HomeMy WebLinkAbout20171020Motion for Approval of Stipulation and Settlement.pdfBRANDON KARPEN, ISB No. 7956
Deputy Attorney General
State of Idaho
Idaho Public Utilities Commission Staff
P.O. Box 83720
Boise, Idaho 83720-001 4
Telephone: (208) 334-03 57
Facsimile: (208) 334-37 62
brandon.karpen@,puc. idaho. eov
IN THE MATTER OF THE
APPLICATION OF AVISTA
CORPORATION DBA AVISTA
UTILITIES FOR AUTHORITY TO
INCRE,ASE ITS RATES AND CHARGES
FOR ELECTRIC AND NATURAL GAS
SERVICE IN IDAHO
BEFORE THE IDAHO PUBLIC UTILITIES COMMISSION
CASE NOS. AVU.E.17.O1
AVU-G-I7-01
MOTION FOR APPROVAL OF
STIPULATION AND SETTLEMENT
The Idaho Public Utilities Commission Staff hereby moves the Commission for an Order
accepting the Settlement Stipulation filed herewith. See Commission Rules 56,276 and274.
l. On June 9,2017, Avista Corporation filed an Application seeking authority to
increase the Company's general rates for electric and natural gas service in Idaho. Avista
proposed a two-year rate plan that would increase annual electric billed revenues by $18.6
million (7 .9%) on January 1, 2018, and by $9.9 million @.2%) on January 1,2019, and increase
annual natural gas revenues by $3.5 million (5.7%) on January l, 2018, and by $2.1 million
(3.3%) on January 1,2019. The Commission suspended the proposed effective date to January 1,
2018. OrderNo.33808.
2. Clearwater Paper, Idaho Conservation League, Idaho Forest Group, the
Community Action Partnership Association of Idaho, and Sierra Club intervened as parties.
MOTION FOR APPROVAL OF STIPULATION AND SETTLEMENT- I
r
-: r: i\lF ["r
3. A settlement conference was noticed and held in the Commission offices on
September 29,2017, and further discussions ensued.
4. Based on settlement discussions, the Parties whose signatures appear on the
Stipulation have agreed to resolve and settle all of the issues in the case (hereinafter "Parties"). A
copy of the signed Stipulation evidencing that settlement is enclosed as Attachment 1. Sierra
Club and the Idaho Conservation League opposed the proposed settlement.
5. The Parties recommend that the Commission grant this Motion and approve the
Stipulation in its entirety, without material change or condition, pursuant toP.P 274.
6. The Parties respectfully request that the Commission consider the Motion, the
Stipulation, and the pre-filed testimony in support of the Stipulation at the time of the technical
evidentiary hearing scheduled in this docket for December 8, 2017. A customer hearing could
occur at a date and time to be set by the Commission. The Parties request an Order allowing for
the implementation of new rates, as per the Stipulation, on January l, 2018.
7. As noted in the Stipulation, the Parties agree that the Stipulation is in the public
interest and that all of its terms and conditions are fair, just and reasonable.
NOW, THEREFORE, the Parties respectfully request that the Commission issue orders
in Case Nos. AVU-E-17-01 and AVU-G-17-01:
l. Granting this Motion and accepting the Stipulation (Attachment 1), in its entirety,
without material change or condition;
2. Authorizing the Company to implement revised tariff schedules designed to
recover the additional annual electric and natural gas revenue from Idaho customers consistent
with the terms of the Stipulation; and
MOTION FOR APPROVAL OF STIPULATION AND SETTLEMENT- 2
3. Authorizing that revised tariff schedules be made effective January 1, 2018,
consistent with the terms of the Stipulation.
Respectfully submitte a *is' fiauyof October, 20 17 .
OFFICE OF THE A GENERAL
Attorney for the Idaho Public Utilities
Commission Staff
l:\Legal\LNOTICE\AWEI 70 I _AVUGI 70 l_bk_Motion.doc
MOTION FOR APPROVAL OF STIPULATION AND SETTLEMENT.3
MOTION FOR APPROVAL OF
STIPULATION AND SETTLEMENT
CASE NOS. AVU-E-17-01 & AVU-G-17-01
ATTACHMENT 1
David J. Meyer, Esq.
Vice President and Chief Counsel of
Regulatory and Governmental Affairs
Avista Corporation
l4llE. Mission Avenue
P.O.Box3127
Spokane, Washingto n 99220
Phone: (509) 495-4316, Fax: (509) 495-8851
Brandon Karpen
Deputy Attorney General
Idaho Public Utilities Commission Staff
P.O. Box 83120
Boise, ID 83720-0074
Phone: (208) 334-0312, Fax: (208) 334-3162
IN THE MATTER OF THE APPLICATION )
oF AVISTA CORPORATION DBA )
AVISTA UTILITIES FOR AUTHORITY TO )
INCREASE MS RATES AND CHARGES )
FOR ELECTRIC AND NATURAL GAS )
SERVICE IN IDAHO )
BEFORE THE IDAHO PUBLIC UTILITIES COMMISSION
CASE NO.AVU-E-17-01
AVU-G-17-01
STIPULATION AND SETTLEMENT
This Stipulation is entered into by and among Avista Corporation, doing business as Avista
Utilities ("Avista" or "Company"), the Staff of the Idaho Public Utilities Commission ("Staff),
Clearwater Paper Corporation ("Clearwater"), Idaho Forest Group, LLC ("Idaho Forest"), and the
Community Action Partnership Association of Idaho ("CAPAI"). These entities are collectively
referred to as the "Settling Parties". The Idaho Conservation League ("ICL"), and the Sierra Club,
do not join in the Settlement Stipulation. The Settling Parties understand this Stipulation is subject
to approval by the Idaho Public Utilities Commission ("IPUC" or the "Commission").
STIPULATION AND SETTLEMENT _ AVU-E-17-01 & AVU-G-l7-OI Page I
I. INTRODUCTION
1. The terms and conditions of this Stipulation are set forth herein. The Settling Parties
agree that this Stipulation represents a fair, just and reasonable compromise of all the issues raised
in the proceeding, is in the public interest and its acceptance by the Commission represents a
reasonable resolution of the multiple issues identified in this case. The Settling Parties, therefore,
recommend that the Commission, in accordance with RP 274, approve the Stipulation and all of
its terms and conditions without material change or condition.
II. BACKGROUND
2. On June 9,2017, Avista filed an Application with the Commission for authority to
increase revenue effective January 1,2018 and January l,2Ol9 for electric and natural gas service
in Idaho. The Company proposed a Two-Year Rate Plan with an increase in electric base revenue
of $ 1 8.6 million or 7 .5%o for 20 1 8, and $9.9 million or 3 .J Vo for 2Ol9 . With regard to natural gas,
the Company proposed an increase in base revenue of $3.5 million or 8.8%o for 2018 (5.7Vo on a
billed basis), and $2.1 million or 5.OVo for 2Ol9 (3.3Vo on a billed basis). By Order No. 33808,
dated June 30,2017, the Commission suspended the proposed schedules of rates and charges for
electric and natural gas service.
3. Petitions to intervene in this proceeding were filed by Clearwater, Idaho Forest,
CAPAI, Idaho Conservation League, and the Sierra Club. The Commission granted these
interventions through IPUC Order Nos. 33804, 33815 and33829.
4. A settlement conference was noticed and held in the Commission offices on
September 29,2017, and was attended by the Settling Parties to this case.l As a compromise of
I The Sierra Club was unable to attend the settlement conference.
STIPULATION AND SETTLEMENT _ AVU-E-I7-01 & AVU-G-17-01 Page2
positions in this case, and for other consideration as set forth below, the Settling Parties agree to
the following terms:
III. TERMS OF THE STIPULATION AND SETTLEMENT
5. Overview of Settlement and Revenue Requirement. The Settling Parties agree that
Avista should be allowed to implement revised tariff schedules designed to increase annual base
electric revenue by $ 12.9 million, or 5.2Vo (on a billed basis the increase is 5.17o), effective January
1, 2018, and increase base revenues by $4.5 million, or I.9Vo (on a billed basis the increase is
1.7%o), effective January 1,2019. For natural gas, the Settling Parties agree that Avista should be
allowed to increase natural gas base revenue by $1.2 million, or 2.9Vo (L.9Vo on a billed basis),
effective January 1,2018, and $ 1. 1 million, or 2.J Vo (I.8Vo on a billed basis), effective January 1,
2019.
6. Two Year Stay-Out. The Parties agree that, in recognition of the two-year rate plan
covered by this Stipulation (January 1, 2018 - December 31,2019), Avista will not file another
electric or natural gas general rate case to increase base rates before May 31,20L9, and any such
rates will not go into effect prior to January 1,2020. This does not apply to tariff filings authorized
by or contemplated by the terms of the Power Cost Adjustment (PCA), Fixed Cost Adjustment
(FCA), the Purchased Gas Adjustment tariff (PGA), or other miscellaneous annual filings. Avista
agrees that the base rates established by this Stipulation will, in conjunction with the PCA, PGA,
and DSM Rider, provide Avista with the opportunity to recover all foreseen and unforeseen costs
for the period January 1, 2018 through December 31,2019 (the "Stay-out Period"). Accordingly,
Avista agrees that it will not file deferred accounting requests or requests to create a regulatory
asset during the Stay-out Period, except in extraordinary circumstances. For purposes of this
paragraph extraordinary circumstances will not include changes in inter-jurisdictional allocation
STIPULATION AND SETTLEMENT _ AVU-E-17-01 & AVU-G-l7-OI Page 3
methodology, accounting changes, or costs related to the Company's participation in Energy
Imbalance Markets.
1 . Cost of Capital. The Settling Parties agree to a 9.5 percent return on equity, with a
50.0 percent common equity ratio. The capital structure and resulting rate of return is as set forth
below:
Component
Capital
Structure Cost Weighted Cost
Debt
Cornrnon Equity
Total
50Vo
5j%b
5.72Vo
9.50Vo
2.86Vo
4.157o
100Vo 7.6lVo
A. ELECTRIC REVENUE REOUIREMENT
Overview of Electric Revenue Requirement (January 1.2018). Below is a summary
table and descriptions of the electric revenue requirement components agreed to by the Settling
Parties effective January 1,2018:
Table No. 1
8
a.)
b.)
c.)
d.)
e.)
f.)
c.)
h.)
i.)
SUMMARY TABLE OF ADJUSTMENTS TO ELECTRIC REVENUE REQUIREMENT
EFFECTIVE JANUARY 1, 2018
(000s of Dollars)
Revenue
Requirement Rate Base
Amount as Filed:
Adjustments:
Cost of Capital
Company 2017 Net Rate Base Updates
Miscellaneous Company Updates: Regulatory Amortization, Uncollectibles,
Maintenance and IS/TI Expenses.
Remove Officer Incentives and Reduce Non-Officers Incentives
Reduce Officer Labor Expenses
Reduce 2017 IS/IT Capital Projects
Delay Meter Data Management Project Recovery to January 1,2019
Remove 2018 Expense: Delay Recovery to Janaury 1,2019
i.) 2018 Labor Increase
ii.) 2018 Underground Equipment Inspection Expense
Miscellaneous Adjustments: Board of Director Expenses, Injuries and
Damages, Legal and Environmental Expenses, Removal of Expiring Lease
Expense and Inclusion of O&M Savings
Adjusted Amounts Effective January 1, 2018
18,571 $ 796,609
(1,926)
$ 12,890 $ 786,087
$
$
$
$
$
$
$
$
$
$
$
(2,6M)
s8$
tt2
(3e3)
(1 l5)
(276) $
(1,07s) $
(447)
(270)
(671)
(1,762)
(6,834)
STIPULATION AND SETTLEMENT _ AVU-E-17-01 & AVU-G-17-01 Page 4
a. Cost of Capital. As previously described (see Paragraph 7 above). This adjustment
reduces the overall revenue requirement by $2.604 million.
b. Company 2017 Net Rate Base Updates. Reflects adjustments to net rate base to update
information related to 2017 capital additions, including related depreciation expense,
as well as the impact on Accumulated Depreciation and Accumulated Deferred Federal
Income Taxes, to reflect balances as of December 31, 2017. This adjustment increases
the overall revenue requirement by $58,000 and reduces net rate base by $1.926
million.
c. Miscellaneous Company Updates. Reflects adjustments to expenses to update
information related to removal of the expiring Colstrip credit amortization,
uncollectible expense, maintenance expense associated with the Company's Colstrip
generation plant, and annualized incremental Information Service/Information
Technology (IS/IT) labor positions added in 2017. This adjustment increases the
overall revenue requirement by $112,000.
d. Remove Officer Incentives and Reduce Non-Officer Incentives Reflects the removal
of all officer incentives. This adjustment also reduces incentives for Non-Officers to a
l$OVo payout ratio. This adjustment decreases the overall revenue requirement by
$393,000.
e. Reduce Officer Labor Expenses. Reduces officer labor expenses to an agreed-upon
level. This adjustment decreases the overall revenue requirement by $115,000.
f. Reduce 2017 IS/IT Capi - Reduces certain capital investments related to
IS/IT refresh and expansion projects planned during 2017. This adjustment decreases
the overall revenue requirement by $276,000, and reduces net rate base by $1.762
million.
STIPULATION AND SETTLEMENT _ AVU-E-17-01 & AVU-G-17-01 Page 5
1
Meter Data Management System expected to go into service in 2017. This system is
delayed for recovery until January l, 2019. This adjustment decreases the overall
revenue requirement by $1.075 million, and reduces net rate base by $6.834 million.
h. Remove 2018 Expense: Delay Recovery to January 1. 2019.
i. 2018 Labor Increase. Removes the 2018 incremental non-executive labor
increases, and includes them with the January l, 2OI9 rate change. This
adjustment decreases the overall revenue requirement by $447,000.
ii. 2018 Undereround Inspe . Removes the 2018
underground equipment inspection costs, and includes them with the
January l,2Ol9 rate change. This adjustment decreases the overall revenue
requirement by $270,000.
i. Miscellaneous Adjustments. Reflects the net change in operating expenses related to:
1) removing requested additional Board of Director expenses ($270,000); 2) removing
legal expenses allocated to Idaho electric in enor ($42,000); 3) removing expenses
associated with certain leases expiring during the 2018 rate year ($192,000); 3)
removing certain 2016 environmental cleanup costs allocated to Idaho electric in error
($48,000); 4) inclusion of the O&M savings associated with the Company's new
website application ($23,000); 5) reducing the six-year average of injuries and damages
($1 1,000); and 6) the net effect of removing certain other miscellaneous A&G expenses
($85,000). The net effect of this adjustment decreases the overall revenue requirement
by $671,000.
ob'T)clqrr lVleter I)ctn lvlanase.ment P cnnrrcnr toJ qr\/,nl o Removes the
STIPULATION AND SETTLEMENT _ AVU-E-17-01 & AVU-G-17-01 Page 6
9. Overview of Electric Revenue Requirement (January 1.2019). Below is a summary
table and descriptions of the incremental Electric revenue requirement components agreed to by
the Settling Parties effective January 1,2019:
Table No.2
a. Add Meter Data Management. Adds the Meter Data Management System expected to
go into service in October of 2011. This system is included for recovery effective
January I,2019. This adjustment increases the overall revenue requirement by $1.075
million, and increases net rate base by $6.834 million.
b. Add 2018 Expenses.
i. 2018 Capital Additions on an AMA Basis. Includes certain 2018 capital
additions on an AMA basis. This adjustment increases the overall revenue
requirement by $1.938 million, and increases net rate base by $2.071
million.
ii. 2018 Propertv Taxes. Includes property tax expense associated with 2018
capital additions. This adjustment increases the overall revenue requirement
by $613,000.
