HomeMy WebLinkAbout20030417Application.pdfBARTON L. KLINE, ISB #1526
MONICA B. MOEN, ISB # 5734
Idaho Power Company
P. O. Box 70
Boise , Idaho 83707
Telephone: (208) 388-2692
FAX Telephone: (208) 388-6936
Attorney for Idaho Power Company
Street Address for Express Mail
1221 West Idaho Street
Boise, Idaho 83702
RECEIVED 0
FH
, ,-
iOu3 APR 11 PM~: 41
, , "
J' \I-
,j \"
rip""; '~'U~-llJ
UTILlf.ES' Cm"'iMISSION
BEFORE THE IDAHO PUBLIC UTILITIES COMMISSION
IN THE MATTER OF THE APPLICATION
OF IDAHO POWER COMPANY FOR
APPROVAL OF THE PURCHASE OF
NON-FIRM ENERGY BETWEEN IDAHO
POWER COMPANY AND PRISTINE
SPRINGS INC.
CASE NO. IPC-03;ab
APPLICATION FOR APPROVAL
OF A UNIFORM AGREEMENT
UNDER SCHEDULE 86
BETWEEN IDAHO POWER
COMPANY AND
PRISTINE SPRINGS INC.
COM ES NOW I daho Power Company ("Idaho Power" or the "Company ) and
hereby applies for an Idaho Public Utilities Commission ("IPUC" or the "Commission
Order approving a Uniform Agreement under Schedule 86 between Idaho Power and
Pristine Springs Inc ("Pristine Springs ) for the purchase of non-firm energy from Qualifying
Facilities dated March 28 , 2003 ("Agreement"). This Application is based upon the
following:
Pristine Springs intends to develop a 200 kW hydroelectric driven
synchronous generator facility located on Warm Creek, north of Twin Falls, Idaho, on the
APPLICATION FOR APPROVAL OF A UNIFORM AGREEMENT UNDER SCHEDULE 86 BETWEEN
IDAHO POWER COMPANY AND PRISTINE SPRINGS INC. - 1
Pristine Springs property ("the Project"). The Project will be a qualified small power
production facility under the applicable provisions of the Public Utilities Regulatory Policy
Act of 1978 ("PURPA"
Idaho Power and Pristine Springs have entered into the Agreement
pursuant to Idaho Power Company s IPUC-approved Schedule 86, Cogeneration and
Small Power Production Non-Firm Energy. The purchase price will be in accordance with
Schedule 86. A copy of the Agreement is attached hereto as Exhibit "
The Project intends to begin operations May 1 , 2003. Idaho Power is
currently working with Pristine Springs to complete the necessary documentation and
construction of interconnection equipment in accordance with the terms of the Agreement.
As of the date of this Application, Pristine Springs appears to be on schedule to energize
the facility on or about the May 1 , 2003 online date.
The Agreement, as signed and submitted by the parties, contains non-
firm energy rates in conformity with posted tariffs and applicable Commission orders.
Section 8 of the Agreement provides that "This Agreement shall not
become effective until the Commission approves all terms and provisions hereof without
change or condition and declares that all payments to be made hereunder shall be allowed
as prudently incurred expenses for ratemaking purposes.
Service of pleadings, exhibits, orders and other documents relating to
this proceeding should be served on the following:
APPLICATION FOR APPROVAL OF A UNIFORM AGREEMENT UNDER SCHEDULE 86 BETWEEN
IDAHO POWER COMPANY AND PRISTINE SPRINGS INC. - 2
Monica Moen
Attorney II
Idaho Power Company
O. Box 70
Boise , Idaho 83707
MMoen (Q) idahopower.com
Randy C. Allphin
Contract Administrator
Idaho Power Company
O. Box 70
Boise, Idaho 83707
RAliphin (Q) idahopower.com
NOW, THEREFORE, based on the foregoing, Idaho Power hereby requests
the Commission its order:
(1 )Approving all terms and provisions of the Uniform Agreement
for the purchase of non-firm energy from Qualifying Facilities between Idaho Power
Company and Pristine Springs Inc. without change or condition; and
(2)Declaring that all payments to be made pursuant to the Uniform
Agreement for the purchase of non-firm energy from Qualifying Facilities between Idaho
Power Company and Pristine Springs Inc. shall be allowed as prudently incurred expenses
for ratemaking purposes.
DATED at Boise , Idaho , this 17th day of April 2003.
f3.
MONICA B. MOEN
Attorney for Idaho Power Company
APPLICATION FOR APPROVAL OF A UNIFORM AGREEMENT UNDER SCHEDULE 86 BETWEEN
IDAHO POWER COMPANY AND PRISTINE SPRINGS INC. - 3
IDAHO POWER COMPANY
SCHEDULE 86
UNIFORM AGREEMENT
For the Purchase of Non-Firm Energy From Qualifying Facilities
Project Name: Pristine Springs Hydro #3
Idaho Power Project Number: 31415165
THIS AGREEMENT made this 28th day of March 2003, between
PRISTINE SPRINGS INC whose mailing address is 274 Kay Drive, Twin Falls, ID 83301 hereinafter called
Seller and IDAHO POWER COMPANY, a corporation with its principal office located at 1221 West Idaho Street, Boise
Idaho hereafter called "Company
NOW, THEREFORE, The parties agree as follows:
Company shall purchase Energy produced by the Seller s Qualifying Facility located at or near Warm Creek,
North of Twin Falls , County of Jerome State of Idaho, located in the Nw 14 of Section Township
Range 17E BM, in the form of three phase 60 Hz and at a nominal phase to phase potential of 12,470 volts, subject
to emergency operating conditions of the Company. Purchases under this Agreement are subject to the Company s applicable
Tariff provisions, including but not limited to Schedules 86 and 72 approved by and as may be hereafter modified by the Idaho
Public Utilities Commission ("Commission ) and the provisions of this Agreement.
2. Seller shall pay Company for all costs of Interconnection Facilities as provided for in Exhibit A of this Agreement
and Schedule 72.
3. In addition to the charges provided under Paragraph 2, Seller shall pay to the Company the monthly Operations
and Maintenance Charge specified in Schedule 72 on the Investment by the Company in Interconnection Facilities which
investment is set forth in Exhibit A, attached hereto and made a part hereof. As such investment changes, in order to provide
facilities to serve Seller s requirements, Company shall notify Seller in writing of additions or deletions of facilities by
forwarding a dated revised Exhibit A, which shall become part of this Agreement. The monthly Operation & Maintenance
Charge will be adjusted to correspond to the Revised Exhibit A.
4. The initial date of acceptance of Energy under this Agreement is subject to the Company s ability to obtain
required labor, materials, equipment, satisfactory rights of way, and comply with governmental regulations.
5. The term of this Agreement shall become effective on the date first above written , and shall continue to full force
and effect until canceled by Seller upon sixty (60) days prior written notice.
6. This Agreement and the rates, terms, and conditions of service set forth or incorporated herein, and the respective
rights and obligations of the parties hereunder, shall be subject to valid laws and to the regulatory authority and orders, rules,
and regulations of the Commission and such other administrative bodies having jurisdiction.
7. Nothing herein shall be construed as limiting the Commission from changing any rates, charges, classification or
service, or any rules, regulation or conditions relating to service under this Agreement, or construed as affecting the right of the
Company or the Seller to unilaterally make application to the commission for any such change.
8. This Agreement shall not become effective until the Commission approves all terms and provisions hereof without
change or condition and declares that all payments to be made hereunder shall be allowed as prudently incurred expenses for
ratemaking purposes.
