Loading...
HomeMy WebLinkAbout20211022Application.pdfRrLEY NEWTON (rSB #r t202) DEPUTY ATTORNEY GENERAL IDAHO PUBLIC UTILITIES COMMISSION PO BOX 83720 BOISE, IDAHO 83720-0074 (208)-334-03r8 r':fi*rivr.j; i'cii*ilT ee ftH S Sl ,',':/li !.\..: -.- .,' ".t,,iii_l'u'', , .,. ,-,1*.li.iliiSlShl Street Address for Express Mail: I I33I W CHINDEN BVLD, BLDG 8, SUITE 2OI-A BOISE, ID 83714 Attomey for the Commission Staff BEFORE THE IDAHO PUBLIC UTILITIES COMMISSION IN THE MATTER OF COMMISSION STAX'F'S APPLICATION TO UPDATE AYISTA CORPORATION'S COST OF CAPITAL INPUTS IN TIIE SURROGATE AVOIDED RESOURCE METHOD CASE NO. AYTI-E-21-16 APPLICATION Pursuant to the Public Utility Regulatory Policies Act of 1978 ("PURPA") and the implementing regulations of the Federal Energy Regulatory Commission ("FERC"), the Idaho Public Utilities Commission ("Commission") has approved a Surrogate Avoided Resource ("SAR") method for calculating the avoided cost rates PURPA qualifuing facilities ("QFs") are paid by Idaho Power Company, Avista Corporation, and PacifiCorp dba Rocky Mountain Power. Avista Corporation's ("Avista") latest general rate case (Case No. AW-E-21-01) has triggered an update of Avista's cost of capital inputs in the SAR Model. In support of this Application, Commission Staffrepresents as follows: I. BACKGROTINI) The Commission calculates and publishes SAR Method rates for QFs that are under the applicable resource type project eligibility cap. The SAR Model uses each utility's approved cost of capital from their last general rate case. Avista's current cost of capital used in the SAR Model was determined in Case No. AW-E-19-04. On Septemba 1,2021, the Commission issued Order No. 35156, in Avista's most recent general rate case (Case No. AW-E-21-01). That order kiggers a needed update of Avista's cost of capital inputs in the SAR Model. Avista's cost of debt changed from 5.2%oto 4,70Yo, and its ) ) ) ) ) ) IAPPLICATION cost of common equity changed from 9.5o/o to 9.40%o. As a result, the weighted cost of capital- which depends on the cost of debt and the cost of common equity- changed from7 .35o/oto 7 .05%. Weighted cost of capital affects avoided cost rates in the SAR Model in two ways: (1) it represents the avoided cost to a utility to finance construction of new facilities; and (2) it is used as a discount rate in the process of levelizing avoided cost rates. When the weighted cost of capital changes it impacts levelized avoided cost rates in opposite directions. For example, when weighted cost of capital decreases, as it has in this case, the cost to finance new facilities decreases, lowering avoided cost of capacity. However, a lower weighted cost of capital also causes higher avoided cost rates when determining levelized rates because cash flows in the future are discounted less when converted to present value. The final change in levelized avoided cost rates depends on the net effect. Therefore, for levelized rates, new avoided cost rates can be higher or lower than the current avoided cost rates, depending on the contract length. However, non-levelized rates are only affected by the decrease in cost to finance new facilities and are consistently lower than the current avoided cost rates. II. TIIE UPDATES l. Stafffirst updated the weighted cost of capital on Tab "AvistaCapCaChg" of the SAR Model, which calculates Avista's Carrying Charge Rate. Next, Staff updated Cell E64 (UTILITY WEIGHTED COST OF CAPITAL) and Cell E65 (CAPITAL CARRYING CHARGE) of Tab "AVOID NEW". Lastly, Staff verified Cell D37 (UTILITY WEIGHTED COST OF CAPITAL) and Cell D50 (CAPITAL CARRYING CHARGE) of Tab "AVOID NEW" were correctly used. 2. lncluded in this Application are the following Attachments: a. An updated SAR Model with all the updates incorporated as mentioned above. b. Attachment A (Avista Avoided Cost Rates for New Contracts). c. Attachment B (Avista Avoided Cost Rates for Renewal Contracts). IIL MODIFIED PROCEDURE. Commission Staff believes that a hearing is not necessary to consider the issues presented herein and respectfully requests that this Application be processed under Modified Procedure, i.e., by written submissions rather than by hearing. Commission Rules of Procedure2}l - 204, IDAPA 2APPLICATION 31.01.01.201-.204. If however, the Commission determines that a technical hearing is required, the Commission Staffstands ready to prepare and present its testimony in such hearing. IV. COMMT]NICATIONS AND SERVICE OF PLEADINGS. Communications and service of pleadings, exhibits, orders, and other documents relating to this proceeding should be sent to the following: Riley Newton Mike Louis Deputy Attorney General for the Idaho Public Idaho Public Utilities Commission Utilities Commission P.O. Box 83720 P.O. Box 83720 Boise,lD 83702-0074 Boise, Idalro 83702-0074 mike.louis@puc.idaho.gov riley.newton@ouc. idaho. sov v. REQUEST FOR RELTEF. Commission Staffrespectfully requests the Commission issue an order: (l) authorizing this matter to be processed by Modified Procedure; (2) approving the updates to the SAR Model as described herein; and (3) approving the updated SAR Method avoided cost rates shown in the attachments to this Application. Respectfully submitted this 22 aay of October 2021. Riley N Deputy Attorney General I:\LcgaI\ELECTRIC\AVU-E-21-16\AV-E2 I 16 _Application_staff_m.docx 3APPLICATION