HomeMy WebLinkAbout20100108Decision Memo.pdfDECISION MEMORANDUM 1
DECISION MEMORANDUM
TO: COMMISSIONER KEMPTON
COMMISSIONER SMITH
COMMISSIONER REDFORD
COMMISSION SECRETARY
COMMISSION STAFF
LEGAL
FROM: NEIL PRICE
DEPUTY ATTORNEY GENERAL
DATE: JANUARY 8, 2010
SUBJECT: AVISTA’S 2009 ELECTRIC INTEGRATED RESOURCE PLAN (IRP);
CASE NO. AVU-E-09-09
On August 31, 2009, Avista Corporation dba Avista Utilities (“Avista”) filed its 2009
Electric Integrated Resource Plan (IRP) with the Commission pursuant to the Commission’s
biennial IRP filing requirements mandated in Order No. 22299, and later modified in Order No.
24729 and Order No. 30262.
On October 9, 2009, the Commission issued a Notice of Application and Modified
Procedure and established a 60-day open comment period. See Order No. 30928. Subsequently,
Commission Staff and the Idaho Conservation League (“ICL”) were the only parties to submit
written comments regarding Avista’s 2009 IRP.
AVISTA’S INTEGRATED RESOURCE PLAN
Avista is headquartered in Spokane, Washington and serves electric customers in
northern Idaho. Avista states that the 2009 IRP “guides the utility’s resource acquisition strategy
over the next two years and the overall direction of resource procurements for the remainder of
the 20-year planning horizon.” IRP Executive Summary at i. Avista also states that its
“Preferred Resource Strategy (PRS) is a mix of renewable resources, conservation, upgrades at
existing facilities, and new gas-fired generation.” Id.
The following is a summary of the Company’s 2009 IRP filing:
Avista contends that conservation and plant upgrades will not be enough
to compensate for an anticipated 1.7 percent energy and capacity load
growth and the expiration of long-term contracts in the future. Id. The
Company estimates that it will experience annual energy deficits
DECISION MEMORANDUM 2
beginning in 2018, increasing to 126 aMW in 2022 and 527 aMW in 2029.
Id. Capacity deficits are forecasted to be 139 MW in 2022 and 667 MW
in 2029. Id.
Avista states that the development of it PRS began with the “identification
and quantification of potential new resources” to serve future resource
demands. Id. at iii. Avista then performed a Western Interconnect-wide
study “to understand the impact of regional markets. . . .” Id. The
Company subjected data developed “from over 250 iterations of potential
future conditions” to a “Monte-Carlo style analysis” and “the results were
used to estimate the Mid-Columbia electricity market. . . .” Id.
Ultimately, the selection of the PRS was “based on forecasted energy and
capacity needs, resource values, state mandated portfolio standards, and
limiting power supply expense variability.” Id.
The IRP notes the strong correlation between natural gas prices and
electricity prices because gas-fired generation is currently the marginal
resource relied upon within the Western Interconnect. Id. at v. The
Company forecasts that the “Mid-Columbia market price is expected to
average $79.56 per MWh in 2009 dollars” through 2029. Id. at iv.
Avista again included carbon emissions in its “Base Case” cost estimates.
Id. at ix. Id. Not surprisingly, the Company projects a precipitous rise in
carbon dioxide emissions prices over the next twenty years. Id., Figure 8,
at viii.
The 2009 PRS aims for an additional 250 of Nameplate (MW) Capacity of
Combined Cycle Combustion Turbine (CCCT) by 2019, 2024 and 2027;
150 MW of NW Wind by 2012 and 2019, and 50 MW by 2022; 5 MW of
Distribution Efficiencies by 2010-2015; 5 MW in Upgrades to its Little
Falls and Upper Falls hydro facilities by 2020; 339 MW of conservation
throughout the planning period. Id., Table 2, at viii.
