HomeMy WebLinkAbout20120720Legal Brief.pdfMcDevitt & Miller LLP
Lawyers RECEIVErf
420W. Bannock Street2012 JUL 20 i n 01 (208) 343-7500 P.O. Box 2564-83701 Chas. F. McDevitt
(208) 336-6912 (Fax) Boise, Idaho 83702 Dean J (Joe) Miller
JT
July 20, 2012
Via Hand Delivery
Jean Jewell, Secretary
Idaho Public Utilities Commission
472 W. Washington St.
Boise, Idaho 83720
Re: GNR-E-11-03
Ridgeine Energy LLC
Dear Ms. Jewell:
Enclosed for filing in the above matter, please find an original and seven (7) copies of Ridgeline
Energy LLC's Legal Brief, together with nine (9) copies of pre-filed exhibit 2201. In addition, a disk
containing PDF version of the Exhibit 2201 is enclosed.
Kindly return a file stamped copy to me.
Very Truly Yours,
McDevitt & Miller LLP
ean J. Yej-
D
Enclosures
ORIGINAL
Dean J. Miller (ISB No. 1968) RECEIVED
Chas. F. McDevitt (ISB No. 835)
McDEVITF & MILLER LLP 2 12 JUL 20 Mi I I 01
420 West Bannock Street
P.O.Box 2564-83701 1 TI ifl COhISS Boise, ID 83702
Tel: 208.343.7500
Fax: 208.336.6912
joemcdevitt-mi1ler.com
chas@mcdevitt-miller.com
Attorneys for Ridgeline Energy LLC
BEFORE THE IDAHO PUBLIC UTILITIES COMMISSION
IN THE MATTER OF THE
COMMISSION'S REVIEW OF PURPA
QF CONTRACT PROVISIONS
INCLUDING THE SURROGATE
AVOIDED RESOURCE
(SAR) AND INTEGRATED RESOURCE
PLANNING (IRP) METHODOLOGIES
FOR CALCULATING PUBLISHED
AVOIDED COST RATES
Case No. GNR-E-11-03
LEGAL BRIEF OF RIDGELINE
ENERGY LLC
INTRODUCTION
Ridgeline Energy LLC (Ridgeline) is the part owner and operator, through its subsidiary,
Rockland Wind Project, LLC, of an 80 MW wind generation project (the Project) located in
Power County, Idaho. The Project is a Qualifying Facility under the applicable provisions of the
Public Utility Regulatory Policies Act of 1978 (PURPA). The Project sells electric energy to
Idaho Power Company (IPCo, Idaho Power) pursuant to a firm energy sales agreement
(Rockland FESA), which was approved by the Commission in Case No. IPC-E-10-24, Order
LEGAL BRIEF OF RIDGELINE ENERGY LLC-1
J ç
'-.-
No. 32125. A true copy of the Rockland FESA is being filed herewith as Ridgeline Pre-Filed
Exhibit 2201.'
Order No. 32557, issued May 25, 2012, granted Ridgeline Intervenor status in this
proceeding. Ridgeline files this Legal Brief in accordance with the Procedural Schedule
established by the Commission in Order No. 32388.
In this Legal Brief, Ridgeline demonstrates that Idaho Power's proposed Schedule 74 is
not applicable to the Rockland FESA. Additionally, if Schedule 74 is applicable, Ridgeline is
entitled to compensation during periods of curtailment for foregone energy sales revenues, and
renewable energy credit revenue.
THE ROCKLAND FESA
The Rockland FESA is not a standard PURPA agreement; it has a number of unique
features. In the Application for approval, filed in Case No. IPC-E-10-24, Idaho Power described
the unique features as follows:
"The varying terms and conditions of this Agreement are more favorable to
Idaho Power customers than the "standard" PURPA terms and conditions
including: (1) provisions for partial completion damages; (2) simplified
Mechanical Availability Guarantee ("MAG") calculation; (3) providing
Renewable Energy Credits ("RECs") to the Company after year 2021; (4) better
financial damage and security provisions for the benefit of customers; (5) more
extensive wind forecasting data; (6) a 25-year contract term; and (7) an energy
price that is lower than the published avoided cost rate. (Application, Pg. 3.)
