(":"11 I ;~ v
zon3 NOV 12 PM 2: Ogit PUbliC
UTILITIES COMr1JSSIOH
Street Address for Express Mail:
472 W. WASHINGTON
BOISE, IDAHO 83702-5983
Attorney for the Commission Staff
BEFORE THE IDAHO PUBLIC UTILITIES COMMISSION
IN THE MATTER OF THE APPLICATION
OF IDAHO POWER COMPANY FOR
AUTHORITY TO INCREASE ITS INTERIM
AND BASE RATES AND CHARGES FOR
ELECTRIC SERVICE.
STAFF'S BRIEF ON IDAHO
POWER'S INTERIM RATE
REQUEST
CASE NO. IPC-O3-
The Commission Staff by its legal counsel Lisa Nordstrom and Weldon B. Stutzman
Deputy Attorneys General, files this memorandum regarding Idaho Power s request for interim
rate relief. In its Notice of Application filed October 28, 2003 , the Commission provided an
opportunity for parties and intervenors to file a legal memorandum no later than November 12
2003. The Commission specifically asked the parties to address the Commission s legal standard
when considering a request for interim rate relief and explain why the immediate rate increase
requested by Idaho Power should or should not be granted. Because the Company has not
alleged in its Application or prefiled testimony that the conditions exist to meet the
Commission s legal standard for approving a temporary rate increase, the Commission should
deny Idaho Power s request.
STAFF'S BRIEF ON IDAHO POWER'
INTERII\1 RATE REQUEST
IMMEDIATE RATE RELIEF REQUIRES A
SHOWING OF FINANCIAL EMERGENCY
The Commission stated its standard for considering interim rate relief in the last
Idaho Power rate case, Case No. IPC-94-5. In that case, Idaho Power sought interim rate
increases based on its investment in two hydroelectric facilities, known as the Milner and Swan
Falls projects.The Commission previously had approved the projects and issued Orders
indicating the Company could expect to earn a return on its reasonable investment in the
projects. Because both plants were operating at the time Idaho Power filed its rate case, the
Company alleged it was not in the public interest for its recovery of the costs of the facilities to
be delayed until completion ofthe rate case. In denying Idaho Power s request, the Commission
clarified the standard for consideration of an interim rate request in Order No. 25683 issued in
August 1994.
First, it is clear that approving a temporary rate increase falls within the discretion of
the Commission. The Commission in Order No. 25683 reiterated its discretionary authority to
consider temporary rates, stating "the granting of interim rate relief is a discretionary matter for
the Commission s consideration." Order No. 25683 quoting Order No. 21209 issued in Case No.
1002-67. The Idaho Supreme Court has affirmed the authority of the Commission to consider
interim rates, stating in Grindstone Butte Mutual Canal Co. v. Idaho Power Company, 98 Idaho
860, 574 P.2d 902 (1978), although "no statute gives explicit authority to the Commission to
enter 'interim' or 'temporary' orders " that nonetheless "implied in the directive of ongoing
investigation is the power to make orders effecting rates that are temporary in nature.
Grindstone 98 Idaho at 864, 574 P.2d at 906.
The Commission also reiterated in Order No. 25683, however, that the standard for
approvIng an interim rate request is high, given the extraordinary relief entailed in such a
request. The Commission stated that although "the question of interim rate relief is at the
discretion of the Commission, (it) is most often granted where a utility is faced with a financial
emergency or is buffeted by circumstances beyond its control." Order No. 25683 , p. 3. The
Commission quoted an earlier Order stating that "interim rate relief is an extraordinary remedy to
be granted only in an emergency or where there is danger that the utility will not be able to
render adequate service if relief is withheld.Id.
STAFF'S BRIEF ON IDAHO POWER'
INTERII\1 RATE REQUEST
The Commission in Order No. 25683 explained why the circumstances of Idaho
Power s request for an immediate rate increase justified a showing of dire financial need. First
the Commission noted that the timing for filing a rate case is entirely in Idaho Power s control.
The Commission stated "that it is possible to plan the completion of a facility and a rate case to
coincide and thus minimize a regulatory lag." Thus, the Commission concluded that Idaho
Power "could have filed its rate case to obtain recovery closer to the completion date of the
(Milner and Swan Falls) facilities." Order No. 25683 , p. 3.
