Loading...
HomeMy WebLinkAbout20151001Land Conveyance.pdfrem. An IDACORP Company PATRICKA. HARRTNGTON Corporate Secretary R[Cf; li/[ i] 2gl5 Ofi I At'l 8: 25 September 28,2015 i&AHS FL'[.ii,-: UTfr,lTl EE CA[{$t ISSl8fi Donald L. Howell Lead Deputy Attorney General ldaho Public Utilities Commission P.O. Box 83720 Boise, ldaho 83720-007 4 Re: ldaho Power Company Land Conveyance Dear Mr. Howell: ldaho Power Company ("ldaho Power" or "Company") plans to sell certain lands and easements to the Ada County Highway District ('ACHD") for ACHD's Franklin Road-Five Mile Road intersection improvement project ("Project") in Boise. ACHD and Idaho Power previously entered into a Right-of-Entry Agreement ("ROE Agreement") for the Project, which recognizes ACHD's right of condemnation and authorizes ACHD to enter the Company's property for construction of the Project. ACHD has substantially completed the Project, and ldaho Power and ACHD have identified the lands and easements to be conveyed by ldaho Power to ACHD for the Project, along with the proposed compensation levels for the lands and easements, and for the related "lmprovements" and "Cost to Cure ltems" associated with the Project, as discussed below. The Idaho Power property sale to ACHD would include the conveyance of fee lands (18,994 square feet), a permanent slope easement (9,778 square feet), a wall maintenance easement (1,987 square feet), and a temporary construction easement (7,710 square feet), all as depicted on the drawing attached hereto as Exhibit A (collectively, the "Propefi"). The Propefi is located at the northwest corner of the Franklin Road-Five Mile Road intersection, and is part of ldaho Power's larger 53.43- acre parcel which includes the Company's Boise Operations Center building and Mechanical & Engineering building and related facilities (the "BOC Property"), also as depicted on Exhibit A. Attached as Exhibit B is a copy of the ACHD Compensation Sumffi?ry, which provides for $230,366.49 in total compensation to ldaho Power for the Project. The fee land and easement valuations are based on an appraised value of $3.25 per square foot for the Property, pursuant to an independent appraisal conducted for ACHD by Hugh T. Pomtier, Certified Appraiser CGA-420, working for Robert C. Williams, MAl, Real Estate Appraising & Consulting. ldaho Power has reviewed the appraisal and has determined that it provides a tair valuation for each of the Fee Acquisition ($46,033.00 + $7,848.75), Permanent Slope Easement ($23,833.88), Wall Maintenance Easement ($4,843.31 ), and Temporary Construction Easement ($2,505.75). P.O. Box 70 (83707) l22I W ldaho 5t. Boise, lD 83702 ldaho Public Utilities Commission September 28,2015 Page2 The Compensation Summary also provides for additional compensation to ldaho Power for "lmprovements" and "Cost to Cure ltems" in connection with the Project. The "lmprovements" include landscaping additions on the Property and the BOC Property, and the "Cost to Cure ltems" include fencing and materials relocation, to accommodate the new boundary between the BOC Property and the expanded road right-of-way. ldaho Power has worked closely with ACHD regarding the "lmprovements" and "Cost to Cure ltems", including the installation of a retaining wall along the east side of the BOC Property adjacent to Five Mile Road, to limit the encroachment of the slope easement on the BOC Propefi. ldaho Power believes that all appropriate steps have been taken to minimize the impact of the Project on the BOC Property, and that the valuations included for the "lmprovements" and "Cost to Cure