HomeMy WebLinkAbout20120504Comments.pdfRECEIVED I AHO PUI3L UTILITIES C01.1SS1ON BEFORE THE IDAHO PUBLIC UTILITIES COMMISSION IN THE MATTER OF THE COMMISSION'S ) REVIEW OF PURPA QF CONTRACT ) PROVISIONS INCLUDING THE ) SURROGATE AVOIDED RESOURCE (SAR) ) AND INTEGRATED RESOURCE PLANNING ) CASE NO. GNR-E-11-03 (ifiP) METHODOLOGIES FOR ) CALCULATING PUBLISHED AVOIDED ) COST RATES. ) ENERGY INTEGRITY PROJECT DIRECT TESTIMONY OF THOMAS TANTON 1 INTRODUCTION 2 Q. Please state your name and business address. 3 A. My name is Thomas Tanton and my business address is 4390 Indian Creek 4 Road, Lincoln, California 95648. 5 Q. By whom are you employed and in what capacity? 6 A. I am President of T 2 & Associates, a firm located in Lincoln, California, 7 which provides consulting services to the energy and technology industries. 8 Q. Please describe your educational background and work experience. 9 A. T 2 & Associates are active primarily in the area of renewable energy and 10 interconnected infrastructures, analyzing and providing advice on their impacts on energy 11 prices, environmental quality and regional economic development. I have 38 years direct 12 and responsible experience in energy technology assessment, resource planning, electric 13 grid integration and infrastructure development. 14 As the General Manager at the Electric Power Research Institute (EPRI), 15 from 2000 to 2003, I was responsible for the overall management and direction of 16 collaborative research and development programs in renewable and hydroelectric 17 generation technologies, integrating technology, market infrastructure, and public policy. 18 From 2003 through 2007, I was Senior Fellow and Vice President of the Houston based 19 Institute for Energy Research. I was also a Senior Fellow in Energy Studies with the 20 Pacific Research Institute until 2010. Until 2000, I was the Principal Policy Advisor with 21 the California Energy Commission (CEC) in Sacramento, California. I began my career 22 there in 1976. I developed and implemented policies and legislation on energy and 23 environmental issues of importance to California, and U.S. and International markets, TANTON, DI -2 Energy Integrity Project I including electric restructuring, gasoline and natural gas supply and pricing, energy 2 facility siting and permitting, environmental issues, power plant siting, technology 3 development, and transportation. I completed the first assessment of environmental 4 externalities used in regulatory settings, placing a monetary value on environmental 5 pollutant emissions. I held primary responsibility for resource planning, comparative 6 economic analysis, environmental assessment of new technologies, and the evaluation of 7 alternatives under state and federal environmental law. I served as Guest Lecturer for the 8 Master in Environmental Science program at California State University Sacramento 9 (CSUS), lecturing on power plant and electric grid technologies and their comparative 10 environmental impacts. 11 In my role as Principal Policy Advisor at the California Energy Commission, I 12 evaluated power plant applications for certification, including environmental, economic 13 and reliability considerations. 14 I have extensive experience with electricity resource planning and resource 15 integration, including use of dispatch modeling to evaluate impacts on customer price and 16 grid reliability from the addition of specific or generic resources to a grid. 17 My curriculum vitae is provided as Exhibit No. 2001 hereto and incorporated by 18 reference herein. 19 Q. What is the purpose of your testimony in this matter? 20 A. I have been asked by Energy Integrity Project to give recommendations 21 relevant to the Idaho Public Utilities Commission's ("Commission") current review of 22 the methodology for computing avoided costs in PURPA implementation. TANTON, DI -3 Energy Integrity Project I I. Recommendations 2 Q. Could you please state your recommendations? 