HomeMy WebLinkAbout20030415Said Exhibit 5.pdfBEFORE THE
IDAHO PUBLIC UTiliTIES COMMISSION
Case No. IPC-O3-
Idaho Power Company
Proposed Tariff Schedules and
Tariffs With legislative Format
Exhibit No.
Gregory W. Said
IDAHO POWER COMPANY THIRTEENTH REVISED SHEET NO. 1-
CANCELS
TWELFTH REVISED SHEET NO. 1-I.P.C. NO. 26, TARIFF 101
SCHEDULE
RESIDENTIAL SERVICE
(Continued)
RESIDENTIAL SPACE HEATING
All space heating equipment to be served by the Company s system shall be single phase
equipment approved by Underwriters' Laboratories, Inc., and the equipment and its installation shall
conform to all National. State and Municipal Codes and to the following:
Individual resistance-type units for space heating larger than 1,650 watts shall be
designed to operate at 240 or 208 volts, and no single unit shall be larger than 6 kW.
Heating units of two kW or larger shall be controlled by approved thermostatic
devices. When a group of heating units, with a total capacity of more than 6 kW,
to be actuated by a single thermostat. the controlling switch shall be so designed
that not more than 6 kW can be switched on or off at anyone time. Supplemental
resistance-type heaters, that may be used with a heat exchanger, shall comply with
the specifications listed above for such units.
MONTHLY CHARGE
The Monthly Charge is the sum of the Customer and the Energy Charges at the following rates:
Customer Charge
$2.51 per meter per month
Enerov CharGe
Base Rate
9303~
Power Cost
Adiustment*
6043~
Effective
Rate
5346~
Minimum Charoe
The monthly Minimum Charge shall be the sum of the Customer Charge and the Energy Charge.
This Power Cost Adjustment (Schedule 55), and Effective Rate expire May 15, 2004.
PAYMENT
The monthly bill rendered for service supplied hereunder is payable upon receipt. and becomes
past due 15 days from the date on which rendered.
IDAHO
Issued - April 15, 2003
Effective - May 16, 2003
Issued Exhibit No.
John R. Gale. Vic Case No. IPC-O3-
1221 \It G. Said, IPCoPage 1 of 53
IDAHO POWER COMPANY THIRTEENTH REVISED SHEET NO. 7-
CANCELS
TWELFTH REVISED SHEET NO. 7-I.P.C. NO. 26, TARIFF NO. 101
SCHEDULE 7
SMALL GENERAL SERVICE
AVAILABILITY
Service under this schedule is available at points on the Company s interconnected system withinthe State of Idaho where existing facilities of adequate capacity and desired phase and voltage are
adjacent to the Premises to be served.
APPLI CABILITY
Service under this schedule is applicable to Electric Service supplied to a Customer at one Pointof Delivery and measured through one meter. This schedule is applicable to Customers with energy
loads that are 3,000 kWh, or less, per month for ten or more months during the Annual Review Period.
This schedule is also applicable to non-profit or tax supported ball fields, fairgrounds or rodeo groundswith high demands and intermittent use exceeding 3,000 kWh per month. This schedule is notapplicable to standby service, service for resale, or shared service, or to individual or multiple family
dwellings first served through one meter after February 9, 1982.
TYPE OF SERVICE
The type of service provided under this schedule is single and/or three-phase, at approximately
60 cycles and at the standard service voltage available at the Premises to be served.
ANNIVERSARY DATE
The Anniversary Date is the date on which service is initially taken under this schedule,
ANNUAL REVIEW PERIOD
The Annual Review Period is the 12-month period ending with the Billing Period in which the
Customer's Anniversary Date falls. Each year, at the end of the Annual Review Period, each Customer's
account will be reviewed for continued service eligibility under this schedule. Customers who qualify for
service under a different schedule will be transferred to the appropriate schedule effective with thenext Billing Period. The accounts of new Customers or Customers whose load characteristics are
experiencing fundamental changes may be reviewed more frequently.
MONTHLY CHARGE
The Monthly Charge is the sum of the Customer and the Energy Charges at the following rates:
Customer CharGe
$2.51 per meter per month
Eneray CharGe
Base Rate
9649~
Power Cost
Adiustment*
8481 ~
Effective
Rate *
8130~ per kWh for all kWh
IDAHO
Issued - April 15. 2003
Effective - May 16. 2003
Issued Exhibit No.
John R. Gale. Vie. Case No. IPC-O3-
1221 VI G. Said, IPCo
Page 2 of 53
IDAHO POWER COMPANY TENTH REVISED SHEET NO. 7-
CANCELS
NINTH REVISED SHEET NO. 7-I.P.C. NO. 26, TARIFF NO. 101
SCHEDULE 7
SMALL GENERAL SERVICE
(Continued)
MONTHLY CHARGE (Continued)
Minimum Charae
The monthly Minimum Charge shall be the sum of the Customer Charge and the Energy Charge.
This Power Cost Adjustment (Schedule 55), and Effective Rate expire May 15, 2004.
PAYMENT
The monthly bill rendered for service supplied hereunder is payable upon receipt. and becomes
past due 15 days from the date on which rendered.
IDAHO
Issued - April 15, 2003
Effective - May 16, 2003
Issue Exhibit No.
John R. Gale. V Case No. IPC-O3-
1221 G. Said, IPCo
Page 3 of 53
IDAHO POWER COMPANY
I.P.C. NO. 26, TARIFF NO. 101
FIFTEENTH REVISED SHEET NO. 9-
CANCELS
FOURTEENTH REVISED SHEET NO. 9-
SCHEDULE 9
LARGE GENERAL SERVICE
(Continued)
FACILITIES BEYOND THE POINT OF DELIVERY
At the option of the Company. transformers and other facilities installed beyond the Point of
Delivery to provide Primary or Transmission Service may be owned, operated, and maintained by the
Company in consideration of the Customer paying a Facilities Charge to the Company.
Company-owned Facilities Beyond the Point of Delivery will be set forth in a Distribution Facilities
Investment Report provided to the Customer. As the Company s investment in Facilities Beyond the
Point of Delivery changes in order to provide the Customer's service requirements, the Company shall
notify the Customer of the additions and/or deletions of facilities by forwarding to the Customer a
revised Distribution Facilities Investment Report.
In the event the Customer requests the Company to remove or reinstall or change Company-
owned Facilities Beyond the Point of Delivery, the Customer shall pay to the Company the "non-
salvable cost" of such removal. reinstallation or change. Non-salvable cost as used herein is comprised
of the total original costs of materials, labor and overheads of the facilities, less the difference between
the salvable cost of material removed and removal labor cost including appropriate overhead costs.
POWER FACTOR
Where the Customer's Power Factor is less than 85 percent as determined by measurement
under actual load conditions, the Company may adjust the kW measured to determine the Billing
Demand by multiplying the measured kW by 85 percent and dividing by the actual Power Factor.
MONTHLY CHARGE
The Monthly Charge is the sum of the Customer, the Basic, the Demand, the Energy, and the
Facilities Charges at the following rates.
SECONDARY SERVICE
Customer Charae
$5.54 per meter per month
Basic Charae
$0.36 per kW of Basic Load Capacity
Demand Charae
$2.73 per kW for all kW of Demand
Enerav CharGe
Base Rate
6150~
Power Cost
Adiustment*
6043~
Effective
Rate
2193~ per kWh for all kWh
IDAHO
Issued - April 15. 2003
Effective - May 16. 2003
Issuec Exhibit No.
John R. Gale, Vie Case No. IPC-O3-
1221 \ G. Said, IPCo
Page 4 of 53
IDAHO POWER COMPANY FIFTEENTH REVISED SHEET NO. 9-
CANCELS
FOURTEENTH REVISED SHEET NO. 9-I.P.C. NO. 26 TARIFF NO. 101
SCHEDULE 9
LARGE GENERAL SERVICE
(Continued)
SECONDARY SERVICE (Continued)
Facilities Charae
None
Minimum Charae
The monthly Minimum Charge shall be the sum of the Customer Charge, the Basic Charge, the
Demand Charge, and the Energy Charge.
This Power Cost Adjustment (Schedule 55), and Effective Rate expire May 15, 2004.
PRIMARY SERVICE
Customer CharGe
$85.58 per meter per month
Basic CharGe
$0.77 per kW of Basic Load Capacity
Demand Charge
$2.65 per kW for all kW of Demand
Eneray CharGe
Base Rate
2. 1308c
Power Cost
Adiustment*
6043~
Effective
Rate
7351~ per kWh for all kWh
Facilities CharGe
The Company s investment in Company-owned Facilities Beyond the Point of Delivery times 1.
percent.
Minimum CharGe
The monthly Minimum Charge shall be the sum of the Customer Charge, the Basic Charge, the
Demand Charge, the Energy Charge, and the Facilities Charge.
This Power Cost Adjustment (Schedule 55), and Effective Rate expire May 15, 2004.
IDAHO
Issued - April 15, 2003
Effective - May 16. 2003
Issuec Exhibit No.
John R. Gale. Vi, Case ~o. IPC-O3-
1221 G. Said, IPCo
Page 5 of 53
IDAHO POWER COMPANY
I.P.C. NO, 26, TARIFF NO. 101
FIFTEENTH REVISED SHEET NO. 9-
CANCELS
FOURTEENTH REVISED SHEET NO. 9-
SCHEDULE 9
LARGE GENERAL SERVICE
(Continued)
TRANSMISSION SERVICE
Customer Charae
$85.58 per meter per month
Basic CharGe
$0.39 per kW of Basic Load Capacity
Demand Charae
$2.57 per kW for all kW of Demand
Eneray Charae
Base Rate
0833~
Power Cost
Adiustment*
6043~
Effective
Rate
687M per kWh for all kWh
Facilities Charae
The Company s investment in Company-owned Facilities Beyond the Point of Delivery times 1.7
percent.
Minimum CharGe
The monthly Minimum Charge shall be the sum of the Customer Charge, the Basic Charge, the
Demand Charge. the Energy Charge, and the Facilities Charge.
This Power Cost Adjustment (Schedule 55), and Effective Rate expire May 15, 2004.
PAYMENT
The monthly bill rendered for service supplied hereunder is payable upon receipt. and becomes
past due 15 days from the date on which rendered.
IDAHO
Issued - April 15, 2003
Effective - May 16. 2003
Issuec Exhibit No.
John R. Gale, Vie Case .No. IPC-O3-
1221 \ G. Said, IPCoPage 6 of 53
IDAHO POWER COMPANY TWELFTH REVISED SHEET NO. 15-1
CANCELS
ELEVENTH REVISED SHEET NO. 15-1I.P.C. NO. 26, TARIFF NO. 101
SCHEDULE 15
DUSK TO DAWN CUSTOMER LIGHTING
AVAILABILITY
Service under this schedule is available to commercial institutions, industrial plants, and
residential Customers presently served from the Company s interconnected system within the State ofIdaho, where existing overhead secondary distribution facilities of adequate capacity, phase. and
voltage are presently available adjacent to the Premises to be lighted.
APPLICABILITY
Service under this schedule is applicable to Electric Service provided for the outdoor dusk todawn lighting of commercial. industrial. and domestic Customer grounds, yards, driveways, andPremises by means of a Company-owned luminary, mounted on an existing Company pole with a
support bracket. automatically controlled by a photoelectric relay.
