HomeMy WebLinkAbout20060626City of Eagle to Staff 1-6.pdfMOORE SMITH BUXTON & TURCKE, CHART
ATTORNEYS AND COUNSELORS AT LAW
950 W. Bannock Street, Suite 520; BorSE, ID 83702
TELEPHONE: (208) 331-1800 FAX: (208) 331-1202 www.msbtlaw.com
STEPHANIEJ. BONNEY
SUSAN E. BuxrON*
MICHAEL C. MOORB
PAULJ. FITZER
BRUCE M. SMITH
PAULA. TURCKE'
TAMMY A. ZOKAN
JOHN J. McFADDEN*1
o/Counsel
* Also admitted in Oregon
I Also admitted in Washington
0 Also admitted in South Dakota
+ Also admitted in New Mexico
June 23 , 2006
Jean Jewell, Secretary
Idaho Public Utilities Commission
472 W. Washington Street
Boise, ID 83720
""0
Re:Case No. UWI-06-
Dear Ms. Jewell:cj"
Please find enclosed for filing three copies of the City of Eagle s Response to FirstProduction Request of the Commission Staff to the City of Eagle, Idaho. A fourth copy isenclosed for return to this office as a conformed copy with filing date. Thank you.
Sincerely yours
MOORE SMITH BUXTON & TURCKE
RED
M. Smith
BMS:jj
Enclosures
Bruce M. Smith, ISB # 3425
Susan E. Buxton, ISB # 4041
MOORE SMITH BUXTON & TURCKE, CHARTERED
Attorneys at Law
950 West Bannock Street, Suite 520
Boise, Idaho 83702
Telephone: (208) 331-1800
Facsimile: (208) 331-1202
' ": \::)" -
;,. c.. .~
; .
Attorney for City of Eagle, Idaho
BEFORE THE IDAHO PUBLIC UTILIES COMMISSION
IN THE MATTER OF THE APPLICATION OF )
UNITED WATER IDAHO INC., TO AMEND
AND REVISE CERTIFICATE OF
CONVENIENCE AND NECESSITY NO 143
Case No. UWI-06-
CITY OF EAGLE'S RESPONSE
TO COMMISSION STAFF'
FIRST PRODUCTION REQUEST
COMES NOW the City of Eagle, Idaho, by and through its attorney of record, Bruce M.
Smith, and submits its Response to First Production Request of Commission Staff to the City of
Eagle, Idaho. Pursuant to Commission Rule of Procedure, the documents were prepared by Vern
Brewer and the record holder is Sharon Bergmann, City Clerk, P.O. Box 1520, Eagle, ID 83616
(208) 939-6813.
REQUEST NO.1: Please provide a map showing the areas currently served by the City
of Eagle water systems. On the map, indicate the locations of all existing production wells and
storage reservoirs. Pleas also indicate the locations and sizes of all existing transmission
pipelines.
RESPONSE TO REQUEST NO.1: See Attachment No.Citv of Eagle Water
System.
REQUEST NO.2: Please provide a map (either the same or a different map from the one
requested above) showing all new well, storage and transmission main facilities that would be
installed in order to provide service to the proposed Kastera development. Clearly indicate the
point of interconnection with existing City facilities.
CITY OF EAGLE'S RESPONSE TO COMMISSION STAFF'S FffiST PRODUCTION REQUEST - 1
RESPONSE TO REQUEST NO.2: See Attachment No.Kastera/Triple Ridge Area.
Actual location oflines shall be determined upon receipt of development plans by Kastera.
REQUEST NO.3: Please provide a map showing the future water system development
plans of the City of Eagle. On the map, indicate the locations of all proposed production wells
and storage reservoirs. Please also indicate the locations and sizes of all proposed transmission
pipelines.
RESPONSE TO REQUEST NO.3: See attachment No.City of Eagle - System
Development Plan Map, major trunk lines and new well locations from City of Eagle, Amended
Master Plan, November, 2005.