SUMMARY TABLE OF ADJUSTMENTS TO ELECTRIC REVENUE REQUIREMENT
EFFECTIVE JANUARY I, 2OI9
(000s of Dollars)
Revenue
Requirement Rate Base
Rate Base Amount Effective January 1, 2018
Incremental Revenue Adjustment to January 1, 2018 Rate Change
(see Tabel No. 1):
a.) Add Meter Data Management Project
b.) Add 2018 Related Capital and Expenses:
i. 2018 Capital Additions on an AMA Basis
ii. Property Tax Expense on 2018 Plant Additions
iii. 2018 Annualized Labor Increase
iv. 2018 Underground Equipment Inspection Expense
January lr2019 Incremental Revenue Adjustment and Rate Base
Amount (above January 1,2018 Rate Change - see Table No. 1)
$ 786,087
r,075 $ 6,834$
$
$
$
$
1,938
613
&8
n0
$ 2,071
$ 4,S44 $ 794,992
STIPULATION AND SETTLEMENT _ AVU-E-17-01 & AVU-G-l7-OI PageT
iii. 2018 Annuahzed Labor Increase. Includes the 2018 annualized non-
iv
executive labor increases. This adjustment increases the overall revenue
requirement by $648,000
2018 Underground Inspection Equipment Expense. Includes the 2018
underground equipment inspection costs. This adjustment increases the
overall revenue requirement by $270,000.
B. NATURAL GAS REVENUE REQUIREMENT
10. Overview of Natural Gas Revenue Requirement (January 1. 2018). Below is a
summary table and descriptions of the natural gas revenue requirement components agreed to by
the Settling Parties effective January I,2018:
Table No.3
a.)
b.)
c.)
d.)
e.)
f.)
c.)
h.)
i.)
j.)
SUMMARY TABLE OF ADJUSTMENTS TO NATURAL GAS REVENUE REQUIREMENT
EFFECTIVE JANUARY 1, 2018
(000s of Dollars)
Revenue
Requirement Rate Base
Amount as Filed:
Adjustments:
Cost of Capital
Company 2017 Net Rate Base Updates
Miscellaneous Company Updates: Uncollectibles and IS/IT Expenses.
Adjust Weather Normalization
Remove Offrcer Incentives and Reduce Non-Officers Incentives
Reduce Officer Labor Expenses
Reduce 2017 ISIIT Capital Projects
Remove Meter Data Management Prolect Delay Recovery to January 1,2019
Remove 2018 Labor Expense: Delay Recovery to Janaury 1,2019
Miscellaneous Adjustments: Board of Director Expenses, Injuries and
Damages, Advertising Expenses, Legal Expenses, Removal of Expiring Lease
Expense and Inclusion of O&M Savings/Expenses.
Adjusted Amounts Effective January 1, 2018
$ 3,+80 $ 144,807
2,199
_$.__LEg_$ 144,932
$
$
$
$
$
$
$
$
$
$
(470)
324 $
20
(1,162)
(105)
(2e)
(43) $
(415) $
(r20)
(300)
(2t4)
( 1,860)
a. Cost of Capital. As previously described (see ParagraphT above). This adjustment
reduces the overall revenue requirement by $470,000.
STIPULATION AND SETTLEMENT - AVU-E-17-01 & AVU-G-17-01 Page 8
b. Company 2017 Net Rate Base Updates. Reflects adjustments to net rate base to update
information related to 2017 capital additions, including related depreciation expense,
as well as the impact on Accumulated Depreciation and Accumulated Deferred Federal
Income Taxes, to reflect balances as of December 31, 2017 . This adjustment increases
the overall revenue requirement by $324,000 and increases net rate base by $2.199
million.
c. Miscellaneous Company Updates. Reflects adjustments to expenses to update
information related to uncollectible expense and annualized incremental IS/IT labor
positions added in2017 . This adjustment increases the overall revenue requirement by
$20,000.
d. Adjust Weather Normalization. Reflects a natural gas weather normalization
adjustment, which increases test year billing determinants, thereby increasing test year
(present) revenue. This adjustment decreases the overall revenue requirement by
$1.162 million.
e. Remove Officer lncentives and Reduce Non-Officer Incentives. Reflects the removal
of all officer incentives. This adjustment also reduces incentives for Non-Officers to a
lo07o payout ratio. This adjustment decreases the overall revenue requirement by
$105,000.
f. Reduce Officer Labor Expenses. Reduces officer labor expenses to an agreed upon
level. This adjustment decreases the overall revenue requirement by $29,000.
g. Reduce 2017 IS/IT Capital Projects - Reduces certain capital investments related to
IS/IT refresh and expansion projects planned during 2011. This adjustment decreases
the overall revenue requirement by $43,000, and reduces net rate base by $214,000.
STIPULATION AND SETTLEMENT _ AVU-E-17-01 & AVU-G-17-01 Page 9
h. Delay Meter Data Management Project Recovery to January 1. 2019. Removes the
Meter Data Management System expected to go into service in 2011. This system is
delayed for recovery until January l, 2019. This adjustment decreases the overall
revenue requirement by $415,000, and reduces net rate base by $1.860 million.
i. Remove 2018 Labor Expense: Delay Recovery to January 1. 2019. Removes the 2018
incremental non-executive labor increases, to be included with the January l,2OI9 rate
change. This adjustment decreases the overall revenue requirement by $120,000.
j. Miscellaneous Adjustments. Reflects the net change in operating expenses related to:
1) removing requested additional Board of Director expenses ($70,000); 2) removing
legal expenses allocated to Idaho natural gas in error ($3,000); 3) removing expenses
associated with certain leases expiring during the 2018 rate year ($53,000); 3) removing
advertising expenses allocated to Idaho natural gas in error ($25,000); a) inclusion of
the O&M savings associated with the Company's new website application ($6,000); 5)
reducing the six-year average of injuries and damages ($127,000); and 6) the net effect
of removing certain other miscellaneous A&G expenses ($16,000). The net effect of
this adjustment decreases the overall revenue requirement by $300,000.
11. Overview of Natural Gas Revenue Requirement (January 1. 2019). Below is a
summary table and descriptions of the incremental Natural Gas revenue requirement components
agreed to by the Settling Parties effective January 1,2019:
STIPULATTON AND SETTLEMENT _ AVU-E-l7-OI & AVU-G-I7-01 Page 10
Table No.4
a. Add Meter Data Management. Adds the Meter Data Management System expected to
go into service in October of 2017. This system is included for recovery effective
January l, 2019. This adjustment increases the overall revenue requirement by
$415,000, and increases net rate base by $1.860 million.
b. Add 2018 Related Caoital and Exoenses
i. 2018 Capital Additions on an AMA Basis. Includes certain 2018 capital additions
on an AMA basis. This adjustment increases the overall revenue requirement by
$414,000, and decreases net rate base by $852,0002.
2018 Property Taxes. Includes property tax expense associated with 2018 capital
additions. This adjustment increases the overall revenue requirement by $122,000.
2018 Annualized Labor Increase. Includes the 2018 annualized non-executive
labor increases. This adjustment increases the overall revenue requirement by
$181,000
2 Removing the impact of 2018 capital additions, as well as removing the impact on accumulated depreciation and
accumulated deferred federal income taxes on total net plant during 2018, has the result ofdecreasing overall net rate
base.
1l
1ll.
a.)
b.)
SUMMARYTABLE OF ADJUSTMENTS TO NATURAL GAS REVENUE REQUIREMENT
EFFECTM JANUARY t,2019
(000s of Dollars)
Revenue
Requirement Rate Base
Rate Base Amount Effective January l, 2018
Incremental Revenue Adjustment to January 1,2018 Rate Change
(see Tabel No. 1):
Add Meter Data Management Project
Add 2018 Related Capital and Expenses:
2018 Capital Additions on an AMA Basis
Property Tax Expense on 2018 Plant Additions
Annualized 2018 Labor Increase
January lr 2019 Incremental Revenue Adjustment and Rate Base
Amount (above January 1, 2018 Rate Change - see Table No. 1)
$ 144,932
415 $ 1,860
$ 1,132 $ 145
$
$
$
$
t.414
122
181
$ (ssz)
ll.
lll.
STIPULATION AND SETTLEMENT _ AVU-E-17-01 & AVU-G-17-01 Page 11
C. OTHER SETTLEMENT COMPONENTS
11. PCA Authorized Level of Expense. The new level of power supply revenues,
expenses, retail load and Load Change Adjustment Rate resulting from the January 1, 2018
settlement revenue requirement for purposes of the monthly PCA mechanism calculations are
detailed in Appendix A.
12. Electric and Natural Gas Fixed Cost Adiustment Mechanisms Authorized Base.
The new level of baseline values for the electric and natural gas fixed cost adjustment mechanism
(FCA) resulting from the January 1, 2018 and January 1,2019 settlement revenue requirements
are detailed as follows:
. Appendix B - 2018 Electric FCA Base
. Appendix C - 2019 Electric FCA Base. Appendix D - 2018 Natural Gas FCA Base. Appendix E - 2019 Natural Gas FCA Base
D. COST OF SERVICE/RATE SPREAD/RATE DESIGN/LOW INCOME
13. Cost of Service/Rate Spread (Base Rate Changes). The Settling Parties do not agree
on any particular cost of service methodology. In recognition, however, that certain rate schedules
are generally above their relative cost of service or could be with modest modifications to
allocation methodology, the Settling Parties agree that Schedules 25 and 25P should receiveJ5Vo
ofthe overall percentage base rate changes for the January 1, 2018 and January l,2Ol9 increases.
All other schedules, except Schedule 1, should receive a pro-rata allocation of the Company's
original request. The remaining revenue requirement should be spread to Schedule 1. For natural
gas, the Settling Parties agreed to a pro-rata allocation of the Company's original request for base
rate changes on January 1, 2018 and January l, 2019, but with restated present base revenue
reflecting the effects of the agreed-upon natural gas weather normalization adjustment.
STTPULATION AND SETTLEMENT _ AVU-E-I7-01 & AVU-G-17-01 Page 12
14. Rate Design. The Settling Parties agree to the rate design changes proposed by the
Company in Mr. Ehrbar's direct testimony for both the January 1 , 2OI8 and January 1 , 20 19 base
rate increases.3 For the electric Residential Basic Charge (Schedule 1), the Settling Parties agreed
that it will increase from $5.75 per month to $6.00 per month effective January 1, 2018, an increase
of $0.25 per month. For the natural gas General Service Basic Charge (Schedule 101), the Settling
Parties agreed that it will increase from $5.25 per month to $6.00 per month effective January 1,
2018, an increase of $0.75 per month. For the rate changes effective January l,2Ol9, the base
revenue increases would be collected through the volumetric energy rates, with no changes to the
basic charges. Appendix F provides a summary of the current and revised rates and charges (as
per the Settlement) for electric and natural gas service.
15. Resulting Percentage Increase by Electric Service Schedule. The following tables
reflect the agreed-upon percentage increase by schedule for electric service:
Effective January 1,2018
Increase in
Base Rates
Increase in
Bilting RatesRate Schedile
Residential Schedule I
General Service Schedules 1ll12
l-arge General Service Schedules 21122
Extra [-arge General Service Schedule 25
Clearwater Paper Schedule 25P
Purrping Service Schedules 31132
Street & Area Lights Schedules 41-48
Overall 52% 5.6%
5.7Vo
5.0Vo
5.4Vo
3.9Vo
3.970
5.9Vo
5.ZVo
5.97o
5.2Vo
5.7 clo
4.7Vo
4.8Vo
6.17o
5.l%o
3 This includes the proposed removal of High-Pressure Sodium Vapor lighting options and the customer area light
calculation methodology described in the direct testimony of Company witness Mr. Ehrbar onpp.22-23. In addition,
the Settling Parties agree with Mr. Ehrbar's proposal to offset the current Schedule 97 (Electric Earnings Test Deferral)
rebate of $2.7 million, which expires on Decemb er 31, 201'l (as outlined on pp. 8-9 of his direct testimony), with $ I .5
million related to the electric earnings test for calendar year 2015 .
STIPULATION AND SETTLEMENT - AVU-E-17-01 & AVU-G-17-01 Page 13
Effective January lr20l9
Rate Schedule
Residential Schedule I
General Service Schedules I l/12
l-arge General Service Schedules 21122
Extra Large General Service Schedule 25
Clearwater Paper Schedule 25P
Punping Service Schedules 31132
Street & Area Lights Schedules 41-48
Overall
Incrcase in
Base Rates
Incrrase in
Biling Rates
1.970
l.l7o
t.8vo
l.3Vo
t.3vo
2.OVo
l.8Vo
2.3Vo
2.7Vo
2.3Vo
2.ZVo
2.ZVo
2.4Vo
7.9Vo
16. Resulting Percentage Increase by Natural Gas Service Schedule. The following
tables reflect the agreed-upon percentage increase by schedule for natural gas service:
Effective January L,2018
l.9Vo 2.3Vo
Increase in
Base Rates
Incrcase in
Biiling RatesRate Schedule
General Service Schedule 101
Large General Service Schedules llllll2
Intemrptible Service Schedules 13 I I 132
Transportation Service Schedule 1 46
Special Contracts Schedule 148
Overall
Effective January l, 2019
Rate Schedule
General Service Schedule 101
L-arge General Service Schedules IIIlll2
Intemrptibb Service Schedules 13 | I 132
Transportation Service Schedule 1 46
Special Contracts Schedule 148
Overall
3.27o
l.4Vo
0.l%o
3.UVo
0.07o
2s%
Increase in
Base Rates
2.2Vo
o.tvo
0.070
3.0%o
0.OVo
ts%
Increase in
Biling Rates
3.OVo
l.3Vo
o.Uvo
2.77o
0.07om
2.tvo
O.7Vo
O.j%o
2.1Vo
O.OVo
t8%
STIPULATION AND SETTLEMENT _ AVU-E-17-01 & AVU-G-I7-01 Page 14
17. Electric Cost of Service Workshop. The Settling Parties agree, prior to the
Company's next general rate case filing, to meet and confer regarding the Company's electric cost
of service study. The purpose of the workshop will be to discuss the merits of differing cost of
service methodologies. Based on the input from the workshop, the Company agrees to provide, at
a minimum, three cost of service studies reflective of the these differing methodologies in its next
general rate case. The Company will provide available information, studies and data requested
by any of the Settling Parties so as to enable meaningful workshop participation and discussion of
issues. Unless it decides to do so, a Party shall not be bound by workshop discussions and may
contest cost of service and rate spread issues in subsequent proceedings.
18. Collaboration on Low Income Issues. The Company and interested parties will
meet and confer to consider whether the Low Income Weatherization Program and Energy
Conservation Education Program funding should be increased from the current Commission-
approved levels of $700,000 and $50,000 respectively. Discussion topics will include the need for
additional funding, how additional funds will be used, how much additional funding will be
necessary, and what impact the increase will have on the energy efficiency tariff rider (Schedules
9 I and 19 1 ) balance. If participants agree that a funding increase is necessary, the Company agrees
to make any necessary filing(s) with the Commission on or before December 3l,2OI7 .
19. Natural Gas Service Rules The Company and interested parties will meet and
confer to review the Commission's Service Rules for Gas Utilities (IDAPA 3 1 .3 1 .01) to determine
which provisions should be retained and/or modified, and, if the participants agree, incorporate
those changes into the Company's tariff. Any changes requiring Commission approval, e.g., tariff
revisions, will be submitted by the Company on or before July 1, 2018.
20. Natural Gas Meter Placement Rules. The Company and interested parties will meet
and confer to review its meter placement and protection policies and practices and determine,
STIPULATION AND SETTLEMENT - AVU-E-17-01 & AVU-G-17-01 Page 15
based on the agreement of the parties, what additional steps should be taken to revise the
Company's current policies and practices. Any necessary changes requiring Commission
approval, e.g., tariff revisions, will be submitted by the Company on or before July 1, 2018.
21. Service@ures Avista has established Service Quality
Performance, Customer Guarantees and a Service Quality Measure Report Card for its customers
in Washington. The Company and interested parties will work to develop similar performance
standards, customer guarantees and a reporting mechanism for its Idaho customers. Following
those discussions, the Company will file its proposal with the Commission requesting
implementation on or before July 1, 2018.
IV. OTHER GENERAL PROVISIONS
22. The Settling Parties agree that this Stipulation represents a compromise of the
positions of the Settling Parties in this case. As provided in RP 2J2, other than any testimony filed
in support of the approval of this Stipulation, and except to the extent necessary for a Settling Party
to explain before the Commission its own statements and positions with respect to the Stipulation,
all statements made and positions taken in negotiations relating to this Stipulation shall be
confidential and will not be admissible in evidence in this or any other proceeding.