CHARACTER OF SERVICE
The facilities required for supplying service, including fixture, lamp, control relay, and support
bracket for mounting on an existing Company pole with secondary service, are supplied, installed,
owned and maintained by the Company in accordance with the Company s standards and
specifications. All necessary repairs and maintenance work, including lamp renewal. will be performedby the Company only during the regularly scheduled working hours of the Company. and theCompany shall be allowed 72 hours, subsequent to notification by the Customer. for replacing anyburned out lamps. Lamps are energized each night from one-half hour after sunset until one-half hourbefore sunrise, thereby providing approximately 4,105 hours of Premises lighting per year.
NEW FACILITIES
Where facilities of the Company are not presently available for a lamp installation which will
provide satisfactory lighting service for the Customer s Premises, the Company may extend its overhead
secondary service facilities, including secondary conductor, poles, anchors, etc., a distance not to
exceed 300 feet to supply the desired service, all in accordance with the charges specified below.
MONTHLY CHARGES
1 .Monthly per unit charge on existing facilities:
AREA LIGHTING
High Pressure Average Base Power Cost
Sodium Vapor Lumens Rate Adiustment*
100 Watt 550 $ 8.$0.21
200 Watt 19,800 $14.$0.
400 Watt 45.000 $22.$0.
Effective
Rate
$ 8.
$14.
$23.
IDAHO
Issued - April 15. 2003
Effective - May 16. 2003
Exhibit No.
ssuec ase No. IPC-O3-John R. Gale, VI( G. Said, IPCo1221 \ Page 7 of 53
IDAHO POWER COMPANY TWELFTH REVISED SHEET NO. 15-
CANCELS
ELEVENTH REVISED SHEET NO. 15-I.P.C. NO. 26, TARIFF NO. 101
SCHEDULE 15
DUSK TO DAWN CUSTOMER LIGHTING
(Continued)
MONTHLY CHARGES (Continued)
FLOOD LIGHTING
High Pressure
Sodium Vapor
200 Watt
400 Watt
Average Base Power Cost Effective
Lumens Rate ustment*Rate *
19,800 $17.$0.$1 7.
45,000 $25.$0.$26.
Metal Halide
400 Watt
1000 Watt
28,800
88,000
$28.
$52.
$0.
$2.
$29.
$54.
* This Power Cost Adjustment (Schedule 55), and Effective Rate expire May 15, 2004.2. The Monthly Charge for New Facilities to be installed, such as overhead (or equivalent)
secondary conductor. poles, anchors, etc., shall be 1.75 percent of the estimated installed cost thereof.3. The Company may provide underground service from existing secondary facilities when
the Customer pays the estimated nonsalvable cost of underground facilities.
PAYMENT
The monthly bill for service supplied hereunder is payable upon receipt. and becomes past due
15 days from the date on which rendered.
IDAHO
Issued - April 15. 2003
Effective - May 16, 2003
Issued Exhibit No.
Case No. IPC-E-O3-0 n . a e. 10 G. Said, IPCo1221 \It Page 8 of 53
IDAHO POWER COMPANY FIFTEENTH REVISED SHEET NO. 19-
CANCELS
FOURTEENTH REVISED SHEET NO. 19-I.P.C. NO. 26, TARIFF NO. 101
SCHEDULE 19
LARGE POWER SERVICE
(Continued)
FACILITIES BEYOND THE POINT OF DELIVERY (Continued)
Point of Delivery changes in order to provide the Customer's service requirements, the Company shall
notify the Customer of the additions and/or deletions of facilities by forwarding to the Customer a
revised Distribution Facilities Investment Report.
In the event the Customer requests the Company to remove or reinstall or change Company-
owned Facilities Beyond the Point of Delivery, the Customer shall pay to the Company the "non-salvable
cost" of such removal. reinstallation or change. Non-salvable cost as used herein is comprised of the
total original costs of materials, labor and overheads of the facilities, less the difference between the
salvable cost of material removed and removal labor cost including appropriate overhead costs.
POWER FACTOR ADJUSTMENT
Where the Customer s Power Factor is less than 85 percent. as determined by measurement
under actual load conditions, the Company may adjust the kW measured to determine the Billing
Demand by multiplying the measured kW by 85 percent and dividing by the actual Power Factor.
TEMPORARY SUSPENSION
When a Customer has properly invoked Rule F, Temporary Suspension of Demand, the Basic Load
Capacity and Billing Demand shall be prorated based on the period of such suspension in accordance
with Rule F. In the event the Customer s metered demand is less than 1.000 kW during the period of
such suspension, the Basic Load Capacity and Billing Demand will be set equal to 1,000 kW for purposes
of determining the Customer s monthly Minimum Charge,
MONTHLY CHARGE
The Monthly Charge is the sum of the Customer. the Basic, the Demand, the Energy, and the
Facilities Charges at the following rates:
SECONDARY SERVICE
Customer CharGe
$5.54 per meter per month
Basic CharGe
$0.36 per kW of Basic Load Capacity
Demand Charge
$2.73 per kW for all kW of Billing Demand
Eneray Charae
Base Rate
S576~
Power Cost
Adiustment*
8221 ~
Effective
Rate
3797~ per kWh for all k
Issued Exhibit No.
John R. Gale. Vic Case ~o. IPC-O3-
1221 VI G. Said, IPCoPage 9 of 53
IDAHO
Issued - April 15. 2003
Effective - May 16. 2003
IDAHO POWER COMPANY FOURTEENTH REVISED SHEET NO. 19-
CANCELS
THIRTEENTH REVISED SHEET NO. 19-I.P.C. NO. 26, TARIFF NO. 101
SCHEDULE 19
LARGE POWER SERVICE
(Continued)
SECONDARY SERVICE (Continued)
Facilities CharGe
None
Minimum Charae
The monthly Minimum Charge shall be the sum of the Customer Charge, the Basic Charge, the
Demand Charge, and the Energy Charge.
This Power Cost Adjustment (Schedule 55), and Effective Rate expire May 15, 2004,
PRIMARY SERVICE
Customer Charae
$85.71 per meter per month
Basic Charae
$0.77 per kW of Basic Load Capacity
Demand Charge
$2.65 per kW for all kW of Billing Demand
Energy Charae
Base Rate
0839~
Power Cost
Adiustment*
8221~
Effective
Rate
9060~ per kWh for all kWh
Facilities Charge
The Company s investment in Company-owned Facilities Beyond the Point of Delivery times 1.
percent.
Minimum Charae
The monthly Minimum Charge shall be the sum of the Customer Charge, the Basic Charge, the
Demand Charge, the Energy Charge, and the Facilities Charge.
This Power Cost Adjustment (Schedule 55), and Effective Rate expire May 15, 2004.
IDAHO
Issued - April 15. 2003
Effective - May 16. 2003
Issuec Exhibit No.
John R. Gale. Vie Case !'lo.
IPC-O3-
1221 \ G. Said, IPCo
Page 10 of 53
IDAHO POWER COMPANY FOURTEENTH REVISED SHEET NO. 19-
CANCELS
THIRTEENTH REVISED SHEET NO. 19-I.P.C. NO. 26, TARIFF NO. 101
SCHEDULE 19
LARGE POWER SERVICE
(Continued)
MONTHLY CHARGE (Continued)
TRANSMISSION SERVICE
Customer Charae
$85.71 per meter per month
Basic Charge
$0.39 per kW of Basic Load Capacity
Demand CharGe
$2.57 per kW for all kW of Billing Demand
Eneray Charae
Base Rate
0375~
Power Cost
Adiustment*
8221 ~
Effective
Rate
8596C per kWh for all kWh
Facilities Charae
The Company s investment in Company-owned Facilities Beyond the Point of Delivery times 1.
percent.
Minimum CharGe
The monthly Minimum Charge shall be the sum of the Customer Charge, the Basic Charge, the
Demand Charge, the Energy Charge, and the Facilities Charge.
This Power Cost Adjustment (Schedule 55), and Effective Rate expire May 15, 2004.
PAYMENT
The monthly bill for service supplied hereunder is payable upon receipt, and becomes past due
15 days from the date on which rendered.
IDAHO
Issued - April 15, 2003
Effective - May 16. 2003
Issuec Exhibit No.. Case No. IPC-O3-0 n . a e, IC IPC1221 \ . al
Page 11 of 53
IDAHO POWER COMPANY
I.P.C. NO. 26, TARIFF NO. 101
TWELFTH REVISED SHEET NO, 24-
CANCELS
ELEVENTH REVISED SHEET NO. 24-
SCHEDULE 24
IRRIGATION SERVICE
(Continued)
FACILITIES BEYOND THE POINT OF DELIVERY (Continued)
In the event the Customer requests the Company to remove or reinstall or change Company-owned Facilities Beyond the Point of Delivery, the Customer shall pay to the Company the "non-salvable
cost" of such removal, reinstallation or change. Non-salvable cost as used herein is comprised of the
total original costs of materials, labor and overheads of the facilities. less the difference between the
salvable cost of material removed and removal labor cost including appropriate overhead costs.
POWER FACTOR ADJUSTMENT
Where the Customer s Power Factor is less than 85 percent. as determined by measurement
under actual load conditions, the Company may adjust the kW measured to determine the Billing
Demand by multiplying the measured kW by 85 percent and dividing by the actual Power Factor.
MONTHLY CHARGE
The Monthly Charge is the sum of the Customer, the Demand, the Energy, and the Facilities
Charges at the following rates.
SECONDARY SERVICE
Customer Charae
$10.07 per meter per month
$ 2.50 per meter per month
Irrigation Season
Out of Season
Demand CharGe
$3.58 per kW of Billing Demand
No Demand Charge
Irrigation Season
Out of Season
Eneray Charae
Power Cost
Adiustment*
1.3163~
1 .3163~
Effective
Rate
1579~ per kWh for all kWh Irrigation Season
9335~ per kWh for all kWh Out of Season
Base Rate
8416~
6172~
Facilities Charae
None
Minimum CharGe
The monthly Minimum Charge shall be the sum of the Customer Charge, the Demand Charge"
and the Energy Charge.
This Power Cost Adjustment (Schedule 55), and Effective Rate expire May 15, 2004.
IDAHO
Issued - April 15. 2003
Effective - May 16. 2003
Issue Exhibit No.
John R. Gale. Vi Case No. IPC-O3-
1221 G. Said, IPCo
Page 12 of 53
IDAHO POWER COMPANY SEVENTEENTH REVISED SHEET NO. 24-
CANCELS
SIXTEENTH REVISED SHEET NO. 24-I.P.C. NO, 26 TARIFF NO. 101
SCHEDULE 24
IRRIGATION SERVICE
(Continued)
MONTHLY CHARGE (Continued)
TRANSMISSION SERVICE
Customer Charae
$85.61 per meter per month
$ 2.50 per meter per month
Irrigation Season
Out of Season
Demand Charae
$3.37 per kW of Billing Demand
No Demand Charge
Irrigation Season
Out of Season
Eneray Charae
Power Cost
Adiustment*
3163~
3163~
Base Rate
7021 ~
4396~
Effective
Rate
0184~ per kWh for all kWh Irrigation Season
7559~ per kWh for all kWh Out of Season
Facilities CharGe
The Company s investment in Company-owned Facilities Beyond the Point of Delivery times 1.
percent.
Minimum Charge
The monthly Minimum Charge shall be the sum of the Customer Charge, the Demand Charge.
the Energy Charge, and the Facilities Charge.
This Power Cost Adjustment (Schedule 55), and Effective Rate expire May 15. 2004.
PAYMENT
All monthly billings for Electric Service supplied hereunder are payable upon receipt. and
become past due 15 days from the date on which rendered. (For any agency or taxing district which
has notified the Company in writing that it falls within the provisions of Idaho Code 967-2302, the past
due date will reflect the 60 day payment period provided by Idaho Code 967-2302.