'Subsequent to the approval of the Rockland FESA, the parties discovered it contained a clerical error. Rather than
Rockland Wind Project LLC, the correct legal name is Rockland Wind Farm LLC. On January 10, 2012, the parties
filed with the Commission a First Amendment which corrected the clerical error. In all other respects the agreement
was ratified as first written.
LEGAL BRIEF OF RIDGELINE ENERGY LLC-2
Idaho Power also explained that energy prices were not based on the Surrogate Avoided
Cost Methodology but rather were derived from the AURORA dispatch model:
"As a basis for energy prices in this Agreement, Idaho Power executed the
AURORA economic dispatch model for this Facility's estimated energy shape as
specified by Commission requirements. This model provides strictly an energy
price based upon the estimated generation from this Facility being available to
meet Idaho Power's customers' energy needs. This AURORA energy price
contains no value for RECs or other items of value identified within the
Agreement. The energy price identified by the AURORA run, including a
discount of $6.50 per megawatt-hour ("MWh") for wind integration, was a
levelized price of $56.21. In comparison, the Published Avoided Cost levelized
price for a 10 average MW or less PURPA wind project with a planned on-line
year of 2011 is $75.88 per MWh." (Application, Pg. 6.)
Idaho Power also described the unique benefits of the FESA:
"Rockland made this unsolicited proposal of a large 80 MW PURPA project to
Idaho Power and requested Idaho Power negotiate this Agreement as required by
the applicable PURPA rules and regulations. Historically, many developers have
avoided or attempted to avoid this large PURPA contracting process by dividing a
large project into multiple, less than 10 average MW projects, thus invoking
application of the Published Avoided Cost Rate and the more prescriptive
contracting process applicable to those smaller QF projects. Idaho Power believes
that the negotiations with Rockland, which resulted in the present Agreement,
evidence the fact that the large PURPA negotiation process is viable and can
result in a project that is both feasible for the developer and more favorable to
Idaho Power customers as compared to FESAs for 10 average MW or smaller QF
projects." (Application, Pgs.7-8.)
The Rockland FESA contains another feature not found in most energy sales agreements
executed by Idaho Power. If Idaho Power does not accept energy for any reason other than
Force Majeure, Forced Outage or temporary disconnection, the seller is entitled to compensation,
as discussed on more detail below.
In approving the Rockland FESA, the Commission expressed its appreciation to
Ridgeline and Idaho Power for creating a workable agreement without resorting to litigation and
contention. The Commission said, "We commend the parties for negotiating an Agreement that
LEGAL BRIEF OF RIDGELINE ENERGY LLC-3
we find sets forth a creative solution to resource issues that have heretofore often resulted only in
impasse and the filing of complaints". (Order No. 32125, Pgs. 9-10, Case No. IPC-E-10-24).
ARGUMENT
A. The Rockland FESA Does Not Permit Unilateral Modification.
As a prelude to discussion of specific legal issues, it is appropriate to keep in mind a
fundamental principle of American Law: a party to a contract, freely entered into, is entitled to
the benefit of the bargain reflected by the contract. The right to rely on the terms of a contract as
written is of constitutional dimensions. The Idaho Constitution, Art. I, Sec 16, provides,
"No.. .law impairing the obligation of contracts shall ever be passed". Accordingly, an act of
government that "...attempts to make material alterations in the character, terms or legal effect
of existing contracts is clearly void." Fidelity State Bank v. North Fork Highway District, 35
Idaho 797,209 P. 448 (1922)2. See also, Steward v. Nelson, 54 Idaho 437, 443, 32 P.2d 843
(1934): "...any law which in its operation amounts to a denial or obstruction of the rights
accruing by a contract.. .is directly obnoxious to the prohibition of the Constitution."