By
Print Name and Title:John Prescott - Vice President, Power Supply
Dated:N\o..r z. t \ 7oJ
tUe/V,pE L M. ST/JR.K.~
Dated:
/fYd
01.1
~ ~
Idaho Power Seller
EXHIBIT A
project No. 31415165
pri sti ne spri ngs Hydro #3
DESCRIPTION OF FACILITY
The seller s Facility is described as one (1) hydro driven synchronous
generator wi th a namepl ate rati ng of 200-KW, 2400-vol t, three-phase, 60
hertz.
LOCATION OF FACILITY
The Faci 1 i ty is located on warm creek (north of Twi n
the NW 1/4 of secti on 19, Townshi p 9 South, Range 17
Meri di an, Jerome county, Idaho.
Fall s, Idaho) i
East, Boi
POINT OF DELIVERY
Energy will be delivered to Idaho power at 12.47-, three-phase, 60-Hz.
The point of Delivery of energy from the seller to Idaho power will be at
Idaho power s pol e-mounted di sconnect swi tch (Di sconnect Devi ce) located
between the Idaho Power provided primary meter and the seller provided 15-
kv rated pole-mounted recloser.
Esti mated Fi rst Enerqy Date
Idaho power and the sell er have agreed upon an Estimated Fi rst Energy
Date as of May 1 , 2003. Both Idaho power and the Seller will have all
necessary equi pment in pl ace no 1 ater then 60 days after the esti mated
First Energy Date to enable the Facility to deliver energy to the Idaho
power system.
stati on use
stati on use wi 11 be el ectri c energy usage as defi ned in schedul e 86.
The demand component of the stati on use shall not exceed 30 Kw and the
annual station usage (Kwh) shall not exceed 5% of the energy delivered
by this Facility to the point of delivery.
LOSSES
AS the cu r rent poi nt of Deli ve ry is the same poi nt as the actual mete ri ng
poi nt, there are no Kwh losses. In the event, the actual meteri ng poi nt
is electrically located at a different point then the point of Delivery,
kwh losses will be calculated in the following manner: Losses shall be set
at 2.00% of the metered energy delivered. when seller has supplied Idaho
power wi th data needed to properly analyze the Losses associ ated wi th the
Facility, Idaho power and seller will review that data and reset the loss
factor for the Facility. If the parties are unable to agree, they will
submit the dispute to the Commission for resolution. Any adjustment will
be retroacti ve to the Fi rst Energy Date.
Exhibit A - page 1 of 6
INTERCONNECTION FACILITIES
Meteri ng and Tel emetrv
Idaho power will provide primary metering (12.47-kv) and the
associ ated meteri ng equi pment (i nstrument transformers) to
accurately measure the energy (Kwh) delivered to Idaho power. This
metering will be separate from any metering of seller s load. Idaho
power provi ded Meter Equi pment wi 11 be owned and mai ntai ned by Idaho
power, with total cost of purchase, installation, operation , and
mai ntenance, i ncl udi ng admi ni strati ve cost to be rei mbursed to Idaho
power by the sell er.
In the event it is determi ned that automated tel emetry is requi red
at this location. Idaho Power will purchase and install this
equipment at the seller s expense. The seller will provide the
necessary communi cati on 1 i nes for thi s automated tel emeter at the
seller s expense.
Di sconnecti on Equi pment
Idaho Power wi 11 provi de and mai ntai n:
protection and control equipment that consists of
instrument transformers, protective relaying, dedicated
DC power supply, and associated controls to remotely
operate the Sell er provi ded 15-kv recl oser. Idaho
power s protection and control equipment will provide
automati c control of the sell er provi ded 15-kv recl oser.
Protecti on and control equi pment is requi red
insure that the seller s Facility will be
di sconnected from Idaho power I s system in the event
of a di sturbance on ei ther Idaho power s system or
the sell er 's Faci 1 i ty. Thi s equi pment is for the
protection of only Idaho power s equipment. The
seller is responsible to provide adequate
protecti on and control equi pment to protect the
seller s equipment from any Idaho power or seller
di sturbances.
speci a 1 Faci 1 i ti
Idaho power wi 11 provi de and mai ntai n:
12.5 Kv three-phase 1 i ne extensi on to the meteri ng and
protecti on packages
Exhi bi t A - page 2 of 6
A si ngl e-phase 7200-120/240V (15-kvA) transformer
connected on Idaho power s si de of the sell er owned
recloser to provi de power to Idaho power s protecti ve
relaying package and to the seller s recloser closing
solenoid.
All pol es and other mounti ng faci 1 i ti es requi red for the
IPC provi ded equi pment.
seller Provided Eauipment and Facilities
pristine springs Hydro #3 will provide and maintain:
overhead secondary vol tage (2, 400-vol t) di stri buti on
ci rcui t from the generator to the generati on step-up
transformer
Generati on step-up transformer. The transformer shall be
two wi ndi ng (an autotransformer is not permi tted)
connected arounded-wve (12, 470Y /7,200 vol t) on the
pri mary si de of the transformer and connected ungrounded
wve , 400Y volt) on the secondary (generator) si de of
the transformer.
15-kv recloser located on the primary side (12.47-kv) of
the generation step-up transformer. The recloser shall
be rated for the conti nuous current of the ci rcui t and
shall have a mi ni mum 12. 5-kA symmetri cal interrupti ng
rati ng. The recloser shall be desi gned for control from
a mi croprocessor-based recloser controll er (e. g. cooper
Power system Form 6, Schwei tzer Engi neeri ng Laboratori es,
Inc. (SEL) 351R , or equal). The Idaho power provided
protecti ve rel ayi ng package wi 11 be uti 1 i zed to perform
the recloser control functions. The recloser shall be
provi ded wi th an auxi 1 i ary swi tch to provi de i ndi cati on
of recloser contact posi ti on (one norma 11 y open contact
and one normally closed contact are requi red) to the
Idaho power protecti ve re 1 ayi ng package. The recloser
shall have a 120/240VAC closing solenoid and Idaho power
wi 11 provi de the 120/240VAC power from the protecti
re 1 ayi ng package.
Exhi bi t A - Page 3 of 6
A si ngl e-phase 7200-120/240v transformer connected on the
generator si de of the recloser to provi de a hot
line/close block potential to the Idaho power protective
rel ayi ng package. The secondary ci rcui t wi 11 be fused at
Idaho power s protective relaying package.
Circuits (recloser control, auxiliary switch, and hot
line/close block potential) and raceway between the
recloser pole and Idaho power s protective relaying
package.
Manual controls/indication to provide manual control and
status of the seller provided circuit-interrupting device
(15-kv recloser). The manual controls shall be
supervised via Idaho Power s protection and control
equipment.
All pol es and other mounti ng faci 1 i ti es requi red for the
Sell e r p rovi ded equi pment .
All equipment and facilities provided by seller shall
meet appl i cabl e UL, ANSI, and IEEE standards, and
shall be installed to meet all applicable local,
state, and federal codes.
The seller shall provide the certification required by
schedul e 72 that the Sell er provi ded Interconnecti on
Faci 1 i ti es are functi oni ng in accordance wi th all
applicable standards and codes and are in good working
condi ti on.
SYNCHRONOUS GENERATORS
If a governor is used, the governor
adjustment to at least five percent
setti ng wi 11 be fi ve percent (5%).
the setti ng wi thi n the fi ve percent
characteri sti cs shall be capabl e of
(5%) speed droop. The initial droop
Idaho power may spec; fy changes in
(5%) capabi 1 i ty.
The Seller shall provide automatic synchronizing equipment or manual
synchronizing with relay supervision. The synchronizing facilities
shall have the following:
sl i p frequency matchi ng 0.1 Hz, or 1 ess
voltage matching +10%, or less
phase angl e acceptance +10 degrees, or 1 ess
Exhi bi t A - page 4 of 6
Breaker closure time compensation
synchronous generators shall be capable of operating continuously at
maximum power output within five percent (5%) of rated voltage and
anywhere wi thi n a power factor range of from ni nety percent (90%)
1 aggi ng to ni nety-fi ve percent (95%) 1 eadi ng.
unless otherwise approved by Idaho Power, synchronous generators shall
be equi pped wi th an exci tati on system capable of automati call
controll i ng generator vol tage over the full range of generator power and
reacti ve capabi 1 i ty .