Deposit. A deposit payment for irrigation Customers is required under the following conditions:
1. Existina Customers: Customers who have two or more reminder notices for nonpayment
of Electric Service during a 12-month period or who have service disconnected for non-payment will be
required to pay a deposit. or provide a guarantee of payment from a bank or financial institution
acceptable to the Company. A reminder notice is issued approximately 45 days after the bill issue date
if the balance owing for Electric SeNice totals $100 or more or approximately 105 days after the bill issue
date for Customers meeting the provisions of Idaho Code 9 67-2302. The deposit for a specific
installation will be computed as follows:
IDAHO
Issued - April 15. 2003
Effective - May 16, 2003
Issuec Exhibit No.
John R. Gale. Vie Case .No. IPC-03-
1221 \i
G. Said, IPCo
Page 13 of 53
IDAHO POWER COMPANY FOURTH REVISED SHEET NO. 25-
CANCELS
THIRD REVISED SHEET NO, 25-I.P.C. NO. 26 TARIFF NO. 101
SCHEDULE 25
IRRIGATION SERVICE - TIME-OF-USE
PILOT PROGRAM
(OPTIONAL)
(Continued)
MONTHLY CHARGE
The Monthly Charge is the sum of the Customer, the TOU Metering, the Demand. the Energy,and the Facilities Charges at the following rates.
SECONDARY SERVICE
Customer Charge
$10.07 per meter per month
$ 2.50 per meter per month
Irrigation Season
Out of Season
TOU Meterina Charae
$3.00 per meter per month
No TOU Meter Charge
Irrigation Season
Out of Season
Demand Charge
$3.58 per kW of Billing Demand
No Demand Charge
Irrigation Season
Out of Season
Eneray CharGe
Base Rate
Power Cost
Adiustment*
Effective
Rate
On-Peak
Mid-Peak
Off-Peak
IN-SEASON
9728~
8416~
1 .4208~
1.3 163~
3163~
1.3163~
2891 ~ per kWh for all kWh
1579~ per kWh for all kWh
7371~ per kWh for all kWh
OUT -OF-SEASON6172~ 1 .3163~9335~ per kWh for all kWh
Facilities Charge
None
Minimum CharGe
The monthly Minimum Charge shall be the sum of the Customer Charge, the TOU Metering
Charge, the Demand Charge, and the Energy Charge.
This Power Cost Adjustment (Schedule 55), and Effective Rate expire May 15, 2004.
IDAHO
Issued - April 15. 2003
Effective - May 16. 2003
Issuec Exhibit No.
. Case No. IPC-03-0 n . ae, I( IPC1221' . aiPage 14 of 53
IDAHO POWER COMPANY FOURTH REVISED SHEET NO. 25-
CANCELS
THIRD REVISED SHEET NO. 25-I.P.C. NO. 26 TARIFF NO. 101
SCHEDULE 25
IRRIGATION SERVICE - TIME-OF-USE
PILOT PROGRAM
(OPTIONAL)
(Continued)
MONTHLY CHARGE (Continued)
TRANSMISSION SERVICE
Customer Charae
$85.61 per meter per month
$ 2.50 per meter per month
Irrigation Season
Out of Season
TOU Meterina Charae
None
Demand CharGe
$3.37 per kW of Billing Demand
No Demand Charge
Irrigation Season
Out of Season
Eneray Charge
Base Rate
Power Cost
Adiustment*
Effective
Rate
On-Peak
Mid-Peak
Off-Peak
IN-SEASON
7287~
7021~
3511 ~
3163~
1 .3163~
1.3163~
0450~ per kWh for all kWh
0184~ per kWh for all kWh
6674~ per kWh for all kWh
OUT -OF-SEASON4396~ 1.3163~7559~ per kWh for all kWh
Facilities CharGe
The Company s investment in Company-owned Facilities Beyond the Point of Delivery times 1.7percent.
Minimum Charae
The monthly Minimum Charge shall be the sum of the Customer Charge, the Demand Charge,
the Energy Charge, and the Facilities Charge.
This Power Cost Adjustment (Schedule 55), and Effective Rate expire May 15, 2004.
IDAHO
Issued - April 15, 2003
Effective - May 16. 2003
Exhibit No.ssue Case No. IPC-03-0 n . a e. G. Said, IPCo1221 Page 15 of 53
IDAHO POWER COMPANY FIFTEENTH REVISED SHEET NO. 40-
CANCELS
FOURTEENTH REVISED SHEET NO. 40- 1I.P.C. NO. 26, TARIFF NO. 101
SCHEDULE 40
UNMETERED GENERAL SERVICE
AVAILABILITY
Service under this schedule is available at points on the Company s interconnected system
within the State of Idaho where existing secondary distribution facilities of adequate capacity. phaseand voltage are available adjacent to the Customer's Premises and the only investment required by
the Company is an overhead service drop.
APPLICABILITY
Service under this schedule applies to Electric Service for the Customer's single- or multiple-unit
loads up to 1,800 watts per unit where the size of the load and period of operation are fixed and, as a
result, actual usage can be accurately determined. Service may include, but is not limited to, street
and highway lighting, security lighting, telephone booths and CAN power supplies which serve line
amplifiers. Facilities to supply service under this schedule shall be installed so that service cannot be
extended to the Customer's loads served under other schedules. Service under this schedule is notapplicable to shared or temporary service, or to the Customer's loads on Premises which have metered
service.
SPECIAL TERMS AND CONDITIONS
The Customer shall pay for all Company investment. except the overhead service drop, required
to provide service requested by the Customer. The Customer is responsible for installing, owning and
maintaining all equipment, including necessary underground circuitry and related facilities to connectwith the Company s facilities at the Company designated Point of Delivery. If the Customer
equipment is not properly maintained, service to the specific equipment will be terminated.
Energy used by CAN power supplies which serve line amplifiers will be determined by the power
supply manufacturer s nameplate input rating assuming continuous operation.
The Company is only responsible for supplying energy to the Point of Delivery and, at its expense,
may check energy consumption at any time.
MONTHLY CHARGE
The average monthly kWh of energy usage shall be estimated by the Company, based on the
Customer s electric equipment and one-twelfth of the annual hours of operation thereof. Since the
service provided is unmetered, failure of the Customer s equipment will not be reason for a reduction in
the Monthly Charge. The Monthly Charge shall be computed at the following rate:
Base Rate
68~
Power Cost
Adiustment
604~
Effective
Rate
6.284~ per kWh for all kWh
Minimum Charae
$1.50 per month
This Power Cost Adjustment (Schedule 55), and Effective Rate expire May 15, 2004.
IDAHO
Issued - April 15, 2003
Effective - May 16. 2003
Issuel Exhibit No.
John R. Gale, Vi Case .No. IPC-03-
1221 G. Said, IPCo
Page 16 of 53
IDAHO POWER COMPANY THIRTEENTH REVISED SHEET NO. 41-
CANCELS
TWELFTH REVISED SHEET NO. 41-I.P.C. NO. 26, TARIFF NO. 101
SCHEDULE 41
STREET LIGHTING SERVICE
AVAILABILITY
Service under this schedule is available throughout the Company s service area within the State
of Idaho where street lighting wires and fixtures can be installed on the Company s existing distribution
facilities.
APPLICABILITY
Service under this schedule is applicable to service required by municipalities or agencies of
federal. state. or county governments for the lighting of public streets, alleys, public grounds, and
thoroughfares. Street lighting lamps will be energized each night from dusk until dawn.
SERVICE LOCATION AND PERIOD
Street lighting facility locations, type of unit and lamp sizes, as changed from time to time by
written request of the Customer and agreed to by the Company, shall be as shown on an Exhibit A for
each Customer receiving service under this schedule. The in-service date for each street lighting facility
will be maintained on the Exhibit A.
The minimum service period for any street lighting facility is 10 years. The Company. upon written
notification from the Customer, will remove a street lighting facility:
At no cost to the Customer, if such facility has been in service for no less than the
minimum service period;
Upon payment to the Company of the removal cost, if such facility has been in service
for less than the minimum service period.
A" - OVERHEAD LIGHTING - COMPANY-OWNED SYSTEM
The facilities required for supplying service, including fixture, lamp, control relay, mast arm or
mounting on an existing utility pole, and energy for the operation thereof, are supplied, installed. owned
and maintained by the Company. All necessary repairs, maintenance work, including group lamp
replacement and glassware cleaning, will be performed by the Company during the regularly
scheduled working hours of the Company on the Company s schedule. Individual lamps will be
replaced on burnout as soon as reasonably possible after notification by the Customer and subject to
the Company s operating schedules and requirements.
MONTHLY CHARGE PER LAMP
High Pressure Average Base Power Cost Effective
Sodium Va Lumens Rate Adiustment*Rate
100 Watt 550 $ 6.$0.$ 6.
200 Watt 19.800 $ 7.$0.$ 7.
400 Watt 45.000 $10.$1.$11.60
This Power Cost Adjustment (Schedule 55), and Effective Rate expire May 15. 2004.
IDAHO
Issued - April 15. 2003
Effective - May 16. 2003
Issuec Exhibit No.
John R. Gale, Vie Case .No. IPC-03-
1221 \ G. Said, IPCoPage 17 of 53
IDAHO POWER COMPANY
I.P.C. NO. 26, TARIFF NO. 101
THIRTEENTH REVISED SHEET NO. 41-
CANCELS
TWELFTH REVISED SHEET NO. 41-
SCHEDULE 41
STREET LIGHTING SERVICE
(Continued)
ADDITIONAL MONTHLY RATE
For Company-owned poles installed after October 5, 1964 required to be used for street
lighting only:
Wood pole """"""""""""""""""""""""""""""""""""'" $1.71 per pole
Steel pole.............................................................................. $6.80 per pole
UNDERGROUND CIRCUITS will be installed when the Customer pays the estimated cost
difference between overhead and underground, or the Customer agrees to pay a monthly charge of
75 percent of the estimated cost difference.
B" - CUSTOMER-OWNED SYSTEM
The Customer s lighting system, including posts or standards, fixtures, initial installation of lamps
and underground cables with suitable terminals for connection to the Company s distribution system. is
installed and owned by the Customer.
Service supplied by the Company includes operation of the system, energy, lamp renewals,
cleaning of glassware, and replacement of defective ballasts and photocells which are standard to the
Company-owned street light units. Service does not include the labor or material cost of replacing
cables, standards, broken glassware or fixtures, or painting or refinishing of metal poles.
MONTHLY CHARGE PER LAMP
High Pressure Average Base Power Cost Effective
Sodium Vapor Lumens Rate Adiustment*Rate
100 Watt 550 $3.$0.$ 3.
200 Watt 19,800 $4.$0.$ 5.
250 Watt 24,750 $5.$0.$ 6.
400 Watt 45,000 $7.$1.$ 8.
This Power Cost Adjustment (Schedule 55), and Effective Rate expire May 15, 2004.
PAYMENT
The monthly bill rendered for service supplied hereunder is payable upon receipt. and becomes
past due 15 days from the date on which rendered.
IDAHO
Issued - April 15. 2003
Effective - May 16. 2003
Exhibit No.Issul Case No. IPC-03-05John R. Gale, \ G. Said, IPCo
122" Page 18 of 53
IDAHO POWER COMPANY FOURTEENTH REVISED SHEET NO. 41-
CANCELS
THIRTEENTH REVISED SHEET NO. 41-I.P.c. NO. 26, TARIFF NO. 101
SCHEDULE 41
STREET LIGHTING SERVICE
NO NEW SERVICE
(Continued)
MONTHLY CHARGE PER LAMP
Average
Lumens
Mercury Vapor
175 Watt
400 Watt
700
18.800
Base Power Cost Effective
Rate ustment"Rate
$ 6.. $0.$ 7.