23. The Settling Parties submit this Stipulation to the Commission and recommend
approval in its entirety pursuant to RP 274. Settling Parties shall support this Stipulation before
the Commission, and no Settling Party shall appeal a Commission Order approving the Stipulation
or an issue resolved by the Stipulation. If this Stipulation is challenged by any person not a party
to the Stipulation, the Settling Parties to this Stipulation reserve the right to file testimony, cross-
examine witnesses and put on such case as they deem appropriate to respond fully to the issues
presented, including the right to raise issues that are incorporated in the settlement terms embodied
STIPULATION AND SETTLEMENT - AVU-E-I7-01 & AVU-G-17-01 Page 16
in this Stipulation. Notwithstanding this reservation of rights, the Settling Parties to this Stipulation
agree that they will continue to support the Commission's adoption of the terms of this Stipulation.
24. If the Commission rejects any part or all of this Stipulation or imposes any
additional material conditions on approval of this Stipulation, each Settling Party reserves the right,
upon written notice to the Commission and the other Parties to this proceeding, within 14 days of
the date of such action by the Commission, to withdraw from this Stipulation. In such case, no
Settling Party shall be bound or prejudiced by the terms of this Stipulation, and each Settling Party
shall be entitled to seek reconsideration of the Commission's order, file testimony as it chooses,
cross-examine witnesses, and do all other things necessary to put on such case as it deems
appropriate. In such case, the Settling Parties immediately will request the prompt reconvening of
a prehearing conference for purposes of establishing a procedural schedule for the completion of
the case, in accordance with law.
25. The Settling Parties agree that this Stipulation is in the public interest and that all
of its terms and conditions are fair, just and reasonable.
26. No Settling Party shall be bound, benefited or prejudiced by any position asserted
in the negotiation of this Stipulation, except to the extent expressly stated herein, nor shall this
Stipulation be construed as a waiver of the rights of any Settling Party unless such rights are
expressly waived herein. Execution of this Stipulation shall not be deemed to constitute an
acknowledgment by any Settling Party of the validity or invalidity of any particular method, theory
or principle of regulation or cost recovery. No Settling Party shall be deemed to have agreed that
any method, theory or principle of regulation or cost recovery employed in arriving at this
Stipulation is appropriate for resolving any issues in any other proceeding in the future. No findings
of fact or conclusions of law other than those stated herein shall be deemed to be implicit in this
Stipulation.
STIPULATION AND SETTLEMENT - AVU-E-17-01 & AVU-G-17-01 Page 17
27. 'I'he obligations of the Settling Parties under this Stipulation are subject to the
Commission's approval of this Stipulation in accordance with its terms and conditions and upon
such approval being upheld on appeal, if any, by a court of competent jurisdiction,
28. This Stipulation may be executed in counterparts and each signed counterpart shall
constitute an original document.
DATED tnir&uy of Octobe r, 2017.
By:
Avista Corporation
Meyer
Attorney for Avista Corporation
Clearwater Paper Corporation
Idaho Public Utilities Commission Staff
Brandon Karpen
Deputy Attorney General
Idaho Forest Group
B
Peter Richardson
Attorney for Clearwater Paper
Community Action Partnership Association
of ldaho
Brad Purdy
Attorney for CAPAI
Ronald Williams
Attorney for Idaho Forest Group LLC
STIPTJLATION AND SETTLEMENT - AVU-E-I7-01 & AVU-G-I7-01 Page l8
27. The obligations of the Settling Parties under this Stipulation are subject to the
Commission's approval of this Stipulation in accordance with its terms and conditions and upon
such approval being upheld on appeal, if any, by a court of competent jurisdiction.
28. This Stipulation may be executed in counterparts and each signed counterpart shall
constitute an original document.
DATED this%Vof October ,2017
Avista Corporation sraff
By:By:
David J. Meyer
Attorney for Avista Corporation General
Clearwater Paper Corporation Idaho Forest Group
By:By:
Peter Richardson
Attorney for Clearwater Paper
Ronald Williams
Attorney for Idaho Forest Group LLC
Community Action Partnership Association
of Idaho
B
Brad Purdy
Attorney for CAPAI
STIPULATION AND SETTLEMENT _ AVU-E-17-01 & AVU-G-17-01 Page 18
27. The obligations of the Settling Parties under this Stipulation are subject to the
Commission's approval of this Stipulation in accordance with its terms and conditions and upon
such approval being upheld on appeal, if any, by a court of competent jurisdiction.
28. This Stipulation may be executed in counterparts and each signed counterpart shall
constitute an original document.
DATED thi?"A day of October,2017
Avista Corporation Idatro Public Utilities Commission Staff
By
David J. Meyer
Attorney for Avista Corporation
Peter Richardson
Attorney for Clearwater Paper
Brandon Karpen
Deputy Attorney General
Idaho Forest Group
Ronald Williams
Attorney for Idaho Forest Group LLC
Community Action Partnership Association
ofldaho
B
Brad Purdy
Attorney for CAPAI
STIPULATION AND SETTLEMENT _ AVU.E-17.01 & AVU.G.17-01 Page 18
27. The obligations of the Settling Parties under this Stipulation are subject to the
Commission's approval ol'this Stipulation in accordance with its terms and conditions and upon
such approval being upheld on appcal, if any, by a court of compctentiurisdiction.
28. This Stipulation nray be executed in counterparts and cach signed counterpart shall
constitute an original document.
DATED this 10 day of october.20l7.
Avista Corporation Idaho Public Utilities Commission Stalf
David J. Meyer
Attorney for Avista Corporation
C leanvater Paper Corporation
By:
Peter Richardson
Attorney for Clearwater Papcr
Brandon Karpcn
Deputy Attorney General
Idaho Fo4st Group
fi,r'14 IB
Community Action Partnership Association
of Idaho
B1'
Brad Purdy
Attorney for CAPAI
Ronald Williams
Altorney lor ldaho Forest Group [,1.C
STIPULATION AND SI]TTLEMEN'T * AVU-E.I7.OI &, AVL'.C-I7-OI Pagc lll
a
27. The obligations of the Settling Parties under this Stipulation are subject to the
Commission's approval of this Stipulation in accordance with its terms and conditions and upon
such approval being upheld on appeal, if any, by a court of competent jurisdiction.
28. This Stipulation may be executed in counterparts and each signed counterpart shall
constitute an original document.
DATED this _ day of October,Z}l7.
Avista Corporation
David J. Meyer
Attomey for Avista Corporation
Clearwater Paper Corporation
Peter Richardson
Attomey for Clearwater Paper
Community Action Partnership Association
of Idaho
Brad
Idaho Public Utilities Commission Staff
Brandon Karpen
Deputy Attomey General
Idaho Forest Group
Ronald Williams
Attomey for Idaho Forest Group LLC
Attorney for CAPAI
APPENDIXA
o
oootr
El .:
EI R
OIol
8l L-
El hotzl
EI Btrl@EI Rd
3t
$
9l ut9x<t
E
E
{ig
Eo
aots
GoF
(,:
o
otoUId
oz
EEr :-€l &
OI
o@@oioooa @" V- o-@oFoQDAQo$eNa;'ig
o@ootFno60@Nsi ?' ts' o'6d66N{NN$i-'o
0660NOFOo- o_ o_ o_t!too@NFO@toNcn'j--6
@
NOOONOFo!-arYN-NNNO6NN6otoN
'j-''j@
ooooFOFOa- a_ @- o_6FOO@@to@toNO----O
@o@oooNo6NOO@odoNNOO{+{Not-''jo
xo
=UJo-o.
zotrJ
o.
@F2IIJ
=ul
E
UJ
1r,
I
IIIJaf
o2
luo
o
i.esY
oEoq
Eoxo
o
coE,
d
G
E,e
QooE
Eli-gEq
NoE'o-EO@EP;s&
EE,EEEOECOg59E:^ooiRoN=;t>o40oE
EHEOE5EPto*e
E9EE5E
@No-,N
5l N
6oFgl Hat
ooooNONOi: N- o- N-
-OOONFOOatoN@-rjo@ o o
tI
6l F
=l N
ooooN600O_ O_ !t_ o_
NOOOoNooOt+NNo;;ee G @
f..
oFl 6_.-l N
6600€FOOoooNc,i ot -- at<tto(r)sFN
o---tja
NN
Er tt-
!l k
d55l EOI NolLI
NO60@oFoa4tsFO{@_NOF@FOOtFNo'-';9
@9FOFOO@o- o- a. D-FOo$ooN6F@FN
@';;o
N@SONOOOo. ri O" o-qFNOF@@OoooNO -' -_ @
6
orooo6iooo@{+o@ri=-oFto{o+otNtFtOdN-dae{F?@tFOO@@
21 5-ol rrt 6cl Nq i=
F ogo Noo. +$'O NNol 6 666l o-FI N
o0
ddT0u,
EEooEEoo
EE
ooglglc?ggooEttc6
9_960oo
olol6llt!lotdl
olEI6lrl
DIot,BI
ol€t:t<t<l(,t
GI
ooo0gEtt
IJJ UJEEa'A
=6U' .'
EE5EIF
o*oo6606!too@Nfl€s B sfl@.{_@.Nd@NONqaqg
+NOSLldN-NQl+NOOEI B E N E8l o- @- o- o-triloN@o6l oooo
o@oo!l 6FOqlNNooEl NSgS9loD<nEls$sg
oooNfl6F.5.Htltro@tt600N.:cl ++ooRl@-oio-N,Xl 4qoc
OrOqN-Fl@oooql+d--N
=NdFNYli.rrocil Foi@^'@ooG
@NrqON@- N_ @_ Gyor@C
=t 660N
@ND!a@a6
oooG@oocoooFoir;oto'Nclo+oc:l$_o_N-(40aoobs
oooe600e*_,:6-c,oooo6l otoi
=lt-o-o-(oFFG@ooe
<600NIONONN{rroio-r'c
o6l B. 3. 8- SF-NO6@O4
ooocONo-
-.V_t-F-Fnl=66cEl ss 13
-l 6Neo6@6e
-.888SaloNoagl @.doa/tNo6N
OI oNoUl ?AAe
o@@NOirtSggl 8Pt6.-t ct tsNNtsglold;.idt6
t|4ooo6
H-@oo
=l :-8-8-sEl-.diooFototo+onfrl6/o-o"o-NxFloNoFGtoNoo
;l -oq,
olEIolEIItt1r.lldEsgftr{
El iF28Nlr'El NNOl 6oticl 666ttitllcEcc{l 5=ri6l tttt
ogott,
.EotrtcoI EsE9EIE:+t.E
EEEEor-€ E(JTE Oour&ZEi<se?8R
APPE,I{DIX B
oE
o
oco
Irt
OJ00
G'o-
rrr -Q I
-9 E9E oEolE,! 3;E<F]
f..O66rN1-1vI€a.lh
al a.l Om€n6r
6G
oooaeQ.d ri oi*a{m\qqali$$.+
6 q,A
\o al€-\
NOo\-ol \o
u4a
Ge9
f-OrthOa.l\o" d c.IoN$F<to €
GEA
€ooo rnoo\dodmo\q€-6 e.l
og
tAag
oooHrclri6o*FN C.l <f,
agag)eaA
\0e€\oonrI ri F:d-Ah€6l c{
C- \O\-rO\ \OidF6lo\ o\F-S
pqa
QO€rao+cl,.cj "f€0\qrr r-
aa ,)
\o o\.Y .O"
O1 n\OF\o" \\o \o€n
6@
i a.l\oo
!f,eoo<O\ma.l rfrf, oo
\oo c{o$N
\o
n a]\OOr\o+odo\o€-d-rno
€oa€
r
m000
6$<tdt! J6Yro.a q
ha-o\oi
oooooo+o\o€€rn€r+\o c.l o\
G| N
G946
Luii
=o
=vQZ
dU-o>/6
ovF
IA 1A
o-
6X
99E(J.o>.6EZovr-
GCA 'A
>.xtrl
oo
oo
Q C,)
oozz99
ora'. Brmo t-.
+m
o\oo\r-. o \o6- J .O"
€
o\ \omoo.ti q\o ^liOd} .1
oooooo+no\6Gl-+m€
r+oO-<matca\oSno<1rl@=t6inGf=ri
mQrrOFo\o
aGqa
h@Nx6CN€iOA6n'eO\ni6i t! -i 9I -l6YNYN
-C)HeooO\€€<f
94tGA
€m\orO\6odd600oddoi
<-ooe.lonH6m\OO\*+OO\O\di 9! -f 9! Fj
-YEYoroOO6ho\o\o
@6A7A
ooa<>oooo<>a{+md\oc-
ts-a
6€6Ha\(>oomit-o<r\on.dt! d9t riat s'l 6 \: o\
-<r!toooh000\* c{ c.l
-t ecaclG
V).,, Q6 ii )i!=5ts>a?ilt4o!!Ev) <)U)
.- a^lz
tr{ c.rE;*<)
Ia{
zelrrl l.iv(J
A.n
*.1
J_S r.:F- -1z>r!oo irl
641I,Uto
-.1
r<oF
coxaz
u..to-
CL
zotrs)
CLF,Jl
Fzlft
lrjJ
Etrltt
FtoIFFlIIJ.JIf,
ciz
UJth
L.,
o.
rEnoNdrvNohor? q*o^q6i
'jJ.ioooal 6aNo\F-€e9o €alo.l.: =l o\
9o^
oz
hm6€Oho<ho€ohd.it+€O\€3t
-ONth-gFFh6l# riFrJ6!t
o&
6\od5e3AV')AOoOoeoG40
al
€o
.5J
oao2-6BgDGEL99.8g &,^?
E € Fi6 Hz.5e7fo-oY* E obo* v H b0E=€98>Ei(dr><<o()<
n\Ot-oOO\
o
EEBE
dFoi,-,& 3! ot'
dZ E<!U0tr>br)OocE!4 q
EEU
<9E",oJF'I -*q aPc)r 6
866(€oos66
o{ ri tf
^oO-
rs
ootrtroo
oo&&ctrODEE
AE
oo()L)t1,ooxxfrrt{
o\
a
x $*
-d,bE c,o(J IU€ Oe 9e
=ttu
o d+E trIJO O€5E.Xl) th lt<
oao
tr\o
c
\o \o
l-t
trc!J
d6oo-o -o
U) U)
n{r
>AlzLOqo5J AC*99a* 6 o<-JJ- c::-tuo oJA66--=aq!EdEE)\il > 6 6rYE O E c
-ad,EdFU o xL r<I E at tLbOEE
s €'a E r*< u.;;xo400B H& € €.-E a,|. l
c- d.6'EE X'E * 9zJ>iiii
sn'o$$
oGgR
&, -i'.' o >r
.EHE,"bFEs5LOo'at858'IBA9c,c4
EEHz EegE g
t-(,t4
oh
6lN60o<>oo (>-d \dol*
Q>Nch1
<-.&t
2?,ql
E
s
ot-codE;(nvoOo
E CA.EtrI!E ><
!?oo;2.>
EEahg
s.E,E*.328il
-c;t-
EE+.EUFirE>.eE<
.EEEl;g
CL
?
o
6g4e+
ooooa<>
-OrO6\O\OO\F-oo\oh(>
as46
uo-d.
t4
1l-
tou
E'o,xlJ-
I
NoboG,CL
60l-aqoimooc.l -i:
r-
a.lr.la,l
tho\$F.O\
ti cn <>\oNr€^ e.iE6
oe
\o in r\<l' ia .+-l oo^ oi
a{a*clo\+
*aa
ra aA
f- fi \O6nq@-+O\!th or
9oi t--
6
6aaoou5\dtra-oH >vod
d
d
HN48,9YOE* I .=6)&
E!r#i
{El, u)z
G
oE
oil
oo
ct)
.E
-9H
I
o
^oE36.\
vgO
E0rH.9 9x
E g:xo9:(.>8a=EE E gE
5EE?5.i5*.72<d<;EE
.q()F.
