HomeMy WebLinkAbout20030630Final Order No 29272.pdfOffice of the Secretary Service Date June 30, 2003 BEFORE THE IDAHO PUBLIC UTILITIES COMMISSION IN THE MATTER OF THE ANNUAL REVISION) AND UPDATED CALCULATION OF THE ADJUSTABLE PORTION OF THE AVOIDED COST RATE FOR EXISTING PURPA CONTRACTS FOR A VISTA CORPORATION DBA A VISTA UTILITIES, FOR IDAHO POWER) COMPANY, AND PACIFICORP DBA UTAH POWER & LIGHT COMPANY. CASE NO. GNR-O3- ORDER NO. 29272 The Idaho Public Utilities Commission in Order No. 28708, Case No. GNR-99- established a methodology for the annual adjustable rate portion of avoided costs for those QF contracts using variable costs associated with Colstrip, a coal-fired generating facility in southeast Montana. The Colstrip adjustments apply only to contracts executed between September 28, 1990 and January 30, 1995. For those QF contracts with Colstrip-related fuel costs and variable O&M, future Colstrip variable cost adjustments are to be calculated by using FERC Form 1 Colstrip Unit Coal Costs per megawatt hour (MWh) and adding $2.00/MWh (the average variable O&M cost of Colstrip plus 20~/MWh for generation taxes plus a five percent (5%) adjustment for line loss). As computed by Commission Staff the Colstrip related adjustable rate for the 2003-2004 year should change from 8.52 mill/kWh to 8.64 mill/kWh. The same calculated rate revision under the avoided cost methodology is used by Avista, PacifiCorp dba UP&L and Idaho Power Company. This change in the variable rate affects existing contracts under the previous coal-based SAR methodology. The adjustable portion of the avoided cost rates under the Sumas-based (gas-fired SAR) methodology is based on annual average gas prices indexed at Sumas, Washington. Reference Order No. 26135, Case Nos. WWP-95-3/IPC-95-7/UPL-95-2. The purpose of including an adjustable component in the avoided cost rates is to capture annual changes in natural gas fuel costs. The Sumas adjustments apply to all SAR methodology contracts executed since January 31 , 1995. As reported by Avista, the indexed gas prices have decreased by $1.90/mmbtu. The previously approved base gas price of $5.23/mmbtu plus the $1.90/mmbtu decrease results in a gas price of $3.33/mmbtu for the 2003-2004 year. This by Staffs calculation equates to a SAR fuel cost of 24.48 mill/kWh as used in the model. Under the ORDER NO. 29272 Commission-approved Sumas-based SAR methodology, the adjustable portion of avoided cost rates is the same for all ofIdaho s major electric utilities. The Commission Staff by letter dated May 29 2003, prepared by Staff Engineer Rick Sterling, calculated changes to the annual adjustable rate portion of avoided costs for those QF contracts using variable costs associated with Colstrip and Sumas for review by the respective utilities.Avista, Idaho Power and PacifiCorp by letter responses indicate that Staff's calculations are correct. COMMISSION FINDINGS The Commission has reviewed and considered the filings of record in Case No. GNR-03-02. We find that the accuracy of the variable rate methodology figures submitted by A vista (Sumas) and calculated by Staff (Colstrip) in this case have not been challenged. The methodology that this Commission has approved for determining the variable components of the avoided cost rates is a relatively simple arithmetic recalculation. We fmd based upon our review of the calculations of both Colstrip and Sumas updates, that the resulting adjustable rates for existing contracts are fair, just and reasonable. CONCLUSIONS OF LAW The Idaho Public Utilities Commission has jurisdiction over A vista Corporation dba Avista Utilities, Idaho Power Company and PacifiCorp dba Utah Power & Light Company, electric utilities, pursuant to the authority and power granted it under Title 61 of the Idaho Code and the Public Utility Regulatory Policies Act of 1978 (PURP A). The Commission has authority under PURP A and the implementing regulations of the Federal Energy Regulatory Commission (FERC) to set avoided costs, to order electric utilities to enter into fixed term obligations for the purchase of energy from qualified facilities and to implement FERC rules. ORDER In consideration of the foregoing and as more particularly described above, IT IS HEREBY ORDERED that the Colstrip-related and Sumas-related adjustable portions of the avoided cost rates for existing PURPA contracts for Avista, Idaho Power and PacifiCorp are changed effective July 1 , 2003, as detailed above. THIS IS A FINAL ORDER. Any person interested in this Order (or in issues finally decided by this Order) may petition for reconsideration within twenty-one (21) days of the ORDER NO. 29272 service date of this Order with regard to any matter decided in this Order. Within seven (7) days after any person has petitioned for reconsideration, any other person may cross-petition for reconsideration. See Idaho Code ~ 61-626. DONE by Order of the Idaho Public Utilities Commission at Boise, Idaho this 30 day of June 2003. MARSHA H. SMITH, COMMISSIONER c:-t::- Jt-~i./L-/ ISSIONER ATTEST: ~t)Je D. Jewell Commission Secretary vld/O:GNRE0302 ORDER NO. 29272