REQUEST NO.4: How many new customers does the City believe it can currently serve
without the addition of new wells or storage reservoirs? Please provide data or computations to
support the estimate.
RESPONSE TO REQUEST NO.4: The City has adequate water to serve 2 624
residences based on public water system needs defined by DEQ. At the present time, the City is
serving approximately 1 320 customers. The City may serve an additional 1 300 customers.
3.25 cis x 7.48 gallons/cis x 60 seconds/minute = l 458 gallons/minute
458 gallons/minute x 1 440 minutes/day = 2 099 520 gallons/day
099.520 gallons/day = 2 624 residences
800 gallons/residence/day
REQUEST NO.5: If the City of Eagle were to provide service to the Kastera
development, how long would it take for the City to install the necessary facilities?
RESPONSE TO REQUEST NO.5: The City's method of extending services is to
review and approve plans submitted by the owner s engineer, then allow the owner to secure the
most favorable bid for installation and make appropriate inspections along with the owner
engineer to ensure that construction meets City standards and approval conditions. In the
instance of Kastera, construction of this magnitude should be able to be constructed well within a
year of plan approval but this depends in part on Kastera s plans and capabilities.
REQUEST NO.6: Does the City of Eagle plan to annex the property comprising the
proposed Kastera development? If so, please describe and provide a timeline for the annexation
process.
RESPONSE TO REQUEST NO.6: Yes, the City has planned to annex the property
because in meetings with the owners it was indicated that they wanted to be annexed.
CITY OF EAGLE'S RESPONSE TO COMMISSION STAFF'S FffiST PRODUCTION REQUEST - 2
Annexation requests by a property owner may be approved within 60 days of filing.
However, the usual course of action is for the owner to present and negotiate a Development
Agreement along with the request for annexation and rezone. The timing for annexation, zoning
and negotiation of a Development Agreement depend upon the owner s and their consultants
response time for reviewing and responding to the City and the breadth of issues involved. The
timeline for statutory public notification including negotiation of a Development Agreement may
be completed in four months. If material changes are made necessitating further public
notification, the process should be completed in six months. However much of the timeline
depends on the developer s ability to get the required work done.
DATED at Boise, Idaho, thi
~ ~
day of June, 2006.
MOORE SMITH BUXTON & TURCKE
CHARTERED
1"
ruce M. Smith
Attorney for City of Eagle, Idaho
CITY OF EAGLE'S RESPONSE TO COMMISSION STAFF'S FffiST PRODUCTION REQUEST - 3
CERTIFICATE OF SERVICE
HEREBY CERTIFY THAT I HAVE THIS 23rd DAY OF JUNE, 2006 SERVED THE
FOREGOING RESPONSE TO THE CITY OF EAGLE'S RESPONSE TO COMMISSION
STAFF'S FIRST PRODUCTION REQUEST IN CASE NO. UWI-06-, BY MAILING A
COpy THEREOF, POSTAGE PREPAID, TO THE FOLLOWING:
Dean 1. Miller, Esq.
McDevitt & Miller LLP
420 West Bannock Street
PO Box 2564
Boise, ID 8370l
('-) U.S. Mail, Postage Prepaid
( )
Hand Delivered
( )
Overnight Mail
( )
Facsimile
Jean Jewell, Secretary
Idaho Public Utilities Commission
472 West Washington Street
O. Box 83720
Boise, ID 83720-0074
"N U.S. Mail, Postage Prepaid
( )
Hand Delivered
( )
Overnight Mail
( ) Facsimile
de M. Smith
Attorney for City of Eagle, Idaho
CITY OF EAGLE'S RESPONSE TO COMMISSION STAFF'S FffiST PRODUCTION REQUEST - 4
fj
j
j
Ci
t
y
o
f
E
a
g
l
e
Wa
t
e
r
S
y
s
t
e
m
.