The second circumstance was the earlier approval by the Commission of the Power
Cost Adjustment (PCA) to enable the Company to annually adjust rates to account for
fluctuations in power costs. The Commission noted that the PCA insulates the Company from
the full effects of changes in power costs, and that the PCA had increased the Company s rates
by approximately 2.5% that year. Because the Commission had approved the PCA to help
insulate the Company from certain risks, the Commission determined that further relief in the
form of interim rates was not necessary.
The third circumstance identified by the Commission relates to the nature of a rate
case. Although the Commission had previously indicated the Company could expect to include
its investment in the Milner and Swan Falls projects in revenue requirement, the Commission
had not guaranteed that including the projects would result in increased rates. The Commission
noted that a rate case examines complex issues involving innumerable factors in determining
revenue requirements, the result of which cannot be known until the issues have been thoroughly
presented and examined. If interim rates are approved, there is a risk that the rates ultimately
approved by the Commission at completion of the rate case could be lower than the interim rates
entitling ratepayers to refunds, which is a cumbersome and expensive process. The Commission
concluded that
, "
under these circumstances, we find interim rates would be inappropriate in the
absence of a financial emergency." Order No. 25683 , p. 4.
The same circumstances that existed in Case No. IPC-94-, which caused the
Commission to deny the Company s request for temporary rates without showing a dire financial
emergency, exist in this case. As before, the timing for the filing of a rate case is completely
within the Company s control. Second, the PCA continues in effect to insulate Idaho Power
from fluctuations in its power costs. Finally, it is only through completion of the rate case, in
which all parties have an opportunity to question and test the Company s evidence, that the
STAFF'S BRIEF ON IDAHO POWER'
INTERII\1 RATE REQUEST
Commission will ultimately approve rates. In the absence of an emergency, it is inappropriate to
approve a temporary rate increase for Idaho Power when permanent rates will be approved by
the Commission at the conclusion of the rate case in approximately six months.
IDAHO POWER DOES NOT CLAIM A FINANCIAL EMERGENCY EXISTS
Four components of revenue requirement claimed by Idaho Power comprise its
request for immediate rate relief. First, Idaho Power seeks recovery for its investment in the
construction and operation of a new plant called the Danskin Power Plant, and claims a revenue
requirement of $7 727 782 for recovery in interim rates. Second, Idaho Power claims a revenue
requirement of $1 573 440 related to three relicensing applications for hydropower facilities the
Company filed in 1995, 1997 and 1998. Third, the Company includes for interim rates a
816 971 revenue requirement resulting from revisions to its depreciation rates for electric
plant in service, based on 2001 plant levels. Fourth, Idaho Power proposes to reallocate the
Idaho jurisdictional share of total system energy as the result of the expiration of firm energy
sales contracts the Company had with other utility companies. The contracts were entered into
when Idaho Power had surplus generating capacity and were timed to expire as the Company
retail customer load increased. Accordingly, a number ofldaho Power s energy supply contracts
have expired since 1994. The Company proposes a revenue requirement of $7 024 145 for
interim rates associated with the jurisdictional reallocation.
To support its claim for immediate rate increases, Idaho Power alleges "It is not in
the public interest for Applicant to continue to absorb the additional costs attributable to the
completion of the Danskin Power Plant, the relicensing of Applicant's Mid-Snake hydroelectric
projects, the revision of the Applicant's depreciation rates for electric plant in service, and the
jurisdictional impacts on net power supply costs while the Commission completes the rather
lengthy process of considering Applicant's Application for general rate relief." Idaho Power
Application, p. 9. This allegation falls far short of a claim of financial emergency. In fact, in its
prefiled testimony supporting its interim rate request, Idaho Power s witness responds to the
question "Why is Idaho Power Company (Idaho Power or the Company) requesting interim rate
relief?" with "We did this because Idaho Power needs to invest significantly in its utility
operations to meet the impacts of growth." Gale Direct, 13-, p. 1-2. In short, Idaho Power
STAFF'S BRIEF ON IDAHO POWER'
INTERII\1 RATE REQ DES T
does not claim financial emergency or immediate need justifies its request for interim rate
increases pending conclusion of the general rate case.
The soundness of the Commission s reasoning to require a showing of financial
emergency is demonstrated by Idaho Power s request in this case. The Commission noted in
Order No. 25683 that the timing of a rate case is in the Company s control and, although the
inevitable lag between the time a case is filed and rate relief is obtained is a legitimate concern
the Company can time its case to minimize the effect of the regulatory lag. In this case, none of
the components of Idaho Power s request for immediate rate relief were recent or unplanned.
