Loading...
HomeMy WebLinkAbout20080505Application.pdf. RECE.\\lEO oy 4' G \ í)ß t\l\ ~ - 5 r n ' \OMi0 ¿d~M\~S\ON Ui\l\1\ESSTATE OF IDAHO OFFICE OF THE ATIORNEY GENERAL LAWRENCE G. WASDEN May 5, 2008 Avista Corporation B lair Strong Paine, Hamblen, et al 717 W. Sprague Avenue, Suite 1200 Spokane, WA 99201-3505 Clint Kalich A vista Utilities 141 1 E. Mission PO Box 3727 Spokane, WA 99220-3727 Michael Andrea Avista Utilities i 4 lIE. Mission PO Box 3727 Spokane, WA 99220-3727 Rocky Mountain Power Dean Brockbank PacifiCorp dba Rocky Mountain Power 201 S. Main Street, Suite 2300 Salt Lake City, UT 841 1 1 Greg Duval1 Laren Hale PacifiCorpdba Rocky Mountain Power 825 NE Multnomah Street Portland, OR 97232 Mark Moench General Counsel 201 S. Main Street, Suite 2300 Salt Lake City, UT 84 i i 1 Ted Weston PacifiCorp dba Rocky Mountain Power One Utah Center 201 S. Main Street, Suite 2300 Salt Lake City, UT 84111 Idaho Power Company Barton L. Kline Idaho Power Company PO Box 70 Boise, ID 83707-007 Randy Al1phin Idaho Power Company PO Box 70 Boise, ID 83707-0070 RE: Case Nos. GNR-E-08-01; PAC-E-08-04 The Idaho Public Utilities Commission in Order No. 28708, Case No. GNR-E-99-1, established a methodology for the annual adjustable rate portion of avoided costs for those QF contracts using, variable costs associated with Colstrip, a coal-fired generating facility in southeast Montana. For those QF contracts with Colstrip~related fuel Contracts & Administrative Law Division, Idaho Public Utilties Commission P.O. Box 83720, Boise, Idaho 83720-0074, Telephone: (208) 334-0300, FAX: (208) 334-3762, E-mail: Ipuc(Øpuc.state.id.us Located at 472 West Washington St., Boise, Idaho 83702 May 5, 2008 Page 2 costs and variable O&M, future Colstrip variable cost adjustments are to be calculated by using FERC Form 1 Colstrip Unit Coal Costs per megawatt hour (MWh) and adding $2.00/MWh (the av7rage variable O&M cost of Colstrip plus 20t/MWh for generation taxes plus a five percent (5%) adjustment for line loss). As computed by Commission Staff the Colstrip related adjustable rate wil change from 11.47 mil/kWh to J2.06 millkWh. The same calculated rate revision under the avoided cost methodology is used by A vista, PacifiCorp dba Rocky Mountain Power and Idaho Power Company. This change in the variable rate affects existing contracts under the previous SAR methodology. The adjustable portion of the avoided cost rates under the Sumas-based methodology is based on annual average gas prices indexed at Sumas, Washington. As reported by Avista, the indexed gas prices have increased by $0.24/MMBtu. The approved gas price of $6.94/MMBtu plus the $0.24/MMBtu increase results in a gas price of $7.1 8/MMBtu for the 2008-2009 year. This equates to a SAR fuel cost of 52.77 millkWh as used in the modeL. In accordance with Order No. 29316, th~ adjustable portion of the avoided cost rate for PacifiCorp contracts with 1992 amendments has also been recomputed, Beginning on July 1, 2003, the adjustable portion for these contracts was ordered to be equal to the average cost of fuel for the Carbon, Hale, Naughton Huntington and Hunter generating plants, including a variable O&M component of $ 1.51 but exclusive of generation taxes and a line loss .adjustment. The variable energy rate applicable to deliveries commencing July 1, 2008 extending through June 30, 2009 has been