HomeMy WebLinkAbout20071113notice_of_consolidated_prehearing_conference.pdfOffice of the Secretary
Service Date
November 13, 2007
BEFORE THE IDAHO PUBLIC UTILITIES COMMISSION
IN THE MATTER OF IDAHO POWER
COMPANY'S PETITION TO INCREASE
THE PUBLISHED RATE ELIGIBILITY CAP
FOR WIND-POWERED SMALL POWER
PRODUCTION FACILITIES; AND
IN THE MATTER OF THE PETITION OF
ROCKY MOUNTAIN POWER FOR AN ORDER REVISING CERTAIN
OBLIGATIONS TO ENTER INTO
CONTRACTS TO PURCHASE ENERGY
GENERA TED BY WIND-POWERED SMALL
POWER GENERATION QUALIFYING FACILITIES
TO ELIMINATE THE 90%/110%
PERFORMANCE BAND FOR WIND-
POWERED SMALL POWER PRODUCTION
FA CILITIES
IN THE MATTER OF THE PETITION OF
VISTA CORPORATION FOR AN ORDER
REVISING A VISTA CORPORATION'
OBLIGATIONS TO ENTER INTO
CONTRACTS TO PURCHASE ENERGY.
GENERATED BY WIND-POWERED SMALL
POWER GENERATION FACILITIES
CASE NO. IPC-07-
CASE NO. P AC-07-
CASE NO. AVU-07-
NOTICE OF CONSOLIDATED
PREHEARING CONFERENCE
the Idaho Public Utilities Commission has authority under the Public Utility
Regulatory Policies Act of 1978 (PURP A) and the implementing regulations of the Federal
Energy Regulatory Commission (FERC) to set avoided costs, to order electric utilities to enter
into fixed-term obligations for the purchase of energy from qualifying facilities (QFs) and to
implement FERC rules.
On February 6, 2007, Idaho Power Company (Idaho Power) in Case No. IPC-07-
03 filed a Petition with the Idaho Public Utilities Commission (Commission) proposing a
$10.72/MWh wind integration adjustment for reduction to the published avoided cost rates
payable to wind QFs. In a report addendum filed with the Commission on October 31 , 2007, the
NOTICE OF CONSOLIDATED
PREHEARING CONFERENCE
Company presents an updated wind integration cost of $7.92/MWh. On April 2, 2007, Avista
Corporation (A vista) filed a Petition proposing a wind integration adjustment to published
avoided cost rates of 12%; and for QFs agreeing to deliver output on a firm hourly schedule, a
percentage reduction of 6%. On April 23 , 2007 , PacifiCorp dba Rocky Mountain Power
(PacifiCorp) filed a Petition proposing a wind integration adjustment of $5.04 per MWh. All
petitions contained additional elements and conditions, i., elimination of 90%1110%
performance band; sharing of costs for wind forecasting services; and QF commitments to
provide a "Mechanical Availability Guarantee" demonstrating physical capability and ability to
generate at full output during 85% of the hours in a month.
Parties of Record
The following parties in Case No. IPC-07-03 requested and were granted
intervenor status: Exergy Development Group ofIdaho LLC; Renewable NW Project and N.
Energy Coalition; PacifiCorp dba Rocky Mountain Power; Ridgeline Energy LLC; Idaho
Windfarms LLC; Cassia Gulch Wind Park LLC and Cassia Wind Farms LLC; Avista
Corporation; Snake River Alliance; Gerald Fleischman; Renaissance Engineering & Design
PLLC; Blue Ribbon Energy LLC; and INL Biofuels and Renewable Energy Technologies.
The following parties in Case No. PAC-07-07 requested and were granted
intervenor status: Intermountain Wind LLC; Exergy Development Group of Idaho LLC;
Renewable NW Project and NW Energy Coalition; Idaho Windfarms LLC; Avista Corporation;
and INL Biofuels and Renewable Energy Technologies.
The following parties in Case No. A VU-07-02 requested and were granted
intervenor status: Exergy Development Group of Idaho LLC; Renewable NW Project and NW
Energy Coalition; Idaho Windfarms LLC; and INL Biofuels and Renewable Energy
Technologies.
