HomeMy WebLinkAbout2000310_sw.docDECISION MEMORANDUM
TO: COMMISSIONER HANSEN
COMMISSIONER SMITH
COMMISSIONER KJELLANDER
MYRNA WALTERS
RON LAW
TONYA CLARK
DON HOWELL
STEPHANIE MILLER
DAVE SCHUNKE
KEITH HESSING
NANCY HARMAN
WORKING FILE
FROM:
DATE: March 10, 2000
RE: CASE NO. AVU-E-00-2 (Avista)
PCA REBATE ( $2,364,000)
On March 1, 2000, Avista Corporation dba Avista Utilities—Washington Water Power Division (Avista; Company) in Case No. AVUE00-2 filed an Application with the Idaho Public Utilities Commission (Commission) proposing a revision to the Companys electric tariff Schedule 66temporary Power Cost AdjustmentIdaho. Avista requests that the Commission approve a $2,364,000, 1.973% rebate to Avistas Idaho customers. The rebate is being requested as a result of the trigger being reached and exceeded in Avistas Power Cost Adjustment (PCA) balancing account. The Companys PCA mechanism was first established in Case No. WWP-E-88-3, Order No. 22816 issued October 31, 1989, and has been extended, modified and clarified in a number of subsequent cases (WWP-E-93-3, Order No. 24874; WWPE94-4, Order No. 25637; WWPE97-10, Order No. 27202; and WWP-E-98-4, Order No. 27824). Since its inception to date of filing, there have been nine rebates totaling $23,184,000 and three surcharges totaling $6,769,000. The PCA-related rate changes are limited to no more than two consecutive surcharges or rebates during any 12-month period, July 1 to June 30, and the annual rate change during any 12-month period is limited to 5%.
Water Powers PCA is used to track changes in revenues and costs associated with variations in hydroelectric generation, prices in the secondary market, and changes in PURPA power expenses. The PCA rate adjustment mechanism is designed to recover/rebate variances in power supply expenses incurred by the Company. The PCA mechanism tracks changes in the Companys power supply costs associated with abnormal weather and stream flows. The weather-related portion of the PCA tracks 100% of the variation in hydro generation from the hydro generation authorized, variation in secondary prices from those authorized, and the related variation in thermal generation. The PCA is also designed to recover contract costs incurred pursuant to the Public Utilities Regulatory Policies Act of 1978 (PURPA) and the related implementing rules and regulations of the Federal Energy Regulatory Commission (FERC) beyond the level included in the Companys general revenue requirement. PURPA contract costs are the result of the Companys federally mandated obligation to purchase the output of qualifying small power and cogeneration facilities and, therefore, are largely outside the control of Avista. The PCA tracks 100% of the changes in costs associated with PURPA contracts. The Company is allowed to record the difference between actual power supply costs and the level of those costs authorized by the Commission. When the total difference in costs exceed $2.2 million, the Company may request authority to implement a surcharge or rebate. As reflected in the Companys Application, the $2.2 million trigger was reached and exceeded in December 1999, based on actual data from the preceding month, November.
Under the Companys proposal in this case, the monthly energy charges of the individual electric rate schedules are to be decreased by the following amounts:
Type of Service
Present
Sch 66 Rebate
Effective 8/1/99; Expires 7/31/00
(2.503%)
Proposed
Sch 66 Rebate
(1.973%)
Schedules 1, 3A-D, & 15
(Residential)
Schedules 11, 12, 13A-D, & 16
(General)
Schedules 17, 21, 22, & 23A-D
(Large General)
Schedule 25
(Extra Large General)
Schedules 18, 31, 32, & 33A-D
(Pumping)
0.115¢/kWh
0.153¢/kWh
0.114¢/kWh
0.077¢/kWh
0.107¢/kWh
0.101¢/kWh
0.137¢/kWh
0.095¢/kWh
0.065¢/kWh
0.081¢/kWh
Flat rate charges for Company-owned or customer-owned street lighting and area lighting service (Schedules 41-49) under the present rebate are reduced by 2.503% and under the proposed rebate will be reduced by a further 1.973%. Implementation of the proposed rebate will result in an overall decrease of 1.973% in the Companys Idaho electric rates or $1.01 in the monthly bill of an average residential customer using 1,000 kWh. The combined effect of both the existing and proposed rebates is an overall decrease of 4.476%, or $2.16 in the monthly bill of an average residential customer using 1,000 kWh. The existing rebate, however, will expire on July 31, 2000.
Avista has requested that its Application be processed under Modified Procedure, i.e., by written submission rather than by hearing. Reference Commission Rules of Procedure, IDAPA 31.01.01.201-204. The Company, as part of its Application, has filed supporting testimony and exhibits.
Commission Decision
Staff recommends that this matter be processed pursuant to Modified Procedure. Does the Commission agree? If not, what is the Commission’s preference?
vld/M:AVU-E-00-2_sw2