$11 .$0.$12.
High Pressure
Sodium Vapor
150 Watt
250 Watt
13.800
24.750
$ 6.
$ 8.
$0.
$0.
$ 7.
$ 9,
This Power Cost Adjustment (Schedule 55), and Effective Rate expire May 15, 2004.
ADDITIONAL MONTHLY RATE
For Company-owned poles installed after October 5, 1964 required to be used for street
lighting only.
Wood Pole............................................................................ $1.71 per pole
Steel Pole.............................................................................. $6.80 per pole
UNDERGROUND CIRCUITS will be installed when the Customer pays the estimated cost difference
between overhead and underground, or the Customer agrees to pay a monthly charge of 1.75 percent
of the estimated cost difference.
B" - ORNAMENTAL LIGHTING - CUSTOMER-OWNED SYSTEM
The Customer s lighting system, including posts or standards, fixtures, initial installation of lamps
and underground cables with suitable terminals for connection to the Company s distribution system. is
installed and owned by the Customer.
Service supplied by the Company includes operation of the system, energy. lamp renewals,cleaning of glassware, and replacement of defective ballasts and photocells which are standard to the
Company owned street light units. Service does not include the labor or material cost of replacing
cables, standards, broken glassware or fixtures, or painting or refinishing of metal poles.
IDAHO
Issued - April 15. 2003
Effective - May 16. 2003
Exhibit No.
Issu Case No. IPC-03-John R. Gale, ' G. Said, JPCo122 Page 19 of 53
IDAHO POWER COMPANY
I.P.C. NO. 26, TARIFF NO. 101
. MONTHLY CHARGE PER LAMP
Incandescent
Average
Lumens
500
Mercury Vapor
175 Watt
400 Watt
1000 Watt
654
19,125
000
High Pressure
Sodium Vapor
70 Watt 200
THIRTEENTH REVISED SHEET NO. 41-
CANCELS
TWELFTH REVISED SHEET NO. 41-
SCHEDULE 41
STREET LIGHTING SERVICE
NO NEW SERVICE
(Continued)
Base Power Cost Effective
Rate Adjustment*Rate
$ 2.$0.$ 3.
$ 5.$0.$ 5.
$ 8.$0.$ 9.
$14.$2.$16.
$ 3.$0.$ 3.
This Power Cost Adjustment (Schedule 55), and Effective Rate expire May 15, 2004.
PAYMENT
The monthly bill rendered for service supplied hereunder is payable upon receipt, and becomes
past due 15 days from the date on which rendered.
IDAHO
Issued - April 15. 2003
Effective - May 16. 2003
Issue, Exhibit No.
John R. Gale. Vi Case ~o. IPC-O3-
1221 G. Said. IPCo
Page 20 of 53
IDAHO POWER COMPANY FIFTEENTH REVISED SHEET NO. 42-
CANCELS
FOURTEENTH REVISED SHEET NO. 42-I.P.C. NO. 26 TARIFF NO. 101
SCHEDULE 42
TRAFFIC CONTROL SIGNAL
LIGHTING SERVICE
APPLICABILITY
SeNice under this schedule is applicable to Electric Service required for the operation of traffic
control signal lights within the State of Idaho. Traffic control signal lamps are mounted on posts orstandards by means of brackets, mast arms, or cable.
The traffic control signal fixtures, including posts or standards, brackets, mast arm, cable, lamps,
control mechanisms, fixtures, service cable, and conduit to the point of, and with suitable terminals for,
connection to the Company s underground or overhead distribution system, are installed, owned,
maintained and operated by the Customer. Service is limited to the supply of energy only for the
operation of traffic control signal lights.
MONTHLY CHARGES
The average monthly kWh of energy usage shall be estimated by the Company based on the
number and size of lamps burning simultaneously in each signal and the average number of hours perday the signal is operated; PROVIDED, HOWEVER, at the Company s option, the wattage of the signal
may be determined by test.
Base Rate
3. 1 05c
Power Cost
Adjustment
604c
Effective
Rate
709c
This Power Cost Adjustment (Schedule 55). and Effective Rate expire May 15, 2004.
PAYMENT
The monthly bill rendered for service supplied hereunder is payable upon receipt, and becomes
past due 15 days from the date on which rendered.
IDAHO
Issued - April 15, 2003
Effective - May 16. 2003
Issue! Exhibit No.
John R. Gale, Vi, Case No. IPC-03-
1221' G. Said. IPCoPage 21 of 53
IDAHO POWER COMPANY TWELFTH REVISED SHEET NO. 26-
CANCELS
ELEVENTH REVISED SHEET NO. 26-I.P.c. NO, 26. TARIFF NO. 101
IDAHO POWER COMPANY
ELECTRIC SERVICE RATE
SCHEDULE 26
FOR
MICRON TECHNOLOGY, INC.
BOISE, IDAHO
SPECIAL CONTRACT DATED SEPTEMBER 1, 1995
(Continued)
MONTHLY ENERGY CHARGE
Eneray CharGe
Base Rate
12.783
Power Cost
Adjustment*
043
Effective
Rate
18.826 mills per kWh for all energy
This Power Cost Adjustment (Schedule 55), and Effective Rate expire May 15, 2004.
MONTHLY 0 & M CHARGES
4 percent of total cost of Substation Facilities.
CONSERVATION PROGRAMS RECOVERY CHARGE
$5.703 per month
IDAHO
Issued - April 15. 2003
Effective - May 16. 2003
Exhibit No.
ssue , ase No. IPC-O3-0 n . a e. I G. Said, IPCo1221 Page 22 of
IDAHO POWER COMPANY
I.P.c. NO, 26, TARIFF NO. 101
THIRTEENTH REVISED SHEET NO. 28-
CANCELS
TWELFTH REVISED SHEET NO. 28-
EXPIRED - LEFT BLANK INTENTIONALLY
IDAHO
Issued - April 15. 2003
Effective - May 16. 2003
Issue Exhibit No.
John R. Gale. Vi Case No. IPC-03-
1221 G. Said, IPCo
Page 23 of 53
IDAHO POWER COMPANY THIRTEENTH REVISED SHEET NO. 29-
CANCELS
TWELFTH REVISED SHEET NO, 29-I.P.C. NO. 26. TARIFF NO. 101
IDAHO POWER COMPANY
ELECTRIC SERVICE RATE
SCHEDULE 29
J. R. SIMPLOT COMPANY
POCATELLO. IDAHO
SPECIAL CONTRACT DATED AUGUST 27,1973
MONTHLY CONTRACT RATE
Demand CharGe
$6.68 per kW of Billing Demand (1)
Eneray CharGe
Base Rate
14.080
Power Cost
Adjustment*
043
Effective
Rate
20.123 mills per kWh for all energy (2)
Minimum Charge
The minimum monthly charge shall be the amount computed in accordance with Paragraph
1. but not less $100.188.61 for any month during the effective term of this Agreement.
This Power Cost Adjustment (Schedule 55). and Effective Rate expire May 15. 2004.
CONSERVATION PROGRAMS RECOVERY CHARGE
$5.061 per month
Contract Chances
(1 )Contract Paragraph No 5.1 (a).
No Change
(2)Contract ParaGraph No. 5.1 (b)
Change 33.450 mills to 20.123 mills
(3)Contract ParaGraph No. 5.
No Change
IDAHO
Issued - April 15. 2003
Effective - May 16. 2003
Exhibit No.I Case No. IPC-O3-John R. Gal G. Said, IPCo
. Page 24 of 53
IDAHO POWER COMPANY THIRTEENTH REVISED SHEET NO. 30-
CANCELS
TWELFTH REVISED SHEET NO. 30-I.P.C. NO. 26. TARIFF NO. 101
IDAHO POWER COMPANY
ELECTRIC SERVICE RATE
SCHEDULE 30
FOR
UNITED STATES DEPARTMENT OF ENERGY
IDAHO OPERATIONS OFFICE
SPECIAL CONTRACT DATED MAY 16.2000
CONTRACT NO. GS-OOP-99-BSD-0124
AVAILABILITY
This schedule is available for firm retail service of electric power and energy delivered for the
operations of the Department of Energy s facilities located at the Idaho National Engineering
Laboratory site, as provided in the Contract for Electric Service between the parties.
MONTHLY CHARGE
The monthly charge for electric service shall be the sum of the Demand. Energy. and
ConseNation Programs Recovery Charges determined at the following rates:
1 .Demand CharGe
$5.10 per kW of Billing Demand Per Month
Eneray Charge
Base
Rate
13.404
Power Cost
Adjustment*
043
Effective
Rate
19.447 mills per kWh for all energy
Conservation Proarams Recovery CharGe
$3.521 per month
This Power Cost Adjustment (Schedule 55). and Effective Rate expire May 15. 2004.
SPECIAL CONDITIONS
Billina Demand:
The Billing Demand shall be the average kW supplied during the 3D-minute period of maximum
use during the month.
Power Factor Adjustment:
When the Power Factor is less than 95 percent during the 30-minute period of maximum load for
the month. Company may adjust the measured Demand to determine the Billing Demand by
multiplying the measured kW of Demand by 0.95 and dividing by the actual Power Factor.
IDAHO
Issued - April 15. 2003
Effective - May 16. 2003
Exhibit No.
Issue! Case No. IPC-03-05
John R. Gale. Vi, G. Said, IPCo
1221 Page 25 of 53
IDAHO POWER COMPANY FIRST REVISED SHEET NO. 32-
CANCELS
SECOND REVISED SHEET NO. 32-I.P.C. NO. 26, TARIFF NO. 101
IDAHO POWER COMPANY
AGREEMENT FOR SUPPLY OF SHIELDED
STREET LIGHTING SERVICE
SCHEDULE 32
FOR THE CITY OF KETCHUM, IDAHO
SPECIAL CONTRACT DATED JUNE 12, 2001
MONTHLY CHARGE PER LAMP
High Pressure
Sodium Vapor
70 Watt
100 Watt
200 Watt
Average
Lumens
6.400
500
22.000
Base
Rate
$ 7.
$ 7.
$ 9.
Power Cost
Adjustment*
$0.
$0.
$0.
Effective
Rate
$ 7.
$ 7.
$10.
This Power Cost Adjustment (Schedule 55) and this Effective Rate expire May 15, 2004.
ADDITIONAL MONTHLY RATE
For Company-owned poles installed after October 5. 1964 required to be used for street
lighting only:
Wood pole ........................................................................... $1.71 per pole
Steel pole.............................................................................. $6.80 per pole
PAYMENT
The monthly bill rendered for service supplied hereunder is payable upon receipt. and becomes
past due 15 days from the date on which rendered.
IDAHO
Issued - April 15. 2003
Effective - May 16. 2003
Exhibit No.
