Loading...
HomeMy WebLinkAbout20161014Application.pdfAvista Corp. 1411 East Mission P.O. Box 3727 Spokane. Washington 99220-0500 Telephone 509-489-0500 Toll Free 800-727-9170 October 13, 2016 Via Electronic Mail Jean D. Jewell, Secretary Idaho Public Utilities Commission Statehouse Mail W. 472 Washington Street Boise, Idaho 83 720 RE: Case No. AVU-E-16-OJ Dear Ms. Jewell: -... __ r- -I J - i_ • ~-; c):.:-_ o.~ ~ ' ' -~-::.~, - (i)(:, (./) 0 :!: ~ = er, ,:-, ;J -, rn 0 ..::-m < :x rn C) 0 w 0) Attached for filing with the Commission is Avista Corporation's, doing business as Avista Utilities, filing in compliance with Order Nos. 32697 and 32802, to update the load forecast, natural gas forecast, and contract information components of the incremental cost Integrated Resource Plan (IRP) avoided cost methodology. A an original and 7 copies are being provided via overnight mail. Please direct any questions regarding this filing to James Gall at 509-495-2189. Sincerely, Linda Gervais Sr. Manager, Regulatory Policy A vista Utilities 509-495-4975 linda. gervais@avistacorp .com Enclosure DAVID J. MEYER VICE PRESIDENT AND CHIEF COUNSEL FOR REGULA TORY AND GOVERNMENT AL AFFAIRS AVISTA CORPORATION P.O. BOX 3727 1411 EAST MISSION A VENUE SPOKANE, WASHINGTON 99220-3727 TELEPHONE: (509) 495-4316 david.meyer@avistacorp.com BEFORE THE IDAHO PUBLIC UTILITIES COMMISSION IN THE MATTER OF AVISTA CORPORATION'S) ANNUAL COMPLIANCE FILING TO UPDATE ) THE LOAD AND GAS FORECASTS IN THE ) INCREMENT AL COST INTEGRATED ) RESOURCE PLAN A VOIDED COST MODEL ) CASE NO. AVU-E-16-_Q_7 A VISTA CORPORATION'S COMPLIANCE FILING I. INTRODUCTION A vista Corporation, doing business as A vista Utilities (hereinafter A vista or Company), at 1411 East Mission Avenue, Spokane, Washington, respectfully submits to the Idaho Public Utilities Commission ("Commission") this filing, in compliance with Order Nos. 32697 and 32802, to update the load forecast, natural gas forecast, and contract information components of the incremental cost Integrated Resource Plan (IRP) avoided cost methodology. Communications in reference to this filing should be addressed to: David J. Meyer, Esq. Vice President and Chief Counsel for Regulatory and Governmental Affairs A vista Corporation P.O. Box 3727 1411 E. Mission A venue, MSC-13 Spokane, WA 99220-3727 Phone: (509) 495-4316 david.meyer@avistacorp.com Linda Gervais Sr. Manager, Regulatory Policy A vista Corporation P.O. Box 3727 1411 E. Mission A venue, MSC-27 Spokane, WA 99220-3727 Phone: (509) 495-4975 linda.gervais@avistacorp.com II. BACKGROUND In its final Order No. 3269i dated December 18, 2012, the Commission determined that the inputs to the IRP avoided cost methodology, utilized for all proposed Public Utility Regulatory Policies Act of 1978 (PURP A) qualifying (QF) projects that exceed the published rate eligibility cap, will be updated every two years upon acknowledgment of the utility's IRP filing, with the exception of the load forecast, natural gas forecast, and QF contract changes, which are to be updated annually. The date for the annual update was changed2 from June to October of each year. 1 Order No. 32697 page 22. 