3 A. I appreciate the PUC's efforts to adopt improved methods for determining 4 the avoided costs delivered by Qualifying Facilities. After reviewing current and 5 proposed methodologies for determining the energy component of the IRP avoided 6 cost, I believe that a significant component has been overlooked. The overlooked 7 component is that the integration of QF generation into the electric system is not 8 perfectly efficient. For a variety of reasons, the quantity of fossil fuel saved by each 9 MWh of QF generation is likely to be less than the quantify of fossil fuel that would 10 have been required to replace that MWh by the next marginal increment of non-QF 11 generation. 12 I recommend that the PUC change the IRP avoided cost calculation by 13 taking the actual fuel savings achieved by each QF into account. I believe the actual 14 fuel savings could be calculated by re-running the chronological dispatch for the 15 contract year with and without the QF, and taking the difference in total fuel 16 consumption. Other State's Commissions have used this method in the past and more 17 accurately accounts for the value of capacity and of energy. 18 Side-by-side chronological dispatch should be benchmarked with actual 19 recent (from the past year) recorded performance of generators on the grid and actual 20 recent recorded loads and load profiles. Such comparisons should be done for each 21 contract year, or small combination of years, and for each QF connecting to the grid. 22 Alternatively, small groupings of QFs, depending on their aggregate capacity and 23 energy, could reduce computational requirements. TANTON, DI -4 Energy Integrity Project Q. Does this complete your testimony at this time? A. Yes, it does. TANTON, DI -5 Energy Integrity Project BEFORE THE IDAHO PUBLIC UTILITIES COMMISSION CASE NO. GNR-E-11-03 ENERGY INTEGRITY PROJECT TANTON, DI TESTIMONY EXHIBIT NO. 2001 Curriculum Vitae Thomas Tanton Mr. Tanton is President of T 2 & Associates, a firm providing consulting services to the energy and technology industries. T 2 & Associates are active primarily in the area of renewable energy and interconnected infrastructures, analyzing and providing advice on their impacts on energy prices, environmental quality and regional economic development. Mr. Tanton has 38 years direct and responsible experience in energy technology and legislative interface, having been central to many of the critical legislative changes that enable technology choice and economic development at the state and federal level. Mr. Tanton is a strong proponent of free market environmentalism and consumer choice, and frequently publishes and speaks against alarmist and reactionary policies and government failures. As the General Manager at EPRI, from 2000 to 2003, Mr. Tanton was responsible for the overall management and direction of collaborative research and development programs in electric generation technologies, integrating technology, market infrastructure, and public policy. A key focus of this work was the integration of intermittent wind with electric grids. He has previously served as a Senior Environmental Fellow with the Pacific Research Institute and Vice President and Adjunct scholar with the Institute for Energy Research. Mr. Tanton has over 38 years experience in the energy, economy, and environmental fields. Until 2000, Mr. Tanton was the Principal Policy Advisor with the California Energy Commission (CEC) in Sacramento, California. He began his career there in 1976. He developed and implemented policies and legislation on energy issues of importance to California, and U.S. and International markets, including electric restructuring, gasoline and natural gas supply and pricing, energy facility siting and permitting, environmental issues, power plant siting, technology development, and transportation. He initiated legislative authorization for the Public Interest Energy Research program and managed the program's research in infrastructure, renewables and environmental areas. Mr. Tanton completed the first assessment of environmental externalities used in regulatory settings. Mr. Tanton held primary responsibility for comparative economic analysis, environmental assessment of new technologies, and the evaluation of alternatives under state and federal environmental