Is~ Case No. IPC-E-O3-
John R. Gale G. Said, IPCo
1 ~ Page 26 of 53
IDAHO POWER COMPANY TWELFTH REVISED SHEET NO. 1-
CANCELS
ELEVENTH REVISED SHEET NO. 1-I.P.C. NO. 26, TARIFF 101
SCHEDULE
RESIDENTIAL SERVICE
(Continued)
RESIDENTIAL SPACE HEATING
All space heating equipment to be served by the Company s system shall be single phaseequipment approved by Underwriters' Laboratories, Inc.. and the equipment and its installation shall
conform to all National. State and Municipal Codes and to the following:
Individual resistance-type units for space heating larger than 1,650 watts shall be
designed to operate at 240 or 208 volts, and no single unit shall be larger than 6 kW.Heating units of two kW or larger shall be controlled by approved thermostaticdevices. When a group of heating units. with a total capacity of more than 6 kW, to be actuated by a single thermostat. the controlling switch shall be so designed
that not more than 6 kW can be switched on or off at anyone time. Supplemental
resistance-type heaters. that may be used with a heat exchanger, shall comply with
the specifications listed above for such units.
MONTHLY CHARGE
The Monthly Charge is the sum of the Customer and the Energy Charges at the following rates:
Customer CharGe
$2.51 per meter per month
Enerav Charae
Base Rate
9303c
Power Cost
Adjustment*
93700.6043
Effective
Rate
86735.5346
Minimum Charae
The monthly Minimum Charge shall be the sum of the Customer Charge and the Energy Charge.
This Power Cost Adjustment (Schedule 55). and Effective Rate expire May 15, 200~~.
PAYMENT
The monthly bill rendered for service supplied hereunder is payable upon receipt. and becomes
past due 15 days from the date on which rendered.
Exhibit No.
Case No. IPC-O3-
G. Said, IPCo
Page 27 of 53 ,
IDAHO POWER COMPANY
I.P.c. NO. 26, TARIFF NO. 101
TWELFTH REVISED SHEET NO. 7-
CANCELS
ELEVENTH REVISED SHEET NO. 7-
SCHEDULE 7
SMALL GENERAL SERVICE
AVAILABILITY
Service under this schedule is available at points on the Company s interconnected system within
the State of Idaho where existing facilities of adequate capacity and desired phase and voltage are
adjacent to the Premises to be served.
APPLICABILITY
Service under this schedule is applicable to Electric Service supplied to a Customer at one Point
of Delivery and measured through one meter. This schedule is applicable to Customers with energy
loads that are 3.000 kWh, or less, per month for ten or more months during the Annual Review Period.
This schedule is also applicable to non-profit or tax supported ball fields. fairgrounds or rodeo grounds
with high demands and intermittent use exceeding 3,000 kWh per month. This schedule is not
applicable to standby service. service for resale, or shared service. or to individual or multiple family
dwellings first served through one meter after February 9, 1982.
TYPE OF SERVICE
The type of service provided under this schedule is single and/or three-phase, at approximately
60 cycles and at the standard service voltage available at the Premises to be seNed.
ANNIVERSARY DATE
The Anniversary Date is the date on which service is initially taken under this schedule.
ANNUAL REVIEW PERIOD
The Annual Review Period is the 12-month period ending with the Billing Period in which the
Customer's Anniversary Date falls. Each year, at the end of the Annual Review Period. each Customer
account will be reviewed for continued service eligibility under this schedule. Customers who qualify for
service under a different schedule will be transferred to the appropriate schedule effective with thenext Billing Period. The accounts of new Customers or Customers whose load characteristics are
experiencing fundamental changes may be reviewed more frequently.
MONTHLY CHARGE
The Monthly Charge is the sum of the Customer and the Energy Charges at the following rates:
Customer CharGe
$2.51 per meter per month
Eneray CharGe
Base Rate
9649c
Power Cost
Adjustment*
72410.8481c
Effective
Rate
7 .68906.8130c per kWh for all kWh
Exhibit No.
Case No. IPC-03-
G. Said, IPCo
Page 28 of 53
IDAHO POWER COMPANY NINTH REVISED SHEET NO. 7-
CANCELS
EIGHTH REVISED SHEET NO. 7-I.P.C. NO, 26, TARIFF NO. 101
SCHEDULE 7
SMALL GENERAL SERVICE
(Continued)
MONTHLY CHARGE (Continued)
Minimum Charge
The monthly Minimum Charge shall be the sum of the Customer Charge and the Energy Charge.
This Power Cost Adjustment (Schedule 55). and Effective Rate expire May 15, 200~~.
PAYMENT
The monthly bill rendered for service supplied hereunder is payable upon receipt, and becomes
post due 15 days from the date on which rendered.
Exhibit No.
Case No. IPC-O3-05
G. Said, IPCo
Page 29 of 53
IDAHO POWER COMPANY
I.P.C. NO. 26, TARIFF NO. 101
FOURTEENTH REVISED SHEET NO. 9-
CANCELS
THIRTEENTH REVISED SHEET NO. 9-
SCHEDULE 9
LARGE GENERAL SERVICE
(Continued)
FACILITIES BEYOND THE POINT OF DELIVERY
At the option of the Company, transformers and other facilities installed beyond the Point of
Delivery to provide PrimarY or Transmission Service may be owned. operated. and maintained by the
Company in consideration of the Customer paying a Facilities Charge to the Company.
Company-owned Facilities Beyond the Point of Delivery will be set forth in a Distribution Facilities
Investment Report provided to the Customer. As the Company s investment in Facilities Beyond thePoint of Delivery changes in order to provide the Customer's service requirements. the Company shallnotify the Customer of the additions and/or deletions of facilities by forwarding to the Customer arevised Distribution Facilities Investment Report.
In the event the Customer requests the Company to remove or reinstall or change Company-owned Facilities Beyond the Point of Delivery. the Customer shall pay to the Company the "non-salvable cost" of such removal. reinstallation or change. Non-salvable cost as used herein is comprised
of the total original costs of materials, labor and overheads of the facilities. less the difference betweenthe salvable cost of material removed and removal labor cost including appropriate overhead costs.
POWER FACTOR
Where the Customer's Power Factor is less than 85 percent. as determined bY measurement
under actual load conditions. the Company may adjust the kW measured to determine the BillingDemand by multiplying the measured kW by 85 percent and dividing by the actual Power Factor.
MONTHLY CHARGE
The Monthly Charge is the sum of the Customer, the Basic, the Demand, the Energy. and theFacilities Charges at the following rates.
SECONDARY SERVICE
Customer Charge
$5.54 per meter per month
Basic CharGe
$0.36 per kW of Basic Load Capacity
Demand CharGe
$2.73 per kW for all kW of Demand
EnerGY CharGe
Base Rate
6150c
Power Cost
Adjustment*
93700.6043
Effective
Rate~3.2193c per kWh for all kWh
Exhibit No.
Case No. IPC-03-
G. Said, IPCo
Page 30 of 53
IDAHO POWER COMPANY
I.P.C. NO. 26, TARIFF NO, 101
FOURTEENTH REVISED SHEET NO. 9-
CANCELS
THIRTEENTH REVISED SHEET NO. 9-
SCHEDULE 9
LARGE GENERAL SERVICE
(Continued)
SECONDARY SERVICE (Continued)
Facilities CharGe
None
Minimum CharGe
The monthly Minimum Charge shall be the sum of the Customer Charge. the Basic Charge. the
Demand Charge. and the Energy Charge.
This Power Cos1 Adjustment (Schedule 55), and Effective Rate expire May 15, 200~.
PRIMARY SERVICE
Customer CharGe
$85.58 per meter per month
Basic CharGe
$0.77 per kW of Basic Load Capacity
Demand CharGe
$2.65 per kW for all kW of Demand
Eneray CharGe
Base Rate
2. 1308c
Power Cost
Adjustment*
6043
Effective
Rate
7351 c per kWh for all kWh
Facilities CharGe
The Company s investment in Company-owned Facilities Beyond the Point of Delivery times 1.
percent.
Minimum Charge
The monthly Minimum Charge shall be the sum of the Customer Charge. the Basic Charge, the
Demand Charge, the Energy Charge. and the Facilities Charge.
This Power Cost Adjustment (Schedule 55), and Effective Rate expire May 15. 200~,1.
Exhibit No.
Case No. IPC-O3-
G. Said, IPCo
Page 31 of 53
IDAHO POWER COMPANY FOURTEENTH REVISED SHEET NO, 9-
CANCELS
THIRTEENTH REVISED SHEET NO. 9-I.P.c. NO. 26, TARIFF NO. 101
SCHEDULE 9
LARGE GENERAL SERVICE
(Continued)
TRANSMISSION SERVICE
Customer CharGe
$85.58 per meter per month
Basic CharGe
$0.39 per kW of Basic Load Capacity
Demand CharGe
$2.57 per kW for all kW of Demand
Eneray Charge
Base Rate
0833c
Power Cost
Adjustment*
93700.6043
Effective
Rate
4m00 6876c per kWh for all kWh
Facilities Charae
The Company s investment in Company-owned Facilities Beyond the Point of Delivery times 1.7percent.
Minimum Charge
The monthly Minimum Charge shall be the sum of the Customer Charge, the Basic Charge. theDemand Charge. the Energy Charge, and the Facilities Charge.
This Power Cost Adjustment (Schedule 55). and Effective Rate expire May 15. 200~~.
PAYMENT
The monthly bill rendered for service supplied hereunder is payable upon receipt and becomes
past due 15 days from the date on which rendered.
Exhibit No.
Case No. IPC-O3-
G. Said. IPCo
Page 32 of 53
IDAHO POWER COMPANY ELEVENTH REVISED SHEET NO. 15-1
CANCELS
TENTH REVISED SHEET NO. 15-1I.P.c. NO. 26, TARIFF NO. 101
SCHEDULE 15
DUSK TO DAWN CUSTOMER LIGHTING
AVAILABILITY
SeNice under this schedule is available to commercial institutions, industrial plants. and
residential Customers presently served from the Company s interconnected system within the State ofIdaho. where existing overhead secondary distribution facilities of adequate capacity. phase, and
voltage are presently available adjacent to the Premises to be lighted.
APPLI CABI LlTY
Service under this schedule is applicable to Electric Service provided for the outdoor dusk todawn lighting of commercial, industrial, and domestic Customer grounds. yards. driveways. and
Premises by means of a Company-owned luminary, mounted on an existing Company pole with a
support bracket, automatically controlled by a photoelectric relay.
CHARACTER OF SERVICE
The facilities required for supplying service, including fixture, lamp, control relay. and support
bracket for mounting on an existing Company pole with secondary service. are supplied. installed.
owned and maintained by the Company in accordance with the Company s standards andspecifications. All necessary repairs and maintenance work, including lamp renewal. will be performed
by the Company only during the regularly scheduled working hours of the Company. and theCompany shall be allowed 72 hours. subsequent to notification by the Customer. for replacing anyburned out lamps. Lamps are energized each night from one-half hour after sunset until one-half hourbefore sunrise. thereby providing approximately 4 105 hours of Premises lighting per year.
NEW FACILITIES
Where facilities of the Company are not presently ovailable for a lamp installation which will
provide satisfactory lighting service for the Customer s Premises. the Company may extend its overheadsecondary service facilities, including secondary conductor, poles. anchors. etc.. a distance not toexceed 300 feet to supply the desired service, all in accordance with the charges specified below.
MONTHLY CHARGES
1 .Monthly per unit charge on existing facilities:
AREA LIGHTING
High Pressure Average Base Power Cost
Sodium Vapor Lumens Rate Adjustment*
100 Watt 550 $ 8.G,MO,
200 Watt 19.800 $14.
400 Watt 45.000 $22.UW.
Effective
Rate
~14.
23.
Exhibit No.
