Loading...
HomeMy WebLinkAbout2005030110th UWI Response Part 1.pdfORIGINAL i" I( t CL !\lP r- . """ !i r ~'i - '- " l!:.J ~t8 2lt P/1 4: 3 UTILirir:s Uf3LiC '- COMNISSION Dean J. Miller McDEVITT & MILLER LLP 420 West Bannock Street O. Box 2564-83701 Boise, ill 83702 Tel: 208.343.7500 Fax: 208.336.6912 ioe~mcd~-miller.com Attorneys for Applicant BEFORE THE IDAHO PUBLIC UTILITIES COMMISSION IN THE MATTER OF THE APPLICATION OF UNITED WATER IDAHO INC. FOR AUTHORITY TO INCREASE ITS RATES AND CHARGES FOR WATER SERVICE IN THE STATE OF IDAHO Case No. UWI- W -04- TENTH RESPONSE OF UWlD TO STAFF'S PRODUCTION REQ UESTS COMES NOW United Water Idaho Inc. ("United" , " the Company ) and responds to Request Numbers 117, 118, 123 , 125 42:6 127 and 129 of Staffs Fourth Production Requests; and Request Numbers 162, 163, 164, 170, 171 and 185 of Staffs Sixth Production Request.. Dated this 1l day of February, 2005. McDEVITT & MILLER LLP \ t~~ Dean J. iller Attorneys for United Water Idaho Inc. TENTH RESPONSE OF UWID TO STAFF'S PRODUCTION REQUESTS-1 CERTIFICATE OF SERVICE I hereby certify that on th~1iay of February, 2005, I caused to be served, via the method(s) indicated below, true and correct copies of the foregoing document, upon: Hand Delivered S. Mail if" Fax Fed. Express Email Hand Delivered S. Mail Fax Fed. Express Email Hand Delivered S. Mail Fax Fed. Express Email Brad M. Purdy Attorney for the Community Action Partnership Association of Idaho 2019 North 17th Street Boise, Idaho 83702 Fax: 208.384.8511 bm urd hotmai1.com Hand Delivered S. Mail Fax Fed. Express Email William M. Eddie Advocates for the West O. Box 1612-83701 1320 West Franklin Street Boise, Idaho 83702 Fax: 208.342.8286 Hand Delivered S. Mail Fax Fed. Express Email Bill Sedivy Idaho Rivers United O. Box 633 Boise, Idaho 83701 Fax: 208.343.9376 iru~idJ!..hori vers. org Sharon Ullman 9627 West Desert Avenue Boise, Idaho 83709 Fax: 362-0843 ~haronu~caQJeone.net Chuck Mickelson Boise City Public Works O. Box 500-83701 150 North Capitol Boulevard Boise, Idaho 83702 Fax: 208.384.7841 ~son~cityofboise.org Douglas K. Strickling Boise City Attorney s Office O. Box 500-83701 150 North Capitol Boulevard Boise, Idaho 83702 Fax: 208.384.4454 ~ling~cityotboise.org Hand Delivered S. Mail Fax Fed. Express Email Scott L. Campbell Moffatt Thomas 101 South Capitol Blvd., 10th Floor O. Box 829-83701-0829 Boise, Idaho 83702 Fax: 208.385.5384 ~c~moffatt.com ~~~ ~Pi?o~TION REQUEST&-2 Hand Delivered S. Mail Fax Fed. Express Email UNITED WATER IDAHO INC. CASE UWI-W-O4-04 FOURTH PRODUCTION REQUEST OF THE COMMISSION STAFF Preparer/Aecordholder/Sponsoring Witness:Scott Ahead Telephone: 208-362-7345 Title: Managing Engineer REQUEST NO. 117: Please list all construction tasks self-performed (not subcontracted) by COM. Please provide evidence that all work self-performed by COM was completed at an equal or lower cost than would have been obtained from other qualified subcontractors. If any work self-performed by COM was competitively bid, please identify the work tasks and provide the competitive bid amounts. RESPONSE NO. 117: COM did not actually self-perform any direct work tasks on the project. They provided construction management, field office and general conditions, permits, bonding, and design. UNITEDW ATER IDAHO INC. CASE UWI-W-O4- FOURTH PRODUCTION REQUEST OF THE COMMISSION STAFF Pre parer/Record holder/Sponsoring Witness:Scott Ahead Telephone: 208-362-7345 Title: Managing Engineer REQUEST NO. 118: Please explain what role, if any, UWI played in approving or selecting the lowest responsible and qualified subcontractors and material/equipment vendors. RESPONSE NO. 118: The Company did have the opportunity to review the subcontractors chosen by COM. This review was primarily for information the Company may have related to subcontractor reputation or work history on other projects. The Company did compare the chosen subcontractor to the GMP expectations in an effort to assure competition, monitor project costs, and manage contingencies. UNITED WATER IDAHO INC. CASE UWI-O4- FOURTH PRODUCTION REQUEST OF THE COMMISSION STAFF Preparer/RecordholderlSponsoring Witness:Scott Rhead Telephone: 208-362-7345 Title: Managing Engineer REQUEST NO. 123: Please provide a copy of any warranties provided by the manufacturer for the CWTP ultra filtration membranes. RESPONSE NO. 123: The requested warranty information associated with the membranes was provided in response to Production Request No. 52. UNITED WATER IDAHO INC. CASE UWI-O4- FOURTH PRODUCTION REQUEST OF THE COMMISSION STAFF Preparer/Recordholder/Sponsoring Witness:Scott Rhead Telephone: 208-362-7345 Title: Managing Engineer REQUEST NO. 125: Please provide