Just as the legislature may not alter existing contracts, neither may an administrative
agency. In a case involving the Idaho Industrial Commission, the Supreme Court said, "The
Commission's procedural misconduct is compounded by constitutional transgressions.. .An
attorney fee agreement constitutes a valid contract under Idaho law. It is clear that, in Idaho,
parties to a contract have a property interest in the subject matter of the contract that is
protectable both under the Contract Clause and the Due Process Clause of the United States
2 In rare circumstances, not applicable here, contracts of public utilities may be subject to modification. Agricultural
Products Corp. v. Utah Power & Light, 98 Idaho 23, 557 P.2d 617 (1976).
LEGAL BRIEF OF RIDGELINE ENERGY LLC-4
Constitution". Curr v. Curr, 124 Idaho 686, 864 P.2d 132 (1993). See also, Deonier v. Public
Employee Retirement Bd. 114 Idaho 721, 760 P.2d 1137 (1988).
The Rockland FESA is very specific as to the means by which it may be modified.
Section 23.1 provides, "No modification to the Agreement shall be valid unless it is in writing
and signed by both Parties...".
Ridgeline has not agreed, in writing or otherwise, to IPCo's attempt to modify the
Rockland FESA by engrafting the terms of proposed Schedule 74 into the Rockland FESA.
B. 18 C.F.R. 292.304(f) is Not Applicable to Fixed Rate Contracts
Impliedly conceding that as a matter of contract law, it lacks the authority to unilaterally
modify the Rockland FESA, Idaho Power turns to 18 C.F.R. 292.304(f) (Section 304(f)) as a
source of authority to impose proposed Schedule 74 curtailment rights. (See, Direct Testimony of
Tessia Park, Pg. 14-15.).
Section 304(f) provides:
"Periods during which purchases not required. (1) Any electric utility which
gives notice pursuant to paragraph (f) (2) of this section will not be required to
purchase electric energy or capacity during any period during which, due to
operational circumstances, purchases from qualifying facilities will result in costs
greater than those which the utility would incur if it did not make such purchases,
but instead generated an equivalent amount of energy itself."
There are strong arguments to support the view that Section 304(f) is not applicable to
projects that have chosen the option to sell energy under a contract with fixed rates as opposed to
the option of selling at prices prevailing at the time of delivery. (See, Direct Testimony of
Richard Guy on behalf of Idaho Wind Partners, and Direct Testimony of Donald W. Schoenbeck
on behalf of North Side Canal Company).
LEGAL BRIEF OF RIDGELLNE ENERGY LLC-5
And, as the Commission is aware, Idaho Wind Partners, an Intervenor in this proceeding,
has filed with the Federal Energy Regulatory Commission a Petition for Declaratory Ruling
seeking a determination that Section 304(f) is applicable only to projects that sell energy priced
at the time of delivery. In Ridgeline's view the arguments contained in the IWP Petition are
compelling, and Ridgeline adopts them, without repeating them in full in this Legal Brief.
C. Under Staff's Analysis, Section 304(1) Curtailment Rights Are Not Available with
Respect to the Rockland FESA.
One reason for believing that Section 304(f) is not applicable to fixed rate contracts is a
passage from FERC Order No. 69, which implemented the PIJRPA regulations. That section
provides:
"The Commission does not intend that this paragraph [Section 304(f)] override
contractual or other legally enforceable obligations incurred by the electric utility
to purchase from a qualifying facility. In such arrangements, the established rate
is based on the recognition that the value of the purchase will vary with the
changes in the utility's operating costs. These variations ordinarily are taken into
account, and the resulting rate represents the average value of the purchase over
the duration of the obligation. The occurrence of such periods may similarly be
taken into account in determining rates for purchases."
In Rebuttal Testimony, Staff Witness Sterling argues that the Surrogate Avoided Cost
Methodology (SAR) does not reflect variations in value during low load scenarios to which
section 304(f) was intended to apply. (See, Sterling Rebuttal, Pg. 5). Witness Sterling asserts
that the SAR only attempts to estimate the cost of building and operating an avoided resource
and it does not model load low-load scenarios, or any other scenarios. Based on this, Witness
Sterling concludes SAR rates are not of the type described in the paragraph quoted above and
that Section 304(f) curtailment rights are available to fixed rate contracts with SAR rates. (See,
Sterling Rebuttal, Pgs. 5-6).