E frfi,x ii [f
.3E<
oe
ldh'o
E
o
E
coxr)z
IJ-Jo-A
zoFIl
CLtrlnF2
IJJ
=t!J
Ft!tll
eloItrlILLIIf
oz
II]a
U
tri
LL00
oo;B-=QU..iLLaaooo.LEgEgEqtdPEdgi-itrouEaimE&,&E&,s(.)rEUE-jts E xt E ts E "lg E YI E } E iE 3 El3 E 3 ?k E El E H Z €e 3 qH s : EE .t sl .t E .t 3F l! <l F. F f& .
almN6
Htur II\l 6hl EEt g
GlF
,Rt i
6J -qsl :
Et f;
z-l
aoc'a
(!
-ctJ,
Iro
oho(!o.
coxozLU
CLo-
2oFIfa-tr]aFzl!
lrjJ
Ft!th
FIoII\rlILIJI:)
ciz
l!ah
L)
--.^---t
1* |
F:!=-eJ
I
:"".1_6t6-O-a {--l
:.".1:-8-i.- 3.rl
I-l
I---_--_tNFf - i6lr- o- F- r- -l
I-l
I--^__--tohlo- r- *_ r- -l
dd I-l
I--^__.-t,- o- -- <- -l3i- - |-l
I
^--___-t€omF 6rl
--o-r- F--l3e- - |-l
I--^--*-t
oN I-l
i
j
E
e
6
"
:
L6^
l"
$
l:
t:IN
t:
l!^
t"
t:t6-l!
----o-.1-6:A!6d616o- €^ 6- d- 6- 6- qlq
-- -- -- N" 6- a- c!o-6h6FdO616
16o66 li---_--*l:6 o $ F,i 6-9!.lo_ios6F6-lo
F- €^ F- q €- N- a!1
-__^--^t-s- F- N- -- 6- 6- qle^
6-hF-oal-
=*"-=*"1-6&toNrFl6Jd;ddd.Ild6Nhdohalo
IX--_----t-O6O66Fhli6^ 6- F^ o. o- N^ Otl.{
+. 6. .,. _" \ ,D" oJo"
=*=*=."116d€@h6htQddddddali4ridohAI-d6s6dsrlNdd+ddd-1d
: "::. " "l:6-+6d6Hltsr- r- 6- o- o- o! qI r-sFd+*oFlhhd6o0dalN
6E',dh l3
,"*"==*l*a- 1 d- *- r" a 1116_
66-66;5lF
J d 6- d ; d -1+odhN.r lR
"*r*=*ol=F66h6-016i 6 ri !d oi -'d1o'-F*+N6fl19
Fd-d- ls
**=**"*l*h@dd+6€lt+ d -i ^i F !o'a1llNdFNo<OlF?" o. s^ o: E 6- -Jolls
^----_-t^
€d++6a6ldi. 1 q o- N- a. qI'"
--^----t^f66-rN6ls
+ 6 a .'i N' .i 6lJ
di J 6 6 6i .i Ji6 6 6 d 6 l€
-^---_J-n6646-GI6
FiF.i+i-ia1+
F- €- 6- 6- 6- 6- <l e:ch60*6-l!-t*
aE
d^t
Hr-F.a
9.=
;
3g
ud
.,s
Eh*
!
*'
o*
€.t
rN
Et
nI
3di
Blaap
Ei
-ua
t_.st
!lEiElz iil* :ql I9
AI } Na,'
!e
-
tr
g.
Iri
s
aN
I
ed
dd
d
aS
$
I
5
. ,EF
E.'
6
ct
.l
t
q
6
E
t
d
$
n
9
.ts
&
a
x
E
a
r
E
I
v
}E;!e>34kErFdZ
rc6---6€l
F- 6- d- <- -l_toN I
I
o - - - - a *l
6d Iil
a-{---ol
6N IHl
-ho--661
FI
I
9
H,x
-9
a
3xce
d=*,4A
E
E?;I
rid4
ItrD<
€T.,3 E.qe ?g3 s
di E
-9
- *e
tJl
ct
Et -gEY.1fl sig 66{ ir r,&gsl Ee
-1 g{ d.Egfl gE
rltl :f'
Elil s,l I
!|ElgFq
aae
.!EErur -ElBsf.E
$91 I
#s^E6 ^g r E
I 9idN -5E :6 o o It6=:=?H E6?+*ii:Pi
#A#EEfl{i E *,8 s-S?t E.l*E$EsgE,
!&t536rEEd3zi
=E-* $-. -es::: 5
$?!+EE=tsJ
iSEfEEfi!'{
EEI{i$EIE
$#0Lr,Id8a
ra;
J
d
J
I
ug
E
EE59UEE,
HS
,qJ
:-Tit 9:
5.IE E;I E '!il=:
iITT
E
3
Zu?E*BTUE
E,g
E<
13$ 33g .q-H :=
Hcd i
el$F T
-oF€oo-.rF+ll!n-No'6€tso6:=1 9l::::9RnRRSFEd7
A
i3Z
6
EE
N
g)
EEEfrl
gilg
t
rrl
>!<.
.E
oE
Eoo2G()Er:dEgEE
€Ball,8.E
:€Eg- z.l_g.E!'
<.lB
(J!
r.E.5Efr>
oo
-2 0
E
Ets
E
?,
Sumc$t
Scenario: AVU€-17{1 Soltlomont Cfie
Load Factor Psak Credit
Trdnsmission By D€mand t2 CP
(b) (c) (d)
Tot€l Cur6nt Rate Revenue
Expms€d as $/kwh
Production
Transmision
oisldbuUon
Common
Total Curont Moldsd Rates
Total Unitorm CurentCost
Expressed as UkWh
Production
Transmission
Dietibution
Comon
Tolal Cutrsnt Uniform Moldod Ratos
R.vanu.lo Co.l R{lo rt Cutr.trt Rdx
AVISTA UTILITIES
Rovonuo b Cost by Fun6li0nal ComponontSummary
For lhe Tffilve Monlhs End6d Decsmbsr 31, 2016
ldaho J!risdiclion
Electdc UtiliV
(e)(0
Systom
Doscripuon Total
Funcllonal Cort Componcnt! ri Curenl R€tum by Schcdulc
Prcduction 115,{11,512
Transmission 25,526,213
Distribltion 60,065,371
Common 45,579,844
(s)
R€sidonlial
Seruice
Sch'l
45,464,829
10,21 5,328
29,117,877
24,192,966
0)
General
S€ruico
Sch I 1-12
15,343,432
3,733,760
11,034,603
7,200,206
(i)
Largo G6n
Sorvico
Sch 21-22
25,763,200
5,829,797
13,010,682
7,4$6,312
0) (k)
Exbe Largo Er(fa Large
G6nssrvic€ SeruicgCP
Sch25 sch2sP
'12,799.054
2,493,976
1,952,773
2,700,197
0
Pumping
Seryice
Sch 31-32
13,503.398 2,123.135
2,816.620 38s.214
334,890 2,048,469
2,490,084 9s7,183
09t29t17
(m)
Slroot&
Aroa Lights
Sch 41-49
414,457
51,578
2,566,070
5$2,095
t
2i
1
5
6
7
I
I
10
11
13
14
15
0
17
18
19
m
?1
246,583,000 108,991,000 37,312,000 52,070,000 19,9{6,000 19,145,000 5,491,000 3,625,000
$0.03908
$0,00864
$0.02034
$0.01543
50.03970
$0.00892
$0.02543
$0.02113
$0.04202
$0,01023
$0.03022
$0.01972
$0.03969
$0,00898
$0.02004
$0,01 150
$0,03s82
$0.00698
$0.00547
$0.00756
$0.03724
$0.00777
$0.00092
$0.00687
$0.0351 6
$0J0638
s0.03392
$0.01552
$0.03100
$0.00386
$0.19229
s0.04443
$0.08350 $0.0e518 $0.10219 $0.08021 $0.05583 $0.05280 $0.09097 $0.27164
Funclion.l Colt Componarb d Unilorn Cuncnt R.tumProduclion 115,204,615Transmission 25,541,027oi8tibulion 60,062,042Common 45,772,316
'13,947,215 25,073,652 12,919,313
2,959,025 5,438,615 2,556,208
9,054,374 12,161,159 2,000,226
6,393,250 7,194,197 2,734,355
17,371,556
11,417,236
31,838,659
25,455,19'|
13,316,328
2,716,800
322,864
2,444,313
2,163,751
405,102
2,146,369
901,409
412,799
51,042
2,538,391
589,301
246,583,000 116,082,641 32,3s3,864 49,867,923 20,210,102 1S,800,305 5,676,630 3,591,534
$0.03901
$0.00865
$0.02034
$0.01sso
$0.04137
$0.00997
$0.02i80
i0.02223
$0.03820
$0.00810
$0,02480
$0.0175'l
$0.03862
$0.00838
$0,01873
$0,0'1108
s0.03016
$0.007'15
s0.00560
s0.00765
$0.03673
$0.00749
$0.00089
$0.00671
$0.03583
$0.00671
$0.03554
$0.01592
$0,03093
$0.00382
$0.19021
$0.04416
$0.083s0
'1.00
$0.'10137
0.9{
10.08861
1.15
$0.07682
1.0{
$0.056s7
0.99
$0.05185
1"02
$0.09400
097
$0.26913
1.01
22
23
24
25
26
Funcllonal Co.l Compon€nta at Proposed RGtum by Schsdulc
Production I 19,320,405
Transmhsiofl 27,802,692
Diskibution 04,757,699
Common 47,592,204
47,r23,397 15,867,464 26,643,703 13,155,119
11,260,910 4,021,562 6,329,347 2,678,256
31,184,748 11,n7,888 14,095,542 2,093,268
2s,2S0,945 7,503,085 7,813,408 2,801,337
13,91 1,500
3,034,405
361,'153
2,589,941
2,195,40E
120,607
2,222,692
980 294
423,815
54,604
2,722,388
613,193
Total Proposed Rato Rovenuo
Common
Produclion
Transmission
0iskibulion
Common
Tohl Uniform Cost
Exprersed as $/kWh
PmduG,lior
Trsmmission
0bribulion
Common
Total unifom Moldad F{at6s
259,473,000 '115,160,000 39,173,000 s4,882,000 20,728,000 r9,897,000 5,819,000 3,814,000
80.01612
$0.02719
$0.02209
$0.03226
90.02055 $0.01204 $0.00784 $0.00714 00,01623 $0.04595
31
tt
31
iA
3't
38
39
40
41
42
Tohl P&pos€d Moldod Ratos $0.08787
Func0ora! Cort Compon.nt d lrnilorm Rcqucatid Rctrm
$0.10057 $0.10729 $0.08454 $0.05801 $0.05488 $0,09635 $0.28500
119,145,838
27,829,800
64,726,473
17,770.888
48,992,167 14,424,358 25,931,438
12,438,891 3,223 810 5,925,282
34,151,369 9,731 157 13,21E,042
26,s28,014 6,669,029 7,532,641
13,361,291
2,184,941
2,174,641
2,8s9,896
13i?1,888
2,959,909
x52,172
2,555,782
2,237,774
441,352
2,324,810
1,005,564
426,922
s5,609
2,774,282
619,932
259,473.000 122,110,472 34,048,3s3 52,607,404 21 180,775 19,639,751 6,009,500 3,876,745
$0.04035
$0.00942
$0.02192
$0.01610
$0,04278
$0.01086
$0.029E2
$0.02317
$0.03951
$0.00883
$0.02665
$0.01827
$0.03994
$0.00913
50.02036
50.01160
$0.03740
$0.00779
$0.00609
$0.00800
$0 0s798
$0.00816
$0.00097
$0.00705
s0.03i05
$0 00731
$0 03850
$0.01665
$0.03199
$0.00417
$0.20789
$0.04615
Rlv.Dua b Cotl Ratlo atPrcpo..d Rttt!
43 Cureil Rfluua to Pmpor.d Cod R.tlo
14 TugdRry.nu.lnor€u€ t2,890,0q1 13,120,000 (1,201,000)
Filo: AVttE-17-01/ IDE!€C Ssttoment COS LF PC tlohod/ SumcostExhibits
$0.08787
1.00
0.t5
$0.10663
0J4
0.69
$0.09325
1.'15
l.{0
$0.0541 7
1.01
0.9,
195,000
$0.0995'l
0.97
0.9!
515,000
$0r9050
0.98
011
252,000
Page 2 ol 4
$0.08104 $0.05928
1.04 0.98
0.99 0.94
!t7,000 1,235,000
2018 Rate Year
$0.001092t T6nrmhsion $.01102 10.00975
CASE NO. AVU-E-17-01 SETTLEMENT STIPULATION APPENDIX B Page 4 - Cost of Service
Line
No.
AVISTA UTILITIES
Revenue Conversion Factor
ldaho - Electric System
TWELVE MONTHS ENDED DECEMBER 3L,2076
Description Factor
1 Revenues 1.000000
Expenses:
Uncollectibles 0.003563
Commission Fees 0.002275
ldaho lncome Tax 0,0s1264
Total Expenses 0.057102
Net Operating lncome Before FIT 0.942898
Federal lncome Tax @ 35%0.330014
REVEN U E CONVERSION FACTOR 0.6L2884
2
1.000000
0.003563
o.04227s3
4
5
6
7
8
0.00s838
0.994L62
Revised per Staff_PR_079, Attachment A
CASE NO. AVU-E-17.01 SETTLEMENT STIPULATION APPENDIX B Page 5 - Rev Conversion Factor
APPENDIX C
0,
.Eo
(!
co
Ir{
OJu0(go-
Os!tr-99
ErEE ,5;;.;tr<td
r
N
?q
(\oa-r{N
€
r-o\
\d<>6l
r
t'- r^N-roAO\h
c.l -itfo
o\oo\f'. O \Oa." J p,\oHn oo
\o<o\€rnd-iC\Et c.)gca
to\+oc-lGlOrO\OF6+61601.,i 9! oi = qio\YoElaloonoio€
oooaoooo
o\c{-mtm*o\
Gl a-lhOtt O\C-€.+ \Oco oo
ao \O
er@
rohhc>c{\o" r; c\mc{rc
6ri
rAG
t-. t'-t-. cl\o-
nF-\o^ \o"o\ c.locl
9a ca
qo@a
ho\onoO\O1c{dhn+s\on
^iadi9!dto\-NrirHOc.lOOO\ \O \Ot
?494GG
66s4G
oooooooooooo
f*BChr-<>€O\oONC.l n
94VaA9)
cao<1. 00
.+ \ooln
F- \O
NH
avq
66
C-O
Nc4c-€-O€rl
sr6
€osiao$q, vi vl€o\.l v1c-
eq et
*\oood} \o"aq c^l6lm\'o"6€&h
qG
.40\c,\€rroo\o\No\o.+\o\o\o.dt!\d!oid \,4 - !,1 ooHO\OOO
vi od <i
-1
ea e) es eq
oao<)-CAo\o\o\\or-mO\-i6oo \o a.l F<>
Gg
oh6hm\ori .f6Nto" \o-\orrf€
oooooooooooo€6*oiNo=F-l-\OOa.lH h+ tt'
GG'A(A
c/)dH5inxDtr>al- & lrJoHg
a
.-dz
AME;
aa
Uail
z c'lrr)*iv(Jria
-.]
(,>Nqa.
<.
ul ii26E)
J-3 ,,rF F-lz>El 6oEia :,1ulv)a
(Jxoz
IJJo-
CL
zotrI
=dtrtlFz
lJ.l
LUJ
EtrJtArloINr-lI
IJ.J
:)
dz
IJJt
L)
a.
o,EnoddFvrohor
E vl \'o^ q Gi'.=m€ocloENO\roO(,go €Nd.Y ra
cb
oz
hMF6Qr)0*\oo&c)hN,;r+\oo\6{,tFod+h.9--1!^e.!
= hrH6+r5
o
s \o cr\
=e9a( ,') dlq9goeoe-6
al
ao.EJ
o
o9^69s,GC!e9S-E &, -?
EE EEEo*t- 9 ob0= v E bod = ,. A db;.;;b>E63><<ca(J<
n\Ot.-6O\
o
rid
EE6F
v6oE.1* o'€'dz E<
-OOtr>booocEC q
E 5U5: !<s6.,oJPd -*
(JP dnag600s66
Notl
^OO-,E
-.1 'r-i
oo
ccoooo&&
ccoo
aa
ooUU'o€ooxxE frr
o\(!
a
g s?