a copy of each monthly status and progress report prepared by COM and provided to UWI for the CWTP. RESPONSE NO. 125: Please find attached the Progress Reports provided by COM to United Water for the period March 2004 through January 2005. UNITED WATER IDAHO INC. CASE UWI-O4- FOURTH PRODUCTION REQUEST OF THE COMMISSION STAFF Preparer/Recordholder/Sponsoring Witness:Scott Rhead Telephone: 208-362-7345 Title: Managing Engineer REQUEST NO. 127: Please provide an updated Gantt chart showing the construction schedule for the CWTP that reflects the revised contractual Substantial Completion date of July 1, 2005. RESPONSE NO. 127: Attached please find the Gantt chart that shows the construction schedule for the CWTP reflecting the revised contractual Substantial Completion date of July 2005. This chart was provided by COM with the March 2004 Progress Report. UNITED WATER IDAHO INC. CASE UWI-O4- FOURTH PRODUCTION REQUEST OF THE COMMISSION STAFF Preparer/RecordholderlSponsoring Witness:Scott Rhead Telephone: 208-362-7345 Title: Managing Engineer REQUEST NO. 129: Has UWI selected any "add-" options as discussed in section 4.2 of COM' proposal? If so , describe which ones and state any additions to the project costs or to the fixed fee. RESPONSE NO. 129: At time of proposals and project beginning one of the primary "unknowns" was related to filter back wash and the waste handling process. CDM originally planned to construct and 18" return line back to the Boise River. After several internal workshops and meetings with the Department of Environmental Quality (DEQ), it was determined that permits for discharge would not likely be approved due to environmental concerns. The company then selected the "add-" option of on-site basins, chemical dosing and decant return to the plant head works. This is a good example of project stewardship by the Company and cooperation by CDM. The net add for on-site waste after subtracting cost of river return line was $1 982 000. No additional fee was paid to CDM as a result of this addition. UNITED WATER IDAHO INC. CASE UWI-O4- SIXTH PRODUCTION REQUEST OF THE COMMISSION STAFF Preparer/RecordholderlSponsoring Witness:Jeremiah Healy Telephone: 208-362-7337 Title: Coordinator of Planning and Rates REQUEST NO. 162: Regarding Witness Healy s workpapers for the Company s Adjustment No. 17, Transportation Expense, the Lease Disposal value of $31 442 listed on page 1 of 3 has a description of "See Attached Spreadsheet". This spreadsheet does not appear to be a part of Mr. Healy s workpapers. Please provide the spreadsheet illustrating how the $31 442 in lease disposal was calculated. RESPONSE NO. 162: Please see the attached spreadsheet under the heading "2005 Disposal Value and the column titled "UWID net value . This column documents the disposal value of $31 ,442. UNITED WATER IDAHO INC. CASE UWI-O4- SIXTH PRODUCTION REQUEST OF THE COMMISSION STAFF Preparer/Recordholder/Sponsoring Witness:Jeremiah Healy Telephone: 208-362-7337 Title: Coordinator of Planning and Rates REQUEST NO. 163: Please provide the total number of United Water customers as of December for the years 2000,2001,2002,2003 and 2004. RESPONSE NO. 163: Below are the December 31 customer counts by class for each respective year: Customer Class 2000 2001 2002 2003 2004 Residential 59,950 61,715 62,767 64,948 66,971 Commercial 420 566 852 906 098 Public Authority 124 126 125 125 Private Fire 233 198 194 Total Customers 68,534 70,562 71,978 74,177 76,388 UNITED WATER IDAHO INC. CASE UWI-O4- SIXTH PRODUCTION REQUEST OF THE COMMISSION STAFF Preparer/Recordholder/Sponsoring Witness:Jeremiah Hea Iy Telephone: 208-362-7337 Title: Coordinator of Planning and Rates REQUEST NO. 164: Please provide the hourly wage as of December 31 , 2004 for the employee who was promoted to Chief Operator, as described in the Company s response to Audit Request No. 73. Please also include the position from which this person was promoted, the starting wage for this position , and if this position was also filled internally. RESPONSE NO. 164: The hourly wage as of December 31 , 2004 for the employee who was promoted to Chief Operator was $21.86. This employee was classified as an Operator prior to the promotion. This hourly rate is composed of $21.41 per hour wage plus $0.45 per hour in recognition of his level III certification from the Idaho Water and Wastewater Certification Board. An internal candidate has been chosen to fill the vacant Operator position. The starting hourly wage for this Operator position will depend on the actual start date. Assuming the successful candidate begins his new role as Operator prior to April 1 , 2005 his hourly rate will be composed of the following