2 Order No. 32802 page 3. ll P age III. LOAD FORECAST The Company's most recent load forecast was developed in July, 2016 for energy and September, 2016 for peak. The recent energy load forecast escalates at 0.5 percent annual average growth rate. The peak forecast growth rate decreased from 0.6 percent to 0.4 percent. Table 1: Peak and Energy Load Forecast Year Energy I-Hour Peak (aMW) (MW) 2017 1,078 1,704 2018 1,087 1,710 2019 1,094 1,717 2020 1,098 1,724 2021 1,109 1,731 2022 1,108 1,738 2023 1,108 1,745 2024 1,108 1,752 2025 1,114 1,759 2026 1,120 1,766 2027 1,126 1,774 2028 1,131 1,781 2029 1,137 1,788 2030 1,143 1,795 2031 1,150 1,802 2032 1,156 1,810 2033 1,162 1,817 2034 1,168 1,824 2035 1,175 1,832 2036 1,181 1,839 2037 1,188 1,846 2038 1,196 1,854 2039 1,203 1,861 2040 1,211 1,869 2041 1,220 1,876 2J Page IV. NATURAL GAS FORECAST The Company's most recent Forward Price Curve was developed using the blend of two national price forecasting consultants' most recent forecasts and forward market prices as of September 141\ 2016. Table 2: Natural Gas Price Forecast Henry Hub Stanfield Year ($/mmbtu) ($/mmbtu) 2017 $3.01 $2.88 2018 $3.00 $2.86 2019 $3.12 $2.98 2020 $3.19 $2.99 2021 $3.42 $3.25 2022 $3.81 $3.64 2023 $4.23 $4.06 2024 $4.27 $4.09 2025 $4.47 $4 .29 2026 $4.81 $4.62 2027 $5.10 $4.92 2028 $5.42 $5.23 2029 $5.75 $5.58 2030 $5.87 $5.73 2031 $6.18 $6.06 2032 $6.27 $6.15 2033 $6.46 $6.40 2034 $6.69 $6.66 2035 $6.98 $6.95 2036 $7.22 $7.19 2037 $7.56 $7.54 2038 $7.85 $7.86 2039 $8.19 $8.21 2040 $8.55 $8.59 2041 $8.92 $8.92 31 Pa g I:! Sources: IHS and Wood Mackenzie V. CONTRACT ADDITIONS AND TERMINATIONS Avista's has not signed any new long-term PPAs or PURPA contracts since the 2015 filing. Although, one small Washington State PURP A hydro facility contract was extended. VI. REQUEST A vista respectfully submits this updated load forecast, natural gas forecast, and contract information in compliance with Order Nos. 32697 and 32802 and requests that the Commission accept the same for filing. DATED at Spokane, Washington, this 13th day of October, 2016. AVISTA CORPORATION Vice President and Chief Counsel for Regulatory and Governmental Affairs 41 Page Avista Corporation AVU-E-16- IRP Compliance Filing Attachment A vista Loads (2016 Forecast) 1-Hour Peak (MW) Year Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Peak 2017 1,704 1,602 1,485 1,316 1,279 1,424 1,579 1,568 1,331 1,345 1,535 1,698 1,704 2018 1,710 1,608 1,491 1,321 1,285 1,430 1,586 1,575 1,337 1,351 1,540 1,705 1,710 2019 1,717 1,615 1,497 1,326 1,291 1,437 1,593 1,582 1,343 1,356 1,547 1,712 1,717 2020 1,724 1,622 1,503 1,332 1,297 1,444 1,601 1,590 1,349 1,362 1,553 1,719 1,724 2021 1,731 1,628 1,509 1,337 1,303 1,450 1,609 1,597 1,356 1,367 1,559 1,726 1,731 2022 1,738 1,635 1,515 1,342 1,309 1,457 1,616 1,605 1,362 1,372 