law. Mr. Tanton served as Guest Lecturer for the Master in Environmental Science program at CSUS, lecturing on power plant and electric grid technologies and their comparative environmental impacts. Mr. Tanton has been recognized for raising awareness of the connection of electricity to other important industries including agriculture, petroleum production, electronics, Exhibit No. 2001 Case No. GNR-E-11-03 T. Tanton, Energy Integrity Project Page 1 of biotechnology, water supply, Internet, and finance. Mr. Tanton served as a team member of California Governor's Office task force on critical infrastructure security, coordinating with national effort lead by White House Office of Science and Technology Policy. He served as lead advisor on energy and infrastructure to California's task force on 21 " Century development (and provided unique leadership relative to California's electric transmission needs), recommended positions and actions on major items before the California Energy and Public Utilities Commissions, and provided representation with external top-level management Boards, Commissions, Legislature and Congress. He has testified before several State legislatures and Congress, and provided expert witness testimony in power plant siting cases. Significant Past Affiliations • West Coast Region-Petroleum Technology Transfer Center (PTTC)- (University of Southern California) • Senior Research Associate—Urban Utility Center; New York Polytechnic Institute • US Combined Heat and Power Association—Co-Chair Pacific Southwest Region Initiative • National Fuel Cell Research Center—University of California, Irvine— Technical Advisory Committee • Complex Interactive Network/Systems Initiative (a Major Collaborative Project led by U.S. Department of Defense re: cyber and network infrastructure security)—Technical and Policy Advisory Committees Recent Publications Natural Gas Demand Impacts from Expanded Use of Renewables in Electricity Generation Thomas Tanton, July 2010 An Estimate of the Economic Impact of A Cai and Trade Auction Tax On California, Thomas Tanton, March, 2010, Testimony to California Air Resources Board American Petroleum Institute, Emission Reductions Associated with US. Oil and Gas Industry Investments in Greenhouse Gas Mitigation Technologies Thomas Tanton March 2010 Tanton, Thomas, et.al . Oil and Gas Industry Investments in Alternative Energy, Frontier Hydrocarbons and Advanced End-Use Technologies; May 2006 Exhibit No. 2001 Case No. GNR-E-1 1-03 T. Tanton, Energy Integrity Project Page 2 of 4 Robert L. Bradley Jr. and Thomas Tanton; Motor Fuel and Natural Disasters: Don't Regulate in Energy, Environment, and Economics: A guide for State Legislators, American Legislative Exchange Council, June 2006 American Petroleum Institute, Key Investments in Greenhouse Gas Mitigation Technologies by Energy Firms, Other Industry and the Federal Government. An Update; Thomas Tanton with Center for Energy Economics, Bureau of Economic Geology, The University of Texas, June 2009 American Petroleum Institute, Key Investments in Greenhouse Gas Mitigation Technologies by Energy Firms, Other Industry and the Federal Government, April 2008 American Petroleum Institute, Oil and Gas Industry Investments In Alternative Energy, Frontier Hydrocarbons and Advanced End-Use Technologies: An Update Thomas Tanton with Center for Energy Economics, Bureau of Economic Geology, The University of Texas, September 2008 Thomas Tanton, How Myths Distort Energy Policy, Power Magazine February 1, 2010 Tanton, Thomas; Renewable Por'folio Standards: Achieving Their Goals? American Coal; ACC; Issue 1, 2006 Tanton, Thomas; The New Future of Renewable Energy World and I Magazine; February 2003 California Energy Commission; Electricity Report 1988, 92, 94, 96, 98; Project Director and Contributing Author. The Electricity Report is California's official electricity planning and regulatory proceeding, integrating demand forecast, resource planning, environmental and economic analysis and comparison of technologies, forming the basis for approval of any power plant proposed for construction in the State. California Energy Commission; Biennial Report 1992, 1995, Advisor and Contributing Author; The Biennial Report is California's official energy Policy Report, integrating analysis of electricity, transportation, conservation and technology R&D markets, trends and opportunities. Technical Assessment Manual, Volume 1, Editions 1-3. 