Case No. IPC-E-O3-
G. Said, IPCo
Page 33 of 53
IDAHO POWER COMPANY ELEVENTH REVISED SHEET NO. 15-2
CANCELS
TENTH REVISED SHEET NO. 15-2I.P.C. NO. 26, TARIFF NO. 101
SCHEDULE 15
DUSK TO DAWN CUSTOMER LIGHTING
(Continued)
MONTHLY CHARGES (Continued)
FLOOD LIGHTING
High Pressure
Sodium Vapor
200 Watt
400 Watt
Average Base Power Cost Effective
Lumens Rate ustment*Rate
19.800 $17.W20.~17.
45,000 $25.26.
Metal Halide
400 Watt
1000 Watt
28,800
88,000
$28.
$52.
29.~4.
* This Power Cost Adjustment (Schedule 55). and Effective Rate expire May 15. 200~.2. The Monthly Charge for New Facilities to be installed. such as overhead (or equivalent)secondary conductor, poles, anchors. etc., shall be 1.75 percent of the estimated installed cost thereof.3. The Company may provide underground seNice from existing secondary facilities whenthe Customer pays the estimated non salvable cost of underground facilities.
PAYMENT
The monthly bill for service supplied hereunder is payable upon receipt. and becomes past due
15 days from the date on which rendered.
Exhibit No.
Case No. IPC-O3-
G. Said, IPCo
Page 34 of 53
IDAHO POWER COMPANY
I.P.C. NO. 26, TARIFF NO. 101
FOURTEENTH REVISED SHEET NO. 19-
CANCELS
THIRTEENTH REVISED SHEET NO. 19-
SCHEDULE 19
LARGE POWER SERVICE
(Continued)
FACILITIES BEYOND THE POINT OF DELIVERY (Continued)
Point of Delivery changes in order to provide the Customer's service requirements. the Company shollnotify the Customer of the additions and/or deletions of facilities by forwarding to the Customer a
revised Distribution Facilities Investment Report.
In the event the Customer requests the Company to remove or reinstall or change Company-owned Facilities Beyond the Point of Delivery. the Customer shall pay to the Company the "non-solvable
cost" of such removal. reinstallation or change. Non-salvable cost os used herein is comprised of thetotal original costs of materials, labor and overheads of the facilities, less the difference between the
solvable cost of material removed and removal labor cost including appropriate overhead costs.
POWER FACTOR ADJUSTMENT
Where the Customer s Power Factor is less than 85 percent, as determined by measurement
under actual load conditions. the Company may odjust the kW measured to determine the BillingDemand by multiplying the measured kW by 85 percent and dividing by the actual Power Factor.
TEMPORARY SUSPENSION
When a Customer has properly invoked Rule F Temporary Suspension of Demand. the Basic LoadCapacity and Billing Demand shall be prorated based on the period of such suspension in accordance
with Rule F. In the event the Customer s metered demand is less than 1 000 kW during the period
such suspension. the Basic Load Capacity and Billing Demand will be set equal to 1.000 kW for purposes
of determining the Customer s monthly Minimum Charge.
MONTHLY CHARGE
The Monthly Charge is the sum of the Customer, the Basic, the Demand. the Energy. and the
Facilities Charges at the following rates:
SECONDARY SERVICE
Customer Charae
$5.54 per meter per month
Basic CharGe
$0.36 per kW of Basic Load Capacity
Demand Charae
$2.73 per kW for all kW of Billing Demand
Eneray Charae
Base Rate
5576(:
Power Cost
Adjustment*
72410 8221c
Effective
Rate
o1.28173.3797c per kWh for all kWh
Exhibit No.
Case No. IPC-O3-
G. Said, IPCo
Page 35 of 53
IDAHO POWER COMPANY
I.P.C. NO. 26. TARIFF NO. 101
THIRTEENTH REVISED SHEET NO. 19-
CANCELS
TWELFTH REVISED SHEET NO. 19-
SCHEDULE 19
LARGE POWER SERVICE
(Continued)
SECONDARY SERVICE (Continued)
Facilities CharGe
None
Minimum CharGe
The monthly Minimum Charge sholl be the sum of the Customer Charge. the Basic Charge. the
Demand Charge. and the Energy Charge.
This Power Cost Adjustment (Schedule 55). and Effective Rate expire May 15. 200~~.
PRIMARY SERVICE
Customer CharGe
$85.71 per meter per month
Basic CharGe
$0.77 per kW of Basic Load Capacity
Demand CharGe
$2.65 per kW for all kWof Billing Demand
Enerav CharGe
Base Rate
0839c
Power Cost
Adjustment*
W-UU),8221
Effective
Rate
80802.9060c per kWh for all kWh
Facilities Charae
The Company s investment in Company-owned Facilities Beyond the Point of Delivery times 1.
percent.
Minimum Charae
The monthly Minimum Charge shall be the sum of the Customer Charge. the Basic Charge. the
Demand Charge, the Energy Charge. and the Facilities Charge.
This Power Cost Adjustment (Schedule 55). and Effective Rate expire May 15. 200~.
Exhibit No.
Case No. IPC-O3-
G. Said, IPCo
Page 36 of 53
IDAHO POWER COMPANY THIRTEENTH REVISED SHEET NO. 19-
CANCELS
TWELFTH REVISED SHEET NO, 19-I.P.C. NO. 26, TARIFF NO. 101
SCHEDULE 19
LARGE POWER SERVICE
(Continued)
MONTHLY CHARGE (Continued)
TRANSMISSION SERVICE
Customer CharGe
$85.71 per meter per month
Basic CharGe
$0.39 per kW of Basic Load Capacity
Demand CharGe
$2.57 per kW for all kW of Billing Demand
Enerav CharGe
Base Rate
0375c
Power Cost
Adjustment*
72410 8221c
Effective
Rate
8596c per kWh for all kWh
Facilities CharGe
The Company s investment in Company-owned Facilities Beyond the Point of Delivery times 1.
percent.
Minimum CharGe
The monthly Minimum Charge shall be the sum of the Customer Charge. the Basic Charge. the
Demand Charge. the Energy Charge. and the Facilities Charge.
This Power Cost Adjustment (Schedule 55). and Effective Rate expire May 15. 200~.
PAYMENT
The monthly bill for service supplied hereunder is payable upon receipt. and becomes past due
15 days from the date on which rendered.
Exhibit No.
Case No. IPC-O3-
G. Said, IPCo
Page 37 of 53
IDAHO POWER COMPANY ELEVENTH REVISED SHEET NO. 24-
CANCELS
TENTH REVISED SHEET NO. 24-I.P.C. NO, 26 TARIFF NO. 101
SCHEDULE 24
IRRIGATION SERVICE
(Continued)
FACILITIES BEYOND THE POINT OF DELIVERY (Continued)
In the event the Customer requests the Company to remove or reinstall or change Company-owned Facilities Beyond the Point of Delivery, the Customer shall pay to the Company the "non-salvable
cost" of such removal. reinstallation or change, Non-salvable cost as used herein is comprised of the
total original costs of materials. labor and overheads of the facilities, less the difference between thesalvable cost of material removed and removal labor cost including appropriate overhead costs,
POWER FACTOR ADJUSTMENT
Where the Customer s Power Factor is less than 85 percent. as determined by measurementunder actual load conditions, the Company may adjust the kW measured to determine the BillingDemand by multiplying the measured kW by 85 percent and dividing by the actual Power Factor.
MONTHLY CHARGE
The Monthly Charge is the sum of the Customer. the Demand. the Energy. and the Facilities
Charges at the following rates.
SECONDARY SERVICE
Customer Charge
$10.07 per meter per month
$ 2.50 per meter per month
Irrigation Season
Out of Season
Demand Charqe
$3.58 per kW of Billing Demand
No Demand Charge
Irrigation Season
Out of Season
Eneray Charge
Power Cost
Adjustment*
3163
3163
Base Rate
8416c
6172c
Effective
Rate
18311.1579c per kWh for all kWh Irrigation Season
95871.9335c per kWh for all kWh Out of Season
Facilities Charoe
None
Minimum Charge
The monthly Minimum Charge shall be the sum of the Customer Charge, the Demond Charge.
and the Energy Charge.
This Power Cost Adjustment (Schedule 55). and Effective Rate expire May 15, 2004J.
Exhibit No.
Case No. IPC-O3-
G. Said, IPCo
Page 38 of 53
IDAHO POWER COMPANY SIXTEENTH REVISED SHEET NO. 24-
CANCELS
FIFTEENTH REVISED SHEET NO. 24-I.P.C. NO. 26 TARIFF NO. 101
SCHEDULE 24
IRRIGATION SERVICE
(Continued)
MONTHLY CHARGE (Continued)
TRANSMISSION SERVICE
Customer Charae
$85.61 per meter per month
$ 2.50 per meter per month
Irrigation Season
Out of Season
Demand CharGe
$3.37 per kW of Billing Demand
No Demand Charge
Irrigation Season
Out of Season
Eneray Charge
Power Cost
Adjustment*
3163
3-1151.3163
Effective
Rate
013M.0l84c per kWh for all kWh Irrigation Season
-1.l8114.7559c per kWh for all kWh Out of Season
Base Rate
7021c
4396c
Facilities CharGe
The Company s investment in Company-owned Facilities Beyond the Point of Delivery times 1,percent.
Minimum CharGe
The monthly Minimum Charge shall be the sum of the Customer Charge. the Demand Charge.the Energy Charge. and the Facilities Charge.
This Power Cost Adjustment (Schedule 55). and Effective Rate expire May 15. 200~.
PAYMENT
All monthly billings for Electric SeNice supplied hereunder are payable upon receipt. andbecome past due 15 days from the date on which rendered. (For any agency or taxing district whichhas notified the Company in writing that it falls within the provisions of Idaho Code S 67-2302. the pastdue date will reflect the 60 day payment period provided by Idaho Code s 67-2302.
Deposit.A deposit payment for irrigation Customers is required under the following conditions:
1. Existing Customers: Customers who have two or more reminder notices for nonpaymentof Electric Service during a 12-month period or who have seNice disconnected for non-payment will berequired to pay deposit. or provide a guarantee of payment from a bank or financial institutionacceptable to the Company. A reminder notice is issued approximately 45 days after the bill issue dateif the balance owing for Electric Service totals $100 or more or approximately 105 days after the bill issuedate for Customers meeting the provisions of Idaho Code s 67-2302. The deposit for a specificinstallation will be computed as follows:
Exhibit No.
Case No. IPC-O3-
G. Said, IPCo
Page 39 of 53
IDAHO POWER COMPANY
I.P.C. NO. 26 TARIFF NO. 101
THIRD REVISED SHEET NO. 25-4
CANCELS
SECOND REVISED SHEET NO. 25-
SCHEDULE 25
IRRIGATION SERVICE - TIME-OF-USE
PilOT PROGRAM
(OPTIONAL)
(Continued)
MONTHLY CHARGE
The Monthly Charge is the sum of the Customer, the TOU Metering, the Demand, the Energy,and the Facilities Charges at the following rates.
SECONDARY SERVICE
Customer Charge
$10.07 per meter per month
$ 2.50 per meter per month
Irrigation Season
Out of Season
TOU Metering CharGe
$3.00 per meter per month
No TOU Meter Charge
Irrigation Season
Out of Season
Demand CharGe
$3.58 per kW of Billing Demond
No Demand Charge
Irrigation Season
Out of Season
Eneroy Charae
Base Rate
Power Cost
Adjustment*
Effective
Rate
On-Peak
Mid-Peak
Off-Peak
IN-SEASON
9728c
8416C
1 .4208C
3163
3163~1.3163
311136.2891 C per kWh for all kWh
'1.18314.1579(; per kWh for all kWh~2.7371 (; per kWh for all kWh
OUT -OF-SEASON
6172(; ~1.3163 95874.9335(; per kWh for all kWh
Facilities Charae
None
Minimum Charge
The monthly Minimum Charge shall be the sum of the Customer Charge. the TOU Metering
Charge, the Demand Charge, and the Energy Charge.
