Loading...
HomeMy WebLinkAbout20221014Application.pdf/.istsra Avista Corp. 141 1 East Mission P.O. Box 3727 Spokane. Washington 99220-0500 Telephone 509-489-0500 Toll Free 800-727-9170 RECEIVED 2022 oCT 14 AM 9.27 IDAHO PUBLIC UTILITIES COIUMISSION October L4,2022 Jan Noriyuki, Secretary Idaho Public Utilities Commission 11331 W. Chinden Blvd. Bldg. 8, Ste. 20l-A Boise,Idaho 83714 RE: Case No. AW-E-22- td Dear Ms. Noriyuki: Attached for filing with the Commission is Avista Corporation's, doing business as Avista Utilities' (Avista or the Company), filing in compliance with Order Nos. 32697 and 32802, to update the Company's load forecast, natural gas forecast, and conffact information components of the incremental cost lntegrated Resource Plan (IRP) avoided cost methodology. Please direct any questions regarding this filing to John Lyons at 509-495-8515 or i ohn. lyons@ avistacorp. com. Sincerely, lolstarr* &o$#dd Shawn Bonfield Sr. Manager of Regulatory Policy & Strategy Avista Utilities 509-495-2782 shawn. bonfi eld@ avistacorp. com Michael G. Andrea (ISB No. 8308) Senior Counsel Avista Corporation 14l l East Missior\ MSC-17 Spokane, WA99202 Phone: (509)495-2564 Facsimile: (509) 77 7 -5468 Email: michael.andrea@avistacorp.com Attorney for Avista Corporation BETORE THE IDAHO PUBLIC UTILITIES COMMISSION IN THE MATTER OF AVISTA CORPORATION'S) ANNUAL COMPLIANCE FILING TO IJPDATE ) THE LOAD AND GAS FORECASTS IN THE ) INCREMENTAL COST INTEGRATED ) RESOURCE PLAN AVOIDED COST MODEL ) TO BE USED FOR AVOIDED COST ) CASENO. AW-E-22.1{ AVISTA CORPORATION'S COMPLIANCE FILING I. INTRODUCTION Avista Corporation, doing business as Avista Utilities (hereinafter Avista or Company), at l4I1 East Mission Avenue, Spokane, Washington, respectfully submits to the Idaho Public Utilities Commission ("Commission") this filing, in compliance with Order Nos. 32697 and32802 in Case No. GNR-E-II-O3, to update the load forecast, nafural gas forecast, and contract infonnation components of the incremental cost Integrated Resource Plan (IRP) avoided cost methodology Communications in reference to this filing should be addressed to: Michael G. Andrea Senior Counsel Avista Corporation P.O.Box3727 1411 E. MissionAvenue, MSC-13 Spokane, WA 99220-3727 Phone: (509)495-4316 michael. andrea(E avi stacorp. com Shawn Bonfield Sr. Manager, Regulatory Policy Avista Corporation P.O.Box3727 l4l I E. Mission Avenue, MSC-27 Spokane, WA 99220-3727 Phone: (509)495-2782 Shawn. Bonfi eld(davistacorp. com II. BACKGROUND In its final Order No. 32697r dated December 18, 2012, the Commission determined that the inputs to the IRP avoided cost methodology, utilized for all proposed Public Utility Regulatory Policies Act of 1978 (PURPA) qualiffing (QF) projects that exceed the published rate eligibility cap, will be updated every two years upon acknowledgment of the utility's IRP filing, with the exception of the load forecast, natural gas forecast, and QF contract changes, which are to be updated annually. The date for the annual update was changed2 from June to October of each year. Further, in Order No. I Order No. 32697 page 22. 2 OrderNo.32802page3, I lPage 32697,the Commission directed that after the filing of a utility's IRP that a case be initiated to determine the capacity deficiency period to be utilized in the Surrogate Avoided Resource (SAR) Methodology. 3 TII. LOAD FORECAST The Company's most recent peak and energy forecast was developed in the surlmer of 2022 and presented at the electric lntegrated Resource Plan (IRP) Technical Advisory Committee (TAC) meeting for the 2023 IRP, held on October 1I,2022. The energy load forecast escalates at 0.74 percent annual average growth rate for 2023 through 2045. Table l: Enerry Load Forecast Year Energy (aMw) 2023 l,ll2 2024 1.1 19 202s 1.122 2026 1.127 2027 1"132 2028 I,139 2029 1,144 2030 1.149 2031 1.156 2032 1,164 2033 l,l7L 2034 1,179 2035 1.188 2036 1.t97 2037 1,206 2038 1,216 2039 1.226 2040 1.238 2041 1.250 2042 1,263 2043 t.277 2lP age 3 OrderNo. 32697 page23. 2044 1,293 2045 1,309 IV. NATTJRAL GAS FORECAS1 The Company's most recent natural gas Forward Price Curve was developed using the blend of two national price forecasting consultant's most recent forecasts, the U.S. Energy lnformation Administration's Annual Energy Outlook (AEO), and forward market prices as of July 26, 2022. Please refer to Table 2 for the natural gas price forecast. Table 2: Natural Gas Price Forecast Year Henry Hub ($/mmbtu) Stanfield ($/rnmbtu) 2023 5.92 s.70 2024 4.79 4.49 2025 4.22 3.73 2026 3.90 3.36 2027 3.75 3.23 2028 3.75 3.25 2029 3.86 3.40 2030 3.97 3.53 2031 4.09 3.68 2032 4.20 3.76 2033 4.36 3.92 2034 4.43 3.97 2035 4.s2 4.07 2036 4.63 4.16 2037 4.77 4.28 2038 4.91 4.34 2039 5.08 4.48 2040 5.34 4.69 204r 5.51 4.83 2042 5.69 4.95 2043 5.92 5.17 2044 6.10 s.28 2045 6.38 s.46 3lPage V. CONTRACT ADDITIONS AI\D TERMINATIONS Since the 2021 filingAvista has signed eight new long-term PURPA contracts, one Power Purchase Agreement (PPA), and one PURPA contract is scheduled to conclude at the end of 2022. The new PURPA contracts include six renewed contracts with existing resources including Deep Creek Energy, Jim Ford Creek Hydro, John Day Creek Hydro, Plummer Saw Mill, Upriver Dam and Waste to Energy. Two new PURPA contracts were signed with the University of Idaho for their combined heat and power and solar projects. One PURPA contract with Deep Creek Energy currently expires at the end of 2022. T\e PPA is with Chelan PUD. Details concerning the dates and sizes of these contracts are included in the workpapers. VI. MODIFIED PROCEDTIRE Avista believes that a hearing is not necessary to consider the issues presented herein and respectfully requests that this Application be processed under Modified Procedure, i.e., by written submissions rather than by hearing. RP 201 et seq. If the Commission determines that a technical hearing is necessary, the Company will be ready to prepare and present its testimony in such hearing. YII. REQUEST Avista respectfully submits this updated load forecast, natural gas forecast, and contract information in compliance with Order Nos. 32697, 32802 afi 35274. The Company respectfully requests that the Commission issue an order accepting its updated 4lPage lod foreeast, natural gas forecas! and oontact information to be used inthe RP metbod with an effective date of Janrary L2A23. DATED at Spokane, Washington, ftis 146 day ofoctober, 2022. AVISTA CORPORATION lsl Miehael G. Andrea Michael G. An&ea Seuior Counsel 5lPage