The generator exci tati on system shall have over and under exci tati on
limiter equipment that will permit voltage regulator action to control
the reacti ve output wi thi n the range of the generator 's capabi 1 i ty.
The reacti ve capabi 1 i ty of the Faci 1 i ty shall be ope rated as speci fi ed
by Idaho power , within the generator reactive capability, to regulate
ei ther the i nterconnecti on vol tage or Faci 1 i ty output power factor or
both. Idaho Power will provide the desi red voltage, power factor, and
schedules required by the seller to set voltage regulators, power factor
regul ators and programmed or remote si gnal controll ers. Idaho Power may
change these desi red values from ti me to ti me as system requi rements
change.
If the Faci 1 i ty is not operated to control reacti ve output in the manner
speci fi ed and after noti fi cati on, the Sell er does not make necessary
corrections within a reasonable time, a default will be declared.
REACTIVE POWER
The excitation system controls shall be set for power factor regulation.
The Seller shall operate the synchronous generator within plus or minus
5% of uni ty power factor.
COSTS
The esti mated cost of the Idaho power provi ded Interconnecti on equi pment,
special Facilities and Metering Equipment is $45,000, which has been
recei ved from the sell er. AS speci fi ed in schedul e 72 INTERCONNECTIONS TO
NON-UTILITY GENERATION or its successor schedul e(s), Idaho Power wi
reconci 1 e the actual expenses agai nst the esti mated cost and a copy of
this reconciliation will be provided to the Seller. Idaho Power will
refund any overpayment or seller will remit any underpayment.
In addition to the installation and construction charges above, during the
term of this Agreement, seller will pay Idaho Power the operation and
mai ntenance charge speci fi ed in schedul e 72 INTERCONNECTIONS TO NON-
Exhi bi t A - page 5 of 6
UTILITY GENERATION or its successor schedul e(s) .
Thi s monthly charge wi 11 begi n as of May 1, 2003 or the date that
Idaho power has completed installation of the Idaho power provided
Interconnecti on Equi pment as speci fi ed wi thi n thi s Exhi bi t
whi chever is 1 ater.
Ini ti all y these monthly charges wi 11 be based upon the esti mated
cost of $45,000. upon completion of the reconciliation of the actual
costs, Idaho power will adjust the previous month(s) billed
operation and maintenance charge to reflect the actual total cost
incurred by Idaho power and the appropri ate refund or bi 11 i ng wi 11
be processes.
SALVAGE
NO 1 ater than si xty (60) days after the termi nati on or ex pi rati on of thi s
Agreement, Idaho power will prepare and forward to the seller an estimate
of the remaining value of those Idaho Power furnished Interconnection
Facil i ti es descri bed in thi s Appendi x, 1 ess the cost of removal and
transfer to Idaho power I s nearest warehouse, if the Interconnecti on
Facilities will be removed. If Seller elects not to obtain ownership of
the Interconnecti on Faci 1 i ti es but instead wi shes that Idaho power
reimburse the seller for said Facilities the Seller may invoice Idaho
Power for the net salvage value as estimated by Idaho power and Idaho
Power shall pay such amount to Seller within thirty (30) days after
recei pt of the i nvoi ce. Se 11 er shall have the ri ght to offset the i nvoi ce
amount agai nst any present or future payments due Idaho power.
Exhibit A - page 6 of 6
IQAHO POWER COMPANY THIRD REVISED SHEET NO. 86-1 IDAHO PUBLIC UTILITIES COMMISSIONCANCELS Approved Effective
SECOND REVISED SHEET NO. 86-1 Aug. 28, 2002 Sept.1 2002
Per O.N. 29093
Jean D. Jewell Secretary
I.P.c. NO. 26. TARIFF NO. 101
SCHEDULE 86
COGENERATION AND SMALL POWER PRODUCTION
NON-FIRM ENERGY
AVAILABILITY
Service under this schedule is available throughout the Company s service territory within the State
of Idaho.
APPLICABILITY
Service under this schedule is applicable to any Seller that:1. Owns or operates a Qualifying Facility with a nameplate capacity rating of less than 10
and desires to sell Energy generated by the Qualifying Facility to the Company on a non-firm, if, as,
and when available basis;2. Meets all applicable requirements of the Company s Schedule 72 and the Generation
Interconnection Process.
DEFINITIONS
A voided Enerav Cost is the weighted average of the daily on-peak and off-peak Dow Jones Mid-
Columbia Electricity Price Index (Dow Jones Mid-C Index) prices for nonfirm energy published in the Wall
Street Journal. If the Dow Jones Mid-C Index prices are not reported for a particular day or days. the
average of the immediately preceding and following reporting periods or days will be used.
Designated Dispatch Facility is the Company s Boise Bench Dispatch Center.
Enerqy means the non-firm electric energy, expressed in kWh, generated by the Qualifying Facility
and delivered by the Seller to the Company in accordance with the conditions of this schedule. Energy is
measured net of Losses and Station Use.
Generation Facility means equipment used to produce electric energy at a specific physical
location, which meets the requirements to be a Qualifying Facility.
Generation Interconnection Process is the Company s generation interconnection application
and engineering review process developed to ensure a safe and reliable generation interconnection.
Interconnection Facilities are all facilities reasonably required by Prudent Electrical Practices and
the National Electric Safety Code to interconnect and safely deliver Energy from the Qualifying Facility to
the Company s system, including, but not limited to, connection. transformation, switching, metering,
relaying, communications, disconnection, and safety equipment.
Losses are the loss of electric energy occurring as a result of the transformation and transmission of
electric energy from the Qualifying Facility to the Point of Delivery.
Point of Deliverv is the location where the Company s and the Seller s electrical facilities are inter-
connected.
IDAHO
Issued Per IPUC Order No. 29093
Effective - September 1, 2002
Issued by IDAHO POWER COMPANY
John R. Gale, Vice President, Regulatory Affairs
1221 West Idaho Street, Boise, Idaho
IDAHO POWER COMPANY FOURTH REVISED SHEET NO. 86-2 IDAHO PUBLIC UTILITIES COMMISSION
CANCELS Approved Effective
THIRD REVISED SHEET NO. 86-Aug. 28, 2002 Sept.1,2002
Per C.N. 29093
Jean D. Jewell Secretary
I.P.c. NO. 26, TARIFF NO. 101
SCHEDULE 86
COGENERATION AND SMALL POWER PRODUCTION
NON-FIRM ENERGY
(Continued)
DEFINITIONS (Continued)
Prudent Electrical Practices are those practices, methods and equipment that are commonly
used in prudent electrical engineering and operations to operate electric equipment lawfully and with
safety, dependability, efficiency and economy.
PURP A means the Public Utility Regulatory Policies Act of 1978.
Qualifyinq Facility is a cogeneration facility or a small power production facility which meets the
PURP A criteria for qualification set forth in Subpart B of Part 292, Subchapter K, Chapter I, Title 18, of the
Code of Federal Regulations.
Schedule 72 is the Company s service schedule which provides for interconnection to non-utility
generation or its successor schedulers) as approved by the Commission.
Seller is any entity that owns or operates a Qualifying Facility and desires to sell Energy to the
Company.
Standby Power is electrical energy or capacity supplied by the Company during an unscheduled
outage of a Qualifying Facility to replace energy consumed by the seller which is ordinarily supplied by
the Seller's Qualifying Facility.
