BEFORE THE IDAHO PUBLIC UTILITIES COMMISSION
IN THE MATTER OF TIlE APPLICATION OF )
IDAHO POWER COMPANY FOR APPROVAL )
OF A NEW SCHEDULE 84—NET METERING.)
)
CASE NO.IPC-E-01-39
)COMMENTS OF THE
)COMMISSION STAFF
)
COMES NOW the Staffofthe Idaho Public Utilities Commission,by and through its
Attorney ofrecord,Scott Woodbury,Deputy Attorney General,and in response to the Notice of
Application,Notice of Modified Procedure and Notice of Comment Deadline/Protest Deadline
issued on November 23,2001,submits the following comments.
On January 22,1997,the Commission issued Order No.26750 authorizing Idaho Power
to implement net metering as a pricing option in the Company’s Tariff Schedule 86—
Cogeneration and Small Power Production—Non-Firm Energy.Net metering was identified as
Option B in the purchase price section of Schedule 86 and described as “offset to retail sales.”In
recent months,the Company states it has received input from potential net metering customers
indicating that the current net metering provision of Schedule 86—Option B—is difficult to
understand and cumbersome to implement.In response to those comments and in an effort to
reduce the administrative requirements of computing individual monthly charges for different
STAFF COMMENTS 1 DECEMBER 21,2001
0 0
generating facilities and multiple customers,the Company is requesting authorization to revise
its net metering provisions.
Description of Proposal
The Company is requesting approval of a net metering option that:
a.allows the Company to use its existing billing system;
b.allows the customer to use a single meter to register the energy supplied by the
Company and the energy delivered by the customer;
c.charges the customer the rate consistent with its class of service while the meter
is running forward;
d.pays the customer the retail rate consistent with its class of service while the
meter is running backward,and
e.does not impose any monthly charges other than those provided for on the
customer’s standard service schedule.
Idaho Power is proposing that its net metering option,the proposed Schedule 84,be
available to customers talcing service under Schedule 1 or Schedule 7 who own and/or operate a
generation facility that is fueled by solar,wind,biomass,or hydro power,or represents fuel cell
technology,is rated at 25 kW of nameplate capacity or less,and is interconnected to the
customer’s individual electric system on the customer’s side of the meter.A single meter will be
utilized for the net metering service.All energy supplied by the Company to the customer will
cause the meter to run forward;all energy delivered by the customer to the Company will cause
the meter to run backward.If the energy supplied by the Company exceeds the energy generated
by the customer during the billing period,the customer will be billed for the net amount of energy
recorded on the meter at the standard Schedule 1 or Schedule 7 tariff rate,as applicable.If the
energy generated by the customer exceeds the energy supplied by the Company during the billing
period,the customer will be credited for the net amount of energy delivered to the Company at
the standard Schedule 1 or Schedule 7 tariff rate,as applicable.
The Company is proposing to make the net metering service under Schedule 84 available
on a first come,first serve basis until the cumulative generation nameplate capacity of net
metering systems connected to the Company’s system equals 2.9 MW.The 2.9 MW limit
represents 1/lOt1 of 1%ofthe Company’s retail peak demand for year 2000.The l/l0t1 of 1%
STAFF COMMENTS 2 DECEMBER 21,2001
0
limit,the Company contends,is considered to be an industry standard and is identical to the limit
on net metering capacity the Commission previously approved for Avista Utilities.
Staff Analysis
Staff agrees that Option B under Schedule 86,the net metering option,is confusing to
customers and difficult for Idaho Power to implement and administer.Staff supports elimination
of Option B from Schedule 86 in favor of a new Schedule 84 that greatly simplifies the
Company’s net metering rules.However,Staffwishes to make the following comments in
support of its positions on various issues.
The Company’s proposal to credit customer generators at full retail rates will,in Staff’s
opinion,pay customers more than the actual value of the generation.Consider,for example,an
instance in which a residential net metering customer completely offsets his entire usage during
the month.The customer would pay only a basic customer charge ($2.51).Idaho Power would
collect no revenue from the sale of kWhs.With only the revenue from the customer charge,
Idaho Power cannot recover its full cost of providing service.To provide service,Idaho Power
must still have distribution plant in place (poles,wires,transformers,etc.),they must still read
meters and send bills,and they still have administrative costs.According to Idaho Power’s
unbundling report for 1999,of the approximately 4.9 0/kWh’total cost for residential and small
customers,generation costs account for 2.47 0/kWh,transmission 0.29 0/kWh,distribution
facilities 1.38 0/kWh,and the remaining 0.80/kWh is for meter reading,billing,and other
general and administrative costs.Net metering allows Idaho Power to avoid some generation
costs and perhaps some transmission costs,but few,if any,other costs.Under Idaho Power’s
current net metering tariff,the credit allowed for customer generation is discounted to account
for this.However,under the proposed new tariff,customer generation is not credited based on
the avoided cost of generation and transmission,but at the full retail rate.
