In March 2001 , the Commission approved Idaho Power Company s Irrigation Load
Reduction Program, authorizing the Company to contract with irrigation customers for electric
load reduction of at least 100 000 kilowatt hours ("kWh") during the 2001 irrigation season.
Order Nos. 28676 and 28699 (Case No. IPC-01-3). On October 19, 2001 , the Company filed
an Application requesting that the Commission authorize the Company to include the costs of the
Irrigation Load Reduction Program in the 2002/2003 Power Costs Adjustment ("PCA") case.
Case No. IPC-01-34. On April 15, 2002, the Commission issued Order No. 28992 granting
Idaho Power s request to recover the direct costs associated with the Irrigation Load Reduction
Program but denying its request to recover "reduced/lost revenue" that may have resulted from
the program s operation.
On May 2, 2002, the Company filed a timely Petition for Reconsideration requesting
that the Commission reconsider its decision regarding the recovery of reduced/lost revenues.
The Company did not offer any new evidence but stated it is available if the Commission desires
to convene a hearing. The other parties in this case have not filed a response to the Company
Petition.
COMMISSION DECISION
Pursuant to Idaho Code g 61-626 "within twenty-eight days after the filing of a
petition for reconsideration the Commission shall determine whether or not it will grant such
reconsideration, and make and enter its order accordingly. If reconsideration be granted, said
order shall specify how the matter will be reconsidered(.
1 The Commission ordered that this was a temporary voluntary program only for 2001. Order No. 28699 at 21.
Idaho Power defined the "2001 growing season" as March 1 2001 through November 30, 2001. RFP at 1 , ~ 1.3.
ORDER NO. 29040
The Commission has determined that the complexity of issues surrounding Idaho
Power s Petition for Reconsideration requires us to thoroughly review the record in this matter in
order to render our decision. Based on Idaho Power s representation and our own determination
we find that the record in this proceeding is sufficient for the Commission to resolve the
Company s Petition. Accordingly, the Commission shall grant Idaho Power s Petition for
Reconsideration for the limited purpose of determining whether based on the record we should
modify Order No. 28992 to allow Idaho Power to recover reduced/lost revenues from the
Irrigation Load Reduction Program.
ORDER
IT IS HEREBY ORDERED that Idaho Power Company Petition for
Reconsideration is granted. The Commission will review the record in this matter in order to
determine whether it should modify Order No. 28992 to allow Idaho Power to recover
reduced/lost revenues from the Irrigation Load Reduction Program.
DONE by Order of the Idaho Public Utilities Commission at Boise, Idaho this 30
day of May 2002.
d/L
MARSHA H. SMITH, COMMISSIONER