Loading...
HomeMy WebLinkAbout20101223Comments in Opposition.pdfMIMURA LAW OFFICES, PLLC. 2176 E. Franklin Rd. Meridian, ID 83642 Phone: (208) 639.4592 Fax: (208) 639.4611 s. Jean Jewell mmission Secretary o Public Utilties commission . Washington B' , ID 83702 RE:GNR -E-1O-04 Dear Ms. Jewel:\~':':¿ ~'";"'i i;..e:ori1C"Nc.,. Than you for your consideration of this matter. Please feel free to call me should you have any questions.Si? Greg Femey ..... R. Greg Ferney (ISB #6591) Mimura Law Offices, PLLC 2176 E. Franlin Rd., Suite 120 Meridian, ID 83642 Telephone: (208) 639-4592 Fax: (208) 639-4611 greg (gmimuralaw.com REGf: ,,'"' PM~: \ G(q,qOEe ..j Attorneys for Interconnect Solar Development, LLC BEFORE THE IDAHO PUBLIC UTILITES COMMSSION IN THE MATTER OF THE JOINT ) PETITION OF IDAHO POWER COMPAN,) A VISTA CORPORTION, AND ROCKY ) MOUNTAIN POWER TO ADDRESS ) AVOIDED COST ISSUES AND JOINT ) MOTION TO ADJUST THE PUBLISHED ) AVOIDED COST RATE ELIGIBILITY CAP) Case No. GNR-E-1O-04 COMMENTS IN OPPOSITION TO JOINT PETITION TO ADJUST PUBLISHED A VOIDED COST RATE ELIGIBILITY CAP Interconnect Solar Development, LLC ("Interconnect Solar" or "ISD") is a solar energy company with two proposed projects in Owyhee County, Idaho. Both projects are near the town of Murhy, Idaho and are less than 10 aMW in size. Interconnect Solar fies these Comments in Opposition to the Joint Petition of Idaho Power Company, Avista Corporation and PacifiCorp dba Rocky Mountain Power and requests that the Commission refuse to grant the Order adjusting the published avoided cost rate eligibilty cap ("Cap") for QFs from 10 MW to 100 kW. A. Solar Energy QFs Should Be Exempt from any Reduction in the 10 MW Eligibility Cap: Interconnect Solar concurs in the comments of the J.R. Simplot Company previously fied in this case, that "non-wind PURPA resources should be excluded from the Joint Petition" of the thee utilties. As noted in those comments, solar QFs "have very different generating Interconnect Solar Development, LLC Comments in Opposition to Joint Motion Page 1 .. characteristics from wind" and "should therefore not be caught in the overly broad sweep of the Joint Motion." Answer of the l.R. Simplot Company, GNR-E-I-04, p. 3. No evidence has yet been presented by any of the three utilties in the case. Only allegations have been made, all referencing the system impact of intermittent wind resources. Solar power is not 'intermittent" and instead has a firm nature to its production that directly matches a utilty's need for energy and capacity during heavy load hours. As noted in Idaho Power's Integrated Resource Plan, solar energy production closely matches the Company's peak demand occuring ". . . during July typically between 4:00 p.m. and 8:00 p.m. and is primarily due to air conditioning and irrigation load. Idaho Power Company, 2009IRP, p. 65. Continued development of solar energy PURP A resources that are not intermittent and delivered during peak summer hours should be encouraged though the continuation of the 10 MW Cap. Solar PURPA resources are not the cause of the alleged resource problem for any of the thee utilties. The 10 MW Cap and standard avoided cost rates should remain in place for non-wind PURP A facilties. Dated this 22 day of December, 2010. Respectfully submitted, R.