-6'u.q Eo r) o
UE Oo !)&iir's-EEo o+E E9o oE{ 6.Xl) th 9.
o6v
H\o,
\O \O
JJ
-]J
6doo
-6.och ch
-{r
G.rz!oEO5JAc* g9
-+ d O:;ddrluoo
--=qqHESEESI( B E E-EdldidH E 5F Fri lr A'o 'Ei'iaAqtr-^55G€il';.d, c e> < h.9.8Jo<oO
E He € €€6*&&tl r'6 E a,E E'E 9 9zi>iiii
tne$$
o6'
E E EAv o o-frcc-
HEE g>868H A ts5X&& ugEEE9000tE5&EEEsO<Aah dZ-a&E E HEo000F->>Fr
-or$o
s) (A
\O<)€\oohdldi \clHoraa6l .\
o\o
+
e?+
\o€Oooo^ v1t t'.oo\ oo-oo\
.+o\r+\o€iO\O\t-\O€sio\6.1
diI d!: rjiYd:€HOiO€
no\o6
@GGG
o.i -l .d oid\on6l66€6r-6
on046n€
o+
m sl_\o (3
ro
€
r\
mo\moo\$O\<lN^.d.ioYO\o <) F.-
nC-o\
6l
J
t-oF
oE
.9
E9
iavo(l\EEE'EEA; ><
E i.:
o:90EE^g*
.3EE.3,='E c
0JqE 8r.l.EeprqE>.efi<
9:o=El:Eo
A
E
on
N
6loa\o
e4 s)a
?,9,4
=o
6gE(J3>/6azovF
tAq
9AEb
o=OEH6o->a
ovF{
a6 tA
E?oo
ooadoo
Q(,;'ooaa
oooooooosl' O\ <f, C-oo*+Fh€h<>\oN!+.+<t- \oe-{ o.l
(J
o-t
rif:o
ou
E'(U.xII
IN
q,bo
G,at-
(Jxoz
IJ.J
CLEL
zotrs
J
CLt-ahFz
IJ.J
=l!J
EIJ.Jtn
FIoIr\FIIIJI)
oz
lJ..tth
l.)
FhO6FO
d6h*Nh
I
lsnotNro| 9^ 6" oo'tooFlHdFl^ v! .'i
o
Gq
66@hho-6-F6{6do+o-
dooo,q93
ox
d
-aaG3,gY'q9e o&
lo6
Eii
E3z
BEE
Eril
o
E
r.l
i.
EAE
!,89:t3
.E iRE Ei6 E:€ ra.>
fEgg5 E g9.EE.r .3.;i €.p9<4ilsio9F9oi
" lB.EEP
.c l<IET<eho
E
EeI
A
lmh+166-l\6-+IN+FlroF
l6
E
'g
OdL6
OodE E;o>g&s
qi6N
Egs
8,5.;al
853.ooT.EtfiPatsr
EI
d
slg
EI E
$Psfi.s3
.HI<lr
E
E
^b
a
&
E
E
i
oU
tso
U
a
D
E,z
h
aF
H4tli +r al
HI ;
tl E
sl *'$6
EIIr,il tr
E
J Iz
b0tr
CL(I,
tt\
I(n
o.too(!o-
5" s"
cEIoI
3
}EiE;r€{E6rFilZ
9l
{td
ltg
---^*^-thsh6-Fel
dddi d..1-ldd I
u=.u=-rl
-l
:""."1r-l
oN I
I
^"^-_-_taO--- ?--l
I-l
I----_--t
-.o-1 e--l-l
I--^__--to5l6^ -^ -- *" -l3E- - |-l
I--^__^.1666- -6t3- o- F- ?- -l
-l
I---_*_-t
66a -rlE=- r I-l
I-^^_---tt- o- -- t- -l3F- -
I
s;
3T
6
g
o
t"
ls.
t:
l;
l-|-:
I
l=
t-
Ir-
I!r
L
t-
t"
IF
-.--.-*t-o;a*@NAld6-@-nqd"aclo)
N-a@F6tI6-- -- -- 6t q 6- +1I o"
F.osnF ls----"--t-tsdod66?16q o" u- ts n- 6-{!|0"qo€s-ealo
-__^---t-o- r- N- _- n 6- nu6-
&6hF-O6l-
d d d ai n .i -'lF'
=xr*s^el*66*6d<tst6.j i d d ri d t{lci
lx*--*---l*d6o6d-frlFn q d- o- o- d. clt.!
t" o. .! 1 F" o- clo"
oNiNN ls_^^--_l-ts6<o6tstslo
6F*do6dl6N6€6d{-Id
tx.,--^-"-t-$r600ahlrdiJdddhld
o .f.d oi i - -'lai666da lE---^---t^6666dOGl66- 6- N- *- F. i- n|6-ha6F€601q
+- e. o- o- ..I F- -lF:aNr,NN lR---_---t^r- r- -- d- 6- -^ qI6-6A6A6d610
d6aNF€;l*
IN^^-*--^t^(,6--FCOt€6- 6" d- s- t- 6- aJ {-
r" @" +" o:6. -- -Jq6€!eq6dd ts
. - . - - _ -l**- F- F- s- -_ o- qlr-
F+666-$l-€6?r6Abldq- 1 6- E- d- o^ oJ*-
6664N 16
------.1^a6-6d6-lo+.o'6d.i6a'lJ
-€+-heO16oi c,i d o.-..i .i -lJo66d6 IE-----_-t-6ddoForld6 F.i,Jriart'
\ €" q.\ 6" h" -lq-t^
sE
iah
t'
ri*
s
FA
*
d
5-8
j
S{
*N
!
F3
q
It
.la
6
er*
di
i
?rFE
E.-
:E
OB
t-- EE
Hsg*
sS
r
o
e
c
a
4
d
I
I.{
3
;
3'
6'
;
I
s
d
J
R
.J
O!
E
o
F"
()
xoz
IJ.Jc4
zaF5f
CL
F-lr',Fzl!
lrlJ
FtrJth
FloIr\t-lIl!Il
ciz
lrJah
L,)
d
s.
a
d6
hA
f
SA
i
6F
E
li?
>
.,? sEIE;{t? !{tt i
il? T
I
I
*66FF6F
S6-
o6---6ol
6N I
-l
6-f---61Oa- +-l
oN I
-no--aal 6rl
I
o
dT^3px46.
5F .?
gl ,8'
flYElrul!t Br
fl u {i
g{i jE
JlI TE
Elfl=39
SilglF
€
4es^Ed *g * E9 EINN 1C :6. o IEEq:E?q"!
!tE#fti$En;?.IYYdTE
; E *,8 5.T?r ?€EEE,gEgEi
$ao5;;e;3
sErt $$q!#EE!,I;i*#88!$nt{#!.ESiE;
i;*s$38*t+E E E,g S EEiEJ35,T,5EEt2Eg6ssxnSEg
Is
,9
HEigAE
E.J
BE
48B!<T
u3 t
$3 Etts o
ili F
3
J
I
a
a
b
EEt?
Ex.5tOEbd
$*8i3E
$ gE
u v?
HsE ErlHi T
b
E
E-aBiE36B
s.trgsBi
d.3
r-n
Jg!E
99
onaa9:!!:!9 Oo-d6+rOre6**!qntrnr<6hhr
J
ts
F
e
z
x
aEnr
N
EE
hlI
6qi
F
htp>,!<a
E
3
.E
i.l
o
o23
t-b
6-.a=EE
!>oEr>!E: OEEE
=E;,t.1
-E lE'.E E-<<.t3BOUE
B,EXlrrr ir.9!
UO
-2 o
Eoo
;l z
(0
Systom
Doscripton Total
Func{onrl CostComponenlr.t CuEont Rdum by Schodule
Pmduclion 1'11,646,270
Tran6mission 25,055.123
Dietibulion 59,196,430
Common 47,685,117
Sumcost
Sconario: AVU{-I7{l Sottement Cage 2019
Load Fact6 Poak Crodit
Transmission By Demand l2 CP(b) {c) (d) (e)
Total Curent Rstr Rovonue
Exp(ess€d as $/tU,ltr
Produc{ion
Transmission
oi8tribu0on
Common
Total Cur6nt Meldod Rates
Expr€sssd as t/kwl
Production
Transmission
Distibution
Common
Total Cunent Unlform M0ld6d Rates
Rryanuoto colt R.tlo rt Cumnt R.lor
ldaho Jurisdicljon
ElBclric Utility 09n9t17
(i) 0) $) (r) (m)
Largo Gon Exta Largo Extrs LargB Pumping Streot&
Soryice GonSoruics SsMceCP SsMce ArsaLighb
Sch 21-22 Sch 2s Sch 25P Sch 3132 Sch 41-49
(s)
Residenlial
Soryico
Sch 1
(h)
G€noral
S€rvica
Sch 11-12
45,111,643
9,976,647
20,634,910
25,267,800
15,228,912
3,671,250
'10,853,569
7,558,209
25,609,640
5,739,727
12,885,978
7,834,655
12,734,393
2,457,988
1,932,538
2,821,080
r3,438,695
2,780,206
325,878
2,600,221
2,109,604
378,134
2,023,619
982,643
113,323
51,171
2,539,997
620,509
246,583,000 108,991,000 37,312,000 52,070,000 19,946,000 '19,145,000 5,434,000 3.625,000
6
7
II
10
't6
1l
18
19
20
21
$0.03882
$0.00848
t0.02005
50.03875
$0.00849
$0.02004
$0.01622
$0 03939
$0.00871
$0.02501
$0.04't09
$0.00978
$0.02740
$0,02329
s0.04171
$0.01 006
$0,02973
$0.03794
$0.00795
$0.02442
$0.01833
t0.03836
s0.00822
$0.01851
$0.01 160
$0.03591
$0.00702
$0.00552
$0.00798
80.03706
$0.00767
$0.00090
s0,03648
s0.00735
$0.000E6
$0.00702
$0.03558
$0.00658
$0.03507
$0.0'1669
$0,03097
$0.00303
$0.19033
$0.03072
$0.00375
$0 10616
$0.0{592
$0.03945
$0.00084
$0.01905
$0.03564
$0.006s8
$0.00541
$0.03493
$0.00t26
50.03351
$0.01615 $0.02207 $0,02070 $0.01207 $0.00790 $0.00717 $g.q'r"9.27 $0.04650
$0.08350 $0.09518 $0,10219 $0.08021 $0,05s83 $0.05280 $0.0909i $0.27164
Functlonal Cost Componcnlr d Unilom CumntRdum11 Produclion 111,418,471 47,048,298 13,852,011 24,902,553 '12,831,153 13,22s,4s9 2,1{8,985 409,98312 Transmission 25,065,275 1 1,203,251 2,903,566 5,336,683 2,508,299 2,665,881 397,509 50,08s13 Dishihrtion 59,191,0$ 31,371,120 8,91i,460 12,017,365 1,970,915 312,054 2J18,079 2,484,30214 Common 47,907,358 26,666,191 6,692,334 7,s33,256 2,810,752 2,543,950 1.,008,114 612,76015 TotalUniformCurontcost 246,583,000 116,209,460 32,365,{01 49,789,857 20,161,119 18,747,344 5,672,688 3,557,130
$0.08350
1.00
00.101s5
0.94
$008864 $0.07670 $0.0s643 $0.05171 50.09393 $0,26655
1.15 1,05 0.99 t.02 0.97 1.02
22
23
24
?(
26
Funcllonsl Cost Componcnts rl Proposed Rclum by Schtdula
Produclon 119,869,116
Transmission 28,111,199
oisribulion 65.427.760
Common 50,608,925
47,326,710
1 1,379,68{
31,765,345
26,867,261
15,929,577
4,061,885
11,838,747
7,998,791
26,789,546
6,412,327
1{,335 517
8,337,610
13,208,909
2,744,731
2,12{,757
2,966,537
13,981,881
3,071,456
361,096
2,743,567
2,246,571
42s,815
2,256,221
1,045,363
425323
55,265
2,150,076
619,737
Tolal Proposed Rato Rsvsnus
Common
Tobl Proposed Moldod Rater
Tolal Uniform Cost
Expressed ae $/tffi
Productlon
Transmission
0i6tibuton
Common
264,017,m0 1 17,339,000 39,829,000 55,875,000 21,001.000 20,158,000 s,931,000 3.881,000
$0,01714 $0.02346 $0.02191 $0.01284 $0,00830 $0.00757 $0.01?31 30.04869
$0.089{1 $0.10247 $0.10909 $0.0€607 $0,05078 $0.05560 $0,09826 $029082
29
30
31
32
33
34
36
37
38
39
40
41
Funcllonll Cost Componlntr rt Unilorm Rcqucrt d Rrlum
Producton 1 19,686,479
Transmission 20,135,043
Dlstdbution 65,384,510Common 50,810,969
49,214,476 14,489,E11 26,049,106 13,421,919
12,515,324 3,259,169 5,990,272 2,815,493
34,{33,067 9,814,286 13,425,932 2,205,242
28,230,352 7,033.102 8,021,995 3,031,917
13,834,380
2,992,374
351,534
2,704,643
2,247,92A
446,192
2,355,421
1,072,112
428,859
56,219
2,799,028
656,547
264,017,000 124,453,219 34,656,668 53,487,304 21,174,571 19,882,931 6,121,653 3,940,654
$0.040s3
$0.00953
$0,02214
$0.01721
$0.04298
$0.01098
$0.03007
$0.02465
$0.03969
$0.00893
$0.02680
$0.01943
$0,04013
s0.00923
$0.02068
$0.01236
$0.03757
$0,00788
$0.00617
$0.00819
$0.03816
$0.00825
$0.00097
$0.00746
$0,037?2
$0.00739
$0.03900
$0.0rr/5
$0.03214
$0,00121
$0.20974
$0.04920
Tohl Uniiom Moldod Ral6s $0.08941 $0.10860 $0.09492 $0.00239 90.06010 $0.05184 $0,10136 $0.29529
4? Rlv.nuctoco.tRr{o.tPrcporodRit r 1.00 0.94 1.15 1,04 0.98 1.0'1 0,97 0,98
43 Cur.il Rmnu! to Prcpoud Cort Rrllo 0.93 O.Et l.0E 0.97 0.93 0.96 0.90 0,92
44 r.r!.tRilw.trom.lo 17,1tr1,000 15,401,000 (2,651000) 1,41I,000 1,54,000 ,3C,000 62t,000 316,000
File: AWE-17{1/ loElec Ss$6n6nt COS LF PC Motod/ SumcostExhibits 2019 Rete Y6ar Paga 2 ol 4
CASE NO. AVU-E-17-01 SETTLEMENT STIPULATION APPENDIX C Page 4 - Cost of Service
27
2E TranrnlBaior
AVISTA UTILITIES
Rovonuo to Cost by Funclional CompnentSummary
For he Tryslvo Monfis Endod oocsmb€r 31, 2016
AVISTA UTILITIES
Revenue Conversion Factor
ldaho - Electric System
TWELVE MONTHS ENDED DECEMBER 31, 2016
Line
No.Description
1 Revenues
Expenses:
Uncollectibles
Factor
Commission Fees o.oo227s
ldaho lncome Tax 0.0s1264
Total Expenses 0.0s7702
Net Operating lncome Before FIT 0.942898
Federal lncome Tax @ 35%0.330014
REVENUE CONVERSION FACTOR 0.612884
2
3
4
5
6
7
8
1.000000
0.003s63
1.000000
0.003563
o.oo227s
0.005838
0.994762
Revised per Staff_PR_079, Attachment A
CASE NO. AVU.E.17-01 SETTLEMENT STIPULATION APPENDIX C Page 5- Rev Conversion Factor
APPENDIX I}
o.g
oU'oco
I
!i
@oo(oil
x-EEE€UE
E g5;rr<E
c^l
.+oot-.
ooo
h a{ r-.<)iF
tm\.\N6O\ \tN\Orr tf,
F-6\OrlF- \oo" oi '{['-oN \
oo\oo\o!f,r)<)+oo<tt'.- \O
or-. oF-nNJYt+O\O
o\
r-c{
e.l
oooooo
on|.lrlo\$o\o\o t-
r-
l.l.+
o
o-h-Oi\Otto\rN-\OhF.
