Loading...
HomeMy WebLinkAbout20170512Attorney General Letter and Worksheets.pdfI .. ::til\,';il lI iltr li:tlJ flSTATE OF IDAHO OFFICE OF THE ATTORNEY GENERAL LAWRENCE G. WASDENVIA E.MAIL May 12,2017 Avista Corporation Michael Andrea michae l. andrea@avi stacorp.com Avista Utilities l4l l E. Mission POBox3727 Spokane, WA99220-3727 Rocky Mountain Power Daniel Solander dan iel.solander@pacifi corp.com Ted Weston ted. weston @ pac ifi co rp. com PacifiCorp dba Rocky Mountain Power One Utah Center 201 S. Main Street, Suite 2300 Salt Lake City, UT 84111 Idaho Power Company Donovan E. Walker dwalker@idahopower.com Idaho Power Company PO Box 70 Boise, D 83707-007 Clint Kalich clint. kalich@av i stacorp.com Avista Utilities l4l1 E. Mission POBox3727 Spokane, WA99220-3727 Brian Dickman brian.dickman@paci fi corp.com Daniel MacNeil daniel.macnei l@pacifi corp.com Hui Shu hui. shu@pacifi corp.com Laren Hale laren.hale@pacifi corp.com PacifiCorp dba Rocky Mountain Power 825 NE Multnomah Street Portland, OR97232 Michael Darrington M Darrin gton@idahopower.com Idaho Power Company PO Box 70 Boise,ID 83707-0070 Re: Case Nos. GI\R-E-17-01; PAC-E-17-04 The Idaho Public Utilities Commission in Order No. 28708, Case No. GNR-E-99-1, established a methodology for the annual adjustable rate portion of avoided costs for those QF contracts using variable costs associated with Colstrip, a coal-fired generating facility in southeast Montana. For those QF contracts with Colstrip-related fuel costs and variable O&M, future Colstrip variable cost adjustments are to be calculated by using FERC Form I Colstrip Unit Coal Costs per megawatt hour (MWh) and adding $2.004,IWh (the average variable O&M cost of Colstrip plus 201lNIWh for generation taxes plus a five percent (5%) adjustment for line loss). As computed Contracts & Administrative Law Division, ldaho Public Utilities Commission P.O. Box 83720, Boise, ldaho 83720-0074, Telephone: (208) 334-0300, FAX: (208) 3349-3762, Email: ipuc@puc.state.id.us Located at 472 West Washington St., Boise, ldaho 33702 May 12,2017 Page2 by Commission Staff the Colsfrip related adjustable rate will change from 15.61 milUkWh to 17.61 milUkWh. The same calculated rate revision under the avoided cost methodology is used by Avista, PacifiCorp dba Rocky Mountain Power, and Idaho Power Company. This change in the variable rate affects existing contracts under the previous SAR methodology. The adjustable portion of the avoided cost rates under the Sumas-based methodology is based on annual average gas prices indexed at Sumas, Washington. As reported by Avista, the indexed gas prices have decreased by $0.243lIvIMBtu. The approved gas price of $3. 0924/tMBtu minus the $0.243l]vIMBtu results in a gas price of $2.850/lvIMBtu for the 2017-2018 year. This equates to a SAR fuel cost of 20.24 milUkWh as used in the model. ln accordance with Order No. 29316, the adjustable portion of the avoided cost rate for PacifiCorp contracts with 1992 amendments has also been recomputed. Beginning on July 1,2003, the adjustable portion for these contracts was ordered to be equal to the average cost of fuel for the Carbon, Hale, Naughton, Huntington, and Hunter generating plants, including a variable O&M component of $ L5l but