LEGAL BRIEF OF RIDGELINE ENERGY LLC-6
Assuming, without admitting, this analysis is correct, it does not apply to the Rockland
FESA because the rates contained in the Rockland FESA were not derived from the SAR
methodology. Rather, the Rockland FESA rates were derived from the AURORA economic
dispatch model. As Idaho Power explained in its Application for approval of the Rockland
FESA, "As a basis for energy prices in this Agreement, Idaho Power executed the AURORA
economic dispatch model for this Facility's estimated energy shape, as specified by Commission
requirements." (Application, Case No. IPC-E-1O-24, Pg. 6).
Rates determined from the AURORA dispatch model are of the type referenced in the
above passage from Order No. 69—the rates are based on the recognition that the value of the
purchase will vary depending on the utility's operating costs under various operating conditions
at various hours.
The AURORA dispatch model has been approved by the Commission in various
contexts. In general, the AUROA model provides detailed estimates of pricing, and resource
values under various market conditons. It applies economic principles and dispatch simulation to
model the relationships of supply, transmission and electricity demand to forecast market prices.
(See, Idaho Power 2009 Integrated Resource Plan, Pg. 95, Case No. IPC-E-9-33). When used to
set rates for PUIRPA purchases, the AURORA model simulates the project's cost during each
hour of the QF's proposed contract term. (See, Direct Testimony of Karl Bokenkamp Pg. 11).
To further support his opinion, Staff Witness Sterling refers to the recent FERC Order,
Entergy Services, 137 FERC 61199, paragraph 56 where FERC states:
"Many avoided cost rates are calculated on an average or composite basis, and
already reflect the variations in the value of the purchase in the lower overall rate.
In such circumstances, the utility is already compensated, through the lower rate it
generally pays for unscheduled QF energy, for any periods during which it
purchases unscheduled QF energy even though that energy's value is lower than
the true avoided cost. On the other hand, for avoided cost rates that are
LEGAL BRIEF OF RIDGELINE ENERGY LLC-7
determined in real-time, such avoided costs adjust to reflect the low (or zero or
negative) value of the unscheduled QF energy, allowing the QF to make its own
curtailment decisions. In neither case is the utility authorized to curtail the QF
purchase unilaterally."
Witness Sterling opines that SAR based rates are not of the type described by FERC in
Entergy. But, AURORA based rates are precisely of the type described by FERC—the utility is
already compensated for any period during which it purchases Rockland energy even though that
energy's value is lower than the true avoided cost, in which case the utility is not authorized to
curtail the QF purchase unilaterally.
And, while the focus of discussion in this case is hours when the real-time avoided cost
may be less than contract rates, it is important to bear in mind that the QF does not receive any
additional compensation in hours when the real-time avoided cost is higher than the contract rate.
This illustrates the fundamental unfairness of Idaho Power's proposal— contrary to the bargain
contained the Rockland FESA, it shifts the financial risk in some hours to the Ridgeline while
Idaho Power retains the benefit in other hours.
In short, Staff rejects the broad proposition that Section 304(f) curtailment rights are not
available with respect to all fixed rate contracts. Rather, Staff suggests Section 304(f) curtailment
is precluded only if contract rates are based on a methodology described in Order No. 69 and in
Entergy. The rates in the Rockland FESA are based on such a methodology. The inescapable
conclusion is that under the Staff analysis, even if it is correct, Section 304(f) curtailment rights
are not available to Idaho Power with respect to the Rockland FESA.
LEGAL BRIEF OF RIDGELINE ENERGY LLC-8
D. In the Event Curtailment is Permitted Under Proposed Schedule 74, Ridgeline is
Entitled to Compensation.
