Loading...
HomeMy WebLinkAbout20220105Informational Filing - Verde Light Community Solar LLC.pdfDONOVAN E. WALKER Lead Counsel dwalker@idahopower.com January 5, 2022 VIA ELECTRONIC MAIL Jan Noriyuki, Secretary Idaho Public Utilities Commission 472 West Washington Street Boise, Idaho 83702 Re: Informational Filing Regarding Qualifying Facility Transaction Verde Light Community Solar, LLC Dear Ms. Noriyuki: Attached please find a copy of the Community Solar Program Puchase Agreement for the state of Oregon between Idaho Power Company (“Idaho Power”) and Verde Light Community Solar, LLC. Because this solar project is located in the state of Oregon and interconnects with Idaho Power’s system in the state of Oregon, this agreement and the rates paid under the agreement are in accordance with the rules and orders of the Public Utility Commission of Oregon. Idaho Power is providing these informational copies for the Idaho Public Utilities Commission’s (“Commission”) records and convenience. Please contact me at (208) 388-5317 if you have any questions. Sincerely, Donovan E. Walker DEW:cld Enclosures cc: Camille Christen RECEIVED 2022 JAN 05 PM 4:22 IDAHO PUBLIC UTILITIES COMMISSION 2 • The Facility has completed Start-Up Testing; • The Company has received written confirmation from the Company’s business unit that administers the Generator Interconnection Agreement (“GIA”) stating that, in accordance with the GIA, all required interconnection facilities have been constructed, all required interconnection tests have been completed and the Facility is physically interconnected with Company’s electric system. Commission means the Public Utility Commission of Oregon. Community Solar Program is the program established for the procurement of electricity from community solar projects pursuant to ORS 757.386(2). Community Solar Program Interconnection is the interconnection service offered by the Company to Projects in the Community Solar Program. Community Solar Program Interconnection Agreement means the generation interconnection agreement to be entered into separately between Project and Company providing for the construction, operation, and maintenance of the Company’s interconnection facilities required to accommodate deliveries of Projects’ Net Output. Contract Year means the period commencing each calendar year on the same calendar date as the Operation Date and ending 364 days thereafter Energy means the non-firm electric energy, expressed in kWh, generated by the Project and delivered to the Company in accordance with the conditions of this schedule. Energy is measured net of Losses and Station Use. Losses are the loss of electric energy occurring as a result of the transformation and transmission of electric energy from the Project to the Point of Delivery. Net Output means all energy produced by Project, less station use and less transformation and transmission losses and other adjustments, if any. For purposes of calculating payment under this Agreement, Net Output shall be the amount of energy flowing through the Point of Delivery. Participant means a customer of the Company that is either a subscriber or owner of a Project. Point of Delivery is the location where the Company’s and Project’s electrical facilities are interconnected. Pre-certified Project is a project that is pre-certified by the Oregon Public Utility Commission under OAR 860-088-0040. Program Administrator means the third-party directed by the Oregon Public Utility Commission to administer the Community Solar Program. Project is one or more solar photovoltaic energy systems used to generate electric energy on behalf of Community Solar Program owners and subscribers and for which owners and subscribers receive credit on their electric bills. Project Manager has the same definition as ORS 757.386(d) and means the entity identified as having responsibility for managing the operation of a community solar project and, if applicable, for maintaining contact with the electric company that procures electricity from the community solar project. A project manager may be: (A) An electric company; or (B) An independent third party. Prudent Electrical Practices are those practices, methods, and equipment that are commonly used in prudent electrical engineering and operations to operate electric equipment lawfully and with safety, dependability, efficiency and economy. PURPA means the Public Utility Regulatory Policies Act of 1978. 