ENERGY INTEGRITY PROJECT
DIRECT TESTIMONY
OF
THOMAS TANTON
1 INTRODUCTION
2 Q. Please state your name and business address.
3 A. My name is Thomas Tanton and my business address is 4390 Indian Creek
4 Road, Lincoln, California 95648.
5 Q. By whom are you employed and in what capacity?
6 A. I am President of T 2 & Associates, a firm located in Lincoln, California,
7 which provides consulting services to the energy and technology industries.
8 Q. Please describe your educational background and work experience.
9 A. T 2 & Associates are active primarily in the area of renewable energy and
10 interconnected infrastructures, analyzing and providing advice on their impacts on energy
11 prices, environmental quality and regional economic development. I have 38 years direct
12 and responsible experience in energy technology assessment, resource planning, electric
13 grid integration and infrastructure development.
14 As the General Manager at the Electric Power Research Institute (EPRI),
15 from 2000 to 2003, I was responsible for the overall management and direction of
16 collaborative research and development programs in renewable and hydroelectric
17 generation technologies, integrating technology, market infrastructure, and public policy.
18 From 2003 through 2007, I was Senior Fellow and Vice President of the Houston based
19 Institute for Energy Research. I was also a Senior Fellow in Energy Studies with the
20 Pacific Research Institute until 2010. Until 2000, I was the Principal Policy Advisor with
21 the California Energy Commission (CEC) in Sacramento, California. I began my career
22 there in 1976. I developed and implemented policies and legislation on energy and
23 environmental issues of importance to California, and U.S. and International markets,
TANTON, DI -2
Energy Integrity Project
I including electric restructuring, gasoline and natural gas supply and pricing, energy
2 facility siting and permitting, environmental issues, power plant siting, technology
3 development, and transportation. I completed the first assessment of environmental
4 externalities used in regulatory settings, placing a monetary value on environmental
5 pollutant emissions. I held primary responsibility for resource planning, comparative
6 economic analysis, environmental assessment of new technologies, and the evaluation of
7 alternatives under state and federal environmental law. I served as Guest Lecturer for the
8 Master in Environmental Science program at California State University Sacramento
9 (CSUS), lecturing on power plant and electric grid technologies and their comparative
10 environmental impacts.
11 In my role as Principal Policy Advisor at the California Energy Commission, I
12 evaluated power plant applications for certification, including environmental, economic
13 and reliability considerations.
14 I have extensive experience with electricity resource planning and resource
15 integration, including use of dispatch modeling to evaluate impacts on customer price and
16 grid reliability from the addition of specific or generic resources to a grid.
17 My curriculum vitae is provided as Exhibit No. 2001 hereto and incorporated by
18 reference herein.
19 Q. What is the purpose of your testimony in this matter?
20 A. I have been asked by Energy Integrity Project to give recommendations
21 relevant to the Idaho Public Utilities Commission's ("Commission") current review of
22 the methodology for computing avoided costs in PURPA implementation.
TANTON, DI -3
Energy Integrity Project
I I. Recommendations
2 Q. Could you please state your recommendations?
3 A. I appreciate the PUC's efforts to adopt improved methods for determining
4 the avoided costs delivered by Qualifying Facilities. After reviewing current and
5 proposed methodologies for determining the energy component of the IRP avoided
6 cost, I believe that a significant component has been overlooked. The overlooked
7 component is that the integration of QF generation into the electric system is not
8 perfectly efficient. For a variety of reasons, the quantity of fossil fuel saved by each
9 MWh of QF generation is likely to be less than the quantify of fossil fuel that would
10 have been required to replace that MWh by the next marginal increment of non-QF
11 generation.
12 I recommend that the PUC change the IRP avoided cost calculation by
13 taking the actual fuel savings achieved by each QF into account. I believe the actual
14 fuel savings could be calculated by re-running the chronological dispatch for the
15 contract year with and without the QF, and taking the difference in total fuel
16 consumption. Other State's Commissions have used this method in the past and more
17 accurately accounts for the value of capacity and of energy.
18 Side-by-side chronological dispatch should be benchmarked with actual
19 recent (from the past year) recorded performance of generators on the grid and actual
20 recent recorded loads and load profiles. Such comparisons should be done for each
21 contract year, or small combination of years, and for each QF connecting to the grid.
