HomeMy WebLinkAbout20031201_694.pdfDECISION MEMORANDUM TO:COMMISSIONER KJELLAND ER COMMISSIONER SMITH CO MMISSI 0 NER HANSEN COMMISSION SECRETARY COMMISSION STAFF LEGAL FROM:SCOTT WOODBURY DATE:NOVEMBER 26, 2003 RE:CASE NOS. A VU-03-8, IPC-03-, PAC-03- AVOIDED COST-VARIABLE RATE REVISED FUEL PRICE (NATURAL GAS) The Idaho Public Utilities Commission in Order No. 29124, Case No. GNR-02- ordered several changes to the variables and manner in which avoided cost rates are to be computed for projects smaller than 10 MW. Among the ordered changes were abandonment of the utility first deficit year, changes in cost variables associated with a combined cycle combustion turbine and changes in the manner in which fuel costs are determined. More specifically for fuel costs, the Commission chose to adopt the medium fuel pnce forecast prepared by the Northwest Power and Conservation Council (formerly the Northwest Power Planning Council) along with the method for establishing the starting year gas price and escalation rate proposed by the Idaho Independent Energy Producer s witness Trippel. Order No. 29124 states that natural gas prices can be updated when a new Northwest Power and Conservation Council forecast becomes available. A new fuel price forecast was prepared by the Council on April 22, 2003. Staff has used this forecast to compute new avoided cost rates for proj ects smaller than 10 MW according to the revised methodology spelled out in Order No. 29124. A copy of the revised fuel price forecast, computation of starting year gas price and escalation rate, and Staff computation of the resultant avoided cost rates was provided to PacifiCorp, Idaho Power and Avista for their review. All utilities by letter accept the calculated rate schedules as accurate. DECISION MEMORANDUM Under the revised fuel price forecast of the Northwest Power & Conservation Council, the starting gas price increases from $3.75/mmbtu to $4.40/mmbtu; the fuel escalation rate decreases from 2.6% to 2.4%. Commission Decision Pursuant to Commission approved avoided cost methodology (Order No. 29124) natural gas prices are to be updated when a new Northwest Power & Conservation Council forecast becomes available. The medium fuel price forecast prepared by the Northwest Power & Conservation Council has changed. The resultant change in avoided cost rates is a simple arithmetic calculation. The new forecast includes a new starting gas price and fuel escalation rate. Staff recommends that the Commission approve the Staff calculated changes in the avoided cost rates for Idaho Power, Avista and PacifiCorp (see attached) for an effective date of December 15 , 2003. Scott Woodbury VldlM:A VUEO38/IPCEO315/PACEO312 DECISION MEMORANDUM AVISTA UTILITIES AVOIDED COST RATES FOR NON-FUELED PROJECTS SMALLER THAN TEN MEGAWATTS December 15, 2003 mills/kWh LEVELIZED NON-LEVELIZED CONTRACT ON-LINE YEAR LENGTH CONTRACT NON-LEVELIZED (YEARS)2003 2004 2005 2006 2007 2008 YEAR RATES 44.45.46.47.49 48.49.77 2003 44. 44.45.46.48.49.50.2004 45. 45.46.47.44 48.49.50.2005 46. 45.46.47.49.50.51.44 2006 47.49 46.47.48.45 49.50.51.2007 48. 46.47.48.50.51.52.2008 49.77 47.48.49.43 50.51.53.2009 50. 47.48.49.51.52.53.2010 52. 48.49.50.51.52.54.2011 53.40 48.49.50.52.53.54.2012 54. 