Loading...
HomeMy WebLinkAbout20020214Approved Tariff.pdfIDA..O PUBLIC UTILITIEScommESlon Dirt Kempthome, Govemor P.O. Box 8372o., Boise, ldaho 8t1720-m74 Paul Kjellander, President Marsha H. Smith, Commissioner Dennis S. Hansen, Commissioner February 14,2002 Barton L. Kline Idatro Power Company PO Box 70 Boise,ID 83707-0070 RE: Case No. IPC-E-01-39 Dear Mr. Kline: Please find enclosed your approved tariffsubmitted in Case No. IPC-E-01-39 pursuant to Order No. 28951. The approval date is February 13,2002 and the effective date is February 13, 2002. Sincerely, 0 D. Jewell Commission Secretary jdj:av Enclosures. Located a|472 West Washington Street, Boise, ldaho 83702 Telephone: (208) 334-0300 Facsimile: (2OA) 334-3762 Anqa Velasouez From: Sent: To: Rick Sterling Wednesday, February 13,2002 3:07 PM Anga Velasquez RE: Case No. IPC-E-01-39 ,,n 1l f Subiect: I reviewed the attached tariff and the corresponding Order. The taritf is correct and comports with the Order. The only thing that should be changed however, is the effective date. The effective date is listed as Dec. 10, 2001. The Order does not specifl an effective date, but it would be reasonable to assume that the effective date should be the date of the Order or the date when a correct tariff is filed. You should also be aware that the Order requires lPCo to make an additional filing within six weeks to permit all customers to participate in net metering. I do not know at this point whether lPCo intends to revise this tariff or to propose an additional one. ln either case, the attached tariff should be made effective now, even if it gets revised in a few weeks. Rick ---Original Message---From: Anga VelasquezSenE Wednesday, February L3,2002 10:35AMTo: Rick SterlingSubject CaseNo.Irc-E-01-39 Rick, I just issued Order No. 28951, IPC-E-01-39 and in the Order is approves a tariff Schedule 84 for ldaho Power. Are these tariffs ok to approve? (attached) Thanks for your help Angie << File: ON28951.pdf >> << File: Pages from ScheduleS4.pdf >> flpp. fc{, 9 - E-oJ J-/3-o7 o 11 , ?8q5 I 1 { |I)AHO POWER COMPANY SECOND REVISED SHEET 84-' CANCET |.P.U.C. NO. 26 TARIFF NO. l0 r FIRST REVISED SHEEI NO. 84-l SCHEDULE 84 CUSTOMER ENERGY PRODUCTION NET MflERING IDAHO PI'tsLIC IMLTNES COMMISSONAPPROVED EFFECTIVE FE 1 ''02 FEB 1 I'C2 A^fi N sEcBFrARy ,\,/A1LA3tLiry Service under this schedule is ovoiloble throughout the Compony's service tenitory within the Stote of ldoho for Customers intending to generote electricity to reduce oll or port of their monthly energy usoge. Service under this schedule is ovoiloble on o first-come, first-served bosis until the cumulotive generotion nomeplote copocity of net metering systems equols 2.9 MW, which represents one-tenth of one percent of the Compony's retoilpeok demond during 2000. APPLICABILIil Service under this schedule is opplicoble to ony Seller thot: Tokes retoil electric service on Schedule I or Schedule 7; 2. Owns ond/or operotes o Generotion Focility thot: o. Hos o totol nomeplote copocity roting of 25 kW or smoller; b. Generotes electricity fueled by solor, wind, biomoss, or hydropower, or represents fuel cell technology; c. ls interconnected to the Seller's individuol electric system on the Seller's side of the Compony's retoil metering point, lhus oll energy received ond delivered by the Compony is through the existing retoil meter. 3. Meets oll opplicoble requirements of the Compony's Schedule 72 ond Generotion lnterconnection Process. DEFINITIONS Generotion Focilitv meons oll equipment used to generole electric energy where the resulting energy is either delivered to the Compony vio o single metering point or is consumed by the customer. Generotion lnterconnection Process is lhe Compony's generotion interconnection opplicotion ond engineering review process developed to ensure o sofe ond relioble generotion interconnection. lnterconnection Focilities ore oll focilities reosonobly required by Prudent Electricol Proctices ond the opplicoble electric ond sofety codes to interconnect ond sofely deliver energy from the Generotion Focility to the Point of Delivery. IDAHO lssued per IPUC Order No.28951 Effective - Februory 13,2@2 lssued by IDAHO POWER COMPANY John R. Gole, Vice President, Regulotory Affoirs l22l West ldoho Street, Boise, ldoho IQAHO pOWER COMPANY FIRST REVTSED SHEEr B4-? CANCEL I.P.U.C. NO.26, TARIFF NO. IOi ORIGINALSHEET NO.84-2 SCHEDULE 84 CUSTOMER ENERGY PRODUCTION NEI METERING (Continued) IDIXO PUBLIC UTILITIES COMMISSIONAPPROVED EFFEfiIVE FEB 1l '02 FE 1 l'02 bfrN sEcHEnRy DEFINITIONS (Continued) Point of Deliverv is the retoil metering point where the Compony's ond the Seller's electricol focilities ore interconnected. Prudent Electricol Proctices ore those proctices, methods ond equipment thot ore commonly used