STAFF COMMENTS
Public Process
Staff began its analysis with a summary description of its participation in the
preparation of Avista’s 2009 IRP document. Comments at 2. Staff notes that it was in “close
contact” with Company officials during the preparation of the document and offered comments
throughout the process. Id. Staff is satisfied that Avista adequately addressed “Staff’s comments
in preparing the final IRP document.” Id. Staff mentioned that public participation in the IRP
process was improved but it “continues to be difficult to achieve full participation from a broad
cross section of customers and interest groups.” Id. Staff urges the Company to “continue its
DECISION MEMORANDUM 3
efforts to involve key customers, customer group representatives, environmental organizations,
and others . . . on the Technical Advisory Committee.” Id.
Load Forecast
Staff believes that the load forecast prepared by Avista is reasonable. Id. at 3. Staff
notes that Avista’s economic forecast was completed in July 2008, more than a year before the
final IRP was submitted. Id. Thus, “Staff does not believe that the full impact of the current
recession is reflected in the Company’s load forecast.” Id. Nevertheless, does not believe that
questions regarding the accuracy of the economic forecast are problematic because the Company
is in a “surplus condition for several years into the future.” Id. Further, new resource additions
are planned for the future when forecasted loads are expected to rebound to forecasted levels. Id.
Environmental Policy
Staff notes the increasing impact that environmental issues have upon electric utility
resource planning. Id. at 4. The Company devoted a substantial portion of its IRP document to
environmental policy and has instituted a formal Climate Change Committee to monitor new
emissions legislation and issues. Id. Avista laid out its plan to comply with all existing state
regulations (WA) of greenhouse gas emissions and “has made reasonable assumptions about the
content, timing and costs of meeting proposed federal requirements.” Id.
Demand-Side Management and Supply-Side Efficiency
Avista’s IRP discloses the Company’s plan to “acquire 102 aMW of energy
efficiency over the next 10 years and 226 aMW over 20 years.” Id. It is anticipated that these
energy efficiency gains will shave 153 MW from the 2020 system peak and 339 MW from the
2029 system peak. Id.
Energy Efficiency
Staff detailed the Company’s processes in “identifying energy efficiency
improvement potentials. . . .” Id. In identifying potential energy efficiency improvements, the
Company relies primarily “upon the Northwest Power and Conservation Council’s Power Plans
and its own contracted studies of energy savings potentials.” Id. at 5. The last contracted study
was conducted in 2005 and Avista states that it will contract another study prior to its 2011 IRP
filing. Id. The energy efficiency goals identified during the IRP process “helps the Company
develop its conservation business plan and establish acquisition targets, while meeting its
regulatory requirements.” Id. While Staff believes that Avista’s approach to identifying and
DECISION MEMORANDUM 4
updating DSM potential is well-reasoned,” it urged the Company to utilize all of its options in
evaluating potential DSM programs so as to ensure “maximum, long-term cost-effective DSM
for a utility’s entire customer base and equitable treatment among its customers.” Id.
Resource Options
Staff summarized the resource options considered by Avista to “meet future resource
deficits.” Id. at 6. In addition to conservation programs, the Company also evaluated
“upgrading existing hydro projects, building new facilities and contracting with other energy
companies for future delivery.” Id. Simple and combined-cycle gas-fired combustion turbines
remain a reliable and relatively inexpensive source of both energy and capacity. Id. Staff added
that the main drawback for these types of facilities continues to be the cost volatility associated
with natural gas. Id.
The Company is not considering adding a pulverized coal facility for the 2009 IRP.
Id. “Concerns over the environmental impact of carbon-based generation technologies have
increased demand for renewable generation, particularly wind.” Id.
Washington State Renewable Portfolio Standard
Staff addressed the impact that the 2006 Washington state voter initiative (I-937), the
Energy Independence Act, had upon the Company’s decision to acquire new renewable
resources. Id. at 7. Avista was compelled by the statute to acquire renewable resources that it
would not otherwise need to meet forecasted loads through the year 2017. Id.
Staff declined to express a position as to the prudency of these acquisitions. Id. at 8.