48.50.51.52.49 53.55.2013 55. 49.50.51.52.54.55.48 2014 57. 49.50.52.53.54.55.2015 58. 50.51.52.53.55.56.2016 60. 50.51.52.54.55.56.2017 61.48 50.52.53.54.55.57.2018 62. 51.52.49 53.55.56.57.2019 64.44 51.52.54.55.40 56.58.2020 65. 51.53.54.47 55.77 57.58.45 2021 67. 52.53.54.56.57.46 58.2022 69. 2023 70. 2024 72.47 2025 74. 2026 75. 2027 77. 2028 79. AVISTA UTILITIES AVOIDED COST RATES FOR FUELED PROJECTS SMALLER THAN TEN MEGAWATTS December 15, 2003 mills/kWh LEVELIZED NON-LEVELIZED CONTRACT ON-LINE YEAR LENGTH CONTRACT NON-LEVELIZED (YEARS)2003 2004 2005 2006 2007 2008 YEAR RATES 13.13.13.13.14.14.2003 13. 13.13.47 13.14.14.43 14.2004 13. 13.13.13.14.14.14.2005 13. 13.45 13.14.14.40 14.15.2006 13. 13.13.14.14.14.15.2007 14. 13.14.14.14.15.15.2008 14. 13.14.14.14.15.15.2009 14. 13.14.14.14.15.15.2010 15. 14.14.44 14.15.15.46 15.2011 15. 14.14.14.15.15.15.2012 16. 14.14.15.15.15.16.2013 16. 14.48 14.15.15.15.16.2014 16. 14.14.15.15.15.16.2015 17. 14.15.15.15.16.16.49 2016 17. 14.15.15.15.16.16.2017 17. 14.15.15.15.16.16.2018 18. 15.15.15.16.16.47 16.2019 18. 15.15.48 15.16.16.16.2020 19. 15.15.15.16.16.17.2021 19. 15.15.16.16.41 16.17.2022 20. 2023 20. 2024 21. 2025 21. 2026 22. 2027 22. 2028 23. EFFECTIVE DATE ADJUSTABLE COMPONENT 12/15/2003 31.24 The total avoided cost rate in each year is the sum of the adjustable component and the fixed component from either of the tables above. Example 1. A 20-year levelized contract with a 2004 on-line date would receive the following rates: Years Rate 15.68 + 31. 15.68 + Adjustable component in each year Example 2. A 4-year non-Ievelized contract with a 2004 on-line date would receive the following rates: Years Rate 13.33 + 31. 13.63 + Adjustable component in year 2005 13.95 + Adjustable component in year 2006 14.27 + Adjustable component in year 2007 IDAHO POWER COMPANY AVOIDED COST RATES FOR NON-FUELED PROJECTS SMALLER THAN TEN MEGAWATTS December 15, 2003 mills/kWh LEVELIZED NON-LEVELIZED CONTRACT ON-LINE YEAR LENGTH CONTRACT NON-LEVELIZED (YEARS)2003 2004 2005 2006 2007 2008 YEAR RATES 44.45.46.47.49.50.2003 44. 45.46.47.41 48.49.50.2004 45. 45.46.47.49.50.51.42 2005 46. 46.47.48.44 49.50.51.2006 47. 46.47.48.50.51.52.2007 49. 47.48.49.45 50.51.53.2008 50. 47.48.49.51.52.53.2009 51.48 48.49.50.41 51.52.54.2010 52. 48.49.50.52.53.54.2011 53. 48.50.51.52.53.55.2012 55. 49.41 50.51.53.54.55.2013 56. 49.51.52.53.45 54.56.2014 57. 50.51.42 52.53.55.56.48 2015 59. 50.51.53.54.55.56.2016 60. 51.52.53.46 54.56.57.2017 62. 51.52.53.55.56.44 57.2018 63. 51.52.54.55.56.58.2019 65. 52.53.54.55.57.58.2020 66. 52.45 53.54.56.57.58.2021 68. 52.54.55.56.57.59.2022 69. 2023 71.49 2024 73. 2025 74. 2026 76. 2027 78. 2028 80. IDAHO POWER COMPANY AVOIDED COST RATES FOR FUELED PROJECTS SMALLER THAN TEN MEGAWATTS December 15, 2003 mills/kWh LEVELIZED NON-LEVELIZED CONTRACT ON-LINE YEAR LENGTH CONTRACT NON-LEVELIZED (YEARS)2003 2004 2005 2006 2007 2008 YEAR RATES 13.49 13.14.14.44 14.15.2003 13.49 13.13.14.14.14.15.2004 13. 13.14.14.43 14.15.15.45 2005 14. 13.14.14.14.15.15.2006 14.44 14.14.14.15.15.41 15.2007 14. 14.14.14.15.15.15.2008 15. 14.14.15.15.15.16.2009 15.46 14.48 14.15.15.15.16.2010 15. 14.14.15.15.16.16.2011 16. 14.15.15.42 15.16.16.2012 16. 14.15.15.15.16.16.2013 16. 