Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
20160526Schuh Exhibit 10, Schedule 1-3.pdf
DAVID J. MEYER VICE PRESIDENT AND CHIEF COUNSEL FOR REGULATORY & GOVERNMENTAL AFFAIRS AVISTA CORPORATION P.O. BOX 3727 1411 EAST MISSION AVENUE SPOKANE, WASHINGTON 99220-3727 TELEPHONE: (509) 495-4316 FACSIMILE: (509) 495-8851 DAVID.MEYER@AVISTACORP.COM BEFORE THE IDAHO PUBLIC UTILITIES COMMISSION IN THE MATTER OF THE APPLICATION ) CASE NO. AVU-E-16-03 OF AVISTA CORPORATION FOR THE ) AUTHORITY TO INCREASE ITS RATES ) EXHIBIT NO. 10 AND CHARGES FOR ELECTRIC SERVICE ) TO ELECTRIC CUSTOMERS IN THE ) KAREN K. SCHUH STATE OF IDAHO ) ) FOR AVISTA CORPORATION (ELECTRIC) Capital Expenditures $207 $247 $262 $296 $352 $407 $375 $405 $405 $405 $405 $0 $50 $100 $150 $200 $250 $300 $350 $400 $450 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 (i n m i l l i o n s ) Electric T&D Other ET Growth Generation Gas Environmental Planned Exhibit No. 10 Case No. AVU-E-16-03 K.Schuh, Avista Schedule 1, Page 1 of 1 ($15.00) $5.00 $25.00 $45.00 $65.00 $85.00 $105.00 1960 1970 1980 1990 2000 2010 2014 Handy Whitman Cost Index (Published in May 2015) Transmission Equipment ‐Accts 354, 355 & 356 Towers & Fixtures (FERC Acct. 354)Poles & Fixtures (FERC Acct. 355)OH Conductors (FERC Acct. 356) Exhibit No. 10 Case No. AVU-E-16-03 K. Schuh, Avista Schedule 2, Page 1 of 4 $0.00 $10.00 $20.00 $30.00 $40.00 $50.00 $60.00 $70.00 $80.00 $90.00 $100.00 1960 1970 1980 1990 2000 2010 2014 Handy Whitman Cost Index (Published May 2015) Transmission Substations Structures & Improvements (FERC Acct. 352)Station Equip. (FERC Acct. 353) Exhibit No. 10 Case No. AVU-E-16-03 K. Schuh, Avista Schedule 2, Page 2 of 4 $0.00 $10.00 $20.00 $30.00 $40.00 $50.00 $60.00 $70.00 $80.00 $90.00 $100.00 1960 1970 1980 1990 2000 2010 2014 Handy Whitman Cost Index (Published in May 2015) Distribution Substations Structures & Improvements (FERC Acct. 361)Station Equip. (FERC Acct. 362) Exhibit No. 10 Case No. AVU-E-16-03 K. Schuh, Avista Schedule 2, Page 3 of 4 $0.00 $20.00 $40.00 $60.00 $80.00 $100.00 1960 1970 1980 1990 2000 2010 2014 Handy Whitman Cost Index (Published in May 2015) Distribution Equipment ‐Accts 364, 365 & 368 Poles (FERC Acct. 364)OH Conductors (FERC Acct. 365)OH Line Transformers (FERC Acct. 368) Exhibit No. 10 Case No. AVU-E-16-03 K. Schuh, Avista Schedule 2, Page 4 of 4 Avista 2016 Capital Additions Detail (System) (Transfers to Plant) Exhibit No. 10 (K. Schuh, Avista) Schedule No. 4, Page #$ (000's) Page Generation / Production: 1 Spokane River License Implementatio $ 1,007 7 Peaking Generatio 500 10 Colstrip Thermal Capital 12,292 16 Cabinet Gorge Unit 1 Refurbishment 14,702 19 Hydro - Post Falls South Channel Gate Replacement 15,648 28 KFGS Reverse Osmosis Syste 4,750 31 Hydro - Nine Mile Reha 73,193 34 Generation DC Supplied System Upgrad 700 37 Coyote Springs LTS 1,980 40 Noxon Station Servic 1,477 43 Hydro - Little Falls Powerhouse Redevelopment 23,833 46 Base Load Hydr 1,149 49 Regulating Hydr 5,786 52 Base Load Thermal Plant 2,200 55 Clark Fork Settlement Agreemen 6,093 58 