in prudent electricol engineering ond operotions to operote electric equipment lowfully ond with sofety, dependobility, efficiency ond economy. Schedule 72 is the Compony's service schedule which provides for interconnection to non-utility generotion or its successor schedule(s) os opproved by the Commission. Seller is ony entity thot owns or operotes o Generotion Focility ond desires to interconnect ond operote o Generotion Focility ond potentiolly sell net surplus energy to the Compony. MONTHLY BILLING The Seller sholl be billed in occordonce with the Seller's opplicoble stondord service Schedule lor Schedule 7, including oppropriote monthly chorges. CONDITIONS OF PURCHASE AND SALE The conditions listed below shollopply to oll tronsoctions under this schedule. l. Bolonces of generotion ond usoge by the Seller: o. lf electricity supplied by the Compony during the Billing Period exceeds the electricity generoted by the Seller ond delivered to the Compony during the Billing Period, the Seller sholl be billed for lhe net electricity supplied by the Compony of the Seller's stondord schedule reloilrote, in occordonce wilh normol metering proctices. b. lf electricity generoted by the Seller during the Billing Period exceeds the electricity supplied by the Compony during the Billing Period, the Seller: Sholl be billed for the opplicoble non-energy chorges for the Billing Period under the Seller's stondord service schedule, ond Sholl be finonciolly credited for the energy delivered to the Compony during the Billing Period of the Seller's stondord service schedule retoilrote. 2. As o condition of interconnection with the Compony, the Seller sholl: o. Complete ond mointoin oll requirements of interconnection in occordonce with lhe opplicoble portions of Schedule 72. t. il. IDAHO lssued per IPUC Order No.2895l Effeclive - Februory 13,2@2 lssued by IDAHO POWER COMPANY John R. Gole, Vice President, Regulolory Affoirs l22l West ldoho Street, Boise, ldoho IQAHO POWER COMPANY FIRST REVISED SHEff NO.84-3 CANCEL I.P.U.C. NO. 26, TARIFF NO. IO I ORIGINAL SHEET NO. 84-3 SCHEDULE 84 CUSTOMER ENERGY PRODUCTION NET METERING (Continued) \llt_o_lu BLt C UTt L tTt Es co M M tsstoNAPpRovED EreeCIVi" FEB 1l '02 tEB t7'02 A^eNl .E'RETABY CONDITIONS OF PURCHASE AND SALE (Continued) b. Complete ond mointoin oll requirements of the Compony's Generotion lnterconnection Process. c. Obtoin written confirmotion from the Compony thot oll conditions to interconnection hove been fulfilled prior to operotion of the Generotion Focility. Such confirmotion sholl not be unreosonobly withheld by the Compony. 3. The Seller sholl never deliver or ottempt to deliver energy to the Compony's system when the Compony's system serving the Seller's Generotion Focility is de-energized for ony reoson. 4. The Compony sholl not be lioble directly or indirectly for permitting or continuing to ollow on ottochment of o net metering focility to the Compony's system, or for the octs or omissions of the Seller thot couse loss or injury, including deoth, to ony third porty. 5. The Seller is responsible for oll costs ossocioted with the Generolion Focility ond lnterconnection Focilities. The Seller is olso responsible for oll costs ossocioted with ony Compony odditions, modificotions, or upgrodes to ony Compony focilities thot the Compony determines ore necessory os o result of the instollotion of the Generotion Focility in order to mointoin o sofe, relioble electricol system. 6. The Compony sholl not be obligoted to occept, ond the Compony moy require the Seller to curtoil, interupt or reduce deliveries of Energy if the Compony, consistent with Prudent Eleclricol Proctices, determines thot curtoilment, intenuption or reduction is necessory becouse of line construction or mointenonce requirements, emergencies, or other criticol operoting conditions on its system. 7. lf the Compony is required by the Commission to institute curtoilment of deliveries of electricity to its customers, the Compony moy require the Seller to curtoil its consumption of electricity in the some monner ond to lhe some degree os other Customers within the some customer closs who do not own Generotion Focilities. 8. The Seller sholl gront to the Compony oll occess to oll Compony equipment ond focilities including odequote ond continuing occess rights to the property of the Seller for the purpose of instollotion, operotion, mointenonce, replocemenl or ony other service required of soid equipment os well os oll necessory occess for inspection, switching ond ony other operotionol requirements of the Seller's lnterconnections Focilities. IDAHO lssued per IPUC Order No.28951 Effective - Februory 13,2@2 lssued by IDAHO POWER COMPANY John R. Gole, Vice President, Regulotory Affoirs l22l West ldoho Streel, Boise, ldoho