Loading...
HomeMy WebLinkAbout20030415Said Exhibit 4.pdfBEFORE THE IDAHO PUBLIC UTiliTIES COMMISSION Case No. IPC-03- Idaho Power Company Schedule 55 Proposed Power Cost Adjustment Effective 5-16-03 through 5-15- Exhibit No. Gregory W. Said IDAHO POWER COMPANY ELEVENTH REVISED SHEET NO. 55-1 CANCELS TENTH REVISED SHEET NO. 55-I.P.C. NO. 26, TARIFF NO. 101 SCHEDULE 55 POWER COST ADJUSTMENT APPLICABILITY This schedule is applicable to the electric energy delivered to all Idaho retail Customers served under the Company s schedules, to the primary portion of the FMC Special Contract and to all other Idaho retail Special Contracts. These loads are referred to as "firm" load for purposes of this schedule. BASE POWER COST The Base Power Cost of the Company s rates is computed by dividing the Company s power cost components by firm kWh load. The power cost components are the sum of fuel expense and purchased power expense (including purchases from cogeneration and small power producers), less the sum of off-system surplus sales revenue and FMC secondary load revenue. The Base Power Cost is5238 cents per kWh. PROJECTED POWER COST The Projected Power Cost is the Company estimate, expressed in cents per kWh, of the power cost components for the forecasted time period beginning April 1 each year and ending the following March 31. The Projected Power Cost is 0.7971 cents per kWh. TRUE- The True-up is based upon the difference between the previous Projected Power Cost and the power costs actually incurred. The True-up is 0.3583 cents per kWh. POWER COST ADJUSTMENT The Power Cost Adjustment is 90 percent of the difference between the Projected Power Cost and the Base Power Cost plus the True-up. The monthly Power Cost Adjustment applied to the Energy rate for Irrigation Service (Schedules 24 and 25) is 1.3163 cents per kWh, for Small General Service (Schedule 7) is 0.8481 cents per kWh and Large Power Service (Schedule 19) is 0.8221 cents per kWh. The monthly Power Cost Adjustment applied to the Energy rate of all other metered schedules and Special Contracts is 0.6043 cents per kWh. The monthly Power Cost Adjustment applied to the per unit charges of the nonmetered schedules is the monthly estimated usage times 0.6043 cents per kWh. EXPIRATION The Power Cost Adjustment included on this schedule will expire May 15, 2004. IDAHO Issued - April 15, 2003 Effective - May 16, 2003 Issuec Exhibit No. John R. Gale, Vie Case No. IPC-O3- 1221 ' G. Said, IPCoPage 1 of