Preferred Resource Strategy
Staff commented that Avista’s Preferred Resource Strategy (PRS) over the 20 year
IRP planning period will include the acquisition of approximately 1,449 MW’s in Nameplate
capacity of “hydro upgrades, wind, conservation, distribution efficiency programs and natural
gas-combined cycle gas turbines.” Id. “Following the acquisition of the wind/renewable that
Avista is currently seeking, the next large capacity addition would be a 250 MW combined cycle
combustion turbine in 2019.” Id.
Avista will be seeking at least 150 of wind capacity by the end of 2019 in order to
meet Washington’s RPS standard and another 50 MW wind resource in 2022 due to additional
RPS obligations created by anticipated load growth over that time period. Id. at 9. Finally,
DECISION MEMORANDUM 5
capacity deficits in 2024 and 2027 will force the Company to acquire another 250 MW natural
gas combined-cycle plant. Id.
Differences from the 2007 IRP
Staff cites the Company’s increased reliance on wind resources as the major
difference between the 2007 IRP and the current IRP. Id. Wind was selected over other
renewable resources due to its availability in large quantities. Id.
Risk Analysis
Staff agreed that Avista’s PRS is “superior to the other resource strategies considered
in the IRP.” Id.
Transmission
Staff commented that the Company’s transmission planning and IRP planning process
appears “to be much more closely aligned and better coordinated than in the past.” Id. at 10.
Avista included a new segment in its current IRP with an “analysis of potential distribution
system efficiency improvements” and a multi-phase plan to identify and “evaluate potential
energy savings from transmission and distribution feeder upgrades.” Id.
2009 Action Plan Items
The Company identified specific action plan items in five key areas to be developed
and studied in Avista’s 2011 IRP: resource additions and analysis, energy efficiency,
environmental policy, modeling and forecasting enhancements and transmission planning. Id.
Staff believes that the listed action items are reasonable and will support Avista’s PRS/planning
process going forward. Id. at 12.
IDAHO CONSERVATION LEAGUE COMMENTS
The Idaho Conservation League (ICL) is “Idaho’s largest state-based conservation
organization” representing over 9,500 members. ICL Comments at 1. ICL is generally
supportive of Avista’s 2009 IRP and focused its comments on three main issues: energy
efficiency, renewable energy, and carbon emissions. Id. ICL applauded Avista’s plan to meet
“26 percent of its new load growth through 2020 with energy efficiency” and was “pleased to see
the Preferred Resource Strategy (PRS) includes 350 megawatts of wind generation.” Id. The
organization encouraged Avista to “explore other non-wind renewable energy options.” Id. ICL
was also “pleased to see no significant increase in carbon emissions over the 20-year timeframe
DECISION MEMORANDUM 6
in the PRS. . . .” Id. at 2. ICL generally supports efforts by the utility to develop “a more diverse
renewable energy portfolio and increasing energy savings with efficiency.” Id.
STAFF RECOMMENDATIONS
Staff stated that Avista’s resource needs are largely driven by the Company’s
obligation to meet Washington’s RPS standards and not its overall load-resource balance. Id.
Accordingly, Staff recommends that the Commission “scrutinize the Company’s decision for
early acquisition of renewables at the time it makes a filing to begin recovering the cost of
renewables in customer rates.” Id. at 13. Staff also recommends that the Commission address
the Idaho and Washington jurisdictional allocation issues presented by the acquisition of new
resources in order to meet Washington’s RPS standards and not load growth. Id. Because the
2009 IRP was based upon a load forecast which was finalized prior to the full impact of the
current recession, Staff recommends that Avista revisit that forecast and make appropriate
revisions in its 2011 IRP. Id. Staff recommends that the Commission accept and acknowledge
Avista’s 2009 IRP. Id.; see also Errata to Staff Comments at 1.
COMMISSION DECISION
Does the Commission wish to accept and acknowledge Avista’s 2009 IRP filing?
M:AVU-E-09-09_np2