components: a base wage of $21.41 per hour, plus $0.30 per hour in recognition of his Level II certification , less $0.15 per hour pursuant to Section 12.3 of Article 12 , Promotional Opportunities, of the current bargaining union contract, or a total per hour wage of $21.56. If he should start after March 31 2005, the hourly wage will be $21.78 per hour, plus $0.30 for Level II certification less the aforementioned $0.15 per hour or $21.93 per hour. The precise start date for the new Operator is at this time unknown pending the hire of his replacement. The Union contract was provided to Staff in response to Audit request No. 24. UNITED WATER IDAHO INC. CASE UWI-04- SIXTH PRODUCTION REQUEST OF THE COMMISSION STAFF Preparer/RecordholderlSponsoring Witness:Jeremiah Healy Telephone: 208-362-7337 Title: Coordinator of Planning and Rates REQUEST NO. 170: Please provide a copy of the invoice from "Utility Billing Services" for the month of December 2004. RESPONSE NO. 170: Please see the attached invoice from Utility Business Services for services rendered for the period November 27, 2004 to December 28, 2004 totaling $47,520.55. UNITED WATER IDAHO INC. CASE UWI-O4- SIXTH PRODUCTION REQUEST OF THE COMMISSION STAFF Preparer/Recordholder/Sponsoring Witness:Jeremiah Healy Telephone: 208-362-7337 Title: Coordinator of Planning and Rates REQUEST NO. 171: Please illustrate how the 72.730/0 test year level of lockbox transactions was calculated in Company Adjustment No. 20. Please include within your response each component of the calculation in an Excel file with all formula intact. RESPONSE NO. 171: The 72.730/0 test year level of lock box transactions as a percentage of bills rendered was calculated as follows: Utility Billing Services processed 460,978 billing units for United Water Idaho during the test period. During the normalized test period, Mellon Bank processed 335,278 lockbox payments. The ratio of payments to bills is thus 72.730/0. The digital files containing documentation of these numbers was provided in the response to Production Request No. 135. One file is titled" Gust Records UBS Exp.xls . The other file is titled" Outside Coli TY Hist" UNITED WATER IDAHO INC. CASE UWI-04- SIXTH PRODUCTION REQUEST OF THE COMMISSION STAFF Preparer/Recordholder/Sponsoring Witness:Jeremiah Healy Telephone: 208-362-7337 Title: Coordinator of Planning and Rates REQUEST NO. 185:, Please provide copies of any employee newsletters issued during the period June 2003 to date. RESPONSE NO. 185: The Shooting Star, the corporation s employee newsletter, is published monthly and distributed to employees bye-mail. Copies are attached cove ring the period from July 2003 through January 2005. No issue was published in June 2003. In addition , United Water Idaho initiated a local employee newsletter, the Idaho News Blitz in June 2004. Three issues were published in 2004 , and copies are attached. The company did not publish a local employee newsletter in 2003 and none have yet been published in 2005. UNITED WATER IDAHO INC. CASE NO. UWI-O4- FOURTH PRODUCTION REQUEST IPUC STAFF TT A C H MEN T RESPONSE TO REQUEST NO. 125 United Water Idaho Columbia Water Treatment Plant The information included in this report is from the period March 1 , 2004 through March 31 2004. Project Budget Contingency Included GMP: Work Authorized to Date: Billings to Date: Contingency Allocated: . $ 16 294 498 $ 550 000 $ 16 844 498 $ 16 844,498 $ 5 303,708 $ 142 103 Original Contract Completion Date: June 1 , 2004/ Ameded to July 1 , 2005 Notice to Proceed Date: February 6, 2004 Approved Changes to Schedule: 0 days Current 30 day Facility Test Start Date: June 1 , 2005 Current Substantial Completion Date: July 1 , 2005 Current Final Completion Date: August 15,2005 Current Schedule Status: 9 days impact Potential Schedule Impacts: Repeated failures of the treated water header to hold the required pressure caused a delay in the work on the building foundation of approximately one week. Weare currently working to make up that time in other areas. The leaks in the header were isolated and identified and repairs were begun. Weare approximately 4 days behind schedule for completion of the building foundations and slab due to delays in the electrical. Weare working to accelerate the conduit installation to makeup that time. Project Schedule: Monthly update attached. Project Photo s: Attached are 9 representative photos. Others are available that document the project progress. The "As Built" drawing sets continue to be maintained at the job site Submittals/RFIs from the subcontractors are being addressed. A copy of the submittal log is attached. . A proposal for extending concrete stemwalls