For the Commission to accept a net metering tariffwhere customer generation is credited
at full retail rates,it must be willing to accept the fact that Idaho Power may not recover its full
costs ofproviding service from net metering customers.Those costs that are uncollected must
either come from Idaho Power through its shareholders or from other customers collectively.
‘The current PCA adds 1 .72/kWh to the base rate.This additional cost is generally considered to be a generation
cost.
STAFF COMMENTS 3 DECEMBER 21,2001
0 C)
Initially,the subsidy for net metering customers is paid by Idaho Power through shareholders,
assuming no provisions are made in the PCA mechanism to recover lost revenue.After a general
rate case,the subsidy of net metering customers would presumably be shifted to the general body
of ratepayers.
One distinction worth pointing out,Staffbelieves,is the difference between energy
provided to customers by Idaho Power and energy provided to Idaho Power by customers.
Energy offered to customers by Idaho Power is firm,meaning that it is available at all times
whenever customers desire to make use Of it.Net generation,on the other hand,is provided by
customers to Idaho Power on a non-firm basis,or on an “if and when available”basis.While
there has always been a difference in the value of firm versus non-firm energy,that difference is
not recognized under Idaho Power’s Schedule 84 proposal.
Despite Staffs concerns about the likelihood that some of the costs of serving net
metering customers will be subsidized by other customers,the overall dollar impacts of net
metering will be small if participation levels are restricted.Staff believes Idaho Power’s
proposal to limit both the maximum size of individual installations to a capacity of 25 kW and
the maximum collective capacity of net metering generation on the Company’s system to 2.9
MW is reasonable.These participation limits are the same as the limits for Avista’s net metering
tariff.
If all net metering customers were 25 kW in size,for example,then 116 customers could
participate in the program before the limit would be reached.Since most customers would not
produce 25 kW,it is more likely that several hundred net metering customers could be
accommodated within the proposed 2.9 MW cap.
Staff believes it will be a long time before the 2.9 MW participation cap is reached.
Avista’s net metering tariff has been in place since October 16,2000,yet it has failed to attract a
single customer in Idaho so far.Idaho Power’s existing net metering rules,which have been in
place since 1983,have only attracted three net metering customers,two ofwhich were connected
in the past six months.Staff recognizes that the new proposed net metering tariff is much more
attractive than the old one and that advancements in technology could improve project
economics.Both of these factors could greatly increase the number of customers participating in
net metering in the future.If the cap were to be reached soon,the Commission could then
reexamine whether to increase the cap.
STAFF COMMENTS 4 DECEMBER 21,2001
(D
If the cap were to be increased at some point,Staff believes it would also be reasonable to
reassess the appropriate rate and charges for net metering at that time.Staff believes that as long
as the number ofnet metering customers is small,then the small subsidy to them may be
appropriate in order to promote and sustain a renewable energy-based net metering program.
However,if and when there is 2.9 MW of net metering on Idaho Power’s system,Staff believes a
more accurate cost based rate should be established.
Staff also wishes to point out that net metering is not the only means for generators to sell
energy to Idaho Power.For firm energy generation,qualifying facilities (QFs)smaller than one
megawatt are still entitled to published avoided cost rates under PURPA.Project-specific rates
are available to QFs one megawatt and larger.For non-firm energy generation,Schedule 86
would still set purchase prices.2 Consequently,even though establishing a limit on the size and
collective capacity of net metering customers could restrict the development of small,renewable
energy projects installed for net metering purposes,it will not eliminate all opportunities to
develop renewable energy projects.
As previously mentioned,Staff believes that the financial impact of net metering will be
minimal.For example,if 120 customers participated in net metering,if each generated 2000
kWhs per month,and if all generation was priced at the rate of the highest residential block,then
the monthly cost to Idaho Power would be approximately $20,000.If this cost is then netted
against the generation and transmission costs avoided by Idaho Power,the overall costs are cut in
half.Less conservative estimates,obviously,would result in even lower costs.
