HomeMy WebLinkAbout20220322_ct1jo.pdfDECISION MEMORANDUM
TO:COMMISSIONER ANDERSON
COMMISSIONER CHATBURN
COMMISSIONER HAMMOND
COMMISSION SECRETARY
COMMISSION STAFF
LEGAL
FROM:CURTIS THADEN
DATE:MARCH 18,2022
SUBJECT:IN THE MATTER OF AVISTA UTILITIES TARIFF ADVICE NO.22-01-EPROPOSEDREVISIONSTOITSIDAHOTARIFFINDEX.
BACKGROUND
On March 4,2022,Avista Corporation d/b/a Avista Utilities (Avista)submitted Tariff
Advice No.22-01-E with proposed revisions to its tariff index page (Sheet B-1)with a proposed
effective date of April 18,2022.The proposed revisions address administrative revisions to
update the current listing of tariff sheets on index page (Sheet B-1)that have either been recently
added or cancelled by the Commission through other proceedings.
STAFF ANALYSIS AND RECOMMENDATION
Staff reviewed each of the Company's proposed tariff changes supplied in the filingand
determined that a Tariff Advice is appropriate for processing the modifications to tariff index
page (Sheet B-1).The proposed modifications are administrative in nature,withdraw a schedule
(never listed in index)that was only active for one year,remove a schedule that was cancelled,
and add two schedules that were approved.Staff recommends that the Commission approve the
Company's proposed revisions to its tariff index page (Sheet B-l),as filed,in Tariff Advice
22-01-E with an effective date of April 18,2022.
DECISION MEMORANDUM -1 -MARCH 18,2022
COMMISSION DECISION
Does the Commission wish to approve the Company's proposed changes to its tariff index
page (Sheet B-1),as filed,with an effective date of April 18,2022?
Curtis Thaden
Udmemso/Decision Memo Tariff Filing Avista ADV No.TA-22·01-E
DECISIONMEMORANDUM -2 -MARCH 18,2022
Avista Corp.
1411 East Mission P.O.Box 3727
Spokane,Washington 99220-0500
Telephone 509-489-0500
Toll Free 800-727-9170
March 4,2022
Commission Secretary
State of Idaho
Idaho Public Utilities Commission
11331 W.Chinden Blvd.Building 8,Suite 201-A
Boise,Idaho 83714
Re:HousekeepingFiling (Electric)ADV No.22-01-E
In accordance with Case No.GNR-U-20-Ol,Order No.34602,which suspends the requirement to file
physical copies,the Company has attached for electronic filing with the Commission the following
original tariff sheet:
Twelfth Revision Sheet B-1 Replacing Eleventh Revision Sheet B-1
The Company requests to withdraw the following tariff sheet:
OriginalSheet 74
The Company requests that the proposedtariff sheet be made effective April 18,2022.The purposeof this
tariff filing is to update the current listing of tariff sheets on the index page (Sheet B)to reflect tariffs that
have either been recently added or canceled by the Commission through other proceedings.A summarized
list of the changes are below:
Withdrawn
Schedule 74 Temporary Federal Income Tax Schedule 74 was in effect from April 1,2019 through
March 31,2020 for the purpose of returning to customers the temporary benefits attributable to the
revisions of the federal income tax code caused by enactment of the Tax Cuts and Jobs Act signed into
law on December22,2017.This effective term of this rate credit has since passed and those benefits are
no longer being returnedto customers and therefore the Company requests to withdraw this tariff in its
entirety.
Removed
Schedule 72 Permanent Federal Income Tax Rate Credit Schedule 72 was canceled as part of the
compliance filing in Avista's 2019 GRC (AVU-E-19-04).
EleventhRevisionSheet B-1
Canceling
1.P.U.C.No.28 TenthRevisionSheet B-1
AVISTA CORPORATION
dba Avista Utilities
INDEX PAGE -IDAHO -continued
Schedule Sheet
Title of Sheet No.