As noted above, the Rockland FESA contains several features not found in most energy
sales agreements executed by Idaho Power Company. For the purpose of this section of
Ridgeline's Legal Brief, the relevant unique features are wind forecasting and energy acceptance
In addition to Rockland being required to contribute to the Idaho Power wind forecasting
cost as specified for all new PURPA wind forecasting costs, the Rockland Agreement also
requires Rockland to install, maintain and provide wind measurement data from state of the art
monitoring equipment to Idaho Power for the full term of the agreement. (Application, Case No.
IPC-E-24, Pg. 5). Paragraph 9.3 provides:
"9.3.1 Historical wind data- Within 60 days after Commission approval of this
Agreement, the Seller shall provide Idaho Power with seven years of historical
wind data from the meteorological towers at the Rockland site. This data will
be provided in an electronic format reasonably acceptable to Idaho Power.
9.3.2 No later than 30 days prior to the First Energy Date the Seller shall have
erected at the site two (2) high quality, hub-height, permanent, meteorological wind
measurement towers at locations on the site equipped with:
(i)Two (2) heated anemometers per tower;
(ii)Two (2) air temperature sensors per tower;
(iii)One (1) barometric pressure sensor (with DCP sensor); and
(iv)Two (2) heated wind vanes per tower.
9.3.3 The wind sensors and air temperature sensors shall be set at two (2) height
locations from ground level. All equipment shall provide reasonably accurate
measurement of wind data. The Seller will install the necessary equipment to be
able to electronically transmit this wind data and wind turbine availability status
real-time to Idaho Power or a designee of Idaho Power in a method and form
reasonably acceptable to Idaho Power and in accordance with Prudent
Electrical Practices. Turbine availability status shall be transmitted beginning
45 days after First Energy Date. Failure by the Seller to operate and maintain
this equipment in a manner to provide reasonably accurate and dependable data
for the full term of this Agreement shall be an event of default.
LEGAL BRIEF OF RIDGELINE ENERGY LLC-9
9.3.4 Seller shall submit to Idaho Power Seller's technical specifications for
the meteorological towers along with a site plan showing the location of the
towers, project layout with turbine locations and the wind rose for the Site, as
applicable."
As a companion to this higher level of predictability of generation, the Rockland FESA
carefully limits circumstances in which energy non-acceptance is permitted and requires
compensation for non-excused curtailment. Paragraph 12.2.4 provides:
"If Idaho Power is unable to accept the energy from this Facility and is not
excused from accepting the Facility's energy, Idaho Power shall pay Seller the
sum of the applicable energy price in paragraph 7.1 or 7.2, plus the Environmental
Attribute Replacement Value (if such curtailment occurs prior to January 1,
2022), plus the PTC Value for each MWh of the estimated energy that Idaho
Power was unable to accept, which shall be estimated to have been delivered at a
rate equivalent to the pro rata average of the amounts specified for the applicable
month in paragraph 6.4."
Paragraph 12.2.1 specifies the circumstances in which Idaho Power is excused from
accepting energy, and limits permitted non-acceptance to three carefully defined circumstances.
Those circumstances are (1) Force Majeure, (2) Idaho Power Forced Outage or (3) temporary
disconnection of the facility in accordance with Seller's interconnection agreement. Non-
acceptance due to low-load contingencies is not a circumstance that relieves Idaho Power of the
obligation of compensation under Paragraph 12.2.4.
As discussed in Section A, supra, a party to a contract is entitled to the benefit of the
contract as written. The right of contract reliance arises not a just from a general sense of
fairness. It is so fundamental that it is constitutionally protected in the First Article of the Idaho
Constitution entitled Declaration of Rights. As such, the right of contract reliance is on a par with
other fundamental rights enumerated in the Declaration of Rights, such as the right to religious
freedom (Sec.4), the right to vote (Sec. 19), the right of free speech (Sec. 9); the right to keep and
bear arms (Sec. 11); the right to be free from unreasonable searches and seizures (Sec. 17).
LEGAL BRIEF OF RIDGELINE ENERGY LLC-10
The Rockland FESA is unambiguous in its definition of excused non-acceptance.
Neither Idaho Power nor the Commission have the legal ability to rewrite the Rockland FESA to
include a new excuse for non-acceptance.