to the top of the floor slabs was evaluated and accepted as an approach to reduce construction time, cost, and overall coordination efforts on the site. Redesign efforts and evaluations were continued to address standby power provisions for the two sites. The Clearwell Building Permit was obtained by the Ada County Building Department on March 23. Building permit for remainder of site was obtained on March 29. Conditional approval was issued by DEQ on March 22 for building slab and all below slab piping. Final approval will be subject to further review. DEQ will require 4 months of pilot testing which will begin in early May. The District Health Department has approved the septic system. The plumbing permit process has begun. Inspection is expected in early April. Storm drain piping has been inspected and approved by State Plumbing Inspector. Coordination with Memcor Membrane System continued regarding submittal review, inspection plans, and delivery. Pilot unit for 4 months of required pilot testing will be provided by Memcor at no charge to UWID. POs have also been issued for many of the critical - long lead item - parts and pieces including the Pumps, Mag meters, Static mixer, and Surge arrestor. Contracting: Subcontracts and vendor contracts continued to be negotiated and signed. To date we have successfully negotiated 9 of the 11 critical subcontracts (copies of each will be forwarded to United Water when we have secured the bond and insurance documents). Team Communication: Weeldy subcontractor meetings are held on Wednesdays at 9:00. Weekly project management meetings are held by conference call on Wednesdays at 3:00. Clear Well: Clearwell erection and welding is ongoing. Welds inspected and x-ray reports to date were reviewed by Strata. All test results were excellent. Basins: The excavation of the basins was restarted with disposal of the material at a Simplot location close to the site. Rock was hit during excavation of Basin #3 and the associated drain line. A large rock ledge was revealed inside Basin #3. Septic System: The septic system, including primary piping, septic tank, pump tank, pump, and drainfield were completed and approved by the District Health Department. Yard Piping: Misc piping, valves, and the suction header have been installed by Owyhee and were tested and repaired"as needed under a contract directly with UWID. Testing failures in the treated water header required considerable attention. Header was drained and visually inspected from the inside. No failures were visible during this inspection. The header was then re- filled and portions were isolated for testing with balloons. Several leaks were identified in the buried flange fittings. Owyhee obtained a confined space permit and welded joints from inside of pipe to repair. Testing and inspection of welds was begun. Dibble has completed the majority of the piping for the stormwater system, the basins and the other misc yard piping. All piping tested to date has passed. Mechanical: RM Mechanical has nearly completed the under slab piping. All piping tested to date has passed. Stormwater: The majority of the stormwater piping and structures were installed. Electrical: The temporary control wire for the clearwell has been installed including the panel that sits in the office trailer. Automation has completed several submittals. have changed the electrical design to include a duct bank in the electrical room to make installation and future expansion easier. All the underslab conduit is scheduled to be installed May 5 End of Report United Water Idaho Columbia W aterTreatment Plant The information included in this report is from the period April 1, 2004 through April 30, 2004. JJtl !tt~:IJJfJr(rt: u:r!:ii~:(it!~, ~:! Project Budget Contingency Included GMP: Work Authorized to Date: Billings to Date: Contingency Allocated: " - $ 16,294 498 $ 550 000 $ 16 844,498 $ 16 844 498 $ 6 372 195 $ 160 340 ': ~ ';~i~tJ i;ii':~'r'k;~r :VlL'j1Mi1i U;i~'~:it:m1 ;;' i;::1:~ ~ ", t!!W~~~~~~?W.Mil~~~!~!&~jL~~l~~WJ, ~~.-'(:" ~i'!