22 Alternatively, small groupings of QFs, depending on their aggregate capacity and
23 energy, could reduce computational requirements.
TANTON, DI -4
Energy Integrity Project
Q. Does this complete your testimony at this time?
A. Yes, it does.
TANTON, DI -5
Energy Integrity Project
BEFORE THE
IDAHO PUBLIC UTILITIES COMMISSION
CASE NO. GNR-E-11-03
ENERGY INTEGRITY PROJECT
TANTON, DI
TESTIMONY
EXHIBIT NO. 2001
Curriculum Vitae
Thomas Tanton
Mr. Tanton is President of T 2 & Associates, a firm providing consulting services to the
energy and technology industries. T 2 & Associates are active primarily in the area of
renewable energy and interconnected infrastructures, analyzing and providing advice on
their impacts on energy prices, environmental quality and regional economic
development. Mr. Tanton has 38 years direct and responsible experience in energy
technology and legislative interface, having been central to many of the critical
legislative changes that enable technology choice and economic development at the state
and federal level. Mr. Tanton is a strong proponent of free market environmentalism and
consumer choice, and frequently publishes and speaks against alarmist and reactionary
policies and government failures.
As the General Manager at EPRI, from 2000 to 2003, Mr. Tanton was responsible for the
overall management and direction of collaborative research and development programs in
electric generation technologies, integrating technology, market infrastructure, and public
policy. A key focus of this work was the integration of intermittent wind with electric
grids. He has previously served as a Senior Environmental Fellow with the Pacific
Research Institute and Vice President and Adjunct scholar with the Institute for Energy
Research.
Mr. Tanton has over 38 years experience in the energy, economy, and environmental
fields. Until 2000, Mr. Tanton was the Principal Policy Advisor with the California
Energy Commission (CEC) in Sacramento, California. He began his career there in 1976.
He developed and implemented policies and legislation on energy issues of importance to
California, and U.S. and International markets, including electric restructuring, gasoline
and natural gas supply and pricing, energy facility siting and permitting, environmental
issues, power plant siting, technology development, and transportation. He initiated
legislative authorization for the Public Interest Energy Research program and managed
the program's research in infrastructure, renewables and environmental areas. Mr. Tanton
completed the first assessment of environmental externalities used in regulatory settings.
Mr. Tanton held primary responsibility for comparative economic analysis,
environmental assessment of new technologies, and the evaluation of alternatives under
state and federal environmental law. Mr. Tanton served as Guest Lecturer for the Master
in Environmental Science program at CSUS, lecturing on power plant and electric grid
technologies and their comparative environmental impacts.
Mr. Tanton has been recognized for raising awareness of the connection of electricity to
other important industries including agriculture, petroleum production, electronics,
Exhibit No. 2001
Case No. GNR-E-11-03
T. Tanton, Energy Integrity Project
Page 1 of
biotechnology, water supply, Internet, and finance. Mr. Tanton served as a team member
of California Governor's Office task force on critical infrastructure security, coordinating
with national effort lead by White House Office of Science and Technology Policy. He
served as lead advisor on energy and infrastructure to California's task force on 21 "
Century development (and provided unique leadership relative to California's electric
transmission needs), recommended positions and actions on major items before the
California Energy and Public Utilities Commissions, and provided representation with
external top-level management Boards, Commissions, Legislature and Congress. He has
testified before several State legislatures and Congress, and provided expert witness
testimony in power plant siting cases.
