HomeMy WebLinkAboutFinal Approved Tariffs.pdfAvista Corp.
1411 East Mission P.O.Box 3727
Spokane.Washington 99220-0500
Telephone 509-489-0500
Toll Free 800-727-9170
March 31,2009
Jean D.Jewell,Secretary
Idaho Public Utilities Commission
Statehouse Mail
W.472 Washington Street
Boise,Idaho 83720
Dear Ms.Jewell:
Advice No.ADV 09-01-E
~~~'V'STA'
Corp.
Attached for filing with the Commission is an electronic copy of the Company's proposed revisions
to the following tariff sheets,I.P.V.C.No.28:
Eleventh Revision Sheet 51D
Twelfth Revision Sheet 51E
Tenth Revision Sheet 51F
Eleventh Revision Sheet 51 G
Twelfth Revision Sheet 51R
Tenth Revision Sheet 51N
Tenth Revision Sheet 510
Canceling
Canceling
Canceling
Canceling
Canceling
Canceling
Canceling
Tenth Revision Sheet 51D
Eleventh Revision Sheet 51 E
Ninth Revision Sheet 51F
Tenth Revision Sheet 51 G
Eleventh Revision Sheet 51 R
Ninth Revision Sheet 51N
Ninth Revision Sheet 51 0
These tariff sheets are being filed to update the Company's Electric Line Extension Schedule 51 to
reflect 2008 average costs and are proposed to become effective May 4,2008.The cost materials
and labor has increased significantly over the past year,resulting in an overall increase in line
extension costs.
Enclosed as Attachment 1 is a copy of the workpapers supporting the line extension cost revisions
contained in the proposed tariff sheets.Please direct any questions to me at 509.495.8620.
Sincerely,
Q~~
Patrick Ehrbar
Sr.Regulatory Analyst,State and Federal Regulation
Avista Utilities
509-495-8620
Pat.ehrbar@avistacorp.com
Enclosures
RECEIVED
2009 March 31 AM 11:49
IDAHO PUBLIC
UTILITIES COMMISSION
I.P.U.C.No.28
Eleventh Revision Sheet 51 D
Canceling
Tenth Revision Sheet 51 D
AVISTA CORPORATION
dba Avista Utilities
SCHEDULE 51 -continued
51D
EXAMPLE:
For a single-phase primary overhead extension of 2310
feet:
1.The Basic Cost is calculated from the charges in
section 7.
a.$3,774 +($4.04 perft x 2310 ft.)=$13,106.
b.The average Basic Cost is $13,106/231 0 ft =
$5.67 per ft.
2.Exceptional Cost:
a.If the cost estimate from the extension drawing is
$14,000,the average estimated primary cost is
$14,000/2310 ft =$6.06 per ft.
b.The Exceptional Cost for a long extension is the
difference between the estimated cost and the
tariffed cost for the length greater than 1500 ft:
EC =($6.06 -$5.67)x (2310 ft -1500 ft)=$316.
3.Total Primary Cost
a.The Customer's primary extension cost is
$13,106 +$316 =$13,422.
b.The total extension cost is calculated by
combining all Basic Costs,Exceptional Costs,
Allowance,Cost Reductions and Share of
Previous Extension for the extension.
5)"Customer-Requested Cost"is the cost of unusual labor and/or
materials which is requested by the Customer but which is not
necessary to construct the Line Extension based on the
Company's minimum design,construction,and operating
practices.All Customer-Requested Costs must be paid in full
by the Customer.Customer-Requested Costs may include,
but are not limited to,the following:
a)facilities to provide three-phase service where single
phase service is adequate
b)construction which is not for electric service
c)facilities longer,deeper,or larger than deemed
appropriate by the Company
d)underground facilities in overhead areas
e)soil compaction on private property
Issued March 31,2009 Effective May 4,2009
Issued by Avista Utilities
~~#'1.w-:::J Norwood,Vice President -State &Federal Regulation
IDAHO PUBLIC UTILITIES COMMISSION
Approved Effective
May 15, 2009 May 18, 2009
Per O.N. 30811
Jean D. Jewell Secretary
I.P.U.C.NO.28
Twelfth Revision Sheet 51 E
Canceling
Eleventh Revision Sheet 51 E
AVISTA CORPORATION
dba Avista Utilities
SCHEDULE 51 -continued
51E
6)"Share of Previous Extension"applies only to Primary Circuits
less than five years old.If part of a previous line extension is
used to serve a new Customer,the new Customer must pay a
share of the previous Primary Circuit cost and Transformer
cost,if shared,to the Company before the start of
construction.The amount paid by the new Customer will be
refunded to existing Customers in relation to their share of the
Primary Circuit and Transformer,if shared.The Company will
refund appropriate shares to the bearers of Extension
Certificates when the Certificates are presented for payment
and the connection of the subsequent Customer has been
verified.The Company will make a reasonable attempt to
inform the bearer of the Certificate when a refund is due.
Bearers of Extension Certificates must apply for refunds
before the original line extension becomes six years old.
Unclaimed refunds will be returned to the contributor.
EXAMPLE:
1.First Customer pays $8,450 for 1,000 feet of
primary underground circuit ($8.45 per foot).
