Loading...
HomeMy WebLinkAbout20070530Application.pdf1 i ; : ; IJ i i I'J: ~' STATE OF IDAHO Ii. " " , : il.Ji i:. :. .J. "".:).::, OFFICE OF THE ATTORNEY GENERAL LAWRENCE G. WASDEN May 24, 2007 Avista Corporation Blair Strong Paine, Hamblen , et al 717 W, Sprague Avenue, Suite 1200 Spokane, WA 99201-3505 Clint Kalich Avista Utilities 1411 E, Mission PO Box 3727 Spokane, WA 99220-3727 Rocky Mountain Power Dean Brockbank PacifiCorp dba Rocky Mountain Power 201 S. Main Street, Suite 2200 Salt Lake City, UT 84111 Mark Widmer PacifiCorp dba Rocky Mountain Power 825 NE Multnomah Street P0I1land, OR 97232 Mark Moench General Counsel 201 S. Main Street, Suite 2300 Salt Lake City, UT 84111 Idaho Power Company Barton L. Kline Idaho Power Company PO Box 70 Boise, ID 83707-007 Randy Allphin Idaho Power Company PO Box 70 Boise, ID 83707-0070 RE:Case Nos. GNR-O7-01; PAC-O7- The Idaho Public Utilities Commission in Order No. 28708 , Case No. GNR-99-, established a methodology for the annual adjustable rate p0l1ion of avoided costs for those QF contracts using, variable costs associated with Colstrip, a coal-fired generating facility in southeast Montana. For those QF contracts with Colstrip-related fuel costs and variable O&M, future Colstrip variable cost adjustments are to be calculated by using FERC Form I Colstrip Unit Coal Costs per megawatt hour (MWh) and adding $2.00/MWh (the average variable O&M cost of Colstrip plus 20~/MWh for generation taxes plus a five percent (5%) adjustment for line loss). As computed by Commission Staff the Colstrip related adjustable rate will change from 9.38 mill/kWh to 11.47 mill/kWh. The same calculated rate revision under the avoided cost methodology is used by A vista, PacifiCorp dba Rocky Mountain Power and Idaho Power Company. This change in the variable rate affects existing contracts under the previous SAR methodology. Contracts & Administrative Law Division, Idaho Public Utilities Commission O. Box 83720, Boise, Idaho 83720-0074, Telephone: (208) 334-0300, FAX: (208) 334-3762. E-mail: Ipuclf!1puc.state.id. Located at 472 West Washington St.. Boise, Idaho 83702 May 24, 2007 Page 2 The adjustable portion of the avoided cost rates under the Sum as-based methodology is based on annual average gas prices indexed at Sum as, Washington. As rep0l1ed by Avista, the indexed gas prices have decreased by $0.87/mmbtu. The approved gas price of $7.80/mmbtu plus the $0.87/mmbtu decrease results in a gas price of $6.94/mmbtu for the 2007-2008 year. This equates to a SAR fuel cost of 51. mill/kWh as used in the model. In accordance with Order No. 29316, the adjustable portion of the avoided cost rate for PacifiCorp contracts with 1992 amendments has also been recomputed. Beginning on July I , 2003, the adjustable p0l1ion for these contracts was ordered to be equal to the average cost of fuel for the Carbon, Hale Naughton Huntington and' Hunter generating plans , including a variable O&M component of $1.51 but exclusive of generation taxes and a line loss adjustment. The variable energy rate applicable to deliveries commencing July 1 , 2007 extending through June 30, 