Station Use is electric energy used to operate the Qualifying Facility which is auxiliary to or directly
related to the generation of electricity and which, but for the generation of electricity, would not be
consumed by the Seller.
Supplementary Power is electric energy or capacity supplied by the Company which is regularly
used by a Seller in addition to the Energy and capacity which the Qualifying Facility usually supplies to the
Seller.
PURCHASE PRICE
The Company will pay the Seller monthly, for each kWh of Energy delivered and accepted at the
Point of Delivery during the preceding calendar month, an amount equal to 85% of the monthly A voided
Energy Cost.
CONDITIONS OF PURCHASE AND SALE
The conditions listed below shall apply to all transactions under this schedule.
Company.
The Company shall purchase Energy from any Seller that offers to sell Energy to the
As a condition of interconnection with the Company, the Seller shall:a. Complete and maintain all requirements of interconnection in accordance with
Schedule 72.
IDAHO
Issued Per IPUC Order No. 29093
Effective - September 1, 2002
Issued by IDAHO POWER COMPANY
John R. Gale, Vice President, Regulatory Affairs
1221 West Idaho Street, Boise, Idaho
I.P.c. NO. 26, TARIFF NO. 101
FOURTH REVISED SHEET NO. 86-3 IDAHO PUBLIC UTILITIES COMMISSION
CANCELS Approved Effective
THIRD REVISED SHEET NO. 86-3 Aug. 28 2002 Sept.2002
Per C.N. 29093
Jean D. Jewell Secretary
IDAHO POWER COMP ANY
SCHEDULE 86
COGENERATION AND SMALL POWER PRODUCTION
NON-FIRM ENERGY
(Continued)
CONDITIONS OF PURCHASE AND SALE (Continued)b. Complete and maintain all requirements of the Company s Generation
Interconnection Process.
Submit proof to the Company of all insurance required by paragraph 12.
d. Obtain written confirmation from the Company that all conditions to
interconnection have been fulfilled prior to operation of the Generation Facility. Such
confirmation shall not be unreasonably withheld by the Company.
3. The Seller shall never deliver or attempt to deliver energy to the Company s system when
the Company s system serving the Seller s Generation Facility is de-energized for any reason.
4. The Seller and the Company shall each indemnify the other, their respective officers,
agents, and employees against all loss, damage, expense, and liability to third persons for injury to or
death of persons or injury to property, proximately caused by the indemnifying party s construction,
ownership, operation or maintenance of, or by failure of, any of such party s works or facilities used in
connection with purchases under this schedule. The indemnifying party shall. on the other party s request.
defend any suit asserting a claim covered by this indemnity. The indemnifying party shall pay all costs that
may be incurred by the other party in enforcing this indemnity.5. The Company shall offer to provide Standby Power and Supplementary Power to the Seller.
Charges for Supplementary and Standby Power will be in accordance with the Company s Schedule 7 as
that schedule is modified from time to time by the Commission.
The Seller shall maintain voltage levels acceptable to the Company.7. The Seller shall maintain at the Qualifying Facility or such other location mutually
acceptable to the Company and Seller, adequate metering and related power production records, in a
form and content recommended by the Company.
Either the Seller or the Company after reasonable notice to the other party, shall have the
right, during normal business hours, to inspect and audit any or all such metering and related power
production records pertaining to the Seller s account.8. During a period of shortage of energy on the Company s system, the Seller shall, at the
Company s request and within the limits of reasonable safety requirements as determined by the Seller,
use its best efforts to provide requested Energy, and sholl. if necessary, delay any scheduled shutdown of
the Qualifying Facility.9. The Company and the Seller shall maintain appropriate operating communications
through the Designated Dispatch Facility.
IDAHO
Issued Per IPUC Order No. 29093
Effective - September 1, 2002
Issued by IDAHO POWER COMPANY
John R. Gale, Vice President, Regulatory Affairs
1221 West Idaho Street, Boise, Idaho
IDAHO POWER COMPANY FOURTH REVISED SHEET NO. 86-IDAHO PUBLIC UTILITIES COMMISSION
CANCELS Approved Effective
THIRD REVISED SHEET NO. 86-Aug. 28, 2002 Sept.2002
Per O.N. 29093
Jean D. Jewell Secretary
I.P.C. NO. 26, TARIFF NO. 101
SCHEDULE 86
COGENERATION AND SMALL POWER PRODUCTION
NON-FIRM ENERGY
(Continued)
CONDITIONS OF PURCHASE AND SALE (Continued)
10. The Company shall not be obligated to accept, and the Company may require the Seller
to curtail. interrupt or reduce deliveries of Energy if the Company, consistent with Prudent Electrical
Practices, determines that curtailment, interruption or reduction is necessary because of line construction
or maintenance requirements, emergencies, or other critical operating conditions on its system.
11. If the Company is required by the Commission to institute curtailment of deliveries of
electricity to its Customers, the Company may require the Seller to curtail its consumption of electricity in
the same manner and to the same degree as other Customers within the same Customer class who
not own Generation Facilities.
12. The Seller shall secure and continuously carry liability insurance coverage for both bodily
injury and property damage liability in the amount of not less than $1,000,000 each occurrence combined
single limit.
Such insurance shall include an endorsement naming the Company as an additional
insured insofar as liability arising out of operations under this schedule and a provision that such liability
policies shall not be canceled or their limits of liability reduced without 30 days' written notice to the
Company. The Seller shall furnish the Company with certificates of insurance together with the
endorsements required herein. The Company shall have the right to inspect the original policies of such
insurance.
13. The Seller shall grant to the Company all necessary rights of way and easements to install,
operate, maintain, replace, and remove the Company s metering and other Interconnection Facilities
including adequate and continuing access rights to the property of the Seller. The Seller warrants that it
has procured sufficient easements and rights of way from third parties as are necessary to provide the
Company with the access described above. The Seller shall execute such other grants, deeds, or
documents as the Company may require to enable it to record such rights of way and easements.
14. Depending on the size and location of the Seller s Qualifying Facility, it may be necessary
for the Company to establish additional requirements for operation of the Qualifying Facility. These
requirements may include, but are not limited to, voltage, reactive, or operating requirements.
IDAHO
Issued Per IPUC Order No. 29093
Effective - September 1, 2002
Issued by IDAHO POWER COMPANY
John R. Gale, Vice President, Regulatory Affairs
1221 West Idaho Street, Boise, Idaho
IDAHO POWER COMPANY FIRST REVISED SHEET NO. 72-IDAHO PUBLIC UTILITIES COMMISSION
CANCELS Approved Effective
ORIGINAL SHEET NO. 72-Sept. 17, 2002 Sept.2002
Per C.N. 29092
Jean D. Jewell Secretary
I.P.c. NO. 26, TARIFF NO. 101
SCHEDULE 72
INTERCONNECTIONS TO
NON-UTILITY GENERATION
A V AILABILITY
Service under this schedule is available throughout the Company s service area within the State
Idaho to Sellers owning or operating Qualifying Facilities or that qualify for Schedule 84.
APPLICABILITY
Service under this schedule applies to the construction, operation, maintenance, Upgrade,
Relocation, or removal of transmission and/or distribution lines and equipment necessary to safely
interconnect a Seller s Generation Facility to the Company s system.
DEFINITIONS
Additional Applicant is a person or entity whose request for electrical connection requires the
Company to utilize existing Interconnection Facilities which are subject to a Vested Interest.
Company is the Idaho Power Company.
Construction Cost is the cost, as determined by the Company, of Upgrades, Relocation or
construction of Company furnished Interconnection Facilities.
Disconnection Eauipment is any device or combination of devices by which the Company can
manually and/or automatically interrupt the flow of energy from the Seller to the Company s system,
including enclosures or other equipment as may be required to ensure that only the Company will have
access to certain of the devices.