MiscellaneousSchedules
51 Line Extension,Conversion,and Relocation Schedule -Idaho...............51
53 Temporary Service ...................................................................................53
54 Line Extension And Conversion Schedule for
Local 1mprovementDistricts -idaho......................................................54
58 Tax Adjustment Schedule -Idaho ............................................................58
59 Residential And Farm Energy Rate Adjustment -Idaho ..........................59
62 Cogeneration And Small Power Production Schedule -Idaho ................62
63 Net Metering Option..................................................................................63
66 Temporary Power Cost Adjustment -Idaho .............................................66
70 Idaho Rules And Regulations...................................................................70
75 Fixed Cost Adjustment -Idaho .................................................................75
90 Electric Energy Efficiency Programs -Idaho............................................90
91 Energy Efficiency Rider Adjustment -Idaho.............................................91
95 Optional Renewable Power Rate -Idaho ................................................95
96 Energy Load Management Program -Pilot..............................................96
97 Rebate of Electric Earnings Test Deferral -Idaho....................................97
Issued December11,2018 Effective January1,2019
Issued by Avista Utilities
By Patrick Ehrbar,Directorof RegulatoryAffairs
Twelfth RevisionSheet B-1
Canceling
I.P.U.C.No.28 EleventhRevisionSheet B-1
AVISTACORPORATION
dba Avista Utilities
INDEX PAGE -IDAHO -continued
Schedule Sheet
No.Title of Sheet No.
Miscellaneous Schedules
51 Line Extension,Conversion,and Relocation Schedule -Idaho...............51
53 Temporary Service ..................................................................................53
54 Line Extension And Conversion Schedule for
Local Improvement Districts -Idaho......................................................54
58 Tax Adjustment Schedule -Idaho ...........................................................58
59 Residential And Farm Energy Rate Adjustment -Idaho ..........................59
62 Cogeneration And Small Power Production Schedule -Idaho ................62
63 Net Metering Option.................................................................................63
66 Temporary Power Cost Adjustment -Idaho .............................................66
70 Idaho Rules And Regulations....................................................70
75 Fixed Cost Adjustment -Idaho.....................................................75
76 Tax Customer Credit -Idaho ...................................................76
85 Idaho Service Quality Program....................................................85
90 Electric Energy Efficiency Programs -Idaho............................................90
91 Energy Efficiency Rider Adjustment -Idaho.............................................91
95 Optional Renewable Power Rate -Idaho ................................................95
96 Energy Load Management Program -Pilot..............................................96
97 Rebate of Electric Earnings Test Deferral -Idaho....................................97
Issued March 4,2022 Effective April 18,2022
Issued by Avista Utilities
By Patrick Ehrbar,Directorof RegulatoryAffairs
Twelfth Revision Sheet B-1
Canceling
I.P.U.C.No.28 EleventhRevision Sheet B-1
AVISTA CORPORATION
dba Avista Utilities
INDEX PAGE -IDAHO -continued
Schedule Sheet
Title of Sheet No.
Miscellaneous Schedules
51 Line Extension,Conversion,and Relocation Schedule -Idaho...............51
53 Temporary Service ......................................................................53
54 Line Extension And Conversion Schedule for
Local Improvement Districts -Idaho..................................................54
58 Tax Adjustment Schedule -Idaho .........................................................58
59 Residential And Farm Energy Rate Adjustment -Idaho ..........................59
62 Cogeneration And Small Power Production Schedule -ldaho ................62
63 Net Metering Option...............................................................................63
66 Temporary Power Cost Adjustment -ldaho .............................................66
70 Idaho Rules And Regulations...............................................................70
75 Fixed Cost Adjustment -1daho .......................................................75
76 Tax Customer Credit -Idaho .......................................................76
85 Idaho Service Quality Program......................................................85
90 Electric Energy Efficiency Programs -Idaho............................................90
91 Energy Efficiency Rider Adjustment -Idaho.............................................91
95 Optional Renewable Power Rate -Idaho ................................................95
96 Energy Load Management Program -Pilot..............................................96
97 Rebate of Electric Earnings Test Deferral -Idaho....................................97
Issued March 4,2022 Effective April 18,2022
Issued by Avista Utilities
By Patrick Ehrbar,Directorof RegulatoryAffairs