1his Power Cost Adjustment (Schedule 55), and Effective Rate expire May 15, 2004J.
Exhibit No.
Case No. IPC-O3-
G. Said, IPCo
Page 40 of 53
IDAHO POWER COMPANY
I.P.C. NO. 26, TARIFF NO. 101
THIRD REVISED SHEET NO. 25-5
CANCELS
SECOND REVISED SHEET NO. 25-5
SCHEDULE 25
IRRIGATION SERVICE - TIME-OF-USE
PILOT PROGRAM
(OPTIONAL)
(Continued)
MONTHLY CHARGE (Continued)
TRANSMISSION SERVICE
Customer CharGe
$85.61 per meter per month
$ 2.50 per meter per month
Irrigation Season
Out of Season
TOU Meterina CharGe
None
Demand Charae
$3.37 per kW of Billing Demond
No Demand Charge
Irrigation Season
Out of Season
Eneroy CharGe
Bose Rate
Power Cost
Adjustment*
Effective
Rate
On-Peak
Mid-Peak
Off-Peak
IN-SEASON
7287C
7021(;
1.3511 (;
3163
3163
3163
0450c per kWh for all kWh
'1.0'1364.0184c per kWh for all kWh
6674c per kWh for all kWh
OUT -OF-SE ASON4396c 3163 781 14.7559c per kWh for all kWh
Facilities CharGe
The Company s investment in Company-owned Facilities Beyond the Point of Delivery times 1.
percent.
Minimum CharGe
The monthly Minimum Charge shall be the sum of the Customer Charge. the Demand Charge,
the Energy Charge. and the Facilities Charge.
This Power Cost Adjustment (Schedule 55), and Effective Rate expire May 15, 200~J.
Exhibit No.
Case No. IPC-O3-
G. Said, IPCo
Page 41 of 53
IDAHO POWER COMPANY
I.P.C. NO. 26, TARIFF NO. 101
FOURTEENTH REVISED SHEET NO. 40-
CANCELS
THIRTEENTH REVISED SHEET NO. 40-1
SCHEDULE 40
UNMETERED GENERAL SERVICE
AVAILABILITY
Service under this schedule is available at points on the Company s interconnected system
within the State of Idaho where existing secondary distribution facilities of adequate capacity. phase
and voltage are available adjacent to the Customer's Premises and the only investment required by
the Company is an overhead service drop.
APPLICABILITY
Service under this schedule applies to Electric Service for the Customer's single- or multiple-unit
loads up to 1,800 watts per unit where the size of the load and period of operation are fixed and, as a
result, actual usage can be accurately determined. Service may include, but is not limited to, street
and highway lighting, security lighting, telephone booths and CATV power supplies which serve line
amplifiers. Facilities to supply service under this schedule sholl be installed so that service cannot
extended to the Customer s loads served under other schedules. Service under this schedule is not
applicable to shored or temporary service. or to the Customer s loads on Premises which have metered
service.
SPECIAL TERMS AND CONDITIONS
The Customer shall pay for all Company investment. except the overhead service drop. required
to provide service requested by the Customer. The Customer is responsible for installing. owning and
maintaining all equipment. including necessary underground circuitry and related facilities to connectwith the Company s facilities at the Company designated Point of Delivery. If the Customer
equipment is not properly maintained, service to the specific equipment will be terminated.
Energy used by CATV power supplies which serve line amplifiers will be determined by the power
supply manufacturer s nameplate input rating assuming continuous operation.
The Company is only responsible for supplying energy to the Point of Delivery and, at its expense,
may check energy consumption at any time.
MONTHLY CHARGE
The average monthly kWh of energy usage shall be estimated by the Company. based on the
Customer s electric equipment and one-twelfth of the annual hours of operation thereof. Since the
service provided is un metered, failure of the Customer s equipment will not be reason for a reduction in
the Monthly Charge. The Monthly Charge shall be computed at the following rate:
Base Rate
68(;
Power Cost
Adjustment
604
Effective
RateMm.284c per kWh for all kWh
Minimum Charge
$1.50 per month
This Power Cost Adjustment (Schedule 55). and Effective Rate expire May 15. 200~.
Exhibit No.
Case No. IPC-O3-
G. Said, IPCo
Page 42 of 53
IDAHO POWER COMPANY
I.P.C. NO. 26, TARIFF NO. 101
TWELFTH REVISED SHEET NO. 41-
CANCELS
ELEVENTH REVISED SHEET NO. 41-
SCHEDULE 41
STREET LIGHTING SERVICE
AVAILABILITY
Service under this schedule is available throughout the Company s service area within the State
" of Idaho where street lighting wires and fixtures can be installed on the Company s existing distribution
facilities.
APPLICABILITY
Service under this schedule is applicable to service required by municipalities or agencies of
federal. state, or county governments for the lighting of public streets. alleys, public grounds, and
thoroughfares. Street lighting lamps will be energized each night from dusk until dawn.
SERVICE LOCATION AND PERIOD
Street lighting facility locations, type of unit and lamp sizes, as changed from time to time by
written request of the Customer and agreed to by the Company, sholl be as shown on an Exhibit A for
each Customer receiving service under this schedule. The in-service date for each street lighting facility
will be maintained on the Exhibit A.
The minimum service period for any street lighting facility is 10 years. The Company, upon written
notification from the Customer, will remove a street lighting facility:
At no cost to the Customer, if such facility has been in service for no less than the
minimum service period:
Upon payment to the Company of the removal cost. if such facility has been in service
for less than the minimum service period.
A" - OVERHEAD LIGHTING - COMPANY-OWNED SYSTEM
The facilities required for supplying service. including fixture. lamp, control relay, mast arm or
mounting on an existing utility pole, and energy for the operation thereof. are supplied, installed, owned
and maintained by the Company. All necessary repairs, maintenance work, including group lamp
replacement and glassware cleaning. will be performed by the Company during the regularly
scheduled working hours of the Company on the CompQny s schedule. Individual lamps will be
replaced on burnout as soon as reasonably possible after notification by the Customer and subject to
the Company s operating schedules and requirements.
MONTHLY CHARGE PER LAMP
High Pressure
Sodium Vaoor
100 Watt
200 Watt
400 Watt
Average
Lumens
550
19.800
45,000
Base
Rate
$ 6.
$ 7.
$10.
Power Cost
Adjustment*
G.7QO.
~1.00
Effective
Rate
~7.~11.
This Power Cost Adjustment (Schedule 55), and Effective Rate expire May 15. 200~.
Exhibit No.
Case No. IPC-03-
G. Said, IPCo
Page 43 of 53
IDAHO POWER COMPANY
I.P.C. NO. 26, TARIFF NO. 101
TWELFTH REVISED SHEET NO. 41-
CANCELS
ELEVENTH REVISED SHEET NO. 41-
SCHEDULE 41
STREET LIGHTING SERVICE
(Continued)
ADDITIONAL MONTHLY RATE
For Company-owned poles installed after October 5, 1964 required to be used for street
lighting only:
Wood pole ........................................................................... $1.71 per pole
Steel pole.............................................................................. $6.80 per pole
UNDERGROUND CIRCUITS will be installed when the Customer pays the estimated cost
difference between overhead and underground, or the Customer agrees to pay a monthly charge of
75 percent of the estimated cost difference.
B" - CUSTOMER-OWNED SYSTEM
The Customer s lighting system, including posts or standards, fixtures, initial installation of lamps
and underground cables with suitable terminals for connection to the Company s distribution system, is
installed and owned by the Customer.
Service supplied by the Company includes operation of the system, energy,. lamp renewals,
cleaning of glassware, and replacement of defective ballasts and photocells which are standard to the
Company-owned street light units. Service does not include the labor or material cost of replacing
cables, standards. broken glassware or fixtures, or painting or refinishing of metal poles.
MONTHLY CHARGE PER LAMP
High Pressure Average Base Power Cost Effective
Sodium Vaoor Lumens Rate Adjustment*Rote
100 Watt 550 $3.Q,..7.Q() . 2 5
200 Watt 19.800 $4.
250 Watt 24.750 $5.6G+O.+-+06.
400 Watt 45,000 $7.+l-,GQ8.
This Power Cost Adjustment (Schedule 55), and Effective Rate expire May 15, 200~.
PAYMENT
The monthly bill rendered for service supplied hereunder is payable upon receipt. and becomes
past due 15 days from the date on which rendered.
Exhibit No.
Case No. IPC-O3-
G. Said, IPCo
Page 44 of 53
IDAHO POWER COMPANY
I.P.C. NO. 26, TARIFF NO. 101
THIRTEENTH REVISED SHEET NO. 41-
CANCELS
TWELFTH REVISED SHEET NO. 41-
SCHEDULE 41
STREET LIGHTING SERVICE
NO NEW SERVICE
(Continued)
MONTHLY CHARGE PER LAMP
Average
Lumens
Mercury Vapor
175 Watt
400 Watt
700
18.800
Base Power Cost Effective
Rate ustment*Rate
$ 6.WW.
$11 .~12.
High Pressure
Sodium Vapor
150 Watt
250 Watt
13,800
24,750
$ 6.
$ 8.2-.-GW.$+G-Ad
This Power Cost Adjustment (Schedule 55), and Effective Rate expire May 15, 200~J.
ADDITIONAL MONTHLY RATE
For Company-owned poles installed after October 5, 1964 required to be used for street
lighting only.
Wood Pole............................................................................ $1.71 per pole
Steel Pole.............................................................................. $6.80 per pole
UNDERGROUND CIRCUITS will be installed when the Customer pays the estimated cost difference
between overhead and underground, or the Customer agrees to pay a monthly charge of 1.75 percentof the estimated cost difference.
B" - ORNAMENTAL LIGHTING - CUSTOMER-OWNED SYSTEM
The Customer s lighting system, including posts or standards, fixtures, initial installation of lamps
and underground cables with suitable terminals for connection to the Company s distribution system.
installed and owned by the Customer.
Service supplied by the Company includes operation of the system, energy. lamp renewals,
cleaning of glassware, and replacement of defective ballasts and photocells which are standard to the
Company owned street light units. Service does not include the labor or material cost of replacing
cables, standards, broken glassware or fixtures, or painting or refinishing of metal poles.
Exhibit No.
Case No. IPC-O3-
G. Said, IPCo
Page 45 of 53
IDAHO POWER COMPANY
I.P.C. NO. 26, TARIFF NO. 101
MONTHLY CHARGE PER LAMP
Incandescent
Average
Lumens
500
Mercury Vapor
175 Watt
400 Watt
1000 Watt
654
125
47,000
High Pressure
Sodium Vapor
70 Watt 200
TWELFTH REVISED SHEET NO, 41-
CANCELS
ELEVENTH REVISED SHEET NO. 41-
SCHEDULE 41
STREET LIGHTING SERVICE
NO NEW SERVICE
(Continued)
Base Power Cost Effective
Rate Adjustment.Rate
$ 2.$ iW-G
$ 5.+-JW .
$ 8.
$14.~2 .16.
$ 3.Q..MO. 1 8 3.20
This Power Cost Adjustment (Schedule 55), and Effective Rate expire May 15, 200~J.