According to the Company s Application, the Danskin Plant was completed in 2001. The three
relicensing applications were filed with the Federal Energy Regulatory Commission in 1995
1997 and 1998. The revised depreciation rates are based on 2001 plant levels. Finally, the
terminated energy contracts behind the anticipated jurisdictional reallocation began expiring in
1994 or 1995. If any of these pieces threatened the financial viability of the Company, it could
have filed for rate relief much sooner than its Application in this case. At the least, Idaho Power
could have filed its Application six or more months earlier than it did, and permanent rates could
have been in place on or before the date the Commission could now approve interim rates.
The PCA also continues to protect the Company from higher energy costs. In its
prefiled testimony to support an interim rate increase, Idaho Power s witness states that "the
Company s PCA application in 2001 was the largest amount ever requested." Keen Direct, 13-
, p. 9. Although the Commission approved most of the 2001 PCA request
, "
(t)he following
year the Company s PCA filing was even greater.Id. According to the Company, the
significant increases in the PCA were largely the reason the Company delayed its general rate
case, since "the sheer magnitude of the power supply expenses in recent years placed their
ratemaking treatment at a higher regulatory priority than the pursuit of general rate relief." Keen
Direct, 13-, p. 11. Thus
, "
the Company chose to postpone filing for general rate relief.Id.
As the Commission previously noted, the success of the PCA to protect Idaho Power from
increased power costs is a sound reason that additional relief by interim rates is not justified, at
least in the absence of a financial emergency.
Finally, each of the components claimed by Idaho Power for interim rates must be
examined and tested by the parties involved in the rate case. It may be that each piece will be
included in the Company s revenue requirement, but the amount of each, the propriety of the
STAFF'S BRIEF ON IDAHO POWER'
INTERII\1 RATE REQUEST
incurred expenses, the complexity of other issues in the case, the uncertainty of the final result of
the case, all justify denial of immediate rate relief. If the Commission determines to hear
evidence on Idaho Power s interim rate request in December, the limited resources of Staff and
intervenors will be diverted to that concentrated effort and away from necessary work on the
general case. On the other hand, the relief for the Company would be fairly insignificant even
were the Commission to approve interim rates. Following a December hearing, the earliest the
temporary rate increases could be implemented would be January 2004. With permanent rates
expected by June or July 2004, the revenue from six or seven months of a 4% rate increase
would not significantly affect the Company s revenue.
CONCLUSION
Idaho Power simply has not alleged a legitimate need for a temporary rate increase
pending the results of its general rate case. The Commission considered a similar request by the
Company in its last rate case, and reiterated then the exceptional nature of interim rate relief.
The Commission will only consider approving interim rates for Idaho Power when it is faced
with a financial emergency, because the Company is protected by its ability to control the filing
of a rate case, the annual relief the Company obtains through the PC A, and the permanent rates
the Commission approves after hearing all the evidence in the case. In these circumstances, it is
incumbent on the Company to show a dire need exists-a financial emergency-before the
Commission will consider a temporary rate increase. Idaho Power has not alleged a financial
emergency exists, and thus the Commission should issue an order denying the Company
request for interim rates pending the conclusion of the rate case.
Respectfully submitted this 12th day of November 2003.
Weldon B. Stutzman
Deputy Attorney General
Lisa Nordstrom
Deputy Attorney General
bls/M:IPCEO313 Staff Memorandum ws
STAFF'S BRIEF ON IDAHO POWER'
INTERII\1 RATE REQUEST
CERTIFICATE OF SERVICE
I HEREBY CERTIFY THAT I HAVE THIS 12TH DAY OF NOVEMBER 2003
SERVED THE FOREGOING STAFF'S BRIEF ON IDAHO POWER'S INTERIM RATE
REQUEST IN CASE NO. IPC-03-, BY MAILING A COpy THEREOF
POSTAGE PREPAID, TO THE FOLLOWING:
BARTON L KLINE
MONICA MOEN
IDAHO POWER COMPANY
PO BOX 70
BOISE, ID 83707-0070
JOHN R GALE
VICE PRESIDENT - REGULATORY
AFFAIRS
IDAHO POWER COMPANY
PO BOX 70
BOISE, ID 83707-0070
~cL~
SECRETARY