuv.i dahopower. com Idaho Public Utilities Commission Attn: Jean Jewell PO Box 83720 Boise, ill 83720-0074 :tPC~E -C)I.../~o( Dear Ms, Jewell: Enclosed are 8 copies of the attached letter for distribution and filing in regards to the Horseshoe Bend Wind Park (Project #31315055) current Energy Sales Agreement with Idaho Power Company. The current Energy Sales Agreement for this project requires the project to purchase energy reserves from the "transmitting entity . As this project is physically located within Northwestern service territory, this has required the project to purchase reserves from Northwestern. Both the project and Northwestern wish to have the project pursue reserve arrangements with parties other then Northwestern. The attached letter agreement does not relieve the project's responsibility of acquiring and providing appropriate reserves but will enable the project to acquire these reserves from parties other than Northwestern. Please file this letter with the Energy Sales Agreement for this project and return to me a file stamped copy, acknowledging receipt ofthis letter and the attachment. Sincerely, () I (;ndY C Allphin Idaho Power Company Page 1 of I POBox 70 Boise, Idaho 83707 1221 W Idaho St. Boise, Idaho 83702 ,.~..,.,.,," .'" '-'-"'.-'""---~--'-"~"""""'~,~' ~M--""'~-'"'~'-'"_~n_.___.,~"-_.~--"...._... ~..,...~.,.~. ~POWER(ID ,.,- .-.. -,-~"",-,-,----",....,...,-,,. _...-.............__...-.,_...~........_-~.......,........,. ",-,. An IDACORP Company -' ._--- ~::::~~~:~- -~._-_._-- ~o.. ~:" f;;=;;~;;;;~(----'-' ... '......_.._.~.._.,,~-_.._------,.~,-_. "'~"-'-"-'-'--' -'n"-"'-"--' ....""'"--- --' -,--,'-.".-'. '"'~'-_""_..,..~--."" "'" ,-."""".....-.....'"'"'-,----..-.---" Randy C. Allphin Planning Administrator Tel: (208) 388-~614 rallohinc'W.idahooower.com United Materials of Great Falls, Inc Attn: Bob McIntyre POBox 1690 Great Falls, MT 59401 E-mail Copy:unitedmaterials1 ~qwest.net PascoeEnergy~ao1.com RE:Horseshoe Bend Wind Park Horseshoe Bend Wind Park representatives and Idaho Power Company representatives have discussed and agreed that paragraph 10.1.2 of the Energy Sales Agreement between Idaho Power Company .and United Materials of Great Falls, Inc dated January 6, 2004 ("Agreement") requires modification to accommodate planned operations of this Facility. Paragraph 10.2 currently contained within the Agreement states: Energy Reserve Requirements The Transmitting Entity(s) will provide all required generation reserves as required by the Western Electricity Coordinating Council (WECC) and/or as required by any other governing agency or industry standard. The existing paragraph 10.1.2 will be deleted and replaced with the following paragraph 10. Enerfry Reserve Requirements At the Seller s sole expense, the Seller shall acquire and provide all required generation reserves as required by the Western Electricity Coordinating Council (WECC) and/or as required by any other governing agency or industry standard. The Seller shall provide Idaho Power with acceptable documentation verifying the acquisition of the required reserves, Idaho Power shall have the right upon reasonable notice to the Seller to inspect all records pertaining to the Seller s acquired reserves to confirm that adequate reserves have been acquired by the Seller. Failure by the Seller to acquire and maintain adequate reserves for this Facility shall be a Material Breach of this Agreement. Page 1 of2 POBox 70 Boise, Idaho 83707 1221 WldahoSt. Boise, Idaho 83702 Please sign this letter in the designated space below and return to Idaho Power Company. Upon receipt of this signed document, I will obtain the appropriate Idaho Power Company signatures, return a copy to you and me a copy with the Idaho Public Utilities Commission ("IPUC" In our documentation sent to the IPUC, I will include a cover letter that will ask the IPUC to include this letter with the original agreement and if the IPUC requires any further action to please notify Idaho Power by November 12, 2007. If the IPUC were to require any additional action approval or process, Idaho Power will advise the project of the IPUC requests and begin the process of complying with their request. Sincerely, 12;; f!. Randy C Allphin Idaho Power Company UNDERSTOOD, AGREED AND ACCEPTED: Title United Materials of Great Falls, Inc k~ J::;Zk/1(7 Bob c t Chat ;mah /0/29/07 Idaho Power Companv Date o~ "- ~1L-. James C. Miller Sr. Vice President, Power Supply ~2--q (07Date Signature Name Page 2 of2 POBox 70 Boise, Idaho 83707 1221 W Idaho St. Boise, Idaho 83702