Loading...
HomeMy WebLinkAbout20041217Phase One AMR Report.pdf-:. IDAHO POWER IDAHO POWER COMPANY O. BOX 70 BOISE, IDAHO 83707 C(ECE!'VED ~ ; ! , f LJ An IDACORP company ?ont: f:f' q Q- '-~;Ul j\,-. t;n , ., (208) 388-2848 FAX (208) 388-6449 mbrilz (g1 idaho ower.com MAGGIE BRILZ '" , , " -' U t,. t \ ""!; ;T' ;""(' (" LJ tiLl i tc..j ~,Ur'jrli ..) nDirector, Pricing December 16, 2004 Ms. Jean D. Jewell, Secretary Idaho Public Utilities Commission P. O. Box 83720 Boise, I D 83720-0074 RE:Status of Phase One AMR Implementation Plan Case No. IPC-02- Dear Ms. Jewell: Commission Order No. 29362 directed Idaho Power 'Company to complete Phase One AMR implementation by December 31 ,2004. Th~ purpose of this letter is to inform the Commission that, with the exception of approximately six meters located in the McCall area, the Phase , One AMR implementation was completed on October 26, 2004. Since that date, all customers included in tHe Phase One AMR implementation have had their meter usage data obtained via the AMR system. The six meters in the McCall area still awaiting AMR installation are associated with properties that have presented access issues. Idaho Power is continuing to work with the owners of these properties to gain access to the meters; however, for most ot these properties, the meter will not be installed until the spring when the owners return from their winter homes. One ot the lessons learned during the implementation process is that the AMR technology being utilized tor Phase One is not compatible with single-phase substations. Consequently, Idaho Power will not be able to install AMR metering capability tor approximately 260 customers in the Emmett operating area and approximately 480 customers in the McCall operating area who are served from single- phase substations. The single-phase substations in these two operating areas are the Ol~, ~idden Lake, :Tamarack, WarrTl ~ake . S?ott, and Smith's Ferry substati~ns. , , Due to' potential is5ues 'related to the dairy industry,ldClho Power has nofinstalled "AMR capabilitttor ani 9~hy ~o9~ted ~ithin the' Emmett or McCall operating areas. In addition , AMR capability Will not be installed at this time fof-'those service locations that currently have a load research meter installed or tor those service points that have continued enrollment in the Agricultural Irrigation Service Time-ot-Use Pilot Program (Schedule 25). Approximately 60 meters in the Emmett operating area and approximately 50 meters in the McCall operating area fall into this classification. If you have any questions regarding the Company s Phase One AMR implementation , please contact me. Sincerely, ?77~ ,,6 Maggie Brilz MB:mb Enclosures Ric Gale P&RS Files Legal Files Status of Phase One AMR Implementation Plan Case No. IPC-O4- Page 2