First Enerqy Date is the date when the Seller begins delivering energy to the Company s system.
Generation Facility means equipment used to produce electric energy at a specific physical
location which meets the requirements to be a Qualifying Facility or that qualify for Schedule 84.
Interconnection Facilities are all facilities which are reasonably required by prudent electrical
practices and the National Electric Safety Code to interconnect and to allow the delivery of energy from
the Seller s Generation Facility to the Company s system, including, but not limited to, Special Facilities,
Disconnection Equipment and Metering Equipment.
Interconnection Point is the point where the Seller s conductors connect to the facilities owned by
the Company.
Meterinq Equipment is the Company owned equipment required to measure, record or telemeter
power flows between the Seller s Generation Facility and the Company s system.
Protection Eauipment is the circuit-interrupting device, protective relaying, and associated
instrument transformers.
PURP A means the Public Utility Regulatory Policies Act of 1978.
IDAHO
Issued Per IPUC Order No. 29092
Effective - September 1, 2002
Issued by IDAHO POWER COMPANY
John R. Gale, Vice President, Regulatory Affairs
1221 West Idaho Street, Boise, Idaho
I.P.C. NO. 26, TARIFF NO. 101
FIRST REVISED SHEET NO. 72-IDAHO PUBLIC UTILITIES COMMISSION
CANCELS Approved Effective
ORIGINAL SHEET NO. 72-Sept. 17, 2002 Sept.1,2002
Per O.N. 29092
Jean D. Jewell Secretary
IDAHO POWER COMPANY
SCHEDULE 72
INTERCONNECTIONS TO
NON-UTILITY GENERATION
(Continued)
DEFINITIONS (Continued)
Qualifyinq Facility is a cogeneration facility or a small power production facility which meets the
PURPA criteria for qualification set forth in Subpart B of Part 292, Subchapter K, Chapter I. Title 18, of the
Code of Federal Regulations.
Relocation is a change in the location of existing Company-owned transmission and/or distribution
lines, poles or equipment.
Schedule 84 is the Company s service schedule which provides for sales of electric energy to the
Company by means of a net metering arrangement or i1s successar(s) as approved by the Commission.
Seller is a non-utility generator who has contracted or will contract with the Company to
interconnect a Generation Facility to the Company s system to sell electric energy to the Company
including net metering sales, os provided in Schedule 84.
Seller Furnished Facilities are those portions of the Interconnection Facilities provided by the Seller.
Special Facilities are additions to or alterations of transmission and/or distribution lines and
transformers, including, but not limited to, Upgrades and Relocation, to safely interconnect the Seller
Generation Facility to the Company s system.
Transfer Cost is the cost, os determined by the Company, for acceptance by the Company of
Seller Furnished Facilities.
Upqrades are those improvements to the Company s existing system which are reasonably
required by prudent electrical practices and the National Electric Safety Code to safely interconnect the
Seller s Generation Facility. Such improvements include, but are not limited to, additional or larger
conductors, transformers, poles, and related equipment.
Vested Interest is the claim for refund that a Seller or Additional Applicant holds in a specific
portion of Company-owned Interconnection Facilities. The Vested Interest expires 5 years from the date
the Company completes construction of its portion of the Interconnection Facilities unless fully refunded
earlier. Vested Interests do not apply to Schedule 84 net metering projects.
COST OF INTERCONNECTION FACILITIES
All Interconnection Facilities provided under this schedule will be valued at the Company
Construction Cost and/or the Transfer Cost for vesting purposes os well os for operation and maintenance
payment obligations.
IDAHO
Issued Per IPUC Order No. 29092
Effective - September 1, 2002
Issued by IDAHO POWER COMPANY
John R. Gale, Vice President, Regulatory Affairs
1221 West Idaho Street, Boise, Idaho
IDAHO POWER COMPANY FIRST REVISED SHEET NO. 72-IDAHO PUBLIC UTILITIES COMMISSION
CANCELS Approved Effective
ORIGINAL SHEET NO. 72-Sept. 17 2002 Sept.1 2002
Per O.N. 29092
Jean D. Jewell Secretary
I.P.c. NO. 26. TARIFF NO. 101
SCHEDULE 72
INTERCONNECTIONS TO
NON-UTILITY GENERATION
(Continued)
PA YMENT FOR INTERCONNECTION FACILITIES
Unless specifically agreed otherwise by written agreement between the Seller and the Company.
the Seller will pay all costs of interconnecting a Generation Facility to the Company s system.
Unless specifically agreed otherwise in a written agreement between the Seller and the Company.an initial cost estimate of Company-owned Interconnection Facilities will be provided to the Seller.
Payment of the estimated cost will be required prior to the Company s ordering, installing, modifying.
upgrading. or performing in any other way work associated with the Interconnection Facilities. Upon
completion of the Company-owned Interconnection Facilities, the actual costs will be reconciled against
the estimated cost previously paid by the Seller and the appropriate billing or refund will be processed.
The Company reserves the right to collect additional costs from the Seller for any additional Company
equipment, modifications, or upgrades the Company deems necessary to operote and maintain a safe,
reliable electrical system as a result of the interconnection of the Seller s Generation Facility to the
Company s system.
CONSTRUCTION AND OPERATION OF INTERCONNECTION FACILITIES
All Seller Furnished Interconnection Facilities will be constructed and maintained in a manner to
be in full compliance with all prudent electrical practices, National Electric Safety Code, and all other
applicable Federal. state, and local safety and electrical codes and standards at all times.
The Seller shall:1. Submit proof to the Company that all licenses, permits. inspections and approvals
necessary for the construction and operation of the Seller s Generation and Interconnection
Facilities under this schedule have been obtained from applicable Federal, state, or local
authorities.2. Submit the designs. plans. specifications, and performance data for the Generation Facility
and Seller Furnished Facilities to the Company for review. The Company s acceptance shall not
be construed as confirming or endorsing the design, or as a warranty of safety, durability, or
reliability of the Generation Facility or Seller Furnished Facilities. The Company will retain the right to
inspect this equipment at its discretion.3. Demonstrate to the Company s satisfaction that the Seller s Generation Facility and Seller
Furnished Facilities have been completed, and that all features and equipment of the Seller
Generation Facility and Seller Furnished Facilities are capable of operating safely to commence
deliveries of Energy into the Company s system.4. Provide and maintain adequate protective equipment sufficient to prevent damage to
the Generation Facility, Seller Furnished Facilities and any other Seller-owned facilities in
conformance with all applicable electrical and safety codes and requirements.
IDAHO
Issued Per IPUC Order No. 29092
Effective - September 1, 2002
Issued by IDAHO POWER COMPANY
John R. Gale, Vice President, Regulatory Affairs
1221 West Idaho Street, Boise, Idaho
I.P.c. NO. 26, TARIFF NO. 101
FIRST REVISED SHEET NO. 72-IDAHO PUBLIC UTILITIES COMMISSION
CANCELS Approved Effective
ORIGINAL SHEET NO. 72-Sept. 17, 2002 Sept.2002
Per O.N. 29092
Jean D. Jewell Secretary
IDAHO POWER COMPANY
SCHEDULE 72
INTERCONNECTIONS TO
NON-UTILITY GENERATION
(Continued)
CONSTRUCTION AND OPERATION OF INTERCONNECTION FACILITIES (Continued)5. Provide and maintain Disconnection Equipment in accordance with all applicable
electrical and safety codes and requirements as described within this Schedule.
6. Provide a 24-hour telephone contact(s). This contact will be used by the Company to
arrange for repairs and inspections or in case of an emergency. The Company will make its best
effort to arrange repairs and inspections during normal business hours and to notify the Seller of
such arrangements in advance. The Company will provide a telephone number to the Seller so
that the Seller can obtain information about Company activity impacting the Seller s facility.