CONCLUSION
Based on the reasons and authorities cited herein, the Commission should hold that (1)
the Rockland FESA is not subject to unilateral modification; (2) that the Rockland FESA is not
subject to curtailment under Section 304(f); (3) if Section 304(f) curtailment is permissible,
Ridgeline is entitled to compensation under section 12.2.4.
DATED this . P day of July, 2012.
MCDEVITT & MILLER, LLP
By: I)_
WeanJ.er
Attorney for Ridgeline Energy LLC
LEGAL BRIEF OF RIDGELINE ENERGY LLC-11
CERTIFICATE OF SERVICE
I hereby certify that on the gray of July, 2012, I caused to be served, via the
method(s) indicated below, true and correct copies of the foregoing document, upon:
Jean Jewell, Secretary Hand Delivered
Idaho Public Utilities Commission U.S. Mail
472 West Washington Street Fax
P.O. Box 83720 Fed. Express
Boise, ID 83720-0074 Email
jjcwell@puc.state.id.us
Donovan E. Walker Hand Delivered
Idaho Power Company U.S. Mail
1221 W. Idaho Street Fax
P.O. Box 70 Fed. Express
Boise, ID 83707 Email
dwalker@idahopower.com
Donald L. Howell, II Hand Delivered
Kristine A. Sasser U.S. Mail
Deputy Attorneys General Fax
Idaho Public Utilities Commission Fed. Express
472 W. Washington (83702) Email
P0 Box 83720
Boise, ID 83720-0074
don.howell@nuc.idaho.gov
kris.sasserpuc.idaho.gov
Michael C. Andrea Hand Delivered
Avisita Utilities U.S. Mail
P.O. Box 3727 Fax
1411 E. Mission Ave Fed. Express
Spokane, WA 99220-3727 Email
Michael.andrea@avistacorp.com
Daniel Solander Hand Delivered
Rocky Mountain Power U.S. Mail
One Utah Center Fax
201 S. Main Street, Suite 2300 Fed. Express
Salt Lake City, UT 84111 Email )*Z.
daniel.solander@pacificorp.com
LEGAL BRIEF OF RIDGELINE ENERGY LLC-12
Dr. Don Reading Hand Delivered
6070 Hill Road U.S. Mail
Boise, Idaho 83703 Fax
dreadingmindspring.com Fed. Express
Email
Ronald L. Williams Hand Delivered
Williams Bradbury U.S. Mail
1015 W. Hays Street Fax
Boise, ID 83702 Fed. Express
ron@williamsbradbury.com Email
Glenn Ikemoto Hand Delivered
Margaret Rueger U.S. Mail
Idaho Wind Farms, LLC Fax
672 Blair Avenue Fed. Express
Piedmont, California 94611 Email
glenni@EnvisionWind.com
margaret@EnvisionWind.com
Greg Ferney Hand Delivered
Mimura Law Office U.S. Mail
2176 E. Franklin Road Fax
Meridian, ID 83642 Fed. Express
gregimimuraIaew.com Email
C. Thomas Arkoosh Hand Delivered
Lori Thomas U.S. Mail
Capital Law Group, PLLC Fax
205 N. 10th th Floor Fed. Express
P.O. Box 2598 Email )41
Boise, Idaho 83701
wthomas@capitollawgroup.com
lthomas(äcapitollawgroup.com
Don Schoenbeck Hand Delivered
RCS U.S. Mail
900 Washington Street, Suite 780 Fax
Vancouver, WA 98660 Fed. Express
dws@r-c-s-inc.com Email
Robert D. Kahn Hand Delivered
Executive Director U.S. Mail
Northwest and Intermountain Power Fax
Producers Coalition Fed. Express
117 Minor Ave., Suite 300 Email
Seattle, WA 98101
rkahn@nippc.org
LEGAL BRIEF OF RIDGELINE ENERGY LLC-13
Don Sturtevant Hand Delivered
Energy Director U.S. Mail
J.R. Simplot Company Fax