Hydro Safety Minor Blanke 75 $ 165,387 Page General: 61 COF Long-Term Restructuring Plan $ 9,550 70 Apprentice Training 60 73 Structures and Improvements/Furniture 3,600 76 Capital Tools & Stores Equipment 2,400 79 COF LngTrm Restruct Ph2 2,991 $ 18,601 Page Transportation: 82 Fleet Budget $ 5,660 $ 5,660 Page Enterprise Technology: 88 Next Generation Radio Refresh $ 6,000 91 Enterprise Security 1,360 94 Customer Facing Technology 286 100 High Voltage Protection for Substations 887 103 AFM COTS Migration 3,800 106 AvistaUtilities.com Redesign 5,536 114 Enterprise Business Continuity Plan 664 117 Technology Expansion to Enable Business Process 2,742 123 Microwave Refresh 4,543 120 Technology Refresh to Sustain Business Process 18,001 $ 43,817 Page 1 of 4 Exhibit No. 10 Case No. AVU-E-16-03 K. Schuh, Avista Schedule 3, Page 1 of 4 Avista 2016 Capital Additions Detail (System) (Transfers to Plant) Exhibit No. 10 (K. Schuh, Avista) Schedule No. 4, Page #$ (000's) Page Electric Transmission / Distribution:Transmission Distribution Total Transmission & Distribution 128 Meter Minor Blanket $ 403 $ 403 131 Elec Replacement/Relocation 2,750 2,750 134 Distribution Minor Rebuild 8,609 8,609 137 Storms 1,000 2,090 3,090 140 Primary URD Cable Replacement 200 200 143 Transmission - NERC Low Priority Mitigation 1,675 1,675 146 Transmission - NERC Medium Priority Mitigation 2,576 2,576 149 Noxon Switchyard Rebuild 11,500 11,500 152 Street Light Management 1,500 1,500 155 Substation - Capital Spares 5,200 5,200 158 SCADA - SOO & BUCC 1,002 1,002 161 Substation - Asset Mgmt. Capital Maintenance 4,100 18 4,118 164 Substation - Station Rebuilds 4,260 4,260 167 Worst Feeders 1,500 1,500 170 Transmission - Asset Management 1,772 1,772 173 Distribution Transformer Change-Out Program 8,406 8,406 176 Tribal Permits and Settlements 314 314 179 Westside Rebuild Phase One 2,525 2,525 182 Distribution Wood Pole Management 7,840 7,840 185 Substation - New Distribution Stations 400 400 188 S Region Voltage Control 5,000 5,000 194 Transmission - Reconductors and Rebuilds 17,559 17,559 197 Spokane Valley Transmission Reinforcement 1,340 1,340 200 Colstrip Transmission 568 568 203 Dist Grid Modernization 6,359 6,359 206 Segment Reconductor and FDR Tie Program 3,801 3,801 209 Distribution Line Protection 125 125 212 Environmental Compliance 50 350 400 $ 60,442 $ 44,351 $ 104,793 Total Non-Revenue Capital $ 338,258 Growth/Revenue - Producing $ 34,765 Total Natural Gas Capital Additions 2016 $ 45,873 Total Washington Direct Capital Additions 2016 $ 18,144 Total Oregon Direct Capital Additions 2016 $ 10,152 Total Capital Additions in 2016 $ 447,192 Page 2 of 4 Exhibit No. 10 Case No. AVU-E-16-03 K. Schuh, Avista Schedule 3, Page 2 of 4 Avista 2017 Capital Additions Detail (System) (Transfers to Plant) Exhibit No. 10 (K. Schuh, Avista) Schedule No. 4, Page #$ (000's) Page Generation / Production: 1 Spokane River License Implementatio $ 17,764 4 Kettle Falls Stator Rewind 7,930 7 Peaking Generation 500 10 Colstrip Thermal Capital 12,432 13 Cabinet Gorge Automation Replacement 2,342 