computed to be $14.1 l/MWh, an increase from $12.1 Tlast year. Accompanying this letter are worksheets showing the computation of the revised adjustable rates for the various affected contracts. If after reviewing the revisions, you accept them as accurate please indicate your approval by letter (or other fiing) directed to the Commission in the reserved case docket numbers identified above. The case heading for the generic adjustment, Case No. GNR-E-08-0 1, wil1 read as fol1ows: IN THE MATTER OF THE ANNAL REVISION AND UPDATED CALCULATION OF THE ADJUSTABLE PORTION OF THE AVOIDED COST RATE(S) FOR EXISTING PURPA CONTRACTS FOR AVISTA CORPORATION DBA AVISTA UTILITIES, FOR IDAHO POWER COMPANY, AND FOR PACIFICORP DBA ROCKY MOUNTAIN POWER. The case heading in the PacifiCorp case for PacifiCorp QF contracts with 1992 Amendment language, Case No. PAC-E-08-04, is as fol1ows: IN THE MA ITER OF THE ANNUAL REVISION OF QF VARIABLE ENERGY PRICES IN ACCORDANCE WITH TERMS OF THEJ 992 AMENDMENTS TO POWER PURCHASE AGREEMENTS BETWEEN IDAHO QFS AND PACIFICORP. Please fie your respective responses with the Commission on or prior to June 3, 2008. Thank you for your cooperation. Please feel free to contactme, or Rick Sterling, if you have any questions. Sincerely, ~at~ Scott D. Woodbury Deputy Attorney General Enclosures bls/L:GNR-E-08-0 i _PAC-E-08-04 _sw_avoided cost COLSTRIP ADJUSTABLE RATE CALCULATION For Period 7/1/08-6/30/09 Colstrip F.uel Cost from Avista FERC Form 1 for CY 2007 line 12 line 20 Net Generation (kwh) Fuel Fuel cost per kwh Fuel Cost per MWh Variable O&M, Gen. Tax, 5% line loss per MWh Total Colstrip Adjustable Rate Reference GNR-E-99-1 O.N. 28708 4/17/2001 Colstrip _08-09 .xls .. 1,672,761,000 $16,829,966 $0.010061 $10.0612 $2.0000 $12.0612 Average Gas Prices at Sumas, Washington from Inside FERCpublication ($/Mtu) Calculating the 2008-2009 Avoided Cost Adjustable Rate 2006 2007 Jan $9.66 $6:41 Feb $7.12 $6.98 Mar $6.39 $7.15 Apr $5.81 $6.60 May $5.89 $6.74 Jun $4.91 $6.86 July $5.09 $6.03 Aug $5.91 $5.22 Sep $5.55 $4.81 Oct $3.91 $5.85 Nov $7.30 $7.45 Dec $7.86 $8.12 Average $6.28 $6.52 Actual Anual Adjustment: $ô.94 :.-($6;28~$6:52t= $7.18 Note: $2.00IMtu = 1997-98 Approved Rate $2.35IMtu = 1998-99 Approved Rate $2.26IMtu = 1999-00 Approved Rate $2.80IMtu = 2000-01 Approved Rate $4.82IMtu =2001-02 Approved Rate $5.23IMtu = 2002-03 Approved Rate $3.33IMtu = 2003-04 Approved Rate $5.31IMtu = 2004-05 Approved Rate $5.92IMtu = 2005-06 Approved Rate $7.80IMtu = 2006-07 Approved Rate $6.94/Mtu = 2007-08 Approved Rate Fu e l C o s t ( $ ) FE R C F o r m 1 - P a g e 4 0 2 , l i n e 2 0 Ge n e r a t i o n ( M W h ) FE R C F o r m 1 - P a g e 4 0 2 , l i n e 1 2 Pa c i f i C o r p To t e l l V a r i a b l e E n e r g y R a t e fo r 2 0 0 8 / 2 0 0 9 Ca r b o n Na u g h t o n Hu n t i n g t o n Hu n t e r To t a l s $ 16 , 1 0 5 , 8 0 1 $ 77 , 3 4 3 , 8 5 7 $ 82 , 6 7 9 , 4 5 0 $ 97 , 3 8 5 , 5 1 4 $ 27 3 , 5 1 4 , 6 2 2 1, 3 3 9 , 3 4 3 5, 2 1 0 , 6 1 8 7, 1 2 7 , 0 8 4 8, 0 3 8 , 6 6 6 $ 21 , 7 1 5 , 7 1 1 $ 12 . 0 3 $ 14 . 8 4 $ 11 . 6 0 $ 12 . 1 1 $ 12 . 6 0 I M W h $ 1. 5 1 I M W h $ 14 . 1 1 I M W h Av ~ r a g e F u e l C o s t ( $ / M W h ) Va r i a b l e O & M IP U C O r d e r N o . 2 8 7 0 9 To t a l V a r i a b l e E n e r g y R a t e f o r 2 0 0 8 / 2 0 0 9 Pa c i f i C o r p 0 8 - 0 9 V a r i a b l e c o s t a d j . x l s