Loading...
HomeMy WebLinkAbout20070529_1945.pdfDECISION MEMORANDUM TO:COMMISSIONER KJELLANDER COMMISSIONER SMITH COMMISSIONER REDFORD COMMISSION SECRETARY LEGAL WORKING FILE FROM:WAYNE HART DATE:MAY 25, 2007 RE:CASE NO. IPC-07-, IDAHO POWER AND C-SQUARED DEVELOPMENT, LLC PETITION FOR EXEMPTION FROM MASTER METERING RULES 102 AND 103. On May 22 2007 , Idaho Power Company and C-Squared Development, LLC filed a Joint Petition for an exemption from Rules 102 and 103 of the Commission s Master Metering Rules for Electric Utilities for the mixed use development to be built at Sixth and Front in Boise. The Joint Petition states that the exemption is justified because the proposed design of the building is projected to use 75% less energy than current standards, and master metering is unlikely to foster an increase in individual energy consumption. In addition, the central heating and cooling system that is to be used in the building improves the overall development's energy efficiency and is engineered to reduce the ability of individual users to materially affect energy usage. The Petitioners requested, and Staff recommends, that its Application be processed by Modified Procedure. COMMISSION DECISION Should the Joint Application of Idaho Power Company and C-Squared Development for an exemption from the Commission s Master Metering Rules be processed by Modified Procedure? i:udmemoslipceO7-12 ipc c-squared master metering dm DECISION MEMORANDUM - 1 -MAY 25 , 2007