--l-a.l<3^i.i:--olt--Ots FnH-b .j\ s
! .ii'6 c.l
C)&
oz
$.+Or|<3omr-+o\o \o rt a.l ..Ioo \o o\ .n €A
-rhh*.E -€orE oirionp
o&
AEA6 AQ 6
6eq
s4{,4 g sq
.+
\o.d
oi
tc*\o
c.l
e*
oa
(n.., rrlf;8i:E>Ot-E!t]"auU)
-.1
EoIZQ--oa-Hqrt(J (' r\&d
J
O
3pstn>-)2.&Airi LQ trlaal(Ja
oxozLlJo-o-
zotrIfo-trvlFz
t-rJ
LIJJ
Fl-rJtll
el?r\F,lI(,
I3
@4
tn$vI +"o a-.1-O\\oo
oO l-a.l a.l
eq4
hoo<<)F61 ,:<
c.l O\=tn6 -O-
(,gs4
C)HO-oo\
f-hc{\+al
Gs4
\o o\\o6hoAodoh
GG6
oooooc)
F-6OO\ c- c-:Ocl
@sa
.++\o c-,a-.t \orq <>ot6Fr
mr\
c-
N
\oo\
e4 4
C)Ho-trl c.l
-l oi< c.t
@6@
oooooo
alo(\lhooo\o:oo
OrH.+$
@@
9A'59
-4J92H(Jo->a
ovF
ea4
9G
=o4N.,< E1., IH6o->6
o9F
Y\ gq 4q
>rxoodaLLooEEoo
a6atOO
'Boc)zzv I
*@G
@6
c.l
e.t
a-l-l
F
F
0Grh
3
€EzQrEq)6r=
E1 U
ll 96ov)r
=sH= G>
-,FcJl{{\o-FtE5gat 9'ts
E E E#E;AEC a4 o'.Eg)giES
T-Eg!e,a*
E E.F{
n-<.1E A'i
,-YI\(n\JraOo{
F.5irr
GlOZ*E0)
trrsa)
0)e
c-t
ooo
;i
o
9aYEFe9-3I E&.,o?5 E t,H'AzE E;ca8o; O E 30N=,\46bd';sb>trd3><<c0u<
C-l 6 i+ r, \O
^o
is
v=/()o
oooo&&
oodE
€'€'
oo()U
1, iorDOxx
F< r&
<
J*
co
C,56ig s?-.id=
3a Ii'-t 0e9e
= ,rr b0H+!LE!:Io0+E EL'o o€
-{ c} .2l)u)h
ooo,=
E\ocJ
\o \o
J.l
JJ
ddoo-o -oaa
.F\
^80 80-'r,-E Egcg ecq F.l c/) cn&+ o r.(i-f, E I
BE 5 E E>.H o d 5
EE FE Elill >, /\zH Qr Ea-6X tr qtrceNGqEr,qboE# o v'E H'EFEcPE9Ef,i€F€,-vokLh?o60. r{!-
E 3 E E gE
.+r,\o g €
Ico
o&haortx
oiF>.'o cts=Eotc(rvH O rrELX2Ei)Eedaee39c)5'6 H<&il
EHHA EA-o-8EEl-al1
:N?n
a
(J
CL&
E'
oL)
E'o.xlJ-
Nooooc
+
Or-N
cn
C\-l<t
oxozlJ.JAd
zotrs
=dtrahFzl!
trlJ
Fl4Jti
oI
r..lIIIl
c.tcoN
@
=1,\o+
a
:f-t:
o.lo\
f\N
a
()bo(u
O{
\o\n
ao
C.lF
cn
a
ooq
co\ocn
N.t
$O\o^
oor-
vaaf-
No\oI(a
e
c.ltat
O
\o
ooN
e
C)bo(\,A
()
o
H()
o&
tr
ilt E
bl 5sl <sl u
sl E
il p
<! rJ.
a
c{
HC)
Eo
v)
UtrC)
()-
c)
()&
*l
o
ts
.n
€'
IaoU€ox
frr
co
d
6a
G)
tro
(.)d
V)'.o)
tro
a/)
=O+.o
F.(.)-o
zLrcl()
U)o)t-.
N
c.i
t
cl
rr)q.)
NJ0)
oU)
.lF
trd)
Ho+,v))(J
tC)o{q)
=tro
o)&
(D
E
ah,€'
v)o().d
o)Xt\
cn
.r)l.rotr
o
V))()
+ro
()p
tz
do
U)o)F-
C.l
H
G)aa)9 'rl Pd
HI E
!l Esl=sI€,tl;
s{8El r
,xl E
a
c-\o+.+
CN
"+\o
oor--
e
c-l
G,
clo
C)atrC)
or'.
E!*g-s.=501
EEA.)=az
6l
Aq)
U)Ofr
(l)IL
a
e()
6lL
cl
4
oq)€ErE i=l{0v!'EUa
E*s9 5>6)irE
8E&EEHi#.E;9r4DZEr)s?E!it:;U;"1E-9i,fr:+l= (l) !'r
6E?r6lGt=Lr!*5zy
E{)
Eao
(l)
6)
ti
s:
boc'a
.!
lr1
I(n
ouo(!
CL
-^te- F.l
.i di
ii t*
tn
t;t;l!t-'
t,lilc'
t;
IJ
ln
l=
l"
ld
t:
lI
t,
l$
l=
lF
t;
li
t:
IF
t-lrl*
I r:.II
l=l=
l9
t,
IF
-t
rij €l
e'l
;:
-l.Jj
i.., hl
ex1E
r
J
-xo. F.
;
B.
vi"
a*
rN
9a It$a a6
3.H
;
8-
+S
j
1
3r*
8F
6
IgIT
J
q
{
I'
ei
,d
d
q
qs
F
dE
R
d
g
j_" rlI
oxozl!o-o.
zotr
J
-1o-tranFzul
LrJJ
ELU
FtoIt-rJI(,
IJ
s.
e
!6Bott
Be?<_ !:EEfg#,88Fqz
Ea
c
3
I
.9
3E
B23
ts
)!
F
.fi?
z
T
H
iitEfr*EdgBgEEJE
{?E{
HE E IJSFO
s:l:$ s E
:-o-,,1 IiEIBh EsttiE EPi{E-! !{ sEi E I
ss E #E E
****1"*l
6'
^9 ^E -3 ^€9x Px P, Bxda aa ea de
B
NE
3
P
E
."t
Il
{l,BI
JI
B.J
HclHgE EE
EI 5E gE 5r gr
fl", Fq Bq E& E&
flIl S; sE 3; 3A
flf,$EggE$fEnfE
3ilE$$ ll$i flgqs $Ii
:t!:!9r:9RFSFiFEE*A
g
3
r'eB
FE
a-.!!g ?E
t*tE
EgisEdl 1
o-Nr.{9F,69
o
A
Ea
I
P6<((J
Ea2eiaoEEtc
elg9* 4.9 dEEAH€ ii
E t.l s
f E;E-s.iE;d!'3!
.E 1.ar 5d 8<=.oEfr6i-!a(fH 95 !3ii>.9 2'<It
,E 4-E L
E
E
gio
a
3
a
e
AVISTA UTILITIES
Company Settlement Summary by Funollon with Margin Analysis
Case 2018 Revenue For lhe Year Endod Decembar 31, 2016
(c)
Line Desqiptlon
(b)
Natural Gas Utility
ldaho Jurlsdicllon
Functlon!l Cost Compononts rt cunent Ratet
1 Production
2 Ljnderground Storags3 Dislributlon
4 Common
5 Tohl Curont Rrl6 Rovenue
6 Exclud€ Cost ot Gas w / Revonus Exp,
7 Totll Urrgln RevGnuc rl Curcnt Ril€s
Margln p€r Them at Curenl Rates
I Productlon
I UndcErcund Storage
10 Dislribution
11 Common
12 Total Curont Margin M6ld6d Rato porThom
40,649,000 t1,196,097 6,960,421
33,'6,150,,121
439,493
1,690,952
26,983,600
11,431,954
313,065
1,145,425
21,855,72'l
9,850,686
123,154
512,681
4,825,616
1,489,089
0
0
0
0
3,273
37,966
268,244
92,179o 401,683
0 401,063
s0.0051 5
$0.01985
$0.31627
s0,13399
$0-00529
$0.01933
$0.37003
s0.16652
$0.00529
$0.02203
$0,20737
$0.06399
$0.00000
$0.00000
$0.00000
$0.00000
$0.001 13
$0.01313
$0.09279
$0.03188
10.47520 10.66ti7 10.20067 30.00000 10.13894
13
14
15
16
17
18
19
21
Func{on.l Cort Compomntr al Unlform Cumnt Rotum
Pmduction
Undorgrcund Stffige
Dislrlbuuon
Common
Totsl Uniform Cunenl Cost
Excludo Cost of GaB w / Rev6nu6 Exp.
Total Uniform Cur€nt Margin
Margln per Th6m at Unitom Curent Retum
Produclion
Underground Storsge
Oistribulion
Common
Totel Cunont Uniform Margin Meldod Rats psr Them
25 Margln to Cost Rrtlo Et Curonl Rats
/o,519,000 u,510,524 5,638,029
430.493
't,647,826
26,939,249
't1,522,432
313.065
1,218,A29
22,869,870
10,108,759
't23,1 54
391,188
3,802.038
1,321,649
0
0
0
0
37,809
267,U1
92,O24
'10,540,000 3/t,110,624 0
0o0
5,638,02S
0
100,u7
0
$0.005't5
$0.01931
s0.31575
$0.13505
s0.00529
$0,01681
s0.16338
s0.05479
$0.00529
$0,02060
00.38660
30.170A8
s0.00000
s0,00000
E0.00000
$0.00000
0 400,4,17
$0.001 13
s0.0'1308
80.09247
so.o3i s330.4752C 30.eS$0 to.21228
1,23
30.00000
0,00
30,1CC6,t
1.000-96'1.00
Functlon!l Corl Componants 8t Proposod Rrl€!
26 Produclion
27 Undorground Storago
28 Dist.lbutlon
29 Common30 Totrl Propo8cd Rrle Rsvenuo
31 Excluds Cost ot Gas w/ Revonue Exp,
32 Tot.l Margln Reyonuo rt Propored Rrtet
Distributlon
Common
Total Unttom Proposed Cost
Excludo Cost of Gas w / R€v€nuo Exp.
Tolal Unitorm Prcposed lllargin
Msrgin per Thsm at Unlform Proposed Retum
Production
Undergrcund Stomgo
Distributlon
Common
Total Prcposod Unifom Margin M€lded Rat€ p€r Thsm
50 Utrgln to Colt Rrllo il Prcposed RaloE
41,720,000 34250,09700
439,486
1,755,668
27,86'1,32"1
'I 1,656,320
313,060
1,205,029
22,690,377
10,06'1,430
123,152
521,349
4,899,720
1,501,200
0
0
0
0
3,27X
39,489
277,230
93,690
?,0*,121 !
0
4't3,303
00
Rales
35 Distdbution
36 Common37 Total Proposed Marpln Meldsd Rat6 per Thcm
Functlonrl Cost Compon€nt8 at Unllom Propo3ed Rotum
Pruduction
Undorground Storage
41,729,000 34,269,097 1,015,121 0 413,C03
$0,13662 i0.17008 $0,06451 S0.0O0OO $0,03241
30.4E908 10.5793't 30.30275 30.00000 30.141t00
38
39
40
41
42
43
44
45
46
47
48
49
439,486
1,723,320
27,826,3't4
I 1,739,880
313,060
1,274,669
23,595,605
10,2$r,777
123.152
409,1 10
3,953,172
1,346,360
0
0
0!
3,273
39,542
277,537
93,742
4,t,729,000 36,483,1fi 683,t,706 0 41a,094
00000
$0.005'15
$0.02020
$0.32614
$0,13700
t0,00529
s0,021 55
$0.39887
30.1741 1
t0.00529
s0.0'1758
$0.16987
t0.05786
s0,00000
$0.00000
$0,00000
00.00000
$0,00r 13
$0.01368
$0.09600
t0.03242
f0.59982 30.25060 $0.00000 t0.ta323
0.97 1.21 0.00
0.94 t.t9 0.00
t0./o909
1.00
0.t7
1.00
0.97
Page 4 - Cost of Service
34 30.02070 to.o2o37
51 Cur.nt ilrrgln to Propolsd Cotl R.tlo
AVU-G-17-01 SETTLE M ENT STI PU LATION AP P E N D IX D
(d) (e) (f) (s) (h) O (k)
Resid€ntial Large Firm lntenupt TransportSystem Servlce Servica Service ServlceTotal Sch 10, Sch 111 Scfi 131 Sch 146
00000
Lo
UolJ-c.9
q,
coL'
I
l,)obo!!
CL
\o
<fo\qo
r-Or00N$o\
sfrolnrooqo
oc)oooq
Fl
coo
c-rnqo
o
oxoz]rJo-4
zoF3lrtrthFzl-rJ
l!J
FIJtn
F{oI
r{I(,
I
J
cam00c.l
9o
.o\oc.l
ci
r--clc\
-i
\t\orn(r)Oo
oc)oOoq
li
I
tu
Pco
EE(,(!
ch
o
IE
CL*t
.Evt
oCL€c,.9
oE
*
FU
trrz
cn&
14
zo(J
HzI!
I!il
\oo\
aa
G)xd
F-o
ootr
GItrq)€o
Ptr
F
f!()L€(l)
mo
Eo()
00tr
GIli(Do.o
oz
a()
tr0)o.xH
cloF
Xfitt"
C)
ot)
(.)
(!ao€€
a()il)tr{
Ho
EEo(.)
o€..E09a*EOooci(!a -l
o(u
(D
0)&
o
o
L
ge
:eGIj(ailH
E EE
E,i BEEEeEH'EenFo=fr)DiEElOE'Za9.Er-1(r) oAal-5rHv-BeHa >.azeEg
H
Flfr]
BF
cn\t|.l\oF6oE
Fi
c.l
lgl
t.rt
(\lNoqo
,l
APPE,T{DIX E,
o.g6UIoco
IFIoOD{!EL
EEE€OE
E.g.EXIr<I.l
e.l6doO\
oc>oo
<)ooohtNHoOOdFNr,n
6@
otoorho\o c.toO\
oi odsl 6l
6e
rar()Ortor\a{ .-l -tc4 O\<lnO\ \O
@@
o<tO\ootltOGIO\n?.1 t-
4@eea
aaaeo^ o^ o^ o-F.'ciOQo\r\No1-O<>6.1ma-n66
ge,
OOd
$\ooooh\o(l.-.+ c.l
c.l00
ciF.
r-
c.l
o\oo\
@4
o+oo\OH-foic{ cino{c{ <)<$
@suva4
oooooooo
NOOc.ltat 0a (\l n\O-EO\O:i(\-f i+
64
9A69
.EEQ2
al(JfaEZovF
694
EAx()85v9E()o->6
o9t-"
aa G
xx
oo6ALLoc)
oo99(J9B}o0)aa
6e4@4
\o
0.,r El8pdts>at- & lJ)oH5
a
o.
.H-O'6tr'.€Va.lHHr-
-.+HHo..l.I-<-tsOts r-\EH-6 .!€- @! .aH,dN
0)d
o
.++or)oOoF$O\o \o + at .;oo \D O\ ao eq
-rhh+-E F\Oo\
6h
0)d
€a-
€Fco \oc{rol t"c?l \o
F- oO C-l
l-.Q-
oo
OoOF-<l' \Oc.l oO
C'- \O
o€ t--t-- 6lt! FjY+o\o
6
F-c.l
a.l
aa @
6@ @ @
F.1
Sdrrll]];
oa*!!triqrU)()&a
J
o
CnE#=52.dai:.i rr.l r!e'5
U)
UJxozlr.lo-CL
zoF5fGtrvlhz
IJ.J
=IJJ
Flr,lt))
Flo
l\F{It9
IJ
oz
trlv,
I
€) V,
r+ o\ \o60\m\orr!nra.d tI .jh Y 6o(ao\
e9v4 g) a
$o\l-O
N€N6rN0aN-l
t-.Ot-
oa
?