3 Qualifying Facility is a solar photovoltaic facility that meets the PURPA criteria for qualification set forth in Subpart B of Part 292, Subchapter K, Chapter I, Title 18, of the Code of Federal Regulations. Station Use is electric energy used to operate the Project that is auxiliary to or directly related to the generation of electricity and which, but for the generation of electricity, would not be consumed by Project. Subscribed Energy means the portions of the Energy generated by the Project and delivered to the Point of Delivery for which the Project has obtained a subscriber or owner and for which the Company must credit the subscribers’ and owners’ electric bills. Transmission Provider means Idaho Power Company, acting in its transmission provider capacity. Unsubscribed Power means the portion of the Energy delivered to the Point of Delivery for which the Project has no subscriber or owner and for that is purchased by the Company at the As-Available Rate. SECTION 2: TERM This Agreement shall become effective after execution by both Parties (“Effective Date”) and shall continue in full force and effect for a period of twenty (20) Contract Years from the Commercial Operation Date. SECTION 3: DELIVERY OF POWER AND COMPENSATION Commencing on the Commercial Operation Date, unless otherwise provided herein, Project will transmit to the Company all Energy generated by the Project and Company will accept all Energy delivered to the Point of Delivery. Company will compensate the Project and Project owners and subscribers for Energy delivered to the Point of Delivery (“Net Output”) on a monthly basis. For the portion of the monthly Net Output that is Subscribed Energy, Company will credit the electric bills of Project owners and subscribers to account for their proportionate share of the Net Output in accordance with the requirements and data provided by the Program Administrator. For the portion of the monthly Net Output that is Unsubscribed Energy, Company will pay the Program Administrator the Company’s As-Available Rate. SECTION 4: ENVIRONMENTAL ATTRIBUTES Company waives any claim to ownership of any Environmental Attributes associated with the Project’s Net Output. SECTION 5: OPERATION AND CONTROL As-Built Supplement. Upon completion of initial (and any subsequent) construction of the solar photovoltaic facility, Project shall provide Company an As-Built Supplement to specify the actual Facility as built. The As-Built Supplement must be reviewed and approved by the Company, which approval shall not be unreasonably withheld, conditioned or delayed. Facility Operation. Project shall operate and maintain the Facility in a safe manner in accordance with the Generation Interconnection Agreement, Prudent Electrical Practices and in accordance with the requirements of all applicable federal, state and local laws and the National Electric Safety Code as such laws and code may be amended from time to time. Company shall have no obligation to purchase Net Output from the Project to the extent the interconnection between the Project and the Company’s electric system is disconnected, suspended or interrupted, in whole or in part, pursuant to the Generation Interconnection Agreement, or to the extent generation curtailment is required as a result of the Company’s s non-compliance with the Generation Interconnection Agreement. 4 The Company shall have the right to inspect the Project to confirm that the Project is operating the solar photovoltaic facility in accordance with the provisions of this Agreement upon reasonable notice to Project. Project is solely responsible for the operation and maintenance of the Facility. The Company shall not, by reason of its decision to inspect or not to inspect the Facility, or by any action or inaction taken with respect to any such inspection, assume or be held responsible for any liability or occurrence arising from the operation and maintenance by Project of the Facility. Scheduled Outages. Project may cease operation of the entire Facility or individual units for maintenance or other purposes. Project shall exercise reasonable efforts to notify Company of planned outages at least ninety (90) days prior. Unplanned Outages. In the event of an unscheduled outage or curtailment exceeding twenty-five (25) percent of the Facility Capacity Rating (other than curtailments due to lack of motive force) expected to last more than 48 hours, Project shall reasonably notify the Company of the unscheduled outage or curtailment, the time when such occurred or will occur, and the anticipated duration. SECTION 6: METERING Company shall design, furnish, install, own, inspect, test, maintain and replace all metering equipment required pursuant to the Generation Interconnection Agreement. Metering shall be performed at the location and in a manner consistent with this Agreement, the Generation Interconnection Agreement, and requirements of the Community Solar Program. All quantities of Energy purchased hereunder shall be adjusted to account for electrical losses, if any between the point of metering and the Point of Delivery, so that the purchased amount reflects the net amount of energy flowing into Idaho Power’s system at the Point of Delivery. Company shall periodically inspect, test, repair and replace the metering equipment as provided in the Generation Interconnection Agreement. If any of the inspections or tests discloses an error exceeding two percent (2%), either fast or slow, proper correction, based upon the inaccuracy found, shall be made of previous readings for the actual period during which the metering equipment rendered inaccurate measurements if that period can be ascertained. If the actual period cannot be ascertained, the proper correction shall be made to the measurements taken during the time the metering equipment was in service since last tested, but not exceeding three (3) months, in the amount the metering equipment shall have