DISCONNECTION EQUIPMENT
Disconnection Equipment is required for all Seller Generation Facilities. The Disconnection
Equipment shall be installed at an electrical location to allow complete isolation of Seller s Generation
and Interconnection Facilities from the Company s system. The Disconnection Equipment for a Schedule
84 net metering facility will be installed at an electrical location on the Seller s side of the Company s retail
metering point to allow complete isolation of the Seller s Generation and Interconnection Facilities from
the Seller s other electrical load and service.
The Disconnection Equipment's operating device shall be:
Readily accessible by the Company at all times.
Clearly marked "Generation Disconnect Switch" with permanent 3/8 inch or larger letters.3. Physically installed at a location within 10 feet of the Interconnection Point or exact,
permanent instructions posted at the Interconnection Point indicating the precise location of the
Disconnection Equipment's operating device.4. Of a design manually operated and lockable in the open position with a standard
Company padlock.
Operation of Disconnection Equipment.If, in the reasonable opinion of the Company, the Seller
operation or maintenance of the Generation Facility or Interconnection Facilities is unsafe or may
otherwise adversely affect the Company s equipment. personnel. or service to its customers, the
Company may physically disconnect the Seller s Generation Facility or Interconnection Facilities by
operation of the disconnection device or by any other means the Company deems necessary to
adequately disconnect the Seller s Generation and Interconnection Facilities from the Company s system.
At such time as the unsafe condition is remedied or other condition adversely affecting the Company
resolved to the Company s satisfaction, the interconnection will be restored.
IDAHO
Issued Per IPUC Order No. 29092
Effective - September 1, 2002
Issued by IDAHO POWER COMPANY
John R. Gale, Vice President, Regulatory Affairs
1221 West Idaho Street. Boise, Idaho
I.P.C. NO. 26, TARIFF NO. 101
FIRST REVISED SHEET NO. 72-IDAHO PUBLIC UTILITIES COMMISSION
CANCELS Approved Effective
ORIGINA L SHEET NO. 72-Sept. 17, 2002 Sept. 1, 2002
Per O.N. 29092
Jean D. Jewell Secretary
IDAHO POWER COMPANY
SCHEDULE 72
INTERCONNECTIONS TO
NON-UTILITY GENERATION
(Continued)
DISCONNECTION EQUIPMENT (Continued)
The Company will disconnect the Seller s Generation and Interconnection Facilities in the event of
any planned or unplanned maintenance or repair of the Company s system connected to the Seller
Generation and Interconnection Facilities. In the event of unplanned maintenance or repairs, no prior
notice will be provided. In the event of planned repairs, the Company will attempt to notify the Seller of
the time and duration of the planned outage.
The Company will disconnect the Seller s Generation Facility and Interconnection Facilities in the
event that any terms and conditions of any applicable Company tariff or contract enabling the
interconnection of the Seller s Generation Facility is deemed by the Company to be in default or
delinquent.
All expenses of disconnection and reconnection incurred by the Company will be billed to the
Seller.
In the case of a net metering facility, disconnection of the service may be necessary. The
disconnection may result in interruption of both energy deliveries trom the Seller s Generation Facility to
the Company as well as interruption of energy deliveries from the Company to the Seller.
The Company will establish the settings of Protection Equipment to disconnect the Seller
Generation Facility and Interconnection Facilities for the protection of the Company s system and
personnel consistent with prudent electrical practices. If the Seller attempts to modify. adjust or otherwise
interfere with the protection equipment or its settings as established by the Company, such action may be
grounds for the Company refusal to continue interconnection of the Seller s Generation and
Interconnection Facilities to the Company s system.
GENERAL REQUIREMENTS OF INTERCONNECTED PROJECTS1. The Company will construct. own, operate and maintain all equipment. Upgrades and
Relocations on the Company s electrical side of the Interconnection Point.2. The Company will clearly mark the Metering Equipment and any other Company
equipment associated with the Seller s Generation Facility and/or Interconnection Facilities
designating the existence of the Seller s Generation Facility as required by prudent electrical
practices.3. The Seller will be required to submit all specific designs. equipment specifications, and test
results of the Seller Furnished Facilities to the Company for review. Upon receipt of the design and
equipment specifications, the Company will review the design and equipment specifications for
conformance with applicable electrical and safety codes and standards.
IDAHO
Issued Per IPUC Order No. 29092
Effective - September 1, 2002
Issued by IDAHO POWER COMPANY
John R. Gale, Vice President. Regulatory Affairs
1221 West Idaho Street, Boise, Idaho
I.P.c. NO. 26, TARIFF NO. 101 ORIGINAL SHEET NO. 72-
IDAHO PUBLIC UTILITIES COMMISSIONApproved EffectiveSept. 17, 2002 Sept. 2002
Per O.N. 29092
Jean D. Jewell Secretary
IDAHO POWER COMPANY
SCHEDULE 72
INTERCONNECTIONS TO
NON-UTILITY GENERATION
(Continued)
SPECIFIC PROJECT REQUIREMENTS
Generation Facilities InterconnectinG as a Schedule 84 (net meterinG) Project
Certification prior to interconnection:
Seller Generation Facilities that qualify for net metering under Schedule 84 will
submit to the Company a certification from an independent qualified party licensed in the
State of Idaho that the design and equipment in the Generation Facility and Seller
Furnished Facilities (1) comply with the standards of this schedule and applicable electric
and building codes and (2) will operate to safely deliver Energy to the Interconnection
Point. The Seller shall provide the credentials and licenses of the certifying party to the
Company for review and acceptance of the certification.
Periodic re-certification:
i. Projects larGer than 25 kW. The Seller will obtain on annual certification from
an independent qualified party licensed in the State of Idaho, certifying the Generation
Facility and Seller Furnished Facilities and equipment are in compliance with all current
applicable electrical and safety codes and are able to safely and reliably continue to
operate. The Seller will provide the credentials and licenses of the certifying party to the
Company for review and acceptance of the certification. A copy of this certification must
be forwarded to the Company by May 1 st of each calendar year in which the Seller
facility is interconnected to the Company s system. Within the first calendar year of
operation, the Seller will be required to supply only the certifications required at the time of
the initial interconnection. If the Company does not accept the annual certification within
sixty days of its receipt, the Generation Facility will be disconnected from the Company
system until such time as the certification is completed and accepted by the Company.
ii. Projects 25 kW and smaller.The above described certification will be
provided every three years.
Hi. Re-certification followinG modifications Prior to making any material
modifications or additions to the Generation Facility or Interconnection Facilities Seller will
provide Company with a written description of the proposed change. The Company will
expeditiously review the proposal and authorize Seller to proceed subject to final
inspection and certification by a qualified party as described in paragraph 1 a above. Any
modifications made without notice will result in disconnection of the facility until such time
as certification of the modified facility is submitted to and accepted by the Company.