Significant Past Affiliations
• West Coast Region-Petroleum Technology Transfer Center (PTTC)-
(University of Southern California)
• Senior Research Associate—Urban Utility Center; New York Polytechnic
Institute
• US Combined Heat and Power Association—Co-Chair Pacific Southwest
Region Initiative
• National Fuel Cell Research Center—University of California, Irvine—
Technical Advisory Committee
• Complex Interactive Network/Systems Initiative (a Major Collaborative
Project led by U.S. Department of Defense re: cyber and network infrastructure
security)—Technical and Policy Advisory Committees
Recent Publications
Natural Gas Demand Impacts from Expanded Use of Renewables in Electricity
Generation Thomas Tanton, July 2010
An Estimate of the Economic Impact of A Cai and Trade Auction Tax On California,
Thomas Tanton, March, 2010, Testimony to California Air Resources Board
American Petroleum Institute, Emission Reductions Associated with US. Oil and Gas
Industry Investments in Greenhouse Gas Mitigation Technologies Thomas Tanton March
2010
Tanton, Thomas, et.al . Oil and Gas Industry Investments in Alternative Energy, Frontier
Hydrocarbons and Advanced End-Use Technologies; May 2006
Exhibit No. 2001
Case No. GNR-E-1 1-03
T. Tanton, Energy Integrity Project
Page 2 of 4
Robert L. Bradley Jr. and Thomas Tanton; Motor Fuel and Natural Disasters: Don't
Regulate in Energy, Environment, and Economics: A guide for State Legislators,
American Legislative Exchange Council, June 2006
American Petroleum Institute, Key Investments in Greenhouse Gas Mitigation
Technologies by Energy Firms, Other Industry and the Federal Government. An Update;
Thomas Tanton with Center for Energy Economics, Bureau of Economic Geology, The
University of Texas, June 2009
American Petroleum Institute, Key Investments in Greenhouse Gas Mitigation
Technologies by Energy Firms, Other Industry and the Federal Government, April 2008
American Petroleum Institute, Oil and Gas Industry Investments In Alternative Energy,
Frontier Hydrocarbons and Advanced End-Use Technologies: An Update Thomas
Tanton with Center for Energy Economics, Bureau of Economic Geology, The
University of Texas, September 2008
Thomas Tanton, How Myths Distort Energy Policy, Power Magazine February 1, 2010
Tanton, Thomas; Renewable Por'folio Standards: Achieving Their Goals? American
Coal; ACC; Issue 1, 2006
Tanton, Thomas; The New Future of Renewable Energy World and I Magazine; February
2003
California Energy Commission; Electricity Report 1988, 92, 94, 96, 98; Project Director
and Contributing Author. The Electricity Report is California's official electricity
planning and regulatory proceeding, integrating demand forecast, resource planning,
environmental and economic analysis and comparison of technologies, forming the basis
for approval of any power plant proposed for construction in the State.
California Energy Commission; Biennial Report 1992, 1995, Advisor and Contributing
Author; The Biennial Report is California's official energy Policy Report, integrating
analysis of electricity, transportation, conservation and technology R&D markets, trends
and opportunities.
Technical Assessment Manual, Volume 1, Editions 1-3. 1980, 1983, 1988 Data base of
economic, environmental and performance characteristics of generation, power delivery
and conservation technologies.
California Energy Commission, Energy Development Report 1994
Exhibit No. 2001
Case No. GNR-E-11-03
T. Tanton, Energy Integrity Project
Page 3 of
Thomas Tanton, Mark Thayer, et.àl. Air Quality Valuation Model; 1994. The air quality
valuation model is a regulatorily accepted model to determine economic values for
various air pollution emissions (restricted to California) based on damage function