2.Second Customer takes service within five years
using 600 feet of the original extension.
3.Both Customers share the first 600 feet equally:
600 ft x $8.45/ft x }2 =$2,535.
4.The Second Customer's payment of $2,535 will be
refunded to the First Customer to reduce his
investment in the 600 feet to $2,535.The First
Customer's investment in the remaining 400 feet
remains at $3,380.($8,450 -$2,535-$2,535=$3,380)
EXCEPTION:If the refund to an existing Customer is
less than $50 each,the new Customer will not be
required to pay that share and the existing Customer
will not receive a refund.
Issued March 31 ,2009 Effective May 4,2009
Issued by Avista Utilities
By~~,...,;:::,;orwOOd.Vice President -State &Federal Regulation
IDAHO PUBLIC UTILITIES COMMISSION
Approved Effective
May 15, 2009 May 18, 2009
Per O.N. 30811
Jean D. Jewell Secretary
I.P.U.C.NO.28
Tenth Revision Sheet 51 F
Canceling
Ninth Revision Sheet 51 F 51F
AVISTA CORPORATION
dba Avista Utilities
SCHEDULE 51 -continued
4.RULES AND CHARGES FOR UNDEVELOPED RESIDENTIAL LOTS
a.A development is a group of neighboring undeveloped lots separated
by no more than streets and under the ownership or legal control of a
single party as determined by the Company.Both the General Rules
and the following rules apply to line extensions within
residential developments.
=
=
+
+
+
+
b.Before Company facilities will be installed,the developer must submit
a written application for service,a copy of the plat as approved by the
governing agency depicting dedicated utility easements approved by
the serving utilities and must pay an extension cost to the Company
which is computed as follows:
Basic Cost
Exceptional Costs
Customer-Requested Costs
Cost Reductions
(one)Design Fee of $185
extension cost within development
cost of extension to development
Share of Previous Extension
extension cost
1)"Basic Cost"will be computed from the following rate per lot
when the Development serves single phase loads,has at least
six lots and the average frontage is no more than 175 feet per
lot.The Basic Cost includes the cost of the Primary Circuit,the
Transformer and the Secondary Circuit in the utility easement
or public right-of-way,but does not include the Service Circuit
from the point of connection with the Secondary Circuit to the
Point of Delivery.Any Exceptional Costs involved with
installation of the service must be paid by the party requesting
the service.
Developments:$1,701 per Lot
Issued March 31 ,2009 Effective May 4,2009
Issued by Avista Utilities
~~#'\~IIY Norwood,Vice President -State &Federal Regulation
IDAHO PUBLIC UTILITIES COMMISSION
Approved Effective
May 15, 2009 May 18, 2009
Per O.N. 30811
Jean D. Jewell Secretary
I.P.U.C.No.28
Eleventh Revision Sheet 51 G
Canceling
Tenth Revision Sheet 51 G
AVISTA CORPORATION
dba Avista Utilities
SCHEDULE 51 -continued
The Basic Cost for all other Developments will be computed
from the rates listed in this Schedule for Service Circuits,
Secondary Circuits,Transformers and Primary Circuits.
2)"Cost Reductions,""Exceptional Costs"and "Share of Previous
Extension"are described under Rules for Individual Customers.
51G
3)"Extension to development"is the line extension between the
Company's existing energized electric facilities and the
boundary of the development.The Rules for Individual
Customers apply to the extension to the development.
c.In lieu of a cash payment of the Basic Cost in a Development,the
Company will accept a cash payment of $522 per lot and a letter of
credit,a contractor's performance bond,promissory note,or another
credit instrument for $1,179 ($1,701 less $522)per lot upon execution of
a written agreement with the Developer.The agreement shall prescribe
the requirements for such a credit instrument and shall permit the face
amount of the instrument to be reduced annually as new customers are
connected within the Development.The Developer may provide
ditching within the Development,for which they will receive a $522 per
lot Cost Reduction.If the Developer provides the ditching,they may
make a cash payment or provide an appropriate credit instrument for
$1,179 per lot.
d.Prior to installation of the Service Circuit to each single-family residence
in a development,the home builder will be required to make a non
refundable cash payment to the Company of $766 per residence.There
will be no charge to the builder for the installation of the Service Circuit to
serve a duplex or multiplex dwelling.
e.A Developer who pays the extension cost described in 4.b.1 )may apply
for a refund annually for each permanent Customer connected within the
Development during the first five years after the extension is completed.
The Company will make a reasonable attempt to inform the bearer of the
certificate when a refund is due.The Company will pay the refund to the
bearer of the Extension Certificate when it is presented to the Company
for payment and the connection of the permanent Customer has been
verified.