1,566 1,733 1,738 2023 1,745 1,641 1,521 1,347 1,315 1,464 1,623 1,612 1,368 1,378 1,572 1,740 1,745 2024 1,752 1,648 1,527 1,353 1,321 1,470 1,631 1,620 1,374 1,383 1,578 1,747 1,752 2025 1,759 1,654 1,533 1,358 1,327 1,477 1,639 1,627 1,380 1,389 1,584 1,754 1,759 2026 1,766 1,661 1,539 1,363 1,333 1,484 1,646 1,635 1,387 1,394 1,591 1,761 1,766 2027 1,774 1,668 1,545 1,369 1,339 1,491 1,654 1,642 1,393 1,400 1,597 1,768 1,774 2028 1,781 1,674 1,551 1,374 1,345 1,498 1,662 1,650 1,399 1,405 1,603 1,775 1,781 2029 1,788 1,681 1,557 1,379 1,351 1,504 1,669 1,658 1,406 1,411 1,610 1,783 1,788 2030 1,795 1,688 1,564 1,385 1,357 1,511 1,677 1,665 1,412 1,416 1,616 1,790 1,795 2031 1,802 1,694 1,570 1,390 1,363 1,518 1,685 1,673 1,419 1,422 1,623 1,797 1,802 2032 1,810 1,701 1,576 1,396 1,370 1,525 1,693 1,681 1,425 1,427 1,629 1,804 1,810 2033 1,817 1,708 1,582 1,401 1,376 1,532 1,700 1,689 1,432 1,433 1,636 1,811 1,817 2034 1,824 1,715 1,589 1,407 1,382 1,539 1,708 1,696 1,438 1,439 1,642 1,819 1,824 2035 1,832 1,722 1,595 1,412 1,388 1,547 1,716 1,704 1,445 1,444 1,649 1,826 1,832 2036 1,839 1,729 1,601 1,418 1,395 1,554 1,724 1,712 1,452 1,450 1,655 1,833 1,839 2037 1,846 1,736 1,608 1,423 1,401 1,561 1,732 1,720 1,458 1,456 1,662 1,841 1,846 2038 1,854 1,743 1,614 1,429 1,408 1,568 1,740 1,728 1,465 1,461 1,669 1,848 1,854 2039 1,861 1,750 1,621 1,435 1,414 1,575 1,749 1,736 1,472 1,467 1,675 1,856 1,861 2040 1,869 1,757 1,627 1,440 1,420 1,583 1,757 1,744 1,478 1,473 1,682 1,863 1,869 2041 1,876 1,764 1,634 1,446 1,427 1,590 1,765 1,753 1,485 1,479 1,689 1,871 1,876 Monthly Average Load (aMW) Year Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec AVG 2017 1,227 1,172 1,087 1,000 944 983 1,080 1,061 960 1,004 1,143 1,277 1,078 2018 1,255 1,185 1,090 999 957 995 1,094 1,054 967 1,012 1,146 1,289 1,087 2019 1,256 1,196 1,102 1,010 957 992 1,097 1,069 982 1,022 1,152 1,290 1,094 2020 1,260 1,163 1,110 1,020 964 1,000 1,103 1,079 984 1,027 1,163 1,302 1,098 2021 1,275 1,212 1,116 1,024 972 1,009 1,111 1,081 988 1,032 1,170 1,312 1,109 2022 1,274 1,212 1,115 1,023 972 1,009 1,111 1,081 988 1,032 1,169 1,312 1,108 2023 1,274 1,212 1,115 1,023 972 1,009 1,111 1,081 988 1,032 1,169 1,312 1,108 2024 1,274 1,212 1,115 1,023 972 1,009 1,110 1,081 988 1,032 1,169 1,312 1,108 2025 1,281 1,218 1,121 1,029 977 1,014 1,117 1,087 993 1,037 1,176 1,319 1,114 2026 1,288 1,225 1,127 1,034 982 1,020 1,123 1,093 999 1,043 1,182 1,326 1,120 2027 1,294 1,231 1,133 1,040 987 1,025 1,128 1,098 1,004 1,048 1,188 1,333 1,126 2028 1,301 1,237 1,139 1,045 992 1,030 1,134 1,104 1,009 1,053 1,194 1,340 1,131 2029 1,308 1,244 1,145 1,050 998 1,035 1,140 1,110 1,014 1,059 1,200 1,347 1,137 2030 1,315 1,250 1,151 1,056 1,003 1,041 1,146 1,115 1,019 1,064 1,206 1,354 1,143 2031 1,322 1,257 1,157 1,061 1,008 1,046 1,152 1,121 1,025 1,070 1,213 1,361 1,150 2032 1,329 1,264 1,163 1,067 1,014 1,052 1,158 1,128 1,030 1,076 1,219 1,368 1,156 2033 1,336 1,271 1,169 1,073 1,019 1,058 1,165 1,134 