analysis: this publication also included submitted testimony.
Thomas Tanton; Vessel Traffic Safety Analysis of the Point Conception Liquefied Natural
Gas Facility 1978
Tanton, Thomas, Analysis of Alternatives to the (proposed) Montezuma Coal Fired
Power Plant (Testimony submitted in compliance with California Environmental Quality
Act) 1983
Tanton, Thomas, and Prabunam Singh Khalsa, Analysis of Alternatives to the (proposed)
"Cal-Coal" Power Plant (Testimony submitted in compliance with California
Environmental Quality Act) 1981
Education
B.S. Chemistry, 1972, California State University, San Diego
Exhibit No. 2001
Case No. GNR-E-1 1-03
T. Tanton, Energy Integrity Project
Page 4 of 4
CERTIFICATE OF SERVICE
I HEREBY CERTIFY that on this 3rd day of May 2012, I served a true and
correct copy of the DIRECT TESTIMONY OF THOMAS TANTON upon the
following named parties by the method indicated below:
Jean D. Jewell, Secretary _Hand Delivery
Idaho Public Utilities Commission X U.S. Mail, postage pre-paid
472 West Washington __Facsimile
Boise, Idaho 83702 X Electronic Mail jean.iewell@puc.idaho.gov
Donald L. Howell, II Hand Delivery
Kristine A. Sasser U.S . Mail, postage pre-paid
Deputy Attorneys General Facsimile Idaho Public Utilities Commission X I Electronic Mail 472 West Washington (83702)
P0 Box 83720
Boise, Idaho 83720-0074
donald.howell(pub.idaho.gov
kris.sasserpub.idaho.gov
Donovan E. Walker Hand Delivery
Jason B. Williams U.S. Mail, postage pre-paid
Idaho Power Company ___Facsimile
P0 Box 70 X Electronic Mail Boise, Idaho 83707-0070
dwalker@idahot,ower.com
jwilliams@idahopower.com
Michael G. Andrea Hand Delivery
Avista Corporation U.S. Mail, postage pre-paid
1411 E. Mission Ave. _______Facsimile
Spokane, WA 99202 X Electronic Mail michael.andrea@avistacorp.com
Daniel Solander Hand Delivery
PacifiCorp/dba Rocky Mountain Power U.S. Mail, postage pre-paid
201 S. Main St., Suite 2300 __Facsimile
Salt Lake City, UT 84111 X Electronic Mail daniel.solander@pacificorp.com
Electronic Copies Only: Hand Delivery
Ken Kaufmann U.S. Mail, postage pre-paid
Lovinger Kaufmann LLP ______Facsimile
825 NE Multnomah Suite 925 x Electronic Mail Portland, OR 97232
kaufmann@lklaw.com
CERTIFICATE OF SERVICE - 1
Peter J. Richardson Hand Delivery
Gregory M. Adams U.S. Mail, postage pre-paid Richardson & O'Leary, PLLC ______Facsimile
P0 Box 7218 X Electronic Mail Boise, ID 83702
peter@richardsonandoleary.com
gregrichardsonandoleary.com
Robert D. Kahn Hand Delivery
Executive Director U.S. Mail, postage pre-paid
Northwest and Intermountain Power Facsimile Producers Coalition X Electronic Mail 1117 Minor Ave., Suite 300
Seattle, WA 98101
rkahn(nippc.org
Don Sturtevant Hand Delivery
Energy Director U.S. Mail, postage pre-paid
J.R. Simplot Company ______Facsimile
P0 Box 27 X Electronic Mail Boise, ID 83707-0027
don.sturtevant@simplot.com
Robert A. Paul Hand Delivery
Grand View Solar II U.S. Mail, postage pre-paid 15690 Vista Circle __Facsimile
Desert Hot Springs, CA 92241 X Electronic Mail robertapau108cgrnajl.com
James Carkulis Hand Delivery
Managing Member U.S. Mail, postage pre-paid
Exergy Development Group of Idaho, _______Facsimile
LLC X Electronic Mail 802 W. Bannock St., Suite 1200
Boise, ID 83702
jcarkulisciexergydeye1oDment.corn
Thomas H. Nelson Hand Delivery
Attorney U.S. Mail, postage pre-paid
P0 Box 1211 ______Facsimile
Weiches, OR 97067-1211 X Electronic Mail nelson@thnelson.com
CERTIFICATE OF SERVICE -2
John R. Lowe
Consultant to Hand Delivery
Renewable Energy Coalition U.S. Mail, postage pre-paid
12050 SW Tremont St. Facsimile
Portland, OR 97225 X_ Electronic Mail
jravenesanmarcos@yahoo.com
R. Greg Ferney Hand Delivery
Mimura Law Offices, PLLC U.S. Mail, postage pre-paid