22 CG HED - Gantry Crane Replacement 3,500 25 KF CT Control Upgrade 667 31 Hydro - Nine Mile Reha 3,814 34 Generation DC Supplied System Upgrade 1,033 37 Coyote Springs LTSA 1,980 40 Noxon Station Service 1,172 43 Hydro - Little Falls Powerhouse Redevelopment 11,470 46 Base Load Hydro 1,149 49 Hydro - Regulating Hydro 3,533 52 Base Load Thermal Plant 2,200 55 Clark Fork Settlement Agreemen 4,226 58 Safety Minor Blanket 80 $ 75,791 Page General: 64 New Airport Hangar $ 1,500 67 Clark Fork Engineering Building 1,089 70 Apprentice Trainin 60 73 Structures and Improvements/Furniture 3,600 76 Capital Tools & Stores Equipment 2,400 79 COF LngTrm Restruct Ph2 8,979 $ 17,628 Page Transportation: 82 Fleet Budget $ 7,700 $ 7,700 Page Enterprise Technology: 85 Mobility in the Field $ 650 88 Next Generation Radio Refresh 375 91 Enterprise Security 2,500 94 Customer Facing Technology 4,000 103 AFM COTS Migration 11,500 114 Enterprise Business Continuity Plan 450 117 Technology Expansion to Enable Business Process 13,700 120 Technology Refresh to Sustain Business Process 17,250 123 Microwave Refresh 4,000 126 Meter Data Management 21,299 $ 75,724 Page 3 of 4 Exhibit No. 10 Case No. AVU-E-16-03 K. Schuh, Avista Schedule 3, Page 3 of 4 Avista 2017 Capital Additions Detail (System) (Transfers to Plant) Exhibit No. 10 (K. Schuh, Avista) Schedule No. 4, Page #$ (000's) Page Electric Transmission / Distribution:Transmission Distribution Total Transmission & Distribution 128 Meter Minor Blanket $ 403 $ 403 131 Elec Replacement/Relocation 2,600 2,600 134 Distribution Minor Rebuild 8,867 8,867 137 Storms 1,000 2,183 3,183 140 Primary URD Cable Replacement 500 500 143 Transmission - NERC Low Priority Mitigation 3,000 3,000 146 Transmission - NERC Medium Priority Mitigation 1,000 1,000 149 Noxon Switchyard Rebuild 6,700 6,700 152 Street Light Management 2,720 2,720 155 Substation - Capital Spares 4,565 4,565 158 SCADA - SOO & BUCC 1,044 1,044 161 Substation - Asset Mgmt. Capital Maintenance 4,100 52 4,152 164 Substation - Station Rebuilds 7,540 7,540 167 Worst Feeders 2,499 2,499 170 Transmission - Asset Management 1,780 1,780 173 Distribution Transformer Change-Out Program 8,115 8,115 176 Tribal Permits and Settlements 300 300 182 Distribution Wood Pole Management 12,000 12,000 185 Substation - New Distribution Stations 275 275 191 SCADA Completion 1,000 1,000 194 Transmission - Reconductors and Rebuilds 20,830 20,830 197 Spokane Valley Transmission Reinforcement 7,200 7,200 200 Colstrip Transmission 398 398 203 Dist Grid Modernization 13,118 13,118 206 Segment Reconductor and FDR Tie Program 4,175 4,175 209 Distribution Line Protection 125 125 212 Environmental Compliance 50 350 400 $ 60,507 $ 57,982 $ 118,488 Total Non-Revenue Capital $ 295,332 Growth/Revenue - Producing $ 36,736 Total Natural Gas Capital Additions 2017 $ 46,985 Total Washington Direct Capital Additions 2017 $ 65,674 Total Oregon Direct Capital Additions 2017 $ 7,994 Total Capital Additions in 2017 $ 452,721 Page 4 of 4 Exhibit No. 10 Case No. AVU-E-16-03 K. Schuh, Avista Schedule 3, Page 4 of 4