Under Idaho Power’s proposal,net metering will be restricted to Schedule 1 and
Schedule 7 customers only (residential and small commercial).Idaho Power’s reason for this
restriction is that customers on these two tariffs are the only ones who do not utilize meters
capable of measuring both demand and energy.Idaho Power states that the current technology
utilized in electronic demand meters does not allow the meter to “run backwards.”In order to
capture any energy delivered to Idaho Power’s system,the energy and demand must be metered
separately.This will require either the installation of an additional meter andlor installation of an
electronic meter with the capability of measuring multiple inputs and outputs.Either ofthese
installations would require that the customer’s meter base be replaced or modified to
2 Currently,non-firm energy rates are set at Mid-C minus 4 mills.Idaho Power is proposing in Case No.IPC-E-0l-
40 to set non-firm energy rates at 85%of Mid-C.
STAFF COMMENTS 5 DECEMBER 21,2001
0 0
accommodate the new meter.In addition,Idaho Power is concerned that if a demand meter
could actually “run backwards,”the demand component of a customer’s bill could potentially be
reduced.Idaho Power contends that it would be inappropriate for non-firm energy delivered by
the customer to be given credit for capacity by offsetting a demand charge.
Staff agrees that it is inappropriate to credit customers for reductions in demand,unless
of course,the reduction in demand endures for the entire month,in which case the customer
would be billed for a lower demand anyway.Staff believes this circumstance would be unlikely
in most cases for most customers.Staff disagrees with Idaho Power that net metering should be
restricted to only Schedules 1 and 7.It is true that a second meter or a more sophisticated meter
may be required for demand metered customers.However,Staffbelieves that demand metered
customers should be allowed to participate in net metering,but that it would be reasonable to
require them to pay any additional costs to cover necessary meter modifications or additions.
Staff proposes that demand metered customers only be credited for generation at the energy rate
of the schedule under which the customer is served.
Nevertheless,while critical of some aspects of the Company’s proposal,Staff generally
supports net metering.Net metering helps to support the continuing development of renewable
energy resources.It also helps to advance energy generation technology and may offer
environmental benefits.
Staff notes that Idaho Power’s net metering proposal is very similar to the net metering
rules afready in place for Avista.Avista’s current net metering rules were approved by the
Commission on April 30,1999.(Reference Order No.28035).
Staff also notes that the Idaho Energy Coalition along with several other groups in Idaho
is pushing a legislative alternative to Idaho Power’s proposed net metering changes.As drafted,
the legislation would establish net metering rules that would apply to all electric utilities in
Idaho.The Idaho Energy Coalition’s proposed legislation would permit much larger net
metering systems than Idaho Power’s proposal.In addition,the legislation would allow
irrigators to take advantage of net metering.Like Idaho Power’s proposal,the legislation also
contains a provision that would authorize the Commission to limit utilities’obligations to
purchase to one percent of the utilities’peak hourly load.Staff contends that the proposed
legislation should not be considered by the Commission in its deliberations in this case.There is
STAFF COMMENTS 6 DECEMBER 21,2001
0 0
no guarantee that the proposed net metering legislation will pass,will pass in a modified form,or
will even be introduced.
Staff Recommendations
Staffrecommends that the Commission approve Idaho Power’s proposed new Schedule
84,but with the following changes:
•Staffrecommends that net metering be made available to all customer classes.
•Staff recommends that demand metered customers desiring to participate in net
metering (irrigation,large commercial and industrial)be required to pay any additional
costs associated with installing additional metering equipment necessary for net
metering.
Staff recommends that demand metered customers,if allowed to participate in net
metering,be credited for the energy they produce at the energy rate applicable to the
tariff under which the customer is currently served.
Respectively submitted this &f day of December 2001.
Scott
Woodbury 7DeputyAttorneyGeneral
Technical Staff:Rick Sterling
SW:RS:i/umisc/commentslipceol .39swrps
STAFF COMMENTS 7 DECEMBER 21,2001
CERTIFICATE OF SERVICE
I HEREBY CERTIFY THAT I HAVE THIS 21ST DAY OF DECEMBER 2001,
SERVED THE FOREGOiNG COMMENTS OF THE COMMISSION STAFF,IN CASE
NO.IPC-E-01-39,BY MAILING A COPY THEREOF,POSTAGE PREPAID,TO THE
FOLLOWING:
BARTON L KLINE MAGGIE BRILZ
SENIOR ATTORNEY DIRECTOR OF PRICING
IDAHO POWER COMPANY IDAHO POWER COMPANY
P0 BOX 70 P0 BOX 70
BOISE ID 83707-0070 BOISE ID 83 707-0070
CERTIFICATE OF SERVICE