2176 E Franklin Rd., Suite 120 __Facsimile
Meridian, 1D 83642 X Electronic Mail greg@mimuralaw.com
Bill Piske, Manager Hand Delivery
Interconnect Solar Development, LLC U.S. Mail, postage pre-paid 1303 E. Carter __Facsimile
Boise, ID 83706 X Electronic Mail billpiskecableone.net
Ronald L. Williams Hand Delivery
Williams Bradbury, P.C. U.S. Mail, postage pre-paid 1015 W. Hays Street _______Facsimile
Boise, ID 83702 X Electronic Mail roncwilliamsbradbury.com
Wade Thomas Hand Delivery
General Counsel U.S. Mail, postage pre-paid
Dynamis Energy, LLC ______Facsimile
776 W Riverside Dr., Suite 15 X Electronic Mail Eagle, ID 83616
wthomas@dynamjsenergy.com
Shelley M. Davis Hand Delivery
Barker Rosholt & Simpson, LLP U.S. Mail, postage pre-paid
1010 W. Jefferson St. (83 702) _______Facsimile
P0 Box 2139 X i Electronic Mail Boise, ID 83701
smd@idahowaters.com
C. Thomas Arkoosh Hand Delivery
Capitol Law Group, PLLC U.S. Mail, postage pre-paid 205 N. 10th St., 4th Floor __Facsimile
P0 Box 2598 X i Electronic Mail Boise, ID 83701
tarkoosh@capitollawgroun.com
CERTIFICATE OF SERVICE -3
Brian Olmstead Hand Delivery
General Manager U.S. Mail, postage pre-paid
Twin Falls Canal Company __Facsimile
P0 Box 326 X Electronic Mail Twin Falls, ID 83303
olmstead@tfcanal.com
Ted Diehl Hand Delivery
General Manager U.S. Mail, postage pre-paid
North Side Canal Company __Facsimile
921 N. Lincoln St. X Electronic Mail Jerome, ID 83338
nscanal@cableone.net
Bill Brown, Chair Hand Delivery
Board of Commissioners of Adams, U.S. Mail, postage pre-paid
County, ID __Facsimile
P0 Box 48 X I Electronic Mail Council, ID 83612
bdbrown(frontiemet.net
Ted S. Sorenson, P.E. Hand Delivery
Birch Power Company U.S. Mail, postage pre-paid
5203 South 11 th East __Facsimile
Idaho Falls, ID 83404 X Electronic Mail ted@tsorenson.net
Glenn Ikemoto Hand Delivery
Margaret Rueger U.S. Mail, postage pre-paid
Idaho Windfarms, LLC ______Facsimile
672 Blair Avenue X I Electronic Mail Piedmont, CA 94611
glennienvisionwind.com
margaret@envisionwind.com
Dean J. Miller Hand Delivery
McDevitt & Miller, LLP U.S. Mail, postage pre-paid
420 W Bannock St. (83702) __Facsimile
P0 Box 2564 X i Electronic Mail Boise, ID 83701
joe@mcdevitt-miller.com
M.J. Humphries Hand Delivery
Blue Ribbon Energy LLC U.S. Mail, postage pre-paid
4515 S. Ammon Road __Facsimile
Ammon, ID 83406 X Electronic Mail blueribbonenergyigmail.com
CERTIFICATE OF SERVICE -4
Aaron F. Jepson
Blue Ribbon Energy LLC
10660 South 540 East
Sandy, UT 84070
arronesg@aol.com
Hand Delivery
U.S. Mail, postage pre-paid
Facsimile
- X Electronic Mail
Megan Walseth Decker
Senior Staff Counsel
Renewable Northwest Project
917 SW Oak Street, Suite 303
Portland, OR 97205
megan(irnp.org
Benjamin J. Otto
Idaho Conservation League
710 N Sixth Street (83702)
P0 Box 844
Boise, ID 83701
botto@idahoconservation.org
Ken Miller
Snake River Alliance
P0 Box 1731
Boise, ID 83701
kmillersnakerivera1liance.org
Liz Woodruff
Snake River Alliance
P0 Box 1731
Boise, ID 83701
lwoodruffsnakeriveralliance.org
Mary Lewallen
Clearwater Paper Corporation
601 W. Riverside Ave., Suite 1100
Spokane, WA 99201
marv.lewal1en@clearwatereaper.com
Dr. Don Reading
6070 Hill Road
Boise, ID 83703
dreadingmindspring.com
Hand Delivery
U.S. Mail, postage pre-paid
________Facsimile
X Electronic Mail
Hand Delivery
U.S. Mail, postage pre-paid
Facsimile
- X Electronic Mail
Hand Delivery
U.S. Mail, postage pre-paid
Facsimile
- X Electronic Mail
Hand Delivery
U.S. Mail, postage pre-paid
Facsimile
- X I Electronic Mail
Hand Delivery
U.S. Mail, postage pre-paid
________Facsimile
- X Electronic Mail
Hand Delivery
U.S. Mail, postage pre-paid
Facsimile
- X Electronic Mail
Tauna Christensen
Energy Integrity Project
CERTIFICATE OF SERVICE -5