Loading...
HomeMy WebLinkAbout20221223_Veolia to Staff Attachment - Response to No. 117.pdfA VEO-W-22-02 IPUC DR 117 Page 1 of 1 VEOLIA WATER IDAHO, INC. CASE VEO-W-22-02 THIRD PRODUCTION REQUEST OF THE COMMISSION STAFF Preparer/Sponsoring Witness: C. Cooper REQUEST NO. 117: Please explain and provide supporting documentation for the “File Relocation plan” found on the list of pro forma projects. Please include any cost benefit analyses and approvals for the project. RESPONSE NO. 117: The file relocation plan project developed a naming convention for scanning paper files to electronic files, and then scanned the paper engineering files going back to 1969 into a searchable electronic format. The scanning was done for several reasons – 1) the paper files take up a lot of space and are heavy, 2) in preparation for our upcoming office remodel, these filing cabinets needed to be removed, 3) with the onset of more remote work, paper files in the office were difficult for employees to access and search, 4) the paper was becoming aged and brittle, and scanning the papers preserved these important facility documents. The project was approved as part of the Victory Office Phase 1 Remodel. Project approvals are attached. VEO-W-22-02 IPUC DR 117 Attachment Page 1 of 3 VEO-W-22-02 IPUC DR 117 Attachment Page 2 of 3 VEO-W-22-02 IPUC DR 117 Attachment Page 3 of 3