1,036 1,082 1,226 1,376 1,162 2034 1,343 1,278 1,176 1,079 1,025 1,063 1,171 1,140 1,042 1,088 1,233 1,383 1,168 2035 1,351 1,285 1,182 1,085 1,030 1,069 1,177 1,146 1,047 1,094 1,240 1,391 1,175 2036 1,359 1,292 1,189 1,091 1,036 1,075 1,184 1,153 1,053 1,100 1,247 1,399 1,181 2037 1,366 1,300 1,196 1,097 1,042 1,082 1,191 1,159 1,059 1,106 1,254 1,407 1,188 2038 1,375 1,307 1,203 1,104 1,049 1,088 1,198 1,166 1,066 1,113 1,261 1,415 1,196 2039 1,383 1,316 1,211 1,111 1,055 1,095 1,206 1,174 1,073 1,120 1,269 1,425 1,203 2040 1,393 1,325 1,219 1,118 1,062 1,103 1,214 1,182 1,080 1,128 1,278 1,434 1,211 2041 1,403 1,334 1,228 1,127 1,070 1,111 1,223 1,190 1,088 1,136 1,287 1,445 1,220 Days 31 28 31 30 31 30 31 31 30 31 30 31 Month 1 2 3 4 5 6 7 8 9 10 11 12 Case No. AVU-E-16-_ -Attachment Page 1 of 10 Natural Gas Prices Price per dth Henry DATE Year Month Hub AECO Sumas Stanfield Malin 1/1/2017 2017 1 3.36 2.64 3.29 3.35 3.40 2/1/2017 2017 2 3.32 2.62 3.12 3.24 3.31 3/1/2017 2017 3 3.19 2.49 2.95 3.07 3.14 4/1/2017 2017 4 2.88 2.16 2.55 2.70 2.78 5/1/2017 2017 5 2.85 2.10 2.43 2.63 2.73 6/1/2017 2017 6 2.87 2.07 2.46 2.64 2.74 7/1/2017 2017 7 2.91 2.16 2.56 2.70 2.81 8/1/2017 2017 8 2.93 2.24 2.62 2.73 2.83 9/1/2017 2017 9 2.88 2.14 2.60 2.70 2.79 10/1/2017 2017 10 2.91 2.16 2.64 2.74 2.80 11/1/2017 2017 11 2.96 2.30 2.81 2.91 2.96 12/1/2017 2017 12 3.11 2.48 3.04 3.09 3.17 1/1/2018 2018 1 3.27 2.75 3.17 3.20 3.29 2/1/2018 2018 2 3.26 2.71 3.14 3.18 3.22 3/1/2018 2018 3 3.15 2.57 3.00 3.05 3.10 4/1/2018 2018 4 2.88 2.24 2.58 2.71 2.77 5/1/2018 2018 5 2.81 2.09 2.35 2.61 2.68 6/1/2018 2018 6 2.85 2.04 2.36 2.62 2.70 7/1/2018 2018 7 2.92 2.11 2.41 2.71 2.78 8/1/2018 2018 8 2.93 2.12 2.51 2.75 2.82 9/1/2018 2018 9 2.87 2.10 2.49 2.71 2.77 10/1/2018 2018 10 2.88 2.10 2.63 2.72 2.78 11/1/2018 2018 11 3.00 2.38 2.79 2.87 2.92 12/1/2018 2018 12 3.17 2.57 3.01 3.12 3.17 1/1/2019 2019 1 3.36 2.76 3.24 3.28 3.38 2/1/2019 2019 2 3.41 2.79 3.28 3.31 3.41 3/1/2019 2019 3 3.31 2.51 3.08 3.18 3.26 4/1/2019 2019 4 3.11 2.22 2.78 2.97 3.05 5/1/2019 2019 5 2.99 2.10 2.57 2.84 2.92 6/1/2019 2019 6 2.95 2.07 2.44 2.76 2.86 7/1/2019 2019 7 2.98 2.11 2.49 2.77 2.87 8/1/2019 2019 8 2.98 2.11 2.58 2.79 2.89 9/1/2019 2019 9 2.98 2.18 2.64 2.83 2.93 10/1/2019 2019 10 3.00 2.21 2.72 2.85 2.95 11/1/2019 2019 11 3.10 2.48 2.86 2.98 3.08 12/1/2019 2019 12 3.32 2.73 3.09 3.16 3.26 1/1/2020 2020 1 3.45 2.85 3.22 3.30 3.41 2/1/2020 2020 2 3.46 2.84 3.23 3.29 3.40 3/1/2020 2020 3 3.36 2.68 3.10 3.17 3.27 4/1/2020 2020 4 3.14 2.25 2.80 2.97 3.05 5/1/2020 2020 5 3.06 2.17 2.60 2.81 2.89 6/1/2020 2020 6 3.02 2.11 2.44 2.76 2.82 7/1/2020 2020 7 3.03 2.12 2.55 2.77 2.85 8/1/2020 2020 8 3.07 2.17 2.67 2.87 2.95 9/1/2020 2020 9 3.01 2.18 2.70 2.83 2.91 Case No. AVU-E-16-_ -Attachment Page 2 of 10 10/1/2020 2020 10 3.02 2.18 2.75 2.83 2.92 11/1/2020 2020 11 3.20 2.61 2.97 3.06 3.16 12/1/2020 2020 12 3.41 2.87 3.18 3.25 3.36 1/1/2021 2021 1 3.51 2.93 3.34 3.40 3.51 2/1/2021 2021 2 3.52 2.99 3.37 3.38 