6lzQrEC)
taU-AB#3.EeR
= ci\
-t-.JFI\
S TE
-!9E.9dE8.E E OFEEBtrD ACI at' r- (l)E9EE.r: g F(<-8EEe .1*€ ,Er- F{#;g'A!ka>9s{
clXiE6toZvE(l)
ao
lI)
(Dn
6l
ooo
.E
-.1
0)
E
9a6gg"LE!o9E.-Q-.9-Q
E E 8.H'kZ€.ET.Ao' ,t 9 c)$E Y H Pbd';Eb>trcl 3><<ou<
almsfh\gts:tsii
^oE*l
:<
()()
oo00&il
ooEE
€', ?
ooC)O'o 'oooxx
o\
J*
6
E u-<r> LUo,,. d ,
-o(J I
i'JU Oe 9e
fEdHvE
o o+E EUo oEt:E o:t6.xl)atL
€o\3
€\o
J
\O \OtreJJ
JJ
(cdoo
-o -o
aa
.N
^80 80.n-E E9cg Iq F.] (, AE* -o -6
B4 5 B g
)..5 q;6 d-* p€ nE-U EE Ei4jj >/ /UY0*--B& E Etr ce 6 saF&6g t 6.E e.EF:6UrioEg*fi€E 9 E A 8.1
EiS#88
+-.\o g €
o
o
o&bao*\-o
li o u-l
-dd-aOOEubbs
JEH6
E g g?!trtr3'UHHEEe& 6
2 C C-JOOD!'E E d.t A O*sEtsoE38 3rh-orlQE h EEou()oFi>>F
-orSo
@s4e@
ooooooooooooo|r)0\+rlO\0Pcoo\\o l--
L,,o-E
IA:
1!t
6o()
E'o.xlJ-
INoo0(Eo-
no\oo
C\l
crl
N$c.I+
l!xozIJILIL
zo
-l-3
=o-trvlFz
Lr.l
l!J
FllJVt
ri()INrlI(,
If
dz
trtv)
L)
C..i
E
(!
v)c)
IEo
o(A
.{.
e
ont*-\ara
4
N
ti()
Eo+aar)tO
F<op<
(.)
C)
o&€g()t
a
€'
aoU€ox
tri
c-l
=fo\o
oor-
(E
(u
o)
co
0)&
(n
()Fo
U)a(Jqi
Lrop
E
z
c6()
anoF
(\l
r-
\o
tarr-\o$
6
$o\o\6io\o
ooc\
4
oooclA
o7trlIp,
ill E
bl 6sl <SI U
st 6vl cileel ii
oo\
=fsfq
co
a
\oo\\o
cr.cft
e
C\l
(.)troIU)
C)
HoAo
o)
C)&
()
V)
€'
U)oU.(,
(,)X
frr
ca
.+
\o
oor-
oooooo
c\lc.Icn(n
e+
ca\aocft\o
o\c\I
q
e
o
(g+l
a
C)
HG)
G)r',
obI)dA
p
U)Lro
EoIU)
U(+ro
tsro)-o
H
zk(d0)
U)0)t-
c\l
H()
CC)*sr
E,\l 9LIEsl Esl 5Sl t-
6l ;
sl s
EI E
EE*!loi€
EEi9daz
ct
(DE
v1q)
q)c,L
oa
k(J
GI
E6lz
^loe)€EEj=
-UIv=EUa,
Ers'95>(l);.{il
.gE&EEEEE5EE?g i.i5'l s 'ii'E<_3<=9RT.
t,Q;i,H:+
5EE
GAtrE
E5Z .+to
Ec)
Egoo
(Da
ii
o0
.Ea-.!Etn
I(n
0)ao(oo-
88 _.,r:
.r.J
8A
68
i
i8.I
sg
3 c.I
.i
d"
jL
=
^tE
B
I.i
!Yi
:
6
;j
ri
F;oi
ri
1
i.d
I
6b-
6
j
f
a
.a
d
x=
3[
s
tl 6IE
E"'€
I
t
ot
I
EEft{8€8>{!r
EAAFlZ
I
q=
dci
a
I
Y
c
d
I
s
a
q
8
d
sI
=
IJ.lxoz
TUo-o-
zotrJ:)CLtrVIFztrJ
LI'J
FlrJth
rloIt\
F.{
I(,
If,
dz
lrlttl
(J
Lo"
-s
8*
$"q;
I
ilIE
E+5
e
3
c
IE
lrlF
t:
l'l=
0
E
9d9E T=s EEa:i+sd
{EX3{ 3*t{{ s E Ei
.E E F}d EI
EEBgrBEEoJEFdSz?
s?;! $
$:"dEBi?lfj*i;***siEi
iiE??{}!.r: E E a3
dff
pza6|g,,d!s*EAai;
EEE!BEEEgEgE
-a _u -o -o$r Hr $r Er66 06 dB 66x, Etr Ei r,trll fi$ Hs Hs Hrtnl -gE -gg -6E -sErt *o? ts fu r! s!xl sg Hs! s 8E llr5il Xg H}E $ IE !]EE
tlBIE $r+ fl5i+ $rE
re6
!oE
E
Et_s lEc_,* E
H${ i
i-lUI
&t
'J
g
(j
rl
itEI;l
at
8I
ii
5l
I
Ib
E
E
HE e.JE!{r 5gtx
fl! 3
r(*rteFo69=J
J!<
o
Ee
BZ
a
ra<((J
2=
^o
5EE?^ 5.9 i=EtrF€ 3<O EF<9& -.:6.: ig ETE -
5.-ii?6!'3E
.E 1+r "'d 8<=v !rl!,:*
-EaOr.9:J !
c9-I x(ia,E!=z* Ec
E
Ecc?r
EI;
AVISTA UTILITIES
Company Setllement Summary by Funclion wlti Ma.gin Analysis
Case 2019 Ravenue For the Year Endsd December 31, 201 6
NaturalGas Utillty
ldaho Jurisdiction
(b)(c) (d) (e)(0 (s)
Resld6ntlalSyslem ServiceTolal Sch 101
(h)
Large Firm
Service
Sch 111
0)
lnl6rrupt
Seruice
Sch 131
(k)
Transport
Soryica
Sch 146Lln€ Description
Functlmil Cort Componcnlr rt Cumnt Ralca1 Production
2 Undergrcund Storags3 Distributlon4 Common
5 Totrl Curront Rato Revanuo
0 Excludo Cost of Gas w / Revonue Exp.
7 Total lr.ryin RivBnus at Curent Ratsr
Dlstdbution
Common
Totsl Ljnifom Curent Cost
Exclude Cost of Gas w / Rsvonua Exp.
Total Unifom Cumnt Majgln
Margin per Thorm at Unifom Curent Relum
Production
Undorground Storago
0istribution
Common
Total Cun€nt Unifom Margin M€lded Rate psr Thom
25 Margln to Cost Rillo !t CumDt Rals
445,533 318.080 125,127 0 3,326
1,642,040 1,099,594 505,097 0 37,348
26.376.438 21,361,097 4,7il,2$3 0 264,058
, 12.083,900 10,418,126 1,568,914 0 96,950
t10,5t19,000 33,198,897 6,910,421 0 40t,683
o0000
40,6'19,000 3t,t98,t97 8,050,421 0 401,683
$0.00523
$0.01925
s0.30915
$0.14163
$0.00538
$0,01859
$0"36'r0s
s0-1761 r
$0-00538
90.02170
$0.20417
$0.06742
$0.00000
$0.00000
$0.00000
s0_00000
$0,001 15
s0.01292
$0.091s3
$0.03353
30.,t7t26 30.66fi7 30.29867 10.00000 10.,r38e,r
00
13
14
15
16
17
18
19
20
21
22
23
24
Funcuon.l Cost Compononlr rt Unllorm curcnt Rctum
Production
Undergound Sto€ge
446,533
1,593,144
26,524.087
12.1 85.236
318,080
1,178,383
22,372,220
10,704,143
125,127
378207
3,492 422
1,384,968
0
0
0
0
3,326
36,555
259,444
96,125
40,649,000 34,5r2,E24 5,680,72t 0
o
395,450
no
40,549,000 34,572,828 6,680,72C 0 396,450
$0.00523
$0.01 867
60.30854
$o.'t4282
t0.00538
$0.01992
90,3781s
$0.18095
$0.00538
s0.01625
00.1s887
$0.05951
s0.00000
$0.00000
s0.00000
$0,00000
$0.001 1 5
$0,01264
$0.06974
$0.03325
10.41526 $0.5e4t3
0,96
t0.13678
1.O2
t0.23981
1.25
t0.00000
0.001.00
Funcllond Cosl Cmponcntr !t Proporad R.t.r
26 PrcftElion
27 Undorground Storage28 Distnbutlon29 Common30 Total Proposod Rate Rrvcnu€
31 Excluds Cost of Gas w / Rovonus Exp,
32 Totrl Uargln Rryonu. rt PropGod Rator
12,546718 10,853,'116 1,593,609 , .""" 0 99,99342,&t9,000 35,289,8s7 7,1t4,421 0 424,683
00000
42,8,19,000 35,209,097 7,13/,121 0 424,C83
$0.14706 $0.18346 S0_06848 50.00000 S0.03459
10.50222 $0.69861 10.30858 30.00000 so.l,OEg
446 522
1,7U AA7
28,073 873
446,522
1,740,442
28,028,889
12.633.547
3',t8,O72
1,215,64
22,899,245
318,072
1,287,037
23,766,435
tl.098.418
125,124
522,147
4,893,541
0
o
0
3,320
40,277
281,097
36
37
38
39
&
4't
42
43
44
A5
(6
47
48
49
Common
Total Prcpos€d Msrgin M€lded Rate psr Tmm
Functlon.l Colt Componantr rt Unlfom Prcpo3ld Rclum
Production
undergrcund Storage
Distributiil
Common
Total Unifom Prcposed Cosl
ExcJude CGt of Gag w / Rovsnue Exp,
Total Unitom Prcpossd Margin
Msrgin p€r Th6m at Uniform Proposed Retum
Productlon
Und€rgound Slorags
DistrihJllon
Common
Total Pmpo66d Unifom Margin Moldod Rats p€r Thm
a2,Et9.000 3G,io9,963
125,124
4't3,080
3,983,412
1,435,500
0
0
0
0
3,326
3S,925
279,042
99,628
6,957.1',t6
0
0
0
121,921
i12,ta0,000 36,469,963 5,967,116 0 421,921
000
50 Margln to Cost Rrtlo 6l Proporod Ratr!
51 Cur.nt Margln lo Propolod Cost R.tio
$0.00538
$0.01775
t0,'171 t7
$0,14807 t0,18781 ,,, ,$0.06169 $0,00000 s0,03.r46lo.Eo222 30.61660 f0.25690 10.00000 30.14;e{
1,00
0.96
1.20
1-17
0.00 '1.01
0.00 0.96
$0.00523
$0"02039
$0.32852
$0.00538
$0.02176
t0.4017s
$0,00000
$0,00000
$0.00000
t0.001 15
t0.01381
$0.09652
0.97
0.tt
34 $0,020E9
CASE NO. AVU-G-17-01 SETTLEMENT STIPULATION APPENDIX E Page 4 - Cost of Service
Margln por Them at Curant Rateag Productiong Undsrground Storage10 Distributlon
11 Common
12 Totsl Cutrent Margin Meld€d Rate perTh€m
Lo
(J(!lJ-c.oIALo
troL)
I
Lr)
OJ
UrO(E
CL
EEu'lelr
lrJxozl!o-o-
zotrs
Jo-trtt\Fzl-rl
EIJ
ELr.tln
rloI
FlI|oIf
cjz
t-rJvl
U
co€ooN
9
v
c)cono
tr-o\cool\lqo
crto
t--raqo
\oc.l
rqo
t-c.tNOq
O
'+\o
ci<)
o
o
Oooqo
6lh
c(lJ
EEC.,
rE
oi
o
I&,
CL*tq-
(DPar1
oo.
!lo.9
o&.
&oFO
I!zoa&F]
z
U
H
zril
rrl/.
\06\ra)ro
CIrF
6)cot)
G'Lc)
oIri
F
Aok€(l)Eo
Eoo
ao
oa
oz
q(l)qtro)o.xI!
o
F.
xctF
C)
EoIJ
()
fit(/)
(l
oc)C)Ir
o
O
G)
E
gEEOooo.cED
q!)t
o
{l)&
o
a
(J
a)A
EoN-ra
&Hlrr:Eau=v)9;AiE fi AiiHErEF'EenHO=EIpzi:a1d EzdUSrrlQhOAAF=tr+(ZEgF-l?zEEE
H
EIH
Btr
\OF-o(\l c.r $oc:
Fl
tnoz
APPE,NI}IX F
(o
o
()(,)('
0-
qo
3<
<l-o-€;TELt!e>E tIJOJOLELgir,' aE5oi
=F.EFor4 [,lJo)i>b<
E
e-E
E$
a5OF
Uo
EF
,TE.4,
.85fis
SPIoto
EEEE<EEEg?
5bE! -oE O*R.EiE o.o.H (/,
EE tbadoY' -AEt!E,I
st* Hrl= aEl5 a'tc <
OE
iioEoao
EoEI
b-No
E
co
pq
o
dtEI
=lol
rJJl
sssssssl s"1':d?.!.!aqledNNNdNFld
ooo@to@t @6NONN@NIO*oOoo-ol Oooo@$lNN{ONNOgtsEaaoqB
sssssssl stlt9qololq.!lqoccccoolo
OO6OFOFI FN6NF6O4FoFoF?o{6qo09-_
O@OOFOtsliFOOFO-@tiF@@NNFdo
N-ooooo.r'qq
FTNON+{l@6d6N6l@nFt600lo6-0@oodoldF*@N?@dOF6OAeAqa
*XSSSrt:q:roF600cDlo ?NeI
O@OOFOFItNOON@F@l+F@ONN-qoci66q66oA
ooN@tso{to@FONO-Flts--€.F-@-o.€J{-66{OO60l 6FOONF946F66OqNoo
NN.NO---N-I?tso-1:F'-nE5
OOOF@{rl FoNNO606lo-@-@-o-lo-@Jo-FO6-OOOltrOONN@d@
-gOOeN@@
R
Ee+'" 9t8,9bm-E c:)
rgBgEE
EEs
EcB
Eg**od*
- E9B EsEE 9ii-ssEge6
EtsF6a
f;goU
.Eg6OELOo
ootrin53EaiPet
gEE
q-
Fe
oo.E
sB'rEg,oo-.4gE.E H;. EpE H S53E EH;6 q E 30.g E gE E 3F.e85,XSi E
FNOto@ts@
z
E:E, od
e&gocl
oEoo&o
o
8.
F
oc:
cn
oNJaa!
co
tl,
Et)otut
EH
Eo
EE
-E6
:r:llt:eS;llq.qqt:dlc?o!\:l ?l
:eSSiBie**l*ONtstsOFdOdo6ricio'ld
N{NONtTl €666N6N616_ D_ F_ r_ 6^ O- OJ O-60@oo@ol @r{ONFeq@e66b6Nqq
:cSr!Sre:R:q:s!aq\q.q-l cooo6000lo
o666000tFD@{INAtFNFFON6qoq0-
slrssrr:es:(ECrtolo!q.Yqh6o6oDolD
ooN@Fott o@F@NOFrl F
- r-: 6_ F_ @- @_ @J i.60{ooool oroON?q5oF6OAAqa6
OFFNNOOI O@@-@AN@l @e@@FtsOsl @to';.i66Aola,iaq@6
-66?61 +ortsi*6Nl d@.o.o-O-lt-@J6.6tsNOOOOI@OOOFeOq*F6@@6No@
NN.NO
FN"o*
EEE
EE6t-Es
-E6F3aX€Ef,*
-69sEsOE Pd.O.EE#
6otsF
6PoEoUJ
oFFNNOOI O@@F@6N@l OF66FNOFIO@--_.i&ooa.rt9o6?
6tA@F$Ol A{d@+GFol60@oo@Ft oN_ooooo_D01-_r6o-?OAo?aOODNqo
EoEeIJco, o!
3(gtf
5;tei.ur6;TNr8;,igf;^goE. tFZUJr -
iuIE=ZtiuoE
EgfiHg*89P
u6'
EH*=o-K.