1980, 1983, 1988 Data base of economic, environmental and performance characteristics of generation, power delivery and conservation technologies. California Energy Commission, Energy Development Report 1994 Exhibit No. 2001 Case No. GNR-E-11-03 T. Tanton, Energy Integrity Project Page 3 of Thomas Tanton, Mark Thayer, et.àl. Air Quality Valuation Model; 1994. The air quality valuation model is a regulatorily accepted model to determine economic values for various air pollution emissions (restricted to California) based on damage function analysis: this publication also included submitted testimony. Thomas Tanton; Vessel Traffic Safety Analysis of the Point Conception Liquefied Natural Gas Facility 1978 Tanton, Thomas, Analysis of Alternatives to the (proposed) Montezuma Coal Fired Power Plant (Testimony submitted in compliance with California Environmental Quality Act) 1983 Tanton, Thomas, and Prabunam Singh Khalsa, Analysis of Alternatives to the (proposed) "Cal-Coal" Power Plant (Testimony submitted in compliance with California Environmental Quality Act) 1981 Education B.S. Chemistry, 1972, California State University, San Diego Exhibit No. 2001 Case No. GNR-E-1 1-03 T. Tanton, Energy Integrity Project Page 4 of 4 CERTIFICATE OF SERVICE I HEREBY CERTIFY that on this 3rd day of May 2012, I served a true and correct copy of the DIRECT TESTIMONY OF THOMAS TANTON upon the following named parties by the method indicated below: Jean D. Jewell, Secretary _Hand Delivery Idaho Public Utilities Commission X U.S. Mail, postage pre-paid 472 West Washington __Facsimile Boise, Idaho 83702 X Electronic Mail jean.iewell@puc.idaho.gov Donald L. Howell, II Hand Delivery Kristine A. Sasser U.S . Mail, postage pre-paid Deputy Attorneys General Facsimile Idaho Public Utilities Commission X I Electronic Mail 472 West Washington (83702) P0 Box 83720 Boise, Idaho 83720-0074 donald.howell(pub.idaho.gov kris.sasserpub.idaho.gov Donovan E. Walker Hand Delivery Jason B. Williams U.S. Mail, postage pre-paid Idaho Power Company ___Facsimile P0 Box 70 X Electronic Mail Boise, Idaho 83707-0070 dwalker@idahot,ower.com jwilliams@idahopower.com Michael G. Andrea Hand Delivery Avista Corporation U.S. Mail, postage pre-paid 1411 E. Mission Ave. _______Facsimile Spokane, WA 99202 X Electronic Mail michael.andrea@avistacorp.com Daniel Solander Hand Delivery PacifiCorp/dba Rocky Mountain Power U.S. Mail, postage pre-paid 201 S. Main St., Suite 2300 __Facsimile Salt Lake City, UT 84111 X Electronic Mail daniel.solander@pacificorp.com Electronic Copies Only: Hand Delivery Ken Kaufmann U.S. Mail, postage pre-paid Lovinger Kaufmann LLP ______Facsimile 825 NE Multnomah Suite 925 x Electronic Mail Portland, OR 97232 kaufmann@lklaw.com CERTIFICATE OF SERVICE - 1 Peter J. Richardson Hand Delivery Gregory M. Adams U.S. Mail, postage pre-paid Richardson & O'Leary, PLLC ______Facsimile P0 Box 7218 X Electronic Mail Boise, ID 83702 peter@richardsonandoleary.com gregrichardsonandoleary.com Robert D. Kahn Hand Delivery Executive Director U.S. Mail, postage pre-paid Northwest and Intermountain Power Facsimile Producers Coalition X Electronic Mail 1117 Minor Ave., Suite 300 Seattle, WA 98101 rkahn(nippc.org Don Sturtevant Hand Delivery Energy Director U.S. Mail, postage pre-paid J.R. Simplot Company ______Facsimile P0 Box 27 X Electronic Mail Boise, ID 83707-0027 don.sturtevant@simplot.com Robert A. Paul Hand Delivery Grand View Solar II U.S. Mail, postage pre-paid 15690 Vista Circle __Facsimile Desert Hot Springs, CA 92241 X Electronic Mail robertapau108cgrnajl.com James Carkulis Hand Delivery Managing Member U.S. Mail, postage pre-paid Exergy Development Group of Idaho, _______Facsimile LLC X Electronic Mail 802 W. Bannock St., Suite 1200 Boise, ID 83702 jcarkulisciexergydeye1oDment.corn Thomas H. Nelson Hand Delivery