3.50 3/1/2021 2021 3 3.47 2.85 3.26 3.29 3.39 4/1/2021 2021 4 3.23 2.40 2.95 3.08 3.16 5/1/2021 2021 5 3.22 2.40 2.86 3.05 3.13 6/1/2021 2021 6 3.32 2.46 2.83 3.07 3.16 7/1/2021 2021 7 3.35 2.43 2.94 3.14 3.23 8/1/2021 2021 8 3.38 2.46 3.02 3.18 3.28 9/1/2021 2021 9 3.39 2.68 3.11 3.21 3.30 10/1/2021 2021 10 3.41 2.69 3.14 3.26 3.34 11/1/2021 2021 11 3.58 2.90 3.30 3.44 3.54 12/1/2021 2021 12 3.68 3.02 3.35 3.51 3.62 1/1/2022 2022 1 3.90 3.22 3.63 3.78 3.89 2/1/2022 2022 2 3.91 3.27 3.63 3.78 3.90 3/1/2022 2022 3 3.82 3.11 3.61 3.66 3.76 4/1/2022 2022 4 3.73 2.84 3.47 3.58 3.66 5/1/2022 2022 5 3.63 2.76 3.25 3.45 3.53 6/1/2022 2022 6 3.65 2.75 3.23 3.42 3.51 7/1/2022 2022 7 3.71 2.78 3.29 3.52 3.60 8/1/2022 2022 8 3.75 2.84 3.40 3.56 3.65 9/1/2022 2022 9 3.72 2.93 3.46 3.51 3.64 10/1/2022 2022 10 3.74 3.00 3.47 3.56 3.67 11/1/2022 2022 11 4.00 3.30 3.74 3.86 3.97 12/1/2022 2022 12 4.18 3.44 3.83 4.00 4.11 1/1/2023 2023 1 4.35 3.52 4.05 4.22 4.34 2/1/2023 2023 2 4.34 3.54 4.09 4.22 4.34 3/1/2023 2023 3 4.21 3.40 4.00 4.05 4.16 4/1/2023 2023 4 4.04 3.17 3.78 3.87 3.95 5/1/2023 2023 5 4.07 3.17 3.68 3.87 3.96 6/1/2023 2023 6 4.09 3.17 3.68 3.86 3.96 7/1/2023 2023 7 4.13 3.19 3.71 3.90 3.99 8/1/2023 2023 8 4.16 3.22 3.85 3.98 4.07 9/1/2023 2023 9 4.17 3.44 3.91 4.00 4.09 10/1/2023 2023 10 4.27 3.55 4.00 4.09 4.20 11/1/2023 2023 11 4.42 3.86 4.19 4.31 4.41 12/1/2023 2023 12 4.46 3.86 4.25 4.31 4.42 1/1/2024 2024 1 4.58 3.96 4.35 4.49 4.56 2/1/2024 2024 2 4.61 4.00 4.35 4.43 4.56 3/1/2024 2024 3 4.30 3.67 4.06 4.14 4.21 4/1/2024 2024 4 4.18 3.32 3.88 4.02 4.08 5/1/2024 2024 5 4.10 3.24 3.65 3.91 3.97 6/1/2024 2024 6 4.12 3.23 3.65 3.87 3.95 7/1/2024 2024 7 4.15 3.34 3.66 3.88 3.97 8/1/2024 2024 8 4.19 3.39 3.85 4.00 4.09 9/1/2024 2024 9 4.14 3.50 3.88 3.97 4.06 10/1/2024 2024 10 4.16 3.50 3.90 4.02 4.09 Case No. AVU-E-16-_ -Attachment Page 3 of 10 11/1/2024 2024 11 4.22 3.74 3.97 4.10 4.18 12/1/2024 2024 12 4.44 3.87 4.06 4.28 4.35 1/1/2025 2025 1 4.58 4.01 4.33 4.45 4.54 2/1/2025 2025 2 4.64 4.05 4.41 4.49 4.58 3/1/2025 2025 3 4.48 3.84 4.24 4.31 4.38 4/1/2025 2025 4 4.38 3.46 4.07 4.23 4.28 5/1/2025 2025 5 4.33 3.61 3.87 4.12 4.18 6/1/2025 2025 6 4.37 3.61 3.84 4.13 4.18 7/1/2025 2025 7 4.42 3.70 3.91 4.16 4.24 8/1/2025 2025 8 4.44 3.67 4.05 4.23 4.30 9/1/2025 2025 9 4.38 3.74 4.06 4.18 4.26 10/1/2025 2025 10 4.41 3.75 4.09 4.22 4.31 11/1/2025 2025 11 4.50 4.02 4.17 4.38 4.45 12/1/2025 2025 12 4.74 4.11 4.36 4.59 4.66 1/1/2026 2026 1 4.92 4.24 4.55 4.77 4.85 2/1/2026 2026 2 4.95 4.25 4.59 4.81 4.89 3/1/2026 2026 3 4.83 4.01 4.53 4.66 4.73 4/1/2026 2026 4 4.68 3.76 4.34 4.49 4.56 5/1/2026 2026 5 4.64 3.90 4.13 4.40 4.46 6/1/2026 2026 6 4.67 3.88 4.08 4.40 4.46 7/1/2026 2026 7 4.72 3.99 4.19 4.44 4.52 8/1/2026 2026 8 4.76 4.06 4.36 4.54 4.61 9/1/2026 2026 9 4.74 4.11 4.37 4.56 4.62 10/1/2026 2026 10 4.77 4.09 4.40 4.60 4.66 11/1/2026 2026 11 4.91 4.47 4.58 4.79 4.86 12/1/2026 2026 12 5.16 4.39 4.78 5.01 5.08 1/1/2027 2027 1 5.15 4.54 4.79 5.02 5.10 2/1/2027 2027 2 