HomeMy WebLinkAbout20030604Order No 29241 Errata.pdfOffice of the Secretary
Service Date
June 4, 2003
BEFORE THE IDAHO PUBLIC UTILITIES COMMISSION
IN THE MATTER OF THE PETITION OF THE
INDEPENDENT ENERGY PRODUCERS OF
IDAHO FOR AN ORDER INCREASING THE
SIZE AT WID CH A Q F IS ENTITLED TO
PUBLISHED AVOIDED COST RATES.
CASE NO. GNR-O3-
ERRATA TO
ORDER NO. 29241
On May 15 , 2003 , IPUC Order No. 29241 was issued by this Commission. The
following change(s) should be made to that Order:
Page 1, Paragraph 2, last sentence
READS:
Under PURP A there are no limitations on the size of eligible wind, solar
waste or geothermal facilities; the size limitation for eligible cogeneration
facilities is 80 MW. 18 C.R. ~ 292.204(a); ~ 292.203.
SHOULD READ:
Under PURP A there are no limitations on the size of eligible wind, solar
waste or geothermal facilities; the size limitation for non-eligible small
power production facilities is 80 MW. 18 C.R. ~ 292.204(a); ~ 292.203.
Cogeneration facilities qualify as QFs regardless oftheir size or the fuel input
used, as long as they satisfy operating and efficiency standards. 18 C.R. ~
292.203(b), ~ 292.205.
ERRATA TO
ORDER NO. 29241
DONE by Order of the Idaho Public Utilities Commission at Boise, Idaho this tf
day of June 2003.
PAUL KJ-ifl , PRESIDENT
JJ
MARSHA H. SMITH, COMMISSIONER
ATTEST:
Commission Secretary
bls/O:GNREO301 2924 1 errata
ERRATA TO
ORDER NO. 29241