~ Interconnect Solar Development, LLC Comments in Opposition to Joint Motion Page 2 CERTIFICATE OF MAING I HEREBY CERTIF that on this 22 day of December, 2010, I caused to be served a tre and correct copy of the foregoing document upon the following individuals via Email: Donovan E. Walker Lisa Nordstrom Idaho Power Company 1221 W. Idaho Street Boise, ID 83707 dwalker(g idahopower.com Inordstrom (i idahopower .com Jean Jewell Idaho Public Utilties Commission 472 W. Washington St. Boise, ID 83702 jean. jewell (ipuc.idaho.gov Daniel E. Solander Rocky Mountain Power 201 South Main, Suite 2300 Salt Lake City, UT 84111 Danie1.solander(i pacificorp.com Dean Miler McDevitt & Miler, LLP P.O. Box 2564 joe (imcdevitt -miler.com Michael G. Andrea A vista Corporation 1411 E. Mission Avenue - MSC-23 Spokane, W A 99202 Michae1.andrea(i avistacorp.com Kris Sassar Deputy Attorney General Idaho Public Utilties Commission 472 W. Washington St. Boise, ID 83702 kris. sassar (i puc. idaho. gOY Peter J. Richardson Gregory M. Adams Richardson & O'Lear 515 N. 27th Street Boise, ID 83702 peter(irichardsonandolear.com greg (g richardsonandolear.com Attorneys for NIPPC and Simplot Ted Weston ID Regulatory Affairs Manager Rocky Mountain Power 201 S. Main Street, Suite 2300 Salt Lake City, UT 84111 ted. weston (i pacificorp.com Robert D. Kah NIPC, Executive Director 1117 Minor Ave, Suite 300 Seattle, W A 9810 1 rkah(inippc.org Ted S. Sorenson, P.E. Sorenson Engineering, Inc. 5203 South 11th East Idaho Falls, ID 83404 ted (i sorenson. net Interconnect Solar Development, LLC Comments in Opposition to Joint Motion Page 3 Scott Woodbury Idaho Public Utilties Commission 472 W. Washington (zip: 83702) POBox 83720 Boise, ID 83720-0074 scott. woodbury (g puc.idaho. gov Robert A. Paul Grand View Solar 15690 Vista Circle Desert Hot Springs, CA 92241 robertpaul (g gmai1.com Don Sturevant Energy Manager J.R. Simplot Company 999 Main Stret, P.O. Box 27 Boise, ID 83707-0027 208-389-7306 don.sturevant(g simplot.com Thomas H. Nelson Renewable Energy Coalition PO Box 1211 Welches, OR 97067 503-622-3262 nelson (g thnelson.com Ronald L. Willams Wiliams Bradbury, P.C. 1015 W. Hays St. Boise ID, 83702 208-344-6633 ron (g willamsbradbur.com Interconnect Solar Development, LLC Glenn Ikemoto Margaret Ruger Idaho Windfarms, LLC 672 Blair Ave. Piedmont, CA 94611 glenni (g pacbell.net Margaret (genvisionwind.com Clair D. Bosen Twin Lakes Canal Company P.O. Box 247 Preston, ID 83263 contact(g twinlakescanalcompany.com Twin Falls Canal Company c/o Brian Olmstead, General Manager P.O. Box 326 Twin Falls, ID 83303-0326 olmstead (gtfcana1.com JohnR. Lowe Consultant to Renewable Energy Coalition 12050 SW Tremont Street Portland, OR 97225 jravenesanmarcos (g yahoo.com Nort Side Canal Company c/o Ted Diehl, General Manager 921 N. Lincoln St. Jerome, ID 83338 nscanal (gcableone.net Comments in Opposition to Joint Motion Page 4 ...'-' . Bil Brown, Chair Board of Commissioners of Adams County, Idaho P.O. Box 48 Council, ID 83612 dbbrown (gfrontiernet.net Wade Thomas Dynamis Energy 776 E. Riverside Drive, Suite 15 Eagle, ID 83616 wthomas (g dynamisenerg.com Paul Marin Intermountain Wind, LLC P.O. Box 353 Boulder, CO paulmarin (g intermountainwind.com James Carkulis Exergy Development Group of Idaho, LLC 802 West Banock Street, Ste. 1200 Boise, ID 83702 jcarkulis (gexergydevelopment.com Interconnect Solar Development, LLC Scott Montgomery Cedar Creek Wind, LLC 668 Rockwood Drive Nort Salt Lake, UT 84054 scott (g westernenergy.us Shelley M. Davis Barker Rosholt & Simpson, LLP 1010 W. Jefferson St., Ste. 102 P.O. Box 2139 Boise, ID 83701-2139 smd (g idahowaters.com Dana Zentz Summit Power Group, Inc. 2006 E. Westminster Spokane, W A 99223 dzentz (g summitpower .com Comments in Opposition to Joint Motion Page 5