M
e
t
e
r
s
.
V
a
l
v
e
s
CD
B
l
o
w
o
t
t
Va
l
v
e
s
J'
Hy
d
r
a
n
t
s
.t
.
U
W
I
D
P
R
V
.t
.
E
a
g
l
e
P
R
V
.
W
e
l
l
s
Se
r
v
i
c
e
s
..
-
-
2
I
n
c
h
M
a
i
n
-.
.
-
4
I
n
c
h
M
a
i
n
-
6
In
c
h
M
a
i
n
.-
-
8
I
n
c
h
Ma
i
n
-1
0
In
c
h
M
a
i
n
-1
2
In
c
h
M
a
i
n
16
I
n
c
h
M
a
i
n
1 i
n
c
h
e
q
u
a
l
s
4
0
0
f
a
a
l
W+
E
--
-
-
Re
v
i
s
e
d
D
a
l
e
:
1
1
-
0
9
-
0
5
EX
H
I
B
I
T
:Sj \
..,,"'1. I II -" II
~ "" "
+12 '
II Ii 12"
City of Eagle
Kastera/Triple Ridge Area
---111
5iC
Legend
/\I Roads
CJ Kastera
CJ Triple Ridge
..
Thompson Acres
CJ Parcels
I8J Eagle City
CJ Eagle AOI
:;)
O=t=j dI"II--
16~
,"",", """""""""
1. City Well No, 1 (existing)
2, City Well No.2 (not in operation)
3. City Well No.3, construct 2006 (by City)
4. Million-gallon storage reservoir, construct 2007 (by City)
5, Floating Feather Well (existing)
6. Trunk line (Thompson Acres - in process)
7. Booster Pump Station(Kastera)
8. Trunk Line(Kastera)
9, Loop line (Kastera)
10. Storage reservoir - (option to be determined - Kastera)
11. Trunk line (Kastera)
EXtflBIT
SE
R
V
I
C
E
A
R
E
A
UN
I
T
E
D
W
A
T
E
R
S
E
R
V
I
C
E
20
"
W
A
T
E
R
L
I
N
E
-
1
6
"
WA
T
E
R
L
I
N
E
-
1
2
"
WA
T
E
R
L
I
N
E
.;
:
:
"
8
"
LO
O
P
L
I
N
E
S
P
E
R
D
E
V
E
L
O
P
M
E
N
T
li
P
"
'
"
PR
E
S
S
U
R
E
Z
O
N
E
B
O
U
N
D
A
R
Y
."
.
"
.
S
E
R
V
I
C
E
A
R
E
A
BO
U
N
D
A
R
Y
41
P
R
E
S
S
U
R
E
RE
L
I
E
F
V
A
L
V
E
EX
I
S
T
I
N
G
W
E
L
L
FU
T
U
R
E
W
E
L
L
T
E
N
T
A
T
I
V
E
L
O
C
A
T
I
D
N
HO
L
L
A
D
A
Y
E
N
G
I
N
E
E
R
I
N
G
C
O
.
Co
,
~
I
,
h
t
"
2
0
0
4
b
y
H
o
"
o
d
o
y
E
o
,
;
m
"
o
,
C
o
.
~I
R
I
,
h
t
.
R
.
.
.
~
d
.\
"
'
~
\
"
~
"
"
"
"
"
~
_
.
5M
G
WE
S
T
E
R
N
R
E
S
E
R
V
O
I
R
S
I
T
E
EL
.
27
2
0
..
A
p
p
l
i
e
d
fo
r
7
-
15
-
0
4
CI
T
Y
O
F
E
A
G
L
E
SY
S
T
E
M
D
E
V
E
L
O
P
M
E
N
T
PL
A
N
M
A
P
fT
=
:F
rIK
~
;..
.
.
,
\.
'
-
N
.
I
I
I
p:
:
:
I
L
E
G
E
N
D
'-.
.
EX
H
I
B
I
T