_6aboc'o
60c
=JO6EE
E adPat
gEE
tsE:ge
Nd6-
E_o6
F$
Eao8o'rE9gE.g Hi,EE.EEgEq€EEEo.5E.H..!6lla=+6B 5 HK.U E Ed/.j-lrdoIa
-NOqn€F@
EIoNJaG
co.a
o
oo
lu
o
ocJ
EpEo
fls.6
;e:r:ere*:!rElqq.!cq\ql0{o{{ool
AVISTA UTILITIES
IDAHO ELECTRIC, CASE NO. AVU.E.I7.OI
PRESENT AND PROPOSED RATE COiiIPONENTS BY SCHEDULE
Effective January 1, 2018
Residential Service - Schedule I
Basic Charge
Energy Charge:
First 600 kwhs
All over 600 kWhs
Base Tarlff Pr€sent Present
Scfr. Rate CIharAdi.(l| Billino Rate(b) (c) (d)
$s.75 $5.75
(a)
General
Rate
lncllDecr)
(e)
$0.25
$0.00486
$0.00543
$1.00
$0.00513
$0.00192
no charge
$0.25lkw
$0.00340
$0.00290
$25.00
$0.25lkw
$0.00200
$0.00r69
$500
$0,2Slkva
$50o
$0.25lkva
$0.25/kva
i1.00
$0.00sss
$0.00473
Schedule 97
Earnings Test
lncrease
(0
Proposed
Billing
Rgtq
(s)
Proposed
Baee Tariff
Rate
(h)
$0.0E935
$0.09977
$0.t0217
$0.07408
no charge
$6.00/kw
$0.06662
$0.05686
$425.00
$5.so/kw
$0.201kw
s0.05499
$0.046s6
$14,000
$5.00/kva
$0.20/kw
$14,000
$5.00/kva
$2.50/kva
$0.20/kw
$0.r0160
00.08660
$6.00 $6.00
General Servlces - Schedule ll
Basic Charge $12.00
Energy Charge:
First 3,650 kWhs $0.09704
All over 3,650 kWhs $0.07216
Demand Charge:
20 kW or less no charge
Over 20 kW $5.75/kW
Larua Gansnl Servlcs - Schedulo 2l
Energy Charge:
First 250,000 kwhs $0.06322
All over I (2) lnctudes all preser $0.05396
Demand Charge:
50 kW or less $400.00
Over 50 kW $5.25lkw
Primary Voltage Discount $0.20/kW
Extra lame Gqnbral Servlce - Sshedulo Zi
Energy Charge:
First 500,000 kWhs $0.05299
All over 500,000 kwhs $0.04487
Demand Charge:
3,000 kva or less $13,500
Over 3,000 kva $4.75/kva
Primary Volt. Discount $0.20/kW
Annual Minimum Present:
$0.08449
$0.09434
$13,s00
$4.75/kva
$2.25lkva
$0.2o/kw
Present:
$0.00267
$0.00267
$0.08716
$0.09701
$0.0004'l
$0.00041
$0.00041
$0.00041
$0.00041
s0.0004t
$0.00041
$0.00041
s0.00041
$0.00041
$0.09243
$0.102E5
$0.{0595
$0.07786
$6.0o/kw
$0.06953
60.05s77
s425.00
$5.5o/kw
$0.2o/kw
$0.05428
$0.04s85
50.10507
$0.09007
$0.00337
$0.00337
$0.002s0
$0,00250
($0.001 12)
($0.00112)
$12.00
$0.10041
$0.07553
no charge
$5.7slkw
$0.06s72
$0.0s646
$400.00
$s 25lkw
$0 20lkw
$0.05187
$0.04375
$13,500
$4.7S/kva
$0.20lkw
$13.00 $13.00
Clearwatar - Schedule 25P
Energy Charge:
all kWhs
Demand Charge:
3,000 kva or less
3,000 - 55,000 kva
Over 55,000 kva
PrimaryVolt. Discount
Annual Minimum
Pumolno Sewlce - Schedule 3l
Basic Charge
Energy Charge:
First 165 kWkwhs
All additional kWhs
$704,290
$0.04308 ($0.00128) $0.04180 $0.00t44 i0.0004t $0.04305 s0.04452
0l{,000
$5.00/kva
$0.20ftw
Proposed: $730,740
Proposed:
$l4,oo0
$5.0O/kva
$2.5O/kva
$0.20/kw
$657,720
$13,500
$4.75lkva
$2.25lkva
$0.20/kw
$63s,880
$10.00
$0.09605
$0.08187
$0.00306
$0.00306
$10.00
$0.09911
$0.08493
$fi.00 $1r.00
(1) lncludas all present rate adjustments: Sch€dule 59 - R€sidential & Farm Energy Rate Ad.iustment, Schedule 66 - Temporary Power
Cost Adjustment, Schedule 91 - Energy Efficiency Rider Adjustment, and Schedule 97 - Earnings Test Deferral
Appendix F - 2018 Electric AVU-E.1 7.01 SETTLEMENT STIPUI-ATION
Page 2 of 6
AVISTA UTILITIES
IDAHO ELECTRIC, CASE NO. AVU-E-17-O{
PRESENT AND PROPOSED RATE COMPO}IENTS BY SCHEDULE
Effective January 1, 2019
Besidential Service - Schedule I
Basic Charge
Energy Charge:
First 600 kWhs
All over 600 kWhs
Base Tariff Present
Sch. Rate OtrerAdi.(l}(b) (c)
$6.00
(a)
Present
Billing Rate
(d)
$6.00
$0.09243
$0.1 028s
General
Rate
lncl(Decr)
(e)
$0.00
$0.00{ El
$0.00202
$0.00
$0.00218
$0.00079
no charge
$0.00r 55
$0.00r 32
$0.00
$0.00087
$0.00074
s0.00
s0.00208
$0.00r77
Schedule 97
Earnings Test
lncreage
(0
Proposed
Billing
Rate
(s)
Proposed
Bage Tariff
Rate
(h)
$0.091{6
$0.'10179
$0.10435
$0.07487
no charge
$6.00/kw
$0.06817
$0.0sEi8
$425.00
$5.50/kw
$0.20/kw
$0.0s586
$0.04730
$14,000
$5.00/kva
$0.2olkw
$14,000
$5.00/kva
$2.50/kva
$0.20/kw
$0.10368
$0.08837
$6.00 $6.00
General Services - Schedule 11
Basic Charge $13.00
Energy Charge:
First 3,650 kWhs $0.10217
All over 3,650 kWhs $0.07408
Demand Charge:
20 kW or less no charge
Over 20 kW $6.00/kW
Letue Gsnsrel Sorvlce -.Sciqlule 21
Energy Charge:
First 250,000 kWhs $0.06662
All over I (2) lncludes all preser $0.05686
Demand Charge:
50 kW or less $425.00
Over 50 kW $5.50/kW
Primary Voltage Discount $0.20/kW
Exta Lar?a Qenaral Servlce - Schedule 25
Energy Charge:
First 500,000 kWhs $0.05499
All over 500,000 kWhs $0.04656
Demand Charge:
3,000 kva or less $14,000
Over 3,000 kva $5.00/kva
Primary Volt. Discount $0.20lkw
Annual Minimum Present:
$0.08935
$0.09977
$14,000
$5.00/kva
$2.50/kva
$0.20/kw
Present:
$0.00308
$0.00308
$0.00050
$0.00050
$0.00050
$0.00050
$0.00050
t0.00050
$0.00050
$0.00050
Proposed:
$0.000s0
$0.000s0
$0.09474
$0.1 0s37
$0.r0863
$0.07915
$6.00/kw
$0.07r58
$0.06r 59
$42s.00
$s,5o/kw
$0.20lkw
$0.0s56s
$0.04709
$r4,000
$5.00/kva
$0.2o/kw
$739,660
$14,000
$5.00/kva
$2.5O/kva
$0.2olkw
0665,640
$0.r0765
$0.09234
$0.00378
$0.00378
$0.00291
$0.00291
($o.ooo71)
($0.00071)
$13.00
$0.1 0595
$0.07786
no charge
$6.00/kw
$0.06953
$0.05977
$425.00
$5.50/kw
$0.20/kw
$0.05428
$0.0458s
$14,000
$5.00/kva
$0.2o/kw
$13.00 $13.00
Cleanrater - Schedule 25P
Energy Charge:
all kWhs
Demand Charge:
3,000 kva or less
3,000 - 55,000 kva
Over 55,000 kva
Primary Volt. Discount
Annual Minimum
Pumolno Servlce . Scheduls.iJ
Basic Charge
Energy Charge:
First 165 kWkWhs
All additional kWhs
$730,740 Proposed:
$0.04452 ($0.00087) $0.04365 $0.00072 $0.00050 i0.04487 $0.04524
$14,000
$5.00/kva
$2.50/kva
$0.2o/kw
$657,720
$11.00
$0.1 01 60
$0.08660
$0.00347
$0.00347
$11.00
$0.1 0507
$0.09007
$r r.00 $r r.00
(1) hdudog all present rate adjustments: Scfiedule 59 - Residential & Farm Energy Rate Adjustment, Schedule 65 - Temporary Power
CostAdjustment, Schedule 91 - Energy Efficiency RiderAdjustrnent, and Schedule 97 - Earnings Test Deferral
Appendix F - 2019 Electric AVU.E.1 7.01 SETTLEMENT STIPUI.ATION Page 3 of 6
@
orfoo)(DL
ooN330K3lh-3 S o 3 i,) 30a.'
NI-t^tDt =tdltl
oJCo
()g.
ooI-ga;aio@3EEI.
6._NI b o s 8t *es,"361 3rA@g
Ee!eS*SSqqq\qr
G,FONON
o-NR i s K 8t B3 h 3 3;1 $o0
oo3-Bs;a:-o6B$
g'
gr a $;l i
NN
-;ooo+$
6oF
zotr5l(L
FaFzlrJ
=I,IJJ
FIUa
?N
(,
Il
rtaHO
E;ET
Ef
.D3o! 067;E6EC
3E
PE"9oteE
E,q
Eii9o
EE
8E
E!Pb"sE2Ro=-as{8uox
,MTvo
E_
BHp6
o.d
ia*
:€
EE8E
Sl srxl El
EIEI30
E EEs
t E$sl"go.6cEt
$ E E E|.aol; o ol'o-cl
Ic!u9E
EeSnr^
cEEEleofod).o EEs
gC-ocEBS=
t€f;H"d)-o E*'
i5
oL'
E -€lo8it
88EgE 6E2ie?H
gcEEB-
E8l
$$1"
o)oN
(!
=trG-,o.:(,o
lIJ
Eoo
o-o(l,oE
lr
.xI'cq)oo.
}SA;s:3:eNOtsOoicto.io
EEsl=
PolJzl
:s:e:e}eISs!\qqqNOOOO
Es,
E! E=
.EEE
OFNI b o:31 g+ s s 3 El B606
N
ostou
(oo}#aia:o6E $E'
oooENo83l N5IeSa6@o@
>s:R:sre:e;QN!t(!OOOniedcictri
o.^NN x o:8t 3SD-,"3El E
oos Ffi BiE:
@oBgc
NSIFd
'-;@6.ol o\\t{
rO
0ifEo
od 6
toF
44
EseiEi-88
o606
Eti9b5E96
g=u1IfrE
qs
Eis!
Ed
P,E€-:9bEC96-a:9 ii.-:<
Es
.frr
E;p5di
g*
gc
.EE
.63)
$l er
sl El30
E gEo
E EETqt! or inFtrftdF
HEE$u"tt
g
" gI
EO96c l+o
Eeie'
"EEo
5Bs-uraoI(|'{
+88
eiHHe
**;Es
TsHEEE[Eg'
3EE-Xcr
E-N^N3 H o s 81 3BiqEAe@-.@
(,
=oclE>o-'tr o o:-cdOJ! sisqE=*#d)! E*
i5
HsH69 T frE E
fEEEEE
b8
$Eq
@oNJ
Er!:,
=G
o.I
(,oEUJ
OLi#
E2
.te
o
AVISTA UTILITIES
IDAHO GAS, CASE NO. AVU.G.{7.01
PRESENT AND PROPOSED RATE COMPONENTS BY SGHEDULE
Effective January 1,2018
Tvoe of Servicg
(a)
General Service - Schedule 10'l
Basic Charge
Usage Charge:
Alltherms
Present Base Present
Distribution Billing PresentRate RateAdj,(1) Fjlfine.R*p(b) (c) (d)
$s.25
$0.47746 $0.27421
$5.2s
$0.75167
General
Rate
lncrease
(e)
$0.75
$0.00617
$0.00990
$0.00266
$0.00198
$0.00153
$1.98
$25,00
$0.00337
Proposed
Billing
Rate
(f)
Proposed
Base
Distribution
Rate
(s)
$6.00
$0.48363
$0.51365
$0.32220
$0.23981
$0.18s34
s102.73
$0.00000
$250.00
$0.13077
Larss General Servlcs - Schedule {l{,
Usage Charge:
First 200 therms $0.50375
200 - 1,000 therms $0.31954
1,000 - 10,000 therms $0.23783
Allover 10,000 therms $0.18381
Minimum Charge:
per month $100.75
per therm $0.00000
Traneoortatlon Servlce - Schedule'146
Basic Charge $225.00
Usage Charge:AllTherms $0.12740
lntenuptlble Servlce - Schedule 131
Usage Charge:AllTherms $0.21972 $0-14814 $0.36786 $0.00637 $0.37423 $0.22809
$0.26581
$0.26581
$0.26581
$0.26581
$0.76956
$0.58535
$0.50364
$0.44962
$6.00
$0.75784
$0.77946
$0.58801
$0.50562
$0.45115
$102.73
$0.26581
$250.00
$0.{3077
$100.7s
$0.26581 $0.26581
$225.00
$0.12740
(1) lncludes Schedule '150 - Purchased Gas Cost Adjustment, Schedule 155 - and Gas Rate Adjustment, Schedule
191 - DSM
Appendix F - 2018 NaturalGas AVU-G-17-01 SETTLEMENT STIPULATION Page 5 of 6
AVISTA UTILITIES
IDAHO GAS, CASE NO. AVU.G.17.O1
PRESENT AND PROPOSED RATE COMPONENTS BY SCHEDULE
Effective January 1, 2019
Tvoe of Service
(a)
Genera! Service - Schedule 101
Basic Charge
Usage Charge:
Alltherms
Present Base Present
Distribution Billing PresentRate Rate Adi.(1) Billinq Rate(b) (c) (d)
$6.00
$0.48363 $0.27421
$6.00
$0.75784
General
Rate
lncrease
(e)
$0.00
$0.01724
$0.01725
s0.00{82
$0.00136
$0.00105
$3.45
$0.00
$0.00364
Proposed
Bllling
Rate
(0
Proposed
Base
Distribution
Rate
(g)
$6.00
$0.50087
$0.53090
$0.32402
$0.24117
$0.18639
$'t06.18
$0.00000
$250.00
$0.13441
Leme General Servlce - Schedule 1{l
Usage Charge:
First 200 therms $0.51365
200 - 1,000 therms $0.32220
1,000 - 10,000 therms $0.23981
Allover 10,000 therms $0.18534
Minimum Charge:
per month $102.73
per therm $0.00000
Traneoortation Servlce - Schedule I46
Basic Charge $250.00
Usage Charge:AllTherms $0.13077
lntemrotlble Serylce - Schedule 131
Usage Charge:AllTherms $0.22609 $0.14814 $037423
$0.26581
$0.26581
$0.26581
$0.26581
$0.77946
$0.58801
$0.s0562
$0.45115
$6.00
$0.77508
$0.79671
$0.58983
$0.50698
$0.45220
$106.18
$0.26581
$250.00
$0.13441
$102.73
$0.26581 $0.26581
$2s0.00
$0.13077
$0.37423 $0.22609
(1) lncludes Schedule '150 - Purchased Gas Cost Adjustment, Schedule 155 and - Gas Rate Adjustment, Schedule
191 - DSM.
Appendix F - 2019 Natural Gas AVU-G-17{1 SETTLEMENT STIPULATION Page 6 of 6