ltems" on the Compensation Summary are fair and reasonable. ldaho Code S 61-328 requires that electric public utilities in ldaho obtain ldaho Public Utilities Commission approval for the sale or transfer of property in ldaho "which is used in the generation, transmission, distribution or supply of electric power and energy to the public." ldaho Power does not believe that S 61-328 is applicable to the Company's proposed conveyance of the Property to ACHD. ldaho Power has coordinated with ACHD to assure that the Project does not materially interfere with ldaho Power's operations at the BOC Property, and the sale of the Property will not impact ldaho Power's utility operations. Finally, it is important to note that ACHD has the right of eminent domain and could condemn the Property for the Project if needed. Such an action would likely result in significant legal costs to ldaho Power and could also result in lower compensation paid by ACHD than currently offered under the Compensation Summary. lf you agree with ldaho Power's assessment that the proposed conveyance of the Property to ACHD as described above would not require Commission approval under S 61-328, please provide confirmation to my attention at the address above. ldaho Power will file final accounting entries with the Commission for the conveyance of the Property to ACHD when the transaction is completed. Sincerely, ,fr,tilftr4/tu1*^ Patrick A. Harrington l/Enclosures cc: Terri Carlock, IPUC EI g?, 3R rlitslzIUt= l6t<Ju g= u-fiu=riOrgt ie,<2 ==EFUUrct3UU2ZooIIoo oo :-F2u =!ui!<ou@ 94 U> z, =b1tss6Ar9,4xo ^dvo :c =di00 lt I oEaEorj frtr g3 r < u6u :; s6il H = 3:g o E ;3FEF Hs* Ho orr *f <N5 Uc u=o q fi = gFE ; E i :BP H H fr 99fr E E E TEI ; .,o Hl=l EIEI oltIJlzloizlzlurl<lolzl 3t9tolhl Htxt Slll =lPlilallllctlolOl EIEI<rEl ;uEEieFgE rHHE$3EEE.i HEIE,IEEHiiaE:gfi egEtI tiriE iEei Ei E3rtEI*i EI!Er6ti HIEIEHH A Io @6n6*{nnNN i'rl il' ti ,u H 1,0, ri lii'' i., Ili. 1,1" ooE6UEu.-' - _8!c66. =E,/'rn IEObE dP -l I I I.lulclFl<.2too uiloao ()l, a ul5 H 6ir P Ei[ E friiafir 6i=,l I I I o og tO z.EJ @= u.t c.!L =3NoNo lI: EEI T $ EcD s!:o o)o- o; c.9o0 =o'oo r.i I ;1fJnl Project Name: Five Mile-Franklin to Fairview Project No: 702041 Name: ldaho Power Company R/W Parcel No: 1 T3N, R1E, Sec 10 APN: 51110449504 EXHIBIT.sBtt COMPENSATION SUMMARY Fee Acquisition: 14,164 sf @ $3.25 per sf Fee Acquisition: 4,830 sf @ $3,25 per sf x 50% Permanent Slope Easement: 9,778 sf @ $e.ZS per sf x75o/o Wall Maintenance Easement: 1.987 s.f. @ $3.25 per sf x75o/o Temporary Construction Easement: lmorovements: Cost to Cure ltems: 7 ,710 sf @ $3.25 per sf x 10o/o Earth Work: 399 cy @ $eS per cy Evergreen Trees: 3 @ 9t,500 each Plants (Carpet Rose, Fountain Grass) Turf Grass: 8,000 sf @ $t.65 per sf Railroad Ties: 140 @ $g.OO per railroad tie Landscaping Curb: 350 lf @ $2.50 per lf Asphalt Paving: 2,600 sf @ $3.00 per sf Gravel Mulch & Weed Barrier Grass Seeding lrrigation System Fencing (Relocation and Temporary): 650 lf Fencing (Permanent):650 rf Electric Sign at Entry Sign Electrical lnstallation Work Relocate 2 Solar Lights: 2 @ gt00 each Relocate Material and lnventory (Based on Owners Bid) Labor and Vehicle Costs Fencing Adjustments at Retaining Wall (Relocation) Temporary lrrigation Main Line lrrigation Repair $46,033.00 $ 7,848.75 $23,833.88 $ 4,843.31 $ 2,505,75 $ 13,965.00 $ 4,500.00 $ 8,500.00 $ 13,200.00$ 1 ,120.00$ 875.00 $ 7,800.00 $ 10,500.00 $ 2,500.00 $ 10,390.00 $ 17,000.00 $ 25,850.00 $ 5,066.80 $ 2,250.00$ 200.00$ 8,600,00 $ 5,250.00 $ 3,380.00$ 2,285.00$ 2,070,00 Total Compensation. ..$UI0J06-49