HomeMy WebLinkAbout19690414Certificate No 268.pdfBEFORE THE IDAHO PUBLIC UTILITIES COMMISSION
IN THE MA1TER OF THE APPLICATION
OF IDAHO POWER COMPANY FOR A
CERTIFICATE OF PUBLIC CONVENIENCE)
AND NECESSITY (FOR TRANSMISSION
LINE ONLY) IN POWER , BINGHAM AND
BUTTE COUNTIES IN THE STATE OF IDAHO.
CASE NO. U-lO 0 6-6 7
CERTIFICATE NO.2 6 8
IT IS HEREBY CERTIFIED that the public convenience and
necessi ty requires and will require the Idaho Power Company, its
successors and assigns to construct. own , maintain and operate a
230 KV transmission line commencing at the SW\ of the NE\ of Sec-
tion 15 , T3N, R2 9E, B. M., Butte County, Idaho, and extend a dis-
tance of approximately sixty (60) miles in a southerly direction
through Butte, Bingham and Power Counties , to the NW\ of the NW\
of Section 22 , T4S, R30E , B., Power County, Idaho, and to
exercise the rights and privileges granted or which may be granted
by any franchise to be obtained from said Butte County, and by
existing franchises in Power and Bingham Counties; and that said
certificate of convenience and necessity be limited to the trans-
mission. interchange and supply of high voltage electrical power
and energy.
This Certificate is predicated upon the Findings and
Order of Order No.9 293 in the above entitled matter , made and
entered this third day of February, 1969 , to which reference is
hereby made.
DATED at Boise , Idaho. this 3rd day of February, 1969.
ATTEST:
~~ ",,-,~,
Secre ary
)tJJfJjgdfh i;'Y1W' -
...... .
JJl-4 I" f!! 'Ii?!vi7f fir:. f"""Lt!;:~'~iii.f.1.,
~; ,
'iiJ.~
.~~ ." '
OW"";flP
~ -. -:- ------, ,- _' ---------~-------
BEFORE. THE IDAHO PUBLIC UTILITIES COMMISSION
IN THE MATTER OF THE APPLICATION
OF IDAHO POWER COMPANY FOR A
CERTIFICATE OF PUBLIC CONVENIENCE
AND NECESSITY (FOR TRANSMISSION
LINE ONLY) IN POWER , BINGHAM AND
BUTTE COUNTIES IN THE STATE OF IDAHO.
CASE NO. U~lOO6-
AMENDED CERTI FI CATE NO.2 68
IT IS HEREBY CERTIFIED that the public convenience and
necessity requires and will require the Idaho Power Company, its
successors and assigns to construct , own, maintain and operate a
230 KV transmission line commencing at the NW\ of the NE\ of Sec-
tion 6 , T2N, R30E , B ., Butte County, Idaho, and extend a dis-
tance of approximately sixty ( 60) miles in a southerly direction
through Butte , Bingham and Power Counties , to the NW\ of the NVf"'4
of Section 22 , T4S, R30E , B., Power County, Idaho , and to
exercise the r~ghts and pri vileges - granted or which may be
. granted by any franchise to be obtained from said Butte County,
and by existing franchises in Power and Bingham Counties; and that
said certificate of convenience and necessity be limited to the
transmission , interchange and supply of h~gh vol tage electrical
power and energy.
This Certificate is predicated upon the Tindings and
Order of Amended Order No. 9293 in the above entitled matter,
made and entered this 14th day of April, 1969 , to which reference
is hereby made.
DATED at Boise, Idaho this 14th day of April, 1969.
ATTEST:
~ ~"'-'
retary
?I ~ia-President
1l\vii' ,~ ;1'j eP We
;;"
;;;;)11);; liT r;:~lff 1m' m1O\.l'YJl.M'VJtt"".;l!:-"'1.' .ii~V11i\.jjC;JIWI
-Ps c'f',:\I1il'' (fir;Jil-&jI/Wi:iv