2008 has been computed by PacifiCorp to be $12.17/MWh, an increase from $12.03 last year. Accompanying this letter are worksheets showing the computation of the revised adjustable rates for the various affected contracts. If after reviewing the revisions , you accept them as accurate please indicate your approval by letter (or other filing) directed to the Commission in the reserved case docket numbers identified above. The case heading for the generic adjustment, Case No. GNR-07-, will read as follows: IN THE MA TTER OF THE ANNUAL REVISION AND UPDATED CALCULATION OF THE ADJUSTABLE PORTION OF THE AVOIDED COST RATE(S) FOR EXISTING PURPA CONTRACTS FOR AVISTA CORPORA TION DBA A VISTA UTILITIES, FOR IDAHO POWER COMPANY AND FOR PACIFICORP DBA ROCKY MOUNTAIN POWER. The case heading in the PacifiCorp case for PacifiCorp QF contracts with 1992 Amendment language Case No. PAC-07-, is as follows: IN THE MATTER OF THE ANNUAL REVISION OF QF VARIABLE ENERGY PRICES IN ACCORDANCE WITH TERMS OF THE 1992 AMENDMENTS TO POWER PURCHASE AGREEMENTS BETWEEN IDAHO QFS AND PACIFICORP. Please file your respective responses with the Commission on or prior to June 15 2007. Thank you for your cooperation. Please feel free to contact me, or Rick Sterling, if you have any questions. Sincerely, exIScott D. Woodbury Deputy Attorney General (208) 334-0320 Enclosures bls/LGNR-O7-0 I PAC-O7-09 sw COLSTRIP ADJUSTABLE RATE CALCULATION For Period 7/1/07-6/30/08 Colstrip Fuel Cost from Avista FERC Form 1 for CY 2006 line 12 line 20 Net Generation (kwh) Fuel Fuel cost per kwh Fuel Cost per MWh Variable O&M , Gen. Tax, 5% line loss per MWh Total Colstrip Adjustable Rate Reference GNR-99-1 D.28708 4/17/2001 578 798 000 $14 953 795 $0.009472 $9.4716 $2.0000 $11.4716 Average Gas Prices at Somas, Washington from Inside FERC publication ($/MMBtu) Calculating the 2007-2008 Avoided Cost Adjustable Rate 2005 2006 Jan $5.$9. Feb $5.$7. Mar $5.$6. Apr $6.41 $5. May $6.$5. Jun $5.$4. July $6.$5. Aug $5.$5. Sep $7.$5. Oct $9.$3. Nov $11.11 $7. Dee $9.$7. Average $7.15 $6.28 Actual Annual Adjustment $7.80 - ($7.15 - $6.28) = $6. Note: $2.00/MMBtu = 1997-98 Approved Rate $2.35/MMBtu = 1998-99 Approved Rate $2.26/MMBtu = 1999-00 Approved Rate $2.80/MMBtu = 2000-01 Approved Rate $4. 82/MMBtu = 2001-02 Approved Rate $5.23/MMBtu = 2002-03 Approved Rate $3.33/MMBtu = 2003-04 Approved Rate $5 .31/MMBtu = 2004-05 Approved Rate $5 . 92/MMBtu = 2005-06 Approved Rate $7.80/MMBtu = 2006-07 Approved Rate Pa c i f i C o r p To t a l V a r i a b l e E n e r g y R a t e fo r 20 0 7 / 2 0 0 8 Ca r b o n Na u g h t o n Hu n t i n g t o n Hu n t e r To t a l s Fu e l C o s t ( $ ) FE R C F o r m 1 - P a g e 4 0 2 , l i n e 2 0 Ge n e r a t i o n ( M W h ) FE R C F o r m 1 - P a g e 4 0 2 , l i n e 1 2 63 3 12 3 65 , 4 0 9 06 5 82 3 62 8 86 , 4 9 3 , 4 1 8 22 2 35 9 23 4 31 2 55 3 92 9 , 4 0 0 13 9 00 7 8, 4 7 7 27 6 $ 20 , 85 8 23 6 10 . 13 . 10 , 10 , 66 / M W h 51 I M W h 12 . 17 / M W h Av e r a g e F u e l C o s t ( $ / M W h ) Va r i a b l e O & M IP U C O r d e r N o . 2 8 7 0 9 To t a l V a r i a b l e E n e r g y R a t e f o r 20 0 6 / 2 0 0 7