exclusive of generation taxes and a line loss adjustment. The variable energy rate applicable to deliveries commencing July l, 2017 extending through June 30, 2018 has been computed to be $23.2944Wh, a decrease from $23.61 last year. Accompanying this letter are worksheets showing the computation of the updated adjustable rates for the various affected contracts. If you accept the updated rates after reviewing them as accurate, please indicate your approval by letter (or other filing) directed to the Commission in the reserved case docket numbers identified above. The case heading for the generic adjustment, Case No. GNR-E-I7-01, will read as follows: IN THE MATTER OF THE ANNUAL REVISION AND UPDATED CALCULATION OF THE ADruSTABLE PORTION OF THE AVOIDED COST RATE(S) FOR EXISTING PURPA CONTRACTS FOR AVISTA CORPORATION DBA AVISTA UTILITIES, FOR IDAHO POWER COMPA}.IY, AND FOR PACIFICORP DBA ROCKY MOUNTAIN POWER. The case heading in the PacifiCorp case for PacifiCorp QF contracts with 1992 Amendment language, Case No. PAC-E-17-04, is as follows: IN THE MATTER OF THE APPLICATION OF ROCKY MOUNTAIN POWER REQUESTING APPROVAL OF THE ANNUAL REVISION OF QF VARIABLE ENERGY PRICES IN PURSUANT TO TERMS OF T}IE 1992 AMENDMENTS TO POWER PURCHASE AGREEMENTS BETWEEN IDAHO QFS AND PACIFICORP. Please file your respective responses with the Commission on or prior to June 10,2017. Thank you for your cooperation. Please feel free to contact Yao Yin if you have any questions Sincerely, J. Huang Deputy Attorney General Enclosures COLSTRIP ADJUSTABLE RATE CALCULATION Updated For Period 7 I 1 I 17 -61301 1 I Colstrip Fuel Cost from Avista FERC Form 1 for CY 2016 line '12 Net Generation (kwh) line 20 Fuel Fuel cost per kwh Fuel Cost per MWh Variable O&M, Gen. Tax,5o/o line loss per MWh Total Colstrip Adjustable Rate $15.6125 $2.0000 $17.6125 ReferenceGNR-E-99-1 O.N.28708 411712001 Colstrip_17-18 Average Gas Prices at Sumas, Washington from Inside FERC publication ($ilVlMBtu) Calculatin g the 2017 -20 18 Avoided Cost Adjustable Rate Jan Feb Mar Apr May Jun July Aug Sep Oct Nov Dec 2015 $3.23 $2.s6 $2.40 $2.1 5 $2.1 3 $2.48 $2.21 $2.43 s2.41 $2.41 $2.1I 92.17 2016 $2.s7 $2.1 0 $1.41 $1.42 $1.34 $1.46 $2.28 $2.34 $2.63 s2.64 $2.62 $3.27 Average $2.416 $2.173 Actual Adiustment: $3.092 - ($2.416 - $2.173): $2.850 Note: $6.94lMMBtu : 2007-08 Approved Rate $7. I 8/MMBtu : 2008-09 Approved Rate $9.004{MBtu : 2009-10 Approved Rate $4.62lMMBtu : 2010-1 1 Approved Rate $4.99/MMBtu : 20 1 1 - I 2 Approved Rate $4.60/MMBtu : 2012-13 Approved Rate $3.45lMMBtu : 20 I 3-14 Approved Rate $4.35/MMBtu = 2014-15 Approved Rate $5. I 0/MMBtu : 20 15-l 6 Approved Rate $3.092lMMBtu : 2016-17 Approved Rate Carbort PacifiCorp Tokl Variable En*rgy Rate tat2017 lzAlQ Naughton $ 110,299,322 Hu*tinglon Hunter Totals $ 129,979,273 g 139,3741A4 $ 379.652,099Fuel Cost($) $ 21)lB FERC FORM 1 - Prga 4OA Uns 20 Generation (MW{ 2818 FERC FORM 1 - rtalga 4w Ut16 12 Average Fuel Cost ($rMWH) VariableO&M TotalVariable Energy Ratrr tur 2017 12A18 Fordeliveries mmmencing July 1,2017 e,rtending through June 30, 2018 12 Pacr'fiCoq/QFe ontnac,{s with approved 1992 amEndment language 4,871,939 5,503,890 7,A57,745 17,433474 21.78 1.61 23.29 $ $ $ /U!WH /t\,l\^/H lutwH Page 1 20L7