Loading...
HomeMy WebLinkAbout20141028Staff 16-20 to UWI.pdfKARL KLEIN DEPUTY ATTORNEY GENERAL IDAHO PUBLIC UTILITIES COMMISSION PO BOX 83720 BOISE, IDAHO 83720-0074 (208) 334-0320 IDAHO BAR NO. 6864 Street Address for Express Mail: 472W. WASHINGTON BOISE, IDAHO 83702-5918 Attorneys for the Commission Staff IN THE MATTER OF UNITED WATER IDAHO INC.'S AND BRIAN SUBDIVISION WATER USBRS ASSOCIATION'S APPLICATION TO ALLOW UNITED WATER TO TAKE OVER BRIAN WATER'S DOMESTIC WATER SYSTEM. DI]Fr',1/-'\r'.;-:_,X:11.*. 1 ?0lt 0CI 29 fiH t0: rr2 BEFORE THE IDAHO PUBLIC UTILITIES COMMISSION cAsE NO. UWr-W-14-01 SECOND PRODUCTION REQUEST OF THE COMMISSION STAFF TO UNITED WATER IDAHO INC. The Staff of the Idaho Public Utilities Commission, by and through its attomey of record, Karl Klein, Deputy Attorney General, requests that United Water Idaho Inc. (United Water) provide the following documents and information as soon as possible, but no later than WEDNESDAY, NOVEMBER 12, 2014.1 This Production Request is to be considered as continuing, and United Water is requested to provide, by way of supplementary responses, additional documents that it or any person acting on its behalf may later obtain that will augment the documents or information produced. Please provide answers to each question, supporting workpapers that provide detail or are the source of information used in calculations, and the name, job title and telephone number of I Staffis requesting an expedited response. If responding by this date will be problematic, please call Staffs attomey at (208) 334-0320. SECOND PRODUCTION REQUEST TO UNITED WATER IDAHO OCTOBER 29,2014 the person preparing the documents. Please identify the name, job title, location and telephone number of the record holder. In addition to the written copies provided as response to the requests, please provide all Excel and electronic files on CD with formulas activated. REQUEST NO. 16: How many water storage reservoirs and booster stations were originally planned in the drinking water system master plan for the Harris Ranch subdivision? Were any planned storage reservoirs elevated (yes/no)? Please explain and provide a map that distinguishes between planned and existing storage reservoirs and booster stations for the Harris Ranch subdivision. REQUEST NO. 17: Absent a looped interconnection to serve Brian Water (i.e., as proposed), was additional reservoir storage planned for the Harris Ranch area? If not, why not? If so, who would have paid for the storage facility? REQUEST NO. 18: Was a transmission line extension installed across the East Park Center Bridge to feed the Harris Ranch Subdivision and other developments on the east and northern side of the Barber Service Level? If so, please explain. If not, why not? REQUEST NO. 19: Are separate irrigation systems installed to serve the Harris Ranch subdivision or any of the other residential developments in the area? Please explain. REQUEST NO.20: Please provide a map of the expected route for the Warm Springs line extension and the proposed looped interconnection route. SECOND PRODUCTION REQUEST TO UNITED WATER IDAHO ocToBER 29,2014 DATED at Boise, Idaho, tnis l4bday of October 2014. Karl Klein Technical Staff: Johanna Bell i:umisc:prodreq/uwi14.lktjb prod req 2 to UWI Deputy Attorney General SECOND PRODUCTION REQUEST TO I"INITED WATER IDAHO ocroBER 29,2014 CERTIFICATE OF SERVICE I HEREBY CERTIFY THAT I HAVE THIS 29TH DAY OF OCTOBER 2014, SERVED THE FOREGOING SECOND PRODUCTION REQUEST OF THE CoMMISSION STAFF TO T NITED WATER IDAHO, INC., IN CASE NO. UWI-W-14.0I, BY MAILING A COPY THEREOF, POSTAGE PREPAID, TO THE FOLLOWING: GREGORY P WYATT I.JNITED WATER IDAHO INC PO BOX t90420 BOISE rD 837t9-0420 EMAIL: greg.wyatt@unitedwater.com RICHARD JUENGLING PRESIDENT BRIAN SUB WATER USERS 5855 E WOOD PLACE BOISE ID 83716 EMAIL: juenelingrichard@gmail.com DEAN J MILLER McDEVITT & MILLER LLP 420 W BANNOCK BOISE ID 83702 EMAIL: joe@mcdevitt-miller.com SECRETA CERTIFICATE OF SERVICE