5.15 4.52 4.78 5.01 5.09 3/1/2027 2027 3 5.06 4.41 4.77 4.90 4.96 4/1/2027 2027 4 4.91 4.18 4.55 4.74 4.78 5/1/2027 2027 5 4.95 4.28 4.52 4.74 4.78 6/1/2027 2027 6 4.99 4.28 4.47 4.74 4.79 7/1/2027 2027 7 5.05 4.40 4.56 4.79 4.84 8/1/2027 2027 8 5.08 4.39 4.65 4.86 4.91 9/1/2027 2027 9 5.06 4.49 4.71 4.85 4.91 10/1/2027 2027 10 5.08 4.52 4.85 4.93 4.99 11/1/2027 2027 11 5.25 4.87 5.05 5.18 5.24 12/1/2027 2027 12 5.46 4.85 5.30 5.34 5.41 1/1/2028 2028 1 5.58 5.04 5.46 5.44 5.54 2/1/2028 2028 2 5.61 5.04 5.48 5.48 5.56 3/1/2028 2028 3 5.46 4.78 5.21 5.29 5.37 4/1/2028 2028 4 5.31 4.68 5.05 5.15 5.19 5/1/2028 2028 5 5.25 4.64 4.82 5.03 5.08 6/1/2028 2028 6 5.29 4.67 4.85 5.01 5.08 7/1/2028 2028 7 5.34 4.77 4.89 5.05 5.12 8/1/2028 2028 8 5.37 4.79 5.06 5.13 5.20 9/1/2028 2028 9 5.31 4.95 5.06 5.09 5.17 10/1/2028 2028 10 5.34 5.00 5.13 5.16 5.25 11/1/2028 2028 11 5.45 5.18 5.37 5.37 5.44 Case No. AVU-E-16-_ -Attachment Page 4 of 10 12/1/2028 2028 12 5.72 5.26 5.59 5.57 5.67 1/1/2029 2029 1 5.86 5.39 5.79 5.76 5.87 2/1/2029 2029 2 5.87 5.37 5.79 5.77 5.86 3/1/2029 2029 3 5.71 5.11 5.58 5.59 5.67 4/1/2029 2029 4 5.60 4.88 5.37 5.44 5.49 5/1/2029 2029 5 5.60 4.96 5.20 5.39 5.44 6/1/2029 2029 6 5.64 4.97 5.22 5.39 5.44 7/1/2029 2029 7 5.71 5.04 5.26 5.40 5.49 8/1/2029 2029 8 5.75 5.09 5.45 5.50 5.58 9/1/2029 2029 9 5.72 5.28 5.46 5.49 5.60 10/1/2029 2029 10 5.73 5.30 5.53 5.56 5.66 11/1/2029 2029 11 5.80 5.48 5.75 5.73 5.82 12/1/2029 2029 12 6.00 5.53 5.92 5.90 6.00 1/1/2030 2030 1 6.02 5.56 5.95 5.94 6.03 2/1/2030 2030 2 6.06 5.62 5.98 5.97 6.06 3/1/2030 2030 3 5.90 5.32 5.82 5.81 5.90 4/1/2030 2030 4 5.69 5.10 5.47 5.54 5.59 5/1/2030 2030 5 5.67 5.09 5.36 5.49 5.54 6/1/2030 2030 6 5.71 5.15 5.38 5.49 5.54 7/1/2030 2030 7 5.79 5.28 5.38 5.52 5.58 8/1/2030 2030 8 5.83 5.31 5.56 5.60 5.69 9/1/2030 2030 9 5.77 5.46 5.65 5.66 5.72 10/1/2030 2030 10 5.81 5.51 5.72 5.68 5.78 11/1/2030 2030 11 6.00 5.73 5.99 5.95 6.05 12/1/2030 2030 12 6.24 5.85 6.17 6.15 6.24 1/1/2031 2031 1 6.38 6.00 6.33 6.31 6.41 2/1/2031 2031 2 6.42 6.06 6.37 6.35 6.45 3/1/2031 2031 3 6.28 5.72 6.23 6.24 6.30 4/1/2031 2031 4 6.03 5.45 5.84 5.91 5.96 5/1/2031 2031 5 5.97 5.40 5.67 5.79 5.84 6/1/2031 2031 6 6.01 5.42 5.68 5.79 5.84 7/1/2031 2031 7 6.09 5.49 5.68 5.83 5.89 8/1/2031 2031 8 6.12 5.52 5.85 5.91 5.97 9/1/2031 2031 9 6.06 5.69 5.94 5.94 6.01 10/1/2031 2031 10 6.09 5.75 6.01 5.97 6.08 11/1/2031 2031 11 6.27 5.94 6.27 6.26 6.34 12/1/2031 2031 12 6.47 6.21 6.40 6.38 6.47 1/1/2032 2032 1 6.61 6.33 6.57 6.54 6.64 2/1/2032 2032 2 6.66 6.38 6.62 6.59 6.69 3/1/2032 2032 3 6.30 5.97 6.25 6.23 6.32 4/1/2032 2032 4 6.03 5.60 5.88 5.94 6.00 5/1/2032 2032 5 6.03 5.60 5.74 5.80 5.88 6/1/2032 2032 6 6.07 5.63 5.74 5.83 5.88 7/1/2032 2032 7 6.14 5.59 5.70 5.86 5.92 8/1/2032 2032 8 6.19 5.67 5.95 6.01 6.08 9/1/2032 2032 9 6.15 5.79 6.05 6.07 6.14 10/1/2032 2032 10 6.17 5.83 6.12 6.12 6.21 11/1/2032 2032 11 6.30 5.97 6.34 6.34 6.43 12/1/2032 2032 12 6.57 6.37 6.54 6.52 6.62 Case No. AVU-E-16-_ -Attachment Page 