Generation Facilities Less Than 1 MW Nameplate Rating
The following requirements are for Generation Facilities with nameplate ratings of less than
1 MW, not including net metering facilities utilizing Schedule 84.
IDAHO
Issued Per IPUC Order No. 29092
Effective - September 1, 2002
Issued by IDAHO POWER COMPANY
John R. Gale, Vice President, Regulatory Affairs
1221 West Idaho Street, Boise, Idaho
IDAHO POWER COMPANY
I.P.c. NO. 26, TARIFF NO. 101 ORIGINAL SHEET NO. 72-
IDAHO PUBLIC UTILITIES COMMISSIONApproved EffectiveSept. 17, 2002 Sept. 2002
Per O.N. 29092
Jean D. Jewell Secretary
SCHEDULE 72
INTERCONNECTIONS TO
NON-UTILITY GENERATION
(Continued)
Generation Facilities Less Than 1 MW Nameplate Rating (Continued)a. The Company shall procure, install, own and maintain Metering Equipment to
record energy deliveries to the Company. This metering will be separate from any other
metering of the Seller s load and may be located on either side of the Interconnection
Point. All acquisition, installation, maintenance, inspection and testing costs related to
Meter Equipment installed to measure the Seller s energy deliveries to the Company shall
be born by the Seller.b. The Seller is responsible for all costs incurred by the Company for the review,
evaluation and testing of Seller supplied designs and equipment regardless as to the
outcome of the review or test results.c. The Seller, upon completion of installation and prior to interconnection of the
Generation Facility to the Company s system, will provide the Company with certification
from a professional engineer licensed in the State of Idaho stating that the Seller
Generation Facility and Interconnection Facilities ore in compliance with all applicable
electrical and safety codes to enable sate and reliable operation.d. The Seller will obtain and provide to the Company an annual certification and
testing by a professional engineer licensed in the State of Idaho, certifying the ongoing
compliance with all applicable electrical and safety codes and that the Seller Furnished
Facilities successfully meet applicable testing requirements and standards. In the event
the Company does not receive and accept the annual certification within 30 days of the
annual anniversary date of the agreement, the project will be disconnected from the
Company s system until such time as the certification is completed and accepted by the
Company.e. In addition to the requirements specified in sections a through d, Generation
Facilities that are greater than 100 kW and less than 1 MW total nameplate rating require
the following:i. If the Company owns the transformer interconnecting the Seller
Generation Facility, then the Seller may own and maintain a secondary voltage
disconnection device that can be operated by both the Seller and the
Company.ii. If the Seller owns the transformer interconnecting the Seller s Generation
Facility, then the Company will own, operate and maintain a primary voltage
disconnection device at the Seller s expense.
iii. The Company will construct, own, operate and maintain all protective
relays and any associated equipment required to operate the protective relays.
IDAHO
Issued Per IPUC Order No. 29092
Effective - September 1, 2002
Issued by IDAHO POWER COMPANY
John R. Gale, Vice President. Regulatory Affairs
1221 West Idaho Street. Boise, Idaho
I.P.C. NO. 26, TARIFF NO. 101 ORIGINAL SHEET NO. 72-
IDAHO PUBLIC UTILITIES COMMISSIONApproved EffectiveSept. 17, 2002 Sept. 2002
Per C.N. 29092
Jean D. Jewell Secretary
IDAHO POWER COMPANY
SCHEDULE 72
INTERCONNECTIONS TO
NON-UTILITY GENERATION
(Continued)
SPECIFIC PROJECT REQUIREMENTS (Continued)
Generation Facilities Greater Than 1 MW Nameplate Ratinq
The Company will own, maintain and operate all Interconnection Facilities and
Disconnection Equipment at the Seller s expense.
TRANSFER OF INTERCONNECTION FACILITIES
Transfer of Interconnection Facilities is available only for Generation Facilities with nameplate
ratings greater than 100 kW.
1. Transfer at First Enerqy Date If the Seller desires to transfer and the Company desires to
accept any Seller Furnished Facilities at the First Energy Date, the following will apply:a. Prior to the beginning of construction, the Seller shall cause the contractor that
constructing the Seller Furnished Facilities to provide the Company with a certificate
naming the Company as an additional insured in the amount of not less than $1,000,000
under the contractor s general liability policy.b. The Company will provide the Seller s contractor with construction and material
specifications and will have final approval of the design of the Seller Furnished Facilities.c. During construction and upon completion, the Company will inspect the Seller
Furnished Facilities to be transferred to the Company. The cost of such inspection will be
borne by the Seller.d. If the Seller Furnished Facilities meet the Company design, material and
construction specifications, are free from defects in materials and workmanship, and the
Seller has provided the Company with acceptable easements, bills of sale and assurance
against labor or materials liens, fhe Company will accept ownership effective os of the First
Energy Date. In the bill of sale, the Seller will warrant to the Company that the Seller
Furnished Facilities are free of any liens or encumbrances and will be free from any defects
in materials and workmanship for a period of one year from the First Energy Dqte.
2. Subsequent Transfer If, after the First Energy Date, the Seller desires to transfer and the
Company desires to accept any Seller Furnished Facilities, the following will apply:a. The Company will inspect the facilities proposed for sale to determine if they meet
the Company s design, material and construction specifications.
IDAHO
Issued Per IPUC Order No. 29092
Effective - September 1 , 2002
Issued by IDAHO POWER COMPANY
John R. Gale, Vice President, Regulatory Affairs
1221 West Idaho Street. Boise, Idaho
IDAHO POWER COMP ANY
I.P.C. NO. 26, TARIFF NO. 101 ORIGINA L SHEET NO. 72-
IDAHO PUBLIC UTILITIES COMMISSIONApproved EffectiveSept. 17, 2002 Sept. 2002
Per O.N. 29092
Jean D. Jewell Secretary
SCHEDULE 72
INTERCONNECTIONS TO
NON-UTILITY GENERATION
(Continued)
Subsequent Transfer (Continued)b. The Company will determine the Transfer Cost of such facilities. The Transfer Cost
will be equal to the depreciated Construction Cost the Company would have incurred if it
had originally constructed the facilities plus the cost, if any, of bringing the facilities into
compliance with the Company s design, material and construction specifications.
Depreciation of the facilities proposed for transfer will be determined on the same basis asthe Company depreciates its own facilities in accordance with the appropriate FERC
account numbers for the type and size of line or equipment involved. The time period
used for the calculation of the depreciated transfer cost will extend from the First Energy
Date until the agreed upon transfer date. The Transfer Cost will be paid to the Company in
cash at the time of transfer. At the same time, the Company will pay the Seller in cash an
amount equal to the depreciated Construction Cost.c. As a condition of the Company s acceptance, the Seller will provide the Companywith acceptable easements, bills of sale and acceptable assurance against labor and
material liens. The bill of sale will include a warranty that the transferred facilities are free ofall liens and encumbrances and will be free from any defects in materials and
workmanship for a period of one year from the date of transfer.d. Effective as of the date of the transfer, the Company will operate and maintain the
transferred facilities.
VESTED INTEREST
A Seller s eligibility for a Vested Interest refund will exist for 5 years after the date the Company
completes construction of its portion of the Interconnection Facilities.1. The Company will provide a refund payment to each Seller holding a Vested Interest in
Company-owned Interconnection Facilities when an Additional Applicant shares use of those
Interconnection Facilities.
The refund payment will be based on the following formula:
Refund =
Linear
Footage
Ratio
Connected
Load/Peak Generation
Ratio
Original
Interconnection
Costa. The Linear Footage Ratio is the length of jointly used Special Facilities divided by the
length of the vested Special Facilities.b. The Connected Load/Peak Generation Ratio is the Connected Load or Peak
Generation of the Additional Applicant divided by the sum of the Connected Load or
Peak Generation of the Additional Applicant and all other Connected Loads and/or Peak
Generation on the Special Facilities.
IDAHO
Issued Per IPUC Order No. 29092
Effective - September 1, 2002
Issued by IDAHO POWER COMPANY
John R. Gale, Vice President, Regulatory Affairs
1221 West Idaho Street, Boise, Idaho
I.P.c. NO. 26, TARIFF NO. 101 ORIGINAL SHEET NO. 72-
IDAHO PUBLIC UTILITIES COMMISSIONApproved EffectiveSept. 17, 2002 Sept. 2002
Per D.N. 29092
Jean D. Jewell Secretary
IDAHO POWER COMPANY
SCHEDULE 72
INTERCONNECTIONS TO
NON-UTILITY GENERATION
(Continued)
VESTED INTEREST (Continued)c. The Original Interconnection Cost is the sum of the Company s Construction Cost
and any Transfer Costs for the Interconnection Facilities to which the Additional Applicant
intends to connect and share usage.3. The Additional Applicant will pay the Company the amount of the Vested Interest
refund(s). Additional Applicants making Vested Interest payments are in turn eligible to receive
refunds within the 5 year limit described above.4. Vested Interest refunds will not exceed 100 percent of the refundable portion of any party
cash payment to the Company.