~7)i4:;""'H)",.7:('",:ifu,:,/",:~:",:, " ",?'",,' d7cf Original Contract Completion Date: June 1, 2004/ Ameded to July 1 , 2005 Notice to Proceed Date: February 6,2004 Approved Changes to Schedule: 0 days Current 30 day Facility Test Start Date: June 1 , 2005 Current Substantial Completion Date: Ju1y 1 , 2005 Current Final Completion Date: August 15,2005 Current Schedule Status: 6 days impact Potential Schedule Impacts: Repeated failures of the treated water header to hold the required pressure caused a delay in the work on the building foundation of approximately one week. Weare currently working to make up that time in other areas. The leaks in the header were isolated and identified during the month of March, with repairs completed during the month of April. We are currently on schedule for completion of the building foundations and slab. Delays in receiving electrical submittals have been offset by the addition of a utility duct bank in the Electrical room and through a coordinated field review and inspection of conduit layouts. Project Schedule: Monthly update attached. Project Photo s: Attached are 9 representative photos. Others are available that document the project progress. Allocated Contingency: Attached is a list of the contingency items identified as an actual cost or forecasted cost. Al! ~;;: ';i!!ii ' ' ';;:tiliJ1 !t' '!:~ ;~);i;;;w 1r." ;;~ fiiJ. . w!lr~~1f2.m ~ f"i1;m\jj' m'1ffi1 *W I\,W':".!,;~"t, ~&, lf"'? ~'::" ;:';,;;+6%1"" "!;bf:'~~f"f":A",, The "As Built" drawing sets continue to be maintained at the job site SubmittalsIRFls from the subcontractors are being addressed. A copy of the submittal log is attached. . A proposal for adding a utility duct bank under the Electrical Room was evaluated and accepted as an approach to minimize a delay in construction time resulting from delays in electrical equipment submittals. The electrical trenches will also provide greater flexibility for expansion alternatives during plant build-out. The design of the duct bank was coordinated between electrical and structural design engineers and the construction team. Stamped drawings have been provided' for review by building inspectors. Coordination efforts were continued to address standby power provisions for the two sites. (;!:(i!111 ~ft ng!llt~!,f,~~r!t~ All relevant permits from the Ada County Building Department have been obtained. Building inspectors approved all building footings on April 22. Conditional approval has been issued by DEQ for the building slab and all below slab piping. A review meeting forthe remainder of the facility is scheduled for May 27. DEQ is requiring four months of pilot testing prior to plant start-up. This testing is expected to begin on May 10. The District Health Department has approved the septic system. Underslab plumbing was inspected and approved by the State plumbing inspector. II(.~mJJ~J~t(I.I~~(~ ii~~~i If ~~ Coordination with Memcor Membrane System continued regarding submittal review, inspection plans, and delivery. Pilot unit for 4 months of required pilot testing will be provided by Memcor at no charge to UWID. POs have also been issued for most of the critical -long lead item - parts and pieces including the Pumps, Mag meters, and Static mixer. . CDM directly procured materials necessary for construction of the utility duct bank under electrical room. Construction work for the trench was done by MCI and Velocity Steel. Contracting: Subcontracts and vendor contracts continued to be negotiated and signed. To date we have successfully negotiated all of the critical subcontracts (copies of each were forwarded to United Water). Team Communication: Weekly subcontractor meetings are held on Wednesdays at 9:00. Weekly project management meetings are held,by conference call on Wednesdays at 3:00. Clear Well: Clearwell erection and welding was completed during the month of April. Welds inspected and x-ray reports were reviewed by Strata. The tank floor was vacuum tested on April 22. All test results were excellent. Sand blasting of tank inside was completed and painting of tank was begun. Basins: The excavation of the basins was continued. Rock hit during excavation of Basin #2 was blasted to remove on April 9. The blast was successful at breaking most of the rock. One small area required additional chipping. The vibration measured a 1.9 at the monitoring point, and is unlikely to have disturbed any of the installed piping. The treated water header will be retested to confirm that all welds continued to hold following the blast. Septic System: The septic system was completed and approved during the month of March. Modifications to the septic tank supply header were begun at the end of April to correct invert elevation of the pipe. Building Foundation: The building grid was laid out and all footings set. Initial inspection of footings on April 12 noted a few clearance problems. Concerns were addressed and footings passed inspection on April 22. Stem wall construction was completed for all walls. Yard Piping: Testing of remaining piping, valves, and fittings installed by Owyhee was completed and approved on April 9. Dibble has completed the majority of the piping for the stormwater system, the basins, and the other misc yard piping. All piping tested to date has passed. Mechanical: RM Mechanical has completed and tested all under slab