Issued March 31 ,2009 Effective May 4,2009
Issued by Avista Utilities
~,J'I-\~y Norwood,Vice President -State &Federal Regulation
IDAHO PUBLIC UTILITIES COMMISSION
Approved Effective
May 15, 2009 May 18, 2009
Per O.N. 30811
Jean D. Jewell Secretary
I.P.U.C.NO.28
Twelfth Revision Sheet 51 H
Canceling
Eleventh Revision Sheet 51 H
AVISTA CORPORATION
dba Avista Utilities
SCHEDULE 51 -continued
51H
For Developers who have made a cash payment to the Company for
the Basic Cost in the development,the sum of all refunds shall not
exceed the total Basic Cost paid by the Developer or $1 ,179 per lot
multiplied by the number lots,whichever is less.The developer must
apply for the refunds before the line extension becomes six years old.
f.In a Development where primary taps may be required into some lots to
provide adequate service or where the loads are not clearly defined,the
Company may elect to install only an initial Primary Circuit through the
Development (no Transformers or Secondary Circuits).The Rules for
Individual Customers will be used to establish the extension cost of
the Primary Circuit and that cost must be paid in advance by the
Developer.
The permanent Customer on each lot must meet the Rules for
Individual Customers for the extension into the lot,except they will not
pay a share of the cost of the Primary Circuit through the Development
or a share of previous extensions outside the Development.The
applicable Allowance will be credited first to the Basic Cost to serve the
permanent Customer.The Developer will be refunded only the portion
of the Allowance not granted or applied to the permanent Customer.
Issued March 31 ,2009 Effective May 4,2009
Issued by Avista Utilities
By ~~#t1.~e;:,:,orwood,Vice President -State &Federal Regulation
IDAHO PUBLIC UTILITIES COMMISSION
Approved Effective
May 15, 2009 May 18, 2009
Per O.N. 30811
Jean D. Jewell Secretary
I.P.U.C.No.28
Tenth Revision Sheet 51 N
Canceling
Ninth Revision Sheet 51 N
AVISTA CORPORATION
dba Avista Utilities
SCHEDULE 51 -continued
51N
Single-Phase
Overhead Primary Circuit:
Fixed Costs:
Variable Costs:
Underground Primary Circuit:
Fixed Costs:
Variable Costs:
Three-Phase*
Overhead Primary Circuit:
Fixed Costs:
Variable Costs:
Underground Primary Circuit:
Fixed Costs:
Variable Costs:
$3,774 per Customer
$4.04 per foot
$1,384 per Customer
$8.45 per foot
$5,706 per Customer
$5.27 per foot
$2,066 per Customer
$16.88 per foot
*Note:Secondary Circuit,Service Circuit,and Transformer costs
for three phase installations will vary based on the installed
capacity of the Line Extension and are not shown in this
Schedule.
g."Secondary Circuit"is the electrical facility from the Company's
Transformer to a handhole or connectors from which one or more
Service Circuits originate.The Secondary Circuit is single phase,is
operated at less than 600 volts to ground and may include conductors,
connectors,supporting structures,conduit,handholes,junction box
and trench.The Basic Cost of the Secondary Circuit shall be
computed using the following rates.
Single Phase Overhead Secondary Circuit:
Fixed Costs:
Variable Costs:
Issued March 31 ,2009
$253 per customer
$4.23 per foot
Effective May 4,2009
Issued by ~).Utilities /
By ,-,A/#'1.~rwOOd,Vice President -State &Federal Regulation
IDAHO PUBLIC UTILITIES COMMISSION
Approved Effective
May 15, 2009 May 18, 2009
Per O.N. 30811
Jean D. Jewell Secretary
I.P.U.C.NO.28
Tenth Revision Sheet 510
Canceling
Ninth Revision Sheet 510
AVISTA CORPORATION
dba Avista Utilities
SCHEDULE 51 -continued
Single Phase Underground Secondary Circuit:
510
Fixed Costs:
Variable Costs:
$199 per customer
$6.80 per foot
h."Service Circuit"is the electrical facility between the Company's
Transformer,connectors,or handhole and the Point of Delivery for a
single Customer or building.The Service Circuit is single phase*,is
operated at less than 600 volts to ground and may include
conductors,connectors,junction box,supporting structures,conduit,
handholes and trench.The Basic Cost of the Service Circuit shall be
computed using the following rates.These rates do not include meters
and metering facilities which are used by the Company for billing
purposes.
Single Phase Overhead Service Circuit:
Fixed Costs:$253 per customer
Variable Costs:$4.23 per foot
Single Phase Underground Service Circuit:
Fixed Costs:$199 per customer
Variable Costs:$6.80 per foot
i."Transformer"Basic Cost shall be computed using the following
rates for single phase transformers.
Single Phase Overhead Transformer Costs:
Single Phase Padmount Transformer Costs:
$1 ,173 per Customer
$1,659 per Customer
j."Underground Facilities"may include primary cable,secondary and
service cable,secondary and service connections,surface-type (pad
mount)Transformers,concrete pads,enclosures,switch gear,
terminations,equipment protective barriers and conduit or duct where
necessary.These facilities will be owned,operated and maintained
by the Company unless otherwise provided for by agreement.
Issued March 31,2009 Effective May 4,2009
Issued by Avista UtilitiesB~~,.,..~orwOOd,Vice President -State &Federal Regulation
IDAHO PUBLIC UTILITIES COMMISSION
Approved Effective
May 15, 2009 May 18, 2009
Per O.N. 30811
Jean D. Jewell Secretary