Attorney U.S. Mail, postage pre-paid P0 Box 1211 ______Facsimile Weiches, OR 97067-1211 X Electronic Mail nelson@thnelson.com CERTIFICATE OF SERVICE -2 John R. Lowe Consultant to Hand Delivery Renewable Energy Coalition U.S. Mail, postage pre-paid 12050 SW Tremont St. Facsimile Portland, OR 97225 X_ Electronic Mail jravenesanmarcos@yahoo.com R. Greg Ferney Hand Delivery Mimura Law Offices, PLLC U.S. Mail, postage pre-paid 2176 E Franklin Rd., Suite 120 __Facsimile Meridian, 1D 83642 X Electronic Mail greg@mimuralaw.com Bill Piske, Manager Hand Delivery Interconnect Solar Development, LLC U.S. Mail, postage pre-paid 1303 E. Carter __Facsimile Boise, ID 83706 X Electronic Mail billpiskecableone.net Ronald L. Williams Hand Delivery Williams Bradbury, P.C. U.S. Mail, postage pre-paid 1015 W. Hays Street _______Facsimile Boise, ID 83702 X Electronic Mail roncwilliamsbradbury.com Wade Thomas Hand Delivery General Counsel U.S. Mail, postage pre-paid Dynamis Energy, LLC ______Facsimile 776 W Riverside Dr., Suite 15 X Electronic Mail Eagle, ID 83616 wthomas@dynamjsenergy.com Shelley M. Davis Hand Delivery Barker Rosholt & Simpson, LLP U.S. Mail, postage pre-paid 1010 W. Jefferson St. (83 702) _______Facsimile P0 Box 2139 X i Electronic Mail Boise, ID 83701 smd@idahowaters.com C. Thomas Arkoosh Hand Delivery Capitol Law Group, PLLC U.S. Mail, postage pre-paid 205 N. 10th St., 4th Floor __Facsimile P0 Box 2598 X i Electronic Mail Boise, ID 83701 tarkoosh@capitollawgroun.com CERTIFICATE OF SERVICE -3 Brian Olmstead Hand Delivery General Manager U.S. Mail, postage pre-paid Twin Falls Canal Company __Facsimile P0 Box 326 X Electronic Mail Twin Falls, ID 83303 olmstead@tfcanal.com Ted Diehl Hand Delivery General Manager U.S. Mail, postage pre-paid North Side Canal Company __Facsimile 921 N. Lincoln St. X Electronic Mail Jerome, ID 83338 nscanal@cableone.net Bill Brown, Chair Hand Delivery Board of Commissioners of Adams, U.S. Mail, postage pre-paid County, ID __Facsimile P0 Box 48 X I Electronic Mail Council, ID 83612 bdbrown(frontiemet.net Ted S. Sorenson, P.E. Hand Delivery Birch Power Company U.S. Mail, postage pre-paid 5203 South 11 th East __Facsimile Idaho Falls, ID 83404 X Electronic Mail ted@tsorenson.net Glenn Ikemoto Hand Delivery Margaret Rueger U.S. Mail, postage pre-paid Idaho Windfarms, LLC ______Facsimile 672 Blair Avenue X I Electronic Mail Piedmont, CA 94611 glennienvisionwind.com margaret@envisionwind.com Dean J. Miller Hand Delivery McDevitt & Miller, LLP U.S. Mail, postage pre-paid 420 W Bannock St. (83702) __Facsimile P0 Box 2564 X i Electronic Mail Boise, ID 83701 joe@mcdevitt-miller.com M.J. Humphries Hand Delivery Blue Ribbon Energy LLC U.S. Mail, postage pre-paid 4515 S. Ammon Road __Facsimile Ammon, ID 83406 X Electronic Mail blueribbonenergyigmail.com CERTIFICATE OF SERVICE -4 Aaron F. Jepson Blue Ribbon Energy LLC 10660 South 540 East Sandy, UT 84070 arronesg@aol.com Hand Delivery U.S. Mail, postage pre-paid Facsimile - X Electronic Mail Megan Walseth Decker Senior Staff Counsel Renewable Northwest Project 917 SW Oak Street, Suite 303 Portland, OR 97205 megan(irnp.org Benjamin J. Otto Idaho Conservation League 710 N Sixth Street (83702) P0 Box 844 Boise, ID 83701 botto@idahoconservation.org Ken Miller Snake River Alliance P0 Box 1731 Boise, ID 83701 kmillersnakerivera1liance.org Liz Woodruff Snake River Alliance P0 Box 1731 Boise, ID 83701 lwoodruffsnakeriveralliance.org Mary Lewallen Clearwater Paper Corporation 601 W. Riverside Ave., Suite 1100 Spokane, WA 99201 marv.lewal1en@clearwatereaper.com Dr. Don Reading 6070 Hill Road Boise, ID 83703 dreadingmindspring.com Hand Delivery U.S. Mail, postage pre-paid ________Facsimile X Electronic Mail Hand Delivery U.S. Mail, postage pre-paid Facsimile - X Electronic Mail Hand Delivery U.S. Mail, postage pre-paid Facsimile - X Electronic Mail Hand Delivery U.S. Mail, postage pre-paid Facsimile - X I Electronic Mail Hand Delivery U.S. Mail, postage pre-paid ________Facsimile - X Electronic Mail Hand Delivery U.S. Mail, postage pre-paid Facsimile - X Electronic Mail Tauna Christensen Energy Integrity Project CERTIFICATE OF SERVICE -5