Background
In Case No. IPC-05-, Idaho Power s Petition to temporarily suspend its purchase
obligations for wind generation, the Commission on August 4, 2005 stated
Based on the record established in this case the Commission finds reason to
believe that wind generation presents operational integration costs to a utility
different from other PURPA qualified resources. We find that the unique
supply characteristics of wind generation and the related integration costs
provide a basis for adjustment to the published avoided cost rates, a
calculated figure that may be different for each regulated utility. The
NOTICE OF CONSOLIDATED
PREHEARlNG CONFERENCE
procedure to determine the appropriate amount of adjustment, we find, and
the identification of what studies, if any, need to be performed to provide
such a number is a matter appropriate for further proceedings. The record
reflects that a wind integration study if required may take six months to
develop. Idaho Power has requested a suspension period from six to nine
months.
Order No. 29839 p. 8.
In reducing the cap for published rates for wind projects offering power on a non-
firmed basis, we found that we had continuing authority to review PURP A rates in order to
protect the public interest. 18 C.R. ~ 292.304(a)(l)(i), (c)(1); Order No. 29839 p. 9.
recognized further that no utility is required to pay more than its avoided cost for QF purchases.
PURPA ~ 210(b); Order No. 29839 p. 9.
In commenting on our changing the published rate availability for certain wind QFs
we stated
We did not eliminate the utility s obligation to purchase from wind QFs, but
we established greater administrative control of contracts during the period of
our investigation. For wind QFs greater than 100 kW offering power on an
unfirmed basis, the door to a purchase contract is not closed. For projects not
qualifying for the published rate, individual negotiation of rates under an IRP
based methodology is required.
Order No. 29872 p. 10.
Pursuant to Commission direction Idaho Power in conjunction with A vista and
PacifiCorp and in consultation with the other parties scheduled and held four workshops (August
, September 20, October 10, and November 18, 2005) and a settlement meeting (January 12
2006). The parties were unsuccessful in reaching mutual agreement on interim settlement issues.
No additional meetings were scheduled until completion of the Company s integration study
(estimated June 2006). See Phase II Workshop Final Report, January 31 , 2006. See also
September 6, 2005 and November 7, 2005 Status Reports.
In early 2007 Idaho Power, A vista and PacifiCorp filed integration studies and
recommended wind integration adjustments. Case Nos. IPC-07-03 (2-16-07); A VU-07-
(4-07); and PAC-07-07 (4-23-07). Workshops ensued. Efforts to obtain a comprehensive
generic settlement were unsuccessful.The Commission on August 22, 2007 established
comment deadlines to bring the matter to closure. The Commission was notified that Renewable
Northwest ProjectlNW Energy Coalition had reached a settlement agreement in principle with
NOTICE OF CONSOLIDATED
PREHEARING CONFERENCE
two of the three utilities and believed that an agreement in principle could be achieved with the
third utility. Additional time was requested to complete settlement discussions, to solicit support
from other parties and to prepare settlement documents. An additional scheduling Order was
issued September 19, 2007. Further negotiation efforts resulted in settlement proposals with
only limited support, i., the utilities, Renewable Northwest Project/NW Energy Coalition
Idaho Windfarms LLC, and Commission Staff.
Given two years of continued effort it appears unlikely to this Commission that the
parties will be able to achieve resolution agreeable to all parties. That being said, however, a
review of the filings reveals that the protracted process was not without constructive benefit.
Studies have been prepared; underlying assumptions have been challenged; a greater
understanding of wind integration is evident; and the learning curve has been reduced.
To bring this matter to conclusion, we find it reasonable to set a prehearing
conference of the parties to identify what issues remain; to determine at what points (if any)
consensus exists; and to determine the scope and timeline of further proceedings.
YOU ARE HEREBY NOTIFIED that a consolidated prehearing conference in
Case Nos. IPC-07-, PAC-07-, and AVU-07-02 will COMMENCE AT 9:00 A.
ON TUESDAY. DECEMBER 11. 2007 AT THE COMMISSION'S HEARING ROOM.
472 WEST WASHINGTON STREET. BOISE. IDAHO
NOTICE OF CONSOLIDATED
PREHEARING CONFERENCE
DATED at Boise, Idaho this
ATTEST:~ill~Je D. Jewell
C mmlSSlon Secretary
bls!N:IPC-07-03 _P AC-07-07 - A VU-O7-02 _
NOTICE OF CONSOLIDATED
PREHEARING CONFERENCE
r/.
MARSHA H. SMITH, COMMISSIONER
:.._
=--L....,---~.
~"