HomeMy WebLinkAbout20110112notice_of_cost_of_service_workshop.pdfOffice ofthe Secretary
Service Date
January 12, 2011
BEFORE THE IDAHO PUBLIC UTILITIES COMMISSION
IN THE MATTER OF THE APPLICATION
OF A VISTA CORPORATION DBA A VISTA
UTILITIES FOR AUTHORITY TO
INCREASE ITS RATES AND CHARGES FOR
ELECTRIC AND NATURAL GAS SERVICE
IN IDAHO.
) CASE NOS. AVU-IO-
VU-IO-
) NOTICE OF
) COST OF SERVICE WORKSHOP
On September 21 , 2010, the Commission issued Order No. 32070 authorizing Avista
to recover $21.25 million in additional annual base revenues for electric service and $1.
million in additional annual base revenues for natural gas service. 1 In addition, the Commission
directed A vista, Staff, and other interested parties to convene a public workshop prior to the
Company s next general rate case to discuss (1) the appropriate size of the first tier energy block
for residential electric service Schedule 1; (2) the possible use of a revised peak credit method
for classifying production costs and other cost of service issues; and (3) other customer service
related issues. Order No. 32070 at 18. On December 20 2010, a workshop was held to address
the appropriate size of the first tier energy block and customer service related issues. This
workshop is intended to address the issues of a revised peak credit method for classifying
production costs and other cost of service matters.
NOTICE OF COST OF SERVICE WORKSHOP
YOU ARE HEREBY NOTIFIED that Commission Staff will hold a workshop on
TUESDAY. FEBRUARY 8. 2011. AT 9:30 A.M. (MOUNTAIN TIME) IN THE
COMMISSION HEARING ROOM. 472 WEST WASHINGTON STREET. BOISE.
IDAHO Persons wishing to participate telephonically may dial toll-free (888) 706-6468; when
prompted. enter Participant Code 472404 Specifically, the purpose of the workshop is to
discuss the possible use of a revised peak credit method for classifying production costs, as well
as consideration of the use of a 12 CP (whether "weighted" or not) versus a 7 CP or other
method for allocating transmission costs.
1 The increase in base electric rates will be offset by $ I 3 million in deferred state income tax (DSIT) in the first year
(beginning October I , 2010) and by $4 million in DSIT in the second year. The increase in base natural gas rates
will be offset by $500 000 in DSIT beginning October 1 2010.
NOTICE OF COST OF
SERVICE WORKSHOP
YOU ARE FURTHER NOTIFIED that all proceedings in this matter will be held in
facilities meeting the accessibility requirements of the Americans with Disabilities Act (ADA).
Persons needing the help of a sign language interpreter or other assistance in order to participate
in or to understand testimony and argument at a public hearing may ask the Commission to
provide a sign language interpreter or other assistance at the hearing. The request for assistance
must be received at least five (5) working days before the hearing by contacting the Commission
Secretary at:
IDAHO PUBLIC UTILITIES COMMISSION
PO BOX 83720
BOISE, IDAHO 83720-0074
(208) 334-0338 (Telephone)
(208) 334-3762 (FAX)
E-mail: secretary~puc.idaho.gov
YOU ARE FURTHER NOTIFIED that all proceedings in this case will be held
pursuant to the Commission s jurisdiction under Title 61 of the Idaho Code and that the
Commission may enter any final Order consistent with its authority under Title 61.
YOU ARE FURTHER NOTIFIED that all proceedings in this matter will be
conducted pursuant to the Commission s Rules of Procedure, ID AP A 31.01.01.000 et seq.
DATED at Boise, Idaho this / J
J-h day of January 2011.
~tD'rJJe D. Jewell
Commission Secretary
N:A VU-IO-A VU-lO-cost of service workshop
NOTICE OF COST OF
SERVICE WORKSHOP