5 of 10 1/1/2033 2033 1 6.71 6.48 6.70 6.66 6.78 2/1/2033 2033 2 6.75 6.53 6.73 6.72 6.82 3/1/2033 2033 3 6.46 6.08 6.47 6.46 6.55 4/1/2033 2033 4 6.27 5.86 6.18 6.25 6.31 5/1/2033 2033 5 6.27 5.83 5.98 6.12 6.17 6/1/2033 2033 6 6.31 5.87 5.98 6.11 6.17 7/1/2033 2033 7 6.38 5.92 6.01 6.24 6.30 8/1/2033 2033 8 6.43 5.97 6.25 6.34 6.41 9/1/2033 2033 9 6.32 5.98 6.24 6.24 6.35 10/1/2033 2033 10 6.34 6.00 6.34 6.31 6.40 11/1/2033 2033 11 6.46 6.12 6.58 6.50 6.60 12/1/2033 2033 12 6.79 6.48 6.94 6.85 6.95 1/1/2034 2034 1 6.95 6.61 7.15 7.02 7.14 2/1/2034 2034 2 7.00 6.67 7.17 7.07 7.17 3/1/2034 2034 3 6.70 6.14 6.73 6.68 6.78 4/1/2034 2034 4 6.46 5.87 6.37 6.42 6.48 5/1/2034 2034 5 6.49 5.90 6.25 6.40 6.46 6/1/2034 2034 6 6.53 5.93 6.23 6.40 6.46 7/1/2034 2034 7 6.62 6.03 6.26 6.46 6.54 8/1/2034 2034 8 6.66 6.07 6.49 6.56 6.64 9/1/2034 2034 9 6.55 6.19 6.50 6.48 6.59 10/1/2034 2034 10 6.57 6.23 6.58 6.54 6.64 11/1/2034 2034 11 6.70 6.34 6.85 6.75 6.86 12/1/2034 2034 12 7.00 6.69 7.22 7.10 7.21 1/1/2035 2035 1 7.33 7.03 7.58 7.42 7.55 2/1/2035 2035 2 7.38 7.05 7.61 7.47 7.59 3/1/2035 2035 3 7.05 6.76 7.13 7.06 7.16 4/1/2035 2035 4 6.72 6.32 6.69 6.65 6.75 5/1/2035 2035 5 6.76 6.30 6.63 6.70 6.77 6/1/2035 2035 6 6.80 6.13 6.54 6.66 6.75 7/1/2035 2035 7 6.90 6.21 6.64 6.75 6.86 8/1/2035 2035 8 6.94 6.37 6.80 6.81 6.94 9/1/2035 2035 9 6.80 6.43 6.77 6.73 6.85 10/1/2035 2035 10 6.83 6.44 6.84 6.81 6.91 11/1/2035 2035 11 6.96 6.60 7.18 7.06 7.17 12/1/2035 2035 12 7.25 6.82 7.45 7.33 7.45 1/1/2036 2036 1 7.67 7.08 7.99 7.87 7.99 2/1/2036 2036 2 7.73 7.39 7.87 7.76 7.87 3/1/2036 2036 3 7.36 7.09 7.44 7.35 7.46 4/1/2036 2036 4 6.94 6.52 6.86 6.87 6.95 5/1/2036 2036 5 6.98 6.52 6.83 6.88 6.97 6/1/2036 2036 6 7.02 6.29 6.72 6.87 6.95 7/1/2036 2036 7 7.13 6.33 6.79 6.93 7.06 8/1/2036 2036 8 7.17 6.61 7.03 7.06 7.17 9/1/2036 2036 9 7.01 6.64 6.98 6.93 7.06 10/1/2036 2036 10 7.05 6.67 7.09 7.03 7.14 11/1/2036 2036 11 7.19 6.84 7.40 7.28 7.41 12/1/2036 2036 12 7.45 6.94 7.63 7.51 7.63 1/1/2037 2037 1 8.11 7.54 8.45 8.31 8.44 Case No. AVU-E-1 6-_ -Attachment Page 6 of 10 2/1/2037 2037 2 8.16 7.66 8.44 8.32 8.43 3/1/2037 2037 3 7.76 7.50 7.85 7.75 7.87 4/1/2037 2037 4 7.24 6.85 7.19 7.14 7.26 5/1/2037 2037 5 7.28 6.86 7.15 7.17 7.29 6/1/2037 2037 6 7.32 6.63 7.04 7.18 7.27 7/1/2037 2037 7 7.45 6.63 7.14 7.25 7.39 8/1/2037 2037 8 7.48 7.01 7.38 7.39 7.50 9/1/2037 2037 9 7.30 6.91 7.29 7.24 7.35 10/1/2037 2037 10 7.34 6.95 7.36 7.31 7.42 11/1/2037 2037 11 7.49 7.17 7.77 7.62 7.75 12/1/2037 2037 12 7.73 7.27 8.02 7.85 7.98 1/1/2038 2038 1 8.52 7.93 8.93 8.75 8.92 2/1/2038 2038 2 8.58 8.09 8.95 8.73 8.90 3/1/2038 2038 3 8.13 7.86 8.22 8.12 8.24 4/1/2038 2038 4 7.50 7.14 7.49 7.44 7.54 5/1/2038 2038 5 7.54 7.06 7.38 7.41 7.54 6/1/2038 2038 6 7.59 6.90 7.32 7.42 7.54 7/1/2038 2038 7 7.72 6.91 7.43 7.56 7.67 8/1/2038 2038 8 7.76 7.28 7.67 7.66 7.78 9/1/2038 2038 9 7.55 7.16 7.54 7.49 7.61 10/1/2038 2038 10 7.60 7.20 7.73 7.63 7.75 11/1/2038 2038 11 7.75 7.40 8.15 7.96 8.09 12/1/2038 2038 