Loading...
HomeMy WebLinkAbout20090921_2711.pdfDECISION MEMORANDUM TO:COMMISSIONER KEMPTON COMMISSIONER SMITH COMMISSIONER REDFORD COMMISSION SECRETARY LEGAL WORKING FILE FROM:T J GOLO DATE:SEPTEMBER 17,2009 RE:IDAHO POWER TARIFF ADVICE NO. 09-07 REVISIONS TO RULE D AND SCHEDULE 66 BACKGROUND Idaho Power Company ("Company ) filed a tariff advice with the Commission proposing to add an "Enhanced Metering Information Service" to Rule D - Metering, and the corresponding charges to Schedule 66 - Miscellaneous Charges. The Company received several requests, mostly from large power customers, to provide enhance levels of metering service to improve efficiencies in their operational practices. Currently, the Company offers two types of Load Profile Metering services under Rule D: (1) Meter Pulse Output Service and (2) Load Profile Recording Service. These services provide data transfer and data collection of kilowatt- hours, kilowatts and V AR-hours. The Meter Pulse Output Service is used to determine load and the Load Profile Recording Service is used to compile data and send it to requesting customers once a month. Both services are provided at the customer s request and charged the appropriate installation, removal, and monthly charges outlined in Schedule 66. However, these services do not provide the enhanced metering information currently being requested by customers. The Company s proposed Enhanced Metering Information Service will provide customers the opportunity to determine and collect specific "real-time" load information customized to their individual needs. The Company proposes to assist requesting customers the transfer and collection of this information via enhanced metering equipment and electronic data transmission. The enhanced metering equipment will provide customers the opportunity to track and record instantaneous kilowatt-hours, kilowatts, V AR-hours, volts, amps, and power quality information such as harmonic distortion. DECISION MEMORANDUM - 1 -SEPTEMBER 17, 2009 STAFF REVIEW Staff reviewed the Company s proposal to add the Enhanced Metering Service information and believes that it is an excellent initiative by the large power customers to efficiently manage energy use in their operations. The customer is responsible of managing its own data storage and determining how long metering information is stored. The Company will provide assistance and direct customers to purchase the data management software compatible with the meter equipment. The Company will install, own, operate, and maintain the enhanced metering system when the requesting customer prepays work order costs for installation. The Company will utilize its work order billing process and all labor, materials, and credit allowances will be itemized in the work orders. Staff reviewed samples of work order installation costs for this enhanced metering service. In all cases, the ION 8600 meter and two Xstream 900 MHz serial radios are standard equipment for all installations. The ION 8600 meter is the metering device that collects and records the enhanced metering information. This meter is more sophisticated than the meters installed in the AMI program. It can measure demand and energy as well as voltage, current energy, power factor, and frequency. It can also provide power quality data such as sags, swells transients, and harmonics. The Xstream radios are needed to transmit and receive the metering information. An ION 8600 meter costs $5 121 and the two Xstream radios cost $530. The customer will receive a credit allowance for the cost of a Company-provided standard revenue meter of $551. Other installations might require additional equipment such as a high gain antenna ($66) or an antenna cable extension (cost varies from $31-$48 depending on length). Other itemized costs include labor, vehicle mileage, and vehicle flat rate. A typical work order installation with the credit allowance of$551 is about $5 500. The Company used standard average unit cost methodology to determine these costs. In addition to the work order cost charges in Schedule 66, per month charges will be included in the customer s monthly bill. The charge is $5 with an existing ION meter and $13 without an existing ION meter. The Company has installed ION meters in some locations for its own benefit. In this case, a nearby customer can utilize that same meter for this enhanced metering service if the customer chooses to pay the $5 per month charge and other appropriate work order costs. The purpose of the monthly charge is to cover expenses for maintaining the metering equipment. The Company will check the customer s metering equipment about every 6 DECISION MEMORANDUM - 2 -SEPTEMBER 17 , 2009 months to ensure the functionality of the metering equipment. Staff believes that the work order costs and other charg~s are appropriate to ensure that the cost to provide this service is recovered from customers requesting this voluntary service. At the same time, the Company can ensure continued safe and reliable metering service by owning, operating, and maintaining the equipment needed for this enhanced service. ST AFF RECOMMENDATION Staff recommends that the Commission approve Idaho Power s Tariff Advice No. 09- Revisions to Rule D and Schedule 66 to add the language "Enhanced Metering Information Service" in Rule D and the appropriate charges in Schedule 66 Section 3 , with an effective date of September 25 2009. COMMISSION DECISION Does the Commission with to accept the proposed revisions in Idaho Power s Tariff Advice No. 09-077 i:udmemoslIPC Tariff Advice No. 09-07 Revisions to Rule D and Schedule 66 DECISION MEMORANDUM - 3 -SEPTEMBER 17 , 2009