P0 Box 27 Fed. Express
Boise, 1D 83707-0027 Email
don.sturtevant@simtlot.com
Robert A. Paul Hand Delivered
Grand View Solar II U.S. Mail
15960 Vista Circle Fax
Desert Hot Springs, CA Fed. Express
robertapau108@gmail.com Email
James Carkulis Hand Delivered
Managing Member U.S. Mail
Exergy Development Group of Idaho, LLC Fax
802 W. Bannock St., Suite 1200 Fed. Express
Boise, ID 83702 Email Ix
jcarkulisexergvdeveloDment.com
M.J. Humphries Hand Delivered
Blue Ribbon Energy LLC U.S. Mail
4515 S. Ammon Road Fax
Ammon, ID 83406 Fed. Express
blueribbonenergy@gmail.com Email
Aaron F. Jepson Hand Delivered
Blue Ribbon Energy LLC U.S. Mail
10660 S. 540E. Fax
Sandy, UT 84070 Fed. Express
arronesq@aol.com Email
John R. Lowe Hand Delivered
Consultant to Renewable Energy Coalition U.S. Mail
12050 SW Tremont St. Fax
Portland, OR 97225 Fed. Express
jiavensanmarcos@yahoo.com Email
Bill Piske, Manager Hand Delivered
Interconnect Solar Development, LLC U.S. Mail
1303 E. Carter Fax
Boise, ID 83706 Fed. Express
billpiske@cableone.net Email
Wade Thomas Hand Delivered
General Counsel U.S. Mail
Dynamis Energy, LLC Fax
776 W. Riverside Dr., Suite 15 Fed. Express
Eagle, ID 836 16 Email
wthomasdynamisenerg.com
LEGAL BRIEF OF RIDGELINE ENERGY LLC-14
Brian Olmstead Hand Delivered
General Manager U.S. Mail
Twin Falls Canal Company Fax
P0 Box 326 Fed. Express
Twin Falls, ID 83303 Email
olmstead@tfcanal.com
Ted Diehl Hand Delivered
General Manager U.S. Mail
North Side Canal Company Fax
921 N. Lincoln St. Fed. Express
Jerome, ID 83338 Email
nscanal@cableone.net
Peter J. Richardson Hand Delivered
Gregory M. Adams U.S. Mail
Richardson & O'Leary, PLLC Fax
P0 Box 7218 Fed. Express
Boise, ID 83702 Email A
peter@richardsonandolearv.com
greg@richardsonandolearv.com
Bill Brown, Chair Hand Delivered
Board of Commissioners of Adams County U.S. Mail
PO Box 48 Fax
Council, ID 83612 Fed. Express
bdbrown@frontier.net Email
Benjamin J. Otto Hand Delivered
Idaho Conservation League U.S. Mail
710N. Sixth Street(83702) Fax
P0 Box 844 Email
Boise, ID 83701
botto@idahoconservation.org
Ken Miller Hand Delivered
Liz Woodruff U.S. Mail
Snake River Alliance Fax
P0 Box 1731 Email
Boise, ID 83701
kmiller@snakeriveralliance.org
lwoodruff@snakeriveralliance.or
Megan Walseth Decker Hand Delivered
Senior Staff Counsel U.S. Mail
Renewable Northwest Project Fax
917 SW Oak Street, Suite 303 Email
Portland, OR 97205
megan@rnp.org
LEGAL BRIEF OF RIDGELINE ENERGY LLC-15
Mary Lewallen Hand Delivered
Clearwater Paper Corporation U.S. Mail
601 W. Riverside Ave., Suite 1100 Fax
Spokane, WA 99201 Email
Marv.lewallen@clearwatemaner.com
Ted S. Sorenson, P.E. Hand Delivered
Birch Power Company U.S. Mail
5203S .11thE. Fax
Idaho Falls, Idaho Email
ted@sorenson.net
Tauna Christensen Hand Delivered
Energy Integrity Project U.S. Mail
769 N 1100 E Shelley, Idaho 83274 Fax
Email taunaenergvintegritvnroject.org
BY: OLcti&i
MCDEVITr & MILLER LLP
LEGAL BRIEF OF RIDGELINE ENERGY LLC-16