12 7.97 7.55 8.34 8.14 8.28 1/1/2039 2039 1 8.98 8.37 9.26 9.23 9.38 2/1/2039 2039 2 9.04 8.58 9.46 9.26 9.42 3/1/2039 2039 3 8.55 8.28 8.63 8.55 8.66 4/1/2039 2039 4 7.80 7.45 7.79 7.71 7.84 5/1/2039 2039 5 7.85 7.46 7.74 7.74 7.86 6/1/2039 2039 6 7.90 7.20 7.64 7.73 7.86 7/1/2039 2039 7 8.04 7.21 7.76 7.85 8.00 8/1/2039 2039 8 8.08 7.61 8.00 7.96 8.12 9/1/2039 2039 9 7.84 7.44 7.83 7.78 7.90 10/1/2039 2039 10 7.90 7.50 8.08 7.98 8.11 11/1/2039 2039 11 8.05 7.68 8.45 8.31 8.44 12/1/2039 2039 12 8.24 7.84 8.64 8.44 8.57 1/1/2040 2040 1 9.48 8.88 9.70 9.74 9.88 2/1/2040 2040 2 9.54 9.19 10.06 9.82 9.97 3/1/2040 2040 3 9.00 8.71 9.20 9.07 9.19 4/1/2040 2040 4 8.12 7.77 8.11 8.03 8.16 5/1/2040 2040 5 8.17 7.78 8.07 8.06 8.18 6/1/2040 2040 6 8.22 7.45 7.96 8.03 8.17 7/1/2040 2040 7 8.38 7.53 8.08 8.16 8.33 8/1/2040 2040 8 8.41 7.91 8.34 8.29 8.46 9/1/2040 2040 9 8.14 7.69 8.11 8.07 8.20 10/1/2040 2040 10 8.21 7.79 8.46 8.32 8.47 11/1/2040 2040 11 8.37 7.99 8.85 8.66 8.80 12/1/2040 2040 12 8.53 8.15 9.01 8.81 8.95 1/1/2041 2041 1 10.00 10.00 10.00 10.00 10.00 2/1/2041 2041 2 10.07 10.07 10.07 10.07 10.07 Case No. AVU-E-16-_ -Attachment Page 7 of 10 3/1/2041 2041 3 9.47 9.47 9.47 9.47 9.47 4/1/2041 2041 4 8.44 8.44 8.44 8.44 8.44 5/1/2041 2041 5 8.50 8.50 8.50 8.50 8.50 6/1/2041 2041 6 8.55 8.55 8.55 8.55 8.55 7/1/2041 2041 7 8.73 8.73 8.73 8.73 8.73 8/1/2041 2041 8 8.76 8.76 8.76 8.76 8.76 9/1/2041 2041 9 8.45 8.45 8.45 8.45 8.45 10/1/2041 2041 10 8.53 8.53 8.53 8.53 8.53 11/1/2041 2041 11 8.70 8.70 8.70 8.70 8.70 12/1/2041 2041 12 8.83 8.83 8.83 8.83 8.83 2017 $3.01 $2.30 $2.76 $2.88 $2.96 2018 $3.00 $2.32 $2.70 $2.86 $2.92 2019 $3.12 $2.35 $2.81 $2.98 $3.07 2020 $3.19 $2.42 $2.85 $2.99 $3.08 2021 $3.42 $2.69 $3.12 $3.25 $3.35 2022 $3.81 $3.02 $3.50 $3.64 $3.74 2023 $4.23 $3.42 $3.93 $4.06 $4.16 2024 $4.27 $3.56 $3.94 $4.09 $4.17 2025 $4.47 $3.80 $4.12 $4.29 $4.36 2026 $4.81 $4.10 $4.41 $4.62 $4.69 2027 $5.10 $4.48 $4.75 $4.92 $4.98 2028 $5.42 $4.90 $5.16 $5.23 $5.31 2029 $5.75 $5.20 $5.53 $5.58 $5.66 2030 $5.87 $5.41 $5.70 $5.73 $5.81 2031 $6.18 $5 .72 $6.02 $6.06 $6.13 2032 $6.27 $5 .89 $6.12 $6.15 $6.23 2033 $6.46 $6 .09 $6.37 $6.40 $6.48 2034 $6.69 $6.22 $6.65 $6.66 $6.75 2035 $6.98 $6.54 $6.99 $6.95 $7.06 2036 $7.22 $6.74 $7.22 $7.19 $7.30 2037 $7.56 $7.08 $7.59 $7.54 $7.66 2038 $7.85 $7.37 $7.93 $7.86 $7.99 2039 $8.19 $7.72 $8.28 $8.21 $8.35 2040 $8.55 $8 .07 $8.66 $8.59 $8.73 2041 $8.92 $8.92 $8 .92 $8.92 $8.92 Case No. AVU-E-16-_ -Attachment Page 8 of 10 NEW OR TERMINATED PURPA CONTRACTS NOT INCLUDED IN THE LAST FILING State Counterparty Type Nameplate Capacity (MW) Expected Energy (aMW Peak Contribution (MW) Type Date Effective WA Hydro Tech LLC Hydro 1.57 1.13 1.14 PURPA extends current purchase Case No. AVU-E-16-_ -Attachment Page 9 of 10 NEW OR TERMINATED PPA SINCE LAST FILING Counterparty Type Nameplate Capacity (MW) Expected Energy (aMW) Peak Contribution (MW) Date Effective Date Ending None to report Case No. AVU-E-16-_ -Attachment Page 10 of 10