Vested Interest refund payments may be waived by notifying the Company in writing.
OPERATION AND MAINTENANCE OBLIGATIONS AND EXPENSES
The Company will operate and maintain Company furnished Interconnection Facilities as well as
any Seller Furnished Facilities transferred to the Company. For all projects not interconnecting as a
Schedule 84 customer, the Seller will pay the Company a monthly operation and maintenance charge
equal to a percentage of the Construction Cost and Transfer Cost paid by the Seller. The percentage will
change annually on the anniversary of the First Energy Date in accordance with the following table:
MONTHLY OPERATION AND MAINTENANCE CHARGES
138 kV and 161 kV
Year
O&M Charge 26%.27%28%29%30%32%33%35%36%38%.40%.41%
Year
O&M Charges .43%.45%.47%.49%52%54%56%59%62%64%67%0.70%
Year
O&M Charge 73%77%80%0.84%0.87%91%96%00%04%09%1.14%
IDAHO
Issued Per IPUC Order No. 29092
Effective - September 1, 2002
Issued by IDAHO POWER COMPANY
John R. Gale, Vice President, Regulatory Affairs
1221 West Idaho Street, Boise, Idaho
IDAHO POWER COMPANY
I.P.C. NO. 26, TARIFF NO. 101 ORIGINAL SHEET NO. 72-
IDAHO PUBLIC UTILITIES COMMISSIONApproved Effective
Sept. 17 2002 Sept. 1 2002
Per O.N. 29092
Jean D. Jewell Secretary
SCHEDULE 72
INTERCONNECTIONS TO
NON-UTILITY GENERATION
(Continued)
OPERATION AND MAINTENANCE OBLIGATIONS AND EXPENSES (Continued)
MONTHLY OPERATING AND MAINTENANCE CHARGES
Below 138 kV
Year
O&M Charge 0.47%0.49%52%54%56%59%61%64%67%70%73%77%
Year
O&M Charge 0.80%84%87%91%95%00%04%09%14%1.19%24%30%
Year
O&M Charge 36%1.42%1.48%55%62%69%77%85%1.93%02%11%
Where a Seller s interconnection will utilize Interconnection Facilities provided under prioragreement(s), the term of which was shorter than 35 years, the operation and maintenance charge for
the Seller s interconnection will be computed to include the expired term of the prior agreement(s).
The cost upon which an individual Seller s operation and maintenance charge is based will be
reduced by subsequent Vested Interest refunds. Additional Applicants who are Sellers will pay themonthly operation and maintenance charge on the amount they paid as an Additional Applicant.
Seller Furnished Facilities not transferred to the Company will be operated and maintained by
the Seller at the Seller s sole risk and expense.
IDAHO
Issued Per IPUC Order No. 29092
Effective - September 1, 2002
Issued by IDAHO POWER COMPANY
John R. Gale, Vice President, Regulatory Affairs
1221 West Idaho Street, Boise, Idaho
IIDC\HO
' '
, An IDACORP Company
Operating ReQuirements, Documentation and Monthlv Reportin2
As required in Schedule 86, item 9
, - "
The Company and the SeHer shaH maintain appropriate Operating
communications. . ." and Schedule 86, item 7
, "
The SeHer shaH maintain at the Qualifying Facility or such otherlocation mutuaUy acceptable to the Company and SeHer, adequate metering and related power production
records, in a form and content recommended by the Company , Idaho Power Company has established general
operating communication, documentation and reporting guidelines for generation facilities of your type and size.
Idaho Power Company reserves the right to modify these guidelines at such time as either the general guidelinesrequire modification or if it is determined that your specific generation unit creates unique Idaho Power
Company system impacts and lor requirements that requires additional communications to enable Idaho PowerCompany to integrate your generation into the Idaho Power Company system.
Planned and Unplanned Project outa2es
Please caB 800-345-1319 and leave the following information:
Project Identification - Project Name and Project Number
. Approximate time outage occurred or is planned to occur.
Estimated day and time of project coming back online.
Planned Outages
Contact Idaho Power Company with any planned outages at the minimum 7 days prior
to the actual outage.
Unplanned outages
Contact Idaho Power Company with any unplanned outages that you estimate will last 8
hours or longer as soon as you make this determination.
OuaHfvin2 FaciHtv Generation Documentation
In accordance with Schedule 86, Item 7 complete documentation of aH planned outages and unplanned
outages including at the minimum; time of outage, meter reading, duration , and cause shaH be maintained at the
Facility.
In addition, documentation of aH activity at the Facility that may impact the current or future generation
capabilities wjJI also be documented. For example - reduced generation do to mechanical problems, reducedgeneration due to water supply restrictions (i.e. ice, low flows etc), Facility maintenance that results in reducedgeneration but not an outage, etc.
..........-.....--...-...................-.......-.......-..-...................--......--..........--...-....-............-....-...........-.--..........-..-..-............-....._-........_.......................-......
Telephone: (208) 388-2614 Fax: (208) 433-5163 RaIJphin (g) Idahopower.com
Ii DVm
POWE
. , ....
An IDACORP Company
MonthJv Generation Reporting and Payment processing
In order for Idaho Power Company to process the payment for your project's monthly generation , it isnecessary that your project proYide month end meter readings to Idaho Power Company. Complete and mail the
attached "Cogeneration and Small Power Production, MonthJy Power Production and Switching Report" to
Idaho Power Company on the last day of every month. Upon receipt of this monthly report Idaho Power
Company will begin the processing of the supplied information and caJculate the applicable energy payment.
This written record of the month end of meter readings, subject to subsequent review and correction by
Idaho Power, will be the basis of payment for energy purchased by Idaho Power Company from the Seller.
Please mail this information to:
Idaho Power Company
Attn: Cogeneration and Small Power Production
POBox 70
Boise, Idaho 83707
Unless specified in writing, Idaho Power Company will make payment to the company / individual and
address as indicated in the Schedule 86 agreement.
...........,.,.",...,.........................,................,..........-...
Telephone: (208) 388-2614 Fax: (208) 433-5163 Rallphin (!j) ldahopower.com
. Project Name:
An :IDACORP Company
Cogeneration and Small Power Production
Monthly Power Production and Switching Report
Month Year
Project Number:
Address:Phone Number:
City:
Meter Number Number:
End of Month Kwh Meter Reading:
Beginning of Month Kwh Meter
Difference:
Times Meter Constant:
Kwh for the Month:
Metered Demand:
Breaker Opening Record
Date Time Meter
Breaker Openin2 Reason Codes
Lack of Adequate Prime Mover
Forced Outage of Facility
Disturbance of IPCo System
Scheduled Maintenance
Testing of Protection Systems
Cause Unknown
Other (Explain)
State:Zip:
Facility Local Auxiliary
Out Service Service
Net Generation
Breaker Closing Record
Reason Date Time Meter
I hereby certify that the above meter readings are true and correct as of the
last day of the above month and that the switching record is accurate and complete
as required by the Energy Sales Agreement to which I am a Party.
...........-.............
_...m_...
-........-......
...._.m..."."'
-""-.....
.."."m........-...
.....-....
m....
TeJephone: (208) 388-2614
Signature Date
......m"""_'...m.,,,."..m,'....m.
.....__.
.mm..
.._....
"".m..........-..........
Fax: (208) 433-5163 Rallphin (gJ ldahopower.com