Loading...
HomeMy WebLinkAbout20030604Order No 29241 Errata.pdfOffice of the Secretary Service Date June 4, 2003 BEFORE THE IDAHO PUBLIC UTILITIES COMMISSION IN THE MATTER OF THE PETITION OF THE INDEPENDENT ENERGY PRODUCERS OF IDAHO FOR AN ORDER INCREASING THE SIZE AT WID CH A Q F IS ENTITLED TO PUBLISHED AVOIDED COST RATES. CASE NO. GNR-O3- ERRATA TO ORDER NO. 29241 On May 15 , 2003 , IPUC Order No. 29241 was issued by this Commission. The following change(s) should be made to that Order: Page 1, Paragraph 2, last sentence READS: Under PURP A there are no limitations on the size of eligible wind, solar waste or geothermal facilities; the size limitation for eligible cogeneration facilities is 80 MW. 18 C.R. ~ 292.204(a); ~ 292.203. SHOULD READ: Under PURP A there are no limitations on the size of eligible wind, solar waste or geothermal facilities; the size limitation for non-eligible small power production facilities is 80 MW. 18 C.R. ~ 292.204(a); ~ 292.203. Cogeneration facilities qualify as QFs regardless oftheir size or the fuel input used, as long as they satisfy operating and efficiency standards. 18 C.R. ~ 292.203(b), ~ 292.205. ERRATA TO ORDER NO. 29241 DONE by Order of the Idaho Public Utilities Commission at Boise, Idaho this tf day of June 2003. PAUL KJ-ifl , PRESIDENT JJ MARSHA H. SMITH, COMMISSIONER ATTEST: Commission Secretary bls/O:GNREO301 2924 1 errata ERRATA TO ORDER NO. 29241