been shown to be in error by such test. Any correction in billings or payments resulting from a correction in the meter records shall be made in the next payment rendered following the repair of the meter. SECTION 7: COMPUTATIONS No later than the second business day of each month, Company will transfer to the Project Administrator the solar production of the Project, which is the Net Output for the month measured in kWh. SECTION 8: COMPENSATION Payment for Unsubscribed Energy. No later than thirty (30) days after receiving kWh from Program Administrator, Company shall send to Program Administrator payment for Project deliveries of Unsubscribed Energy to Company, together with computations supporting such payment. Company may offset any such payment to reflect amounts owing from Project to Company pursuant to this Agreement, the Generation Interconnection Agreement, or any other agreement between the Parties. Corrections. Company shall have up to three months to adjust any payment made pursuant to Section 10.1. In the event Company determines it has overpaid Project, Company may adjust Project’s future payment for Unsubscribed Energy accordingly in order to recapture any overpayment in a reasonable time. Interest. Any amounts owing after the due date thereof shall bear interest at the Prime Rate plus two percent (2%) from the date due until paid; provided, however, that the interest rate shall at no time exceed the maximum rate allowed by applicable law. 5 Payment for Subscribed Energy. Company will credit the electric bills of Project owners and subscribers for their proportionate shares of Subscribed Energy in accordance with data provided by Program Administrator. SECTION 9: SUCCESSORS AND ASSIGNS This Agreement and all of the terms shall be binding upon and inure to the benefit of the respective successors and assigns of the Parties. No assignment by either Party shall become effective without approval from the Public Utility Commission of Oregon. SECTION 10: NOTICES All notices except as otherwise provided in this Agreement shall be in writing shall be directed as follows and shall be directed as follows and shall be considered if delivered in person or when deposited in the U.S. Mail, postage prepared by certified or registered mail and return receipt requested. SECTION 11: TERMINATION This Agreement shall terminate at any time the Program Administrator has notified Company in writing that the Project is no longer certified as a Project in the Oregon Community Solar Program pursuant to ORS 757.386(2), or if the Project has not been certified as a Project in the Oregon Community Solar Program within one (1) calendar year from the Commercial Operation Date, or by mutual agreement of the Parties. SECTION 12: INDEMNIFICATION Indemnification - Each Party shall agree to hold harmless and to indemnify the other Party, its officers, agents, affiliates, subsidiaries, parent company and employees against all loss, damage, expense and liability to third persons for injury to or death of person or injury to property, proximately caused by the indemnifying Party’s, (a) construction, ownership, operation or maintenance of, or by failure of, any of such Party’s works or facilities used in connection with this Agreement, or (b) negligent or intentional acts, errors or omissions. The indemnifying Party shall, on the other Party’s request, defend any suit asserting a claim covered by this indemnity. The indemnifying Party shall pay all documented costs, including reasonable attorney fees that may be incurred by the other Party in enforcing this indemnity. SECTION 13: INSURANCE For Projects greater than 200 kW, the Seller shall secure and continuously carry insurance as specified within this Section for the term of the Agreement. Insurance Requirements: 1. All insurance required by this Agreement shall be placed with an insurance company with an A.M. Best Company rating of B+ or better. 2. If the insurance coverage required in this Appendix is cancelled, materially changed or lapses for any reason, the Seller will immediately notify Idaho Power in writing. This notice will advise Idaho Power of the specific reason for cancellation, material change or lapse and the steps being taken to comply with these Insurance Requirements. Failure to provide this notice and to comply with these Insurance Requirements within five (5) days of the cancellation, material change or lapse will constitute a Material Breach and Idaho Power may terminate this Agreement. 3. Prior to the Operation Date and subsequently within ten (10) days of the annual anniversary of the Operation Date, the Seller shall provide a Certificate of Insurance in the name of Idaho Power Company and list Idaho Power Company as an Additional Insured Endorsement and Waiver of Subrogation Endorsement. 4. The Certificate of Insurance shall evidence the appropriate insurance coverage of Comprehensive General Liability Insurance for both bodily injury and property damage with limits equal to one million dollars ($1,000,000), each occurrence, combined single limit. The deductible for such insurance shall be consistent with current Insurance Industry Utility practices for similar property.