PAYMENT
The monthly bill rendered for service supplied hereunder is payable upon receipt, and becomes
past due 15 days from the date on which rendered.
Exhibit No.
Case No. IPC-O3-
G. Said, IPCo
Page 46 of 53
IDAHO POWER COMPANY FOURTEENTH REVISED SHEET NO. 42-
CANCELS
THIRTEENTH REVISED SHEET NO. 42-I.P.c. NO. 26, TARIFF NO. 101
SCHEDULE 42
TRAFFIC CONTROL SIGNAL
LIGHTING SERVICE
APPUCABI LlTY
Service under this schedule is applicable to Electric Service required for the operation of traffic
control signal lights within the State of Idaho. Traffic control signal lamps are mounted on posts or
standards by means of brackets, mast arms, or cable.
The traffic control signal fixtures, including posts or standards, brackets, mast arm, cable, lamps,
control mechanisms, fixtures, service cable, and conduit to the point of, and with suitable terminals for.
connection to the Company s underground or overhead distribution system, are installed, owned.
maintained and operated by the Customer. Service is limited to the supply of energy only for the
operation of traffic control signal lights.
MONTHLY CHARGES
The average monthly kWh of energy usage shall be estimated by the Company based on the
number and size of lamps burning simultaneously in each signal and the average number of hours perday the signal is operated; PROVIDED, HOWEVER, at the Company s option, the wattage of the signal
may be determined by test.
Base Rate
105c
Power Cost
Adjustment
-+-,w.7O.604
Effective
Rate~3.709
This Power Cost Adjustment (Schedule 55), and Effective Rate expire May 15, 20~.
PAYMENT
The monthly bill rendered for service supplied hereunder is payable upon receipt. and becomes
past due 15 days from the date on which rendered.
Exhibit No.
Case No. IPC-O3-
G. Said, IPCo
Page 47 of 53
IDAHO POWER COMPANY
I.P.C. NO. 26, TARIFF NO. 101
TENTH REVISED SHEET NO. 55-
CANCELS
NINTH REVISED SHEET NO. 55-1
SCHEDULE 55
POWER COST ADJUSTMENT
APPLICABILITY
This schedule is applicable to the electric energy delivered to all Idaho retail Customers served
" under the Company s schedules, to the primary portion of the FMC Special Contract. and to all other
Idaho retail Special Contracts. These loads are referred to as "firm" load for purposes of this schedule.
BASE POWER COST
The Base Power Cost of the Company s rates is computed by dividing the Company s power
cost components by firm kWh load. The power cost components are the sum of fuel expense and
purchased power expense (including purchases from cogeneration and small power producers). less
the sum of off-system surplus soles revenue and FMC secondary load revenue. The Base Power Cost is
5238 cents per kWh.
PROJECTED POWER COST
The Projected Power Cost is the Company estimate, expressed in cents per kWh, of the power
cost components for the forecasted time period beginning April 1 each year and ending the following
March 31. The Projected Power Cost is 7971 cents per kWh.
TRUE-
The True-up is based upon the difference between the previous Projected Power Cost and the
power costs actually incurred. The True-up is 721 LlO.3583 cents per kWh.
POWER COST ADJUSTMENT
The Power Cost Adjustment is 90 percent of the difference between the Projected Power Cost
and the Base Power Cost plus the True-up.
The monthly Power Cost Adjustment applied to the Energy rate for Irrigation Service (Schedules
24 and 25) is 3163 cents per kWh. eAG--for Small General Service (Schedule 7) is 72'110.8481
cents per kWh and Laroe Power Service (Schedule 19) is 0.8221 cents per kWh . The monthly Power Cost
Adjustment applied to the Energy rate of all other metered schedules and Special Contracts
93700.6043 cents per kWh. The monthly Power Cost Adjustment applied to the per unit charges of the
nonmetered schedules is the monthly estimated usage times 93700.6043 cents per kWh.
EXPIRATION
The Power Cost Adjustment included on this schedule will expire May 15. 200~J.
Exhibit No.
Case No. IPC-O3-
G. Said, IPCo
Page 48 of 53
IDAHO POWER COMPANY
I.P.C. NO, 26. TARIFF NO. 101
MONTHLY ENERGY CHARGE
Energy CharGe
Bose Rate
12.783
ELEVENTH REVISED SHEET NO. 26-2
CANCELS
TENTH REVISED SHEET NO. 26-2
IDAHO POWER COMPANY
ELECTRIC SERVICE RATE
SCHEDULE 26
FOR
MICRON TECHNOLOGY, INC.
BOISE. IDAHO
SPECIAL CONTRACT DATED SEPTEMBER 1, 1995
(Continued)
Power Cost.
Adjustment*
19.3706.043
Effective
Rate
18.826 mills per kWh for all energy
This Power Cost Adjustment (Schedule 55), and Effective Rate expire May 15, 200~.
MONTHLY 0 & M CHARGES
4 percent of total cost of Substation Facilities.
CONSERV ATION PROGRAMS RECOVERY CHARGE
$5,703 per month
Exhibit No.
Case No. IPC-O3-
G. Said, IPCo
Page 49 of 53
IDAHO POWER COMPANY
I.P.C. NO. 26 TARIFF NO. 101
TWELFTH REVISED SHEET NO. 28-
CANCELS
ELEVENTH REVISED SHEET NO. 28-
EXPIRED - LEFT BLANK INTENTIONALLY
ID/\HO POWER COMPANY
ELECTRIC SERVICE .'\GREEMENT
SCHEDULE 28
FOR
FMC CORPOR/\TIOr--J
SPECIAL COr--JTRi\CT D.l\,TED DECEMBER 30, 1997
MONTHLY CHf\RGES
FIRST BLOCK MONTHLY CHi\RGES
Contract Domond Charco
$3.70 par kW for tho fin;t 120,000 kVV
Enorov Charco
Baso Roto
6650('
roy/or Cost
I\diu€.tmont*
9370('
Effoctivo
Roto
6020(' per k\"!h
This PO\vor Cost Adjustmont (Schodulo 55), and Effoctivo Rato oxpiro on May 15, 2003.
Tho First Block of Enorgy is 120,000 kIN par hour for ovary hour during tho Billing Period.
SECOND BLOCK MONTHLY CH/\RGES
Contract Damond Charco
$1.39 par kIN for tho noxt 130,000 kW
DolivGrY Charaa
112(' par kWh delivered
Commodity Charco
Tho cmt of providing onorgy to FMc. including, but not limitod to, anorgy purchases, off system
transmission, rowrvos, replocomont of losws and onorgy balancing.
Oparating Rosorvas Charao
$0.22 par kIN par day for RowrvQS for load suppliod in Socond Block of Enorgy which was not prq
committod and pro supplied by tho Company.
Excess Domand CharGe
SO.102 per kIN for all kW ovor 250,000 kIN in any Domand Interval
CONSERV,AJION rROGR,I\MS RECOVERY CHARGE
$32.387 por month
Exhibit No.
Case No. IPC-O3-
G. Said, IPCo
Page 50 of 53
IDAHO POWER COMPANY
I.P.C. NO. 26, TARIFF NO. 101
TWELFTH REVISED SHEET NO. 29-
CANCELS
ELEVENTH REVISED SHEET NO. 29-
IDAHO POWER COMPANY
ELECTRIC SERVICE RATE
SCHEDULE 29
J. R. SIMPLOT COMPANY
POCATELLO. IDAHO
SPECIAL CONTRACT DATED AUGUST 27, 1973
MONTHLY CONTRACT RATE
Demand CharGe
$6.68 per kW of Billing Demand (1)
Eneray Charge
Base Rate
14.080
Power Cost
Adjustment"
19.3706.043
Effective
Rate
20. 123 mills per kWh for all energy (2)
Minimum CharGe
The minimum monthly charge shall be the amount computed in accordance with Paragraph
1. but not less $100,188.61 for any month during the effective term of this Agreement.
This Power Cost Adjustment (Schedule 55), and Effective Rote expire May 15, 200~J.
CONSERVATION PROGRAMS RECOVERY CHARGE
$5,061 per month
Contract Changes
(1)Contract Paroaraph No 5.1 (a).
No Change
(2)Contract ParaGraph No. 5.(b)
Change 33.45031.321 mills to 20.12333.450 mills
(3)Contract ParaGraph No. 5.
No Change
Exhibit No.
Case No. IPC-O3-
G. Said, IPCo
Page 51 of 53
IDAHO POWER COMPANY TWELFTH REVISED SHEET NO. 30-1
CANCELS
ELEVENTH REVISED SHEET NO. 30-I.P.c. NO. 26, TARIFF NO. 101
IDAHO POWER COMPANY
ELECTRIC SERVICE RATE
SCHEDULE 30
FOR
UNITED STATES DEPARTMENT OF ENERGY
IDAHO OPERATIONS OFFICE
SPECIAL CONTRACT DATED MAY 16.2000
CONTRACT NO. GS-OOP-99-BSD-O124
AVAILABILITY
This schedule is available for firm retail service of electric power and energy delivered for the
operations of the Department of Energy facilities located at the Idaho National Engineering
Laboratory site, as provided in the Contract for Electric Service between the parties.
MONTHLY CHARGE
The monthly charge for electric service sholl be the sum of the Demand, Energy, and
Conservation Programs Recovery Charges determined at the following rates:
Demond Charae
$5.10 per kW of Billing Demand Per Month
Enemy CharGe
Bose
Rate
13.404
Power Cost
Adjustment*
19.3706.043
Effective
Rate~19.447 mills per kWh for all energy
Conservation Proarams Recovery CharGe
$3.521 per month
This Power Cost Adjustment (Schedule 55), and Effective Rate expire May 15. 200~.
SPECIAL CONDITIONS
1 .Billina Demand:
The Billing Demand shall be the average kW supplied during the 30-minute period of maximum
use during the month.
Power Factor Adjustment:
When the Power Factor is less than 95 percent during the 30-minute period of maximum load for
the month. Company may adjust the measured Demand to determine the Billing Demand by
multiplying the measured kW of Demand by 0.95 and dividing by the actual Power Factor.
Exhibit No.
Case No. IPC-O3-
G. Said, IPCo
Page 52 of 53
IDAHO POWER COMPANY
I.P.C. NO. 26, TARIFF NO. 101
SECOND REVISED SHEET NO. 32-
CANCELS
FIRST REVISED SHEET NO. 32-
IDAHO POWER COMPANY
AGREEMENT FOR SUPPLY OF SHIELDED
STREET LIGHTING SERVICE
SCHEDULE 32
FOR THE CITY OF KETCHUM, IDAHO
\ .
SPECIAL CONTRACT DATED JUNE 12, 2001
MONTHLY CHARGE PER LAMP
High Pressure
Sodium Vapor
70 Watt
100 Watt
200 Watt
Average
Lumens
400
500
22,000
Base
Rate
$ 7.
$ 7.
$ 9.
Power Cost
Adjustment*
GAeO.
MW.
Effective
Rate~7 .
..uh9+ 1 0.
This Power Cost Adjustment (Schedule 55) and this Effective Rate expire May 15, 200~~.
ADDITIONAL MONTHLY RATE
For Company-owned poles installed after October 5, 1964 required to be used forstreet
lighting only:
Wood pole ........................................................................... $1.71 per pole
Steel pole.............................................................................. $6.80 per pole
PAYMENT
The monthly bill rendered for service supplied hereunder is payable upon receipt, and becomes
past due 15 days from the date on which rendered.
Exhibit No.
Case No. IPC-O3-
G. Said, IPCo
Page 53 of 53