14.15.15.16.16.41 16.2014 17. 15.15.45 15.16.16.16.2015 17. 15.15.15.16.16.17.2016 18. 15.15.16.16.41 16.17.2017 18. 15.43 15.16.16.16.17.2018 18. 15.15.16.16.17.17.42 2019 19.43 15.16.16.16.17.17.2020 19. 15.16.16.48 16.17.17.2021 20. 15.16.16.16.17.17.2022 20. 2023 21. 2024 21. 2025 22. 2026 22. 2027 23. 2028 23. EFFECTIVE DATE ADJUSTABLE COMPONENT 12/15/2003 31. The total avoided cost rate in each year is the sum of the adjustable component and the fixed component from either of the tables above. Example 1. A 20-year levelized contract with a 2004 on-line date would receive the following rates: Years Rate 16.21 + 31. 16.21 + Adjustable component in each year Example 2. A 4-year non-Ievelized contract with a 2004 on-line date would receive the following rates: Years Rate 13.80 + 31. 14.12 + Adjustable component in year 2005 14.44 + Adjustable component in year 2006 14.78 + Adjustable component in year 2007 PACIFICORP AVOIDED COST RATES FOR NON-FUELED PROJECTS SMALLER THAN TEN MEGAWATTS December 15, 2003 mills/kWh LEVELIZED NON-LEVELIZED CONTRACT ON-LINE YEAR LENGTH CONTRACT NON-LEVELIZED (YEARS)2003 2004 2005 2006 2007 2008 YEAR RATES 44.46.47.48.49.50.2003 44. 45.47 46.47.48.49.51.2004 46. 45.47.48.49.50.48 51.2005 47. 46.45 47.48.49.51.52.22 2006 48. 46.48.49.50.51.52.2007 49. 47.40 48.49.50.52.53.2008 50. 47.48.50.51.52.53.2009 51. 48.49.44 50.51.53.54.2010 52. 48.49.51.52.53.54.2011 54. 49.50.51.52.53.55.2012 55. 49.50.51.53.54.42 55.2013 56. 49.51.52.53.54.56.2014 58. 50.51.52.54.55.56.2015 59. 50.51.53.54.40 55.57.2016 60. 51.52.53.54.56.57.42 2017 62.41 51.42 52.53.55.56.47 57.2018 63. 51.52.54.55.56.58.2019 65.41 52.53.54.55.57.58.2020 66. 52.53.54.56.57.58.2021 68. 52.53.55.56.57.59.2022 70. 2023 71. 2024 73. 2025 75.29 2026 77. 2027 78. 2028 80. PACIFICORP AVOIDED COST RATES FOR FUELED PROJECTS SMALLER THAN TEN MEGAWATTS December 15, 2003 mills/kWh LEVELIZED NON-LEVELIZED CONTRACT ON-LINE YEAR LENGTH CONTRACT NON-LEVELIZED (YEARS)2003 2004 2005 2006 2007 2008 YEAR RATES 13.14.14.14.15.15.2003 13. 13.14.14.14.15.15.2004 14. 14.14.14.15.15.15.2005 14. 14.14.49 14.15.15.15.2006 14. 14.14.14.15.15.16.2007 15. 14.44 14.15.15.46 15.16.2008 15. 14.14.15.26 15.15.16.2009 15. 14.15.15.15.16.16.48 2010 16. 14.15.15.15.16.16.2011 16.46 14.15.15.16.16.16.2012 16. 15.15.43 15.16.16.16.2013 17. 15.15.15.16.27 16.17.2014 17. 15.15.16.16.16.17.2015 18. 15.42 15.16.16.16.17.2016 18.45 15.15.16.16.17.17.40 2017 18. 15.15.16.16.17.17.2018 19. 15.16.16.46 16.17.17.2019 19. 15.16.16.16.17.17.2020 20. 15.16.28 16.17.17.43 17.2021 20. 16.16.16.17.17.17.2022 21. 2023 21. 2024 22. 2025 22. 2026 23. 2027 23. 2028 24. EFFECTIVE DATE ADJUSTABLE COMPONENT 12/15/2003 31. The total avoided cost rate in each year is the sum of the adjustable component and the fixed component from either of the tables above. Example 1. A 20-year levelized contract with a 2004 on-line date would receive the following rates: Years Rate 16.37 + 31. 16.37 + Adjustable component in each year Example 2. A 4-year non-Ievelized contract with a 2004 on-line date would receive the following rates: Years Rate 14.04 + 31. 14.36 + Adjustable component in year 2005 14.69 + Adjustable component in year 2006 15.03 + Adjustable component in year 2007