piping. Electrical: The electrical design has been changed to include a duct bank in the electrical room to counter delays in electrical equipment submittals and to increase flexibility in future expansion alternatives. Installation of the duct bank was completed on April 30. Installation of all underslab conduit in the chemical areas was completed , reviewed, and inspected April 29. Completion of underslab conduit in remainder of building is expected to be completed during first week of May. Delays in the VFD submittal have been caused by difficulty in coordinating with Idaho Power, which must provide a harmonics report for Automation. CDM, United Water, and Automation held a coordination meeting with Idaho power on April 13. Coordination will continue into the month of May End of Report . - United Water Idaho Columbia Water Treatment Plant Progress Report for Period through May 31 , 2004 The information included in this report is from the period May 1 2004 through May 31, 2004. Project Budget Contingency Included GMP: Work Authorized to Date: Billings to Date: Contingency Allocated: " $ 16 294,498 $ 550,000 $ 16 844,498 $ 16,844,498 $ 8,640,997 $ 289,920 Original Contract Completion Date: June 1 , 2004/Ameded to July 1 2005 Notice to Proceed Date: February 6, 2004 Approved Changes to Schedule: 0 days Contract 30 day Facility Test Start Date: June 1 , 2005 Contract Substantial Completion Date: July 1 2005 Contract Final Completion Date: August 15,2005 Current 30 day Facility Test Start Date: March 21, 2005 Current Schedule Status: -66 days Potential Schedule Impacts: Clearwell commissioning was delayed during the month of May due to concerns raised by the tank supplier (CBI) over their Ribbonflow baffling design. Modifications were eventually made to the adjustable inlet baffle to address these concerns. A number of the electrical submittals have been rejected, which may cause delays in the overall project if approved equipment cannot be ordered and received onsite prior to addition of the building roof. Continued delays in receiving the electrical harmonics study,have also prevented the ability to review the VFD submittal. A delay in getting the final color for the building from the Architect has delayed the start of the masonry 10 days. Previous delays caused by the treated water header testing may result in eventual delays if they do not continue to be offset by efficiency improvements elsewhere in the project. Project Schedule: MontWy update attached. Project Photo s: Attached are 5 representative photos. Others are available that document the project progress. Allocated Contingency: Attached is a list of the contingency items identified as an actual cost or forecasted cost. The "As Built" drawing sets continue to be maintained at the job site Submittals/RFIs from the subcontractors are being addressed. A copy of the submittal log is attached. Coordination efforts were continued to address standby power provisions for the two sites. At the request of United Water, CDM evaluated the addition of roof hatches in the treated water pump room to simplify installation and removal of pumps. It was determined that this change would require relocation of air handling units, and ventilation ducts, in addition to the roof modifications directly related to the hatches. Based on a preliminary cost estimate developed by CDM, and on discussions of potential pump replacement procedures, United Water directed CDM to continue without the addition of the roof hatches. . CDM met with UWID, BRS and JUB to discuss site security issues on May 27. CDM will revise drawings to include changes to fencing and landscaping based on the security review. The micro filtration pilot unit was delivered to the Marden Plant on May 7. May 10 a representative from US Filter arrived to begin installation and startup of the pilot plant as well as to conduct training of UWID staff. Problems with a solenoid valve delayed initial startup for two days. It was later determined that damage to one of the three membrane modules during shipping had caused damage to some of the membrane fibers, causing repeated failures of the integrity testing and higher than expected particles in the product water. May 20 a representative from USFilter came to the site to replace the damaged module. The pilot unit was restarted on May 21 and the official testing period was begun. The first weekly water quality samples were taken on May 24. All relevant permits from the Ada County Building Department have been obtained. Building inspectors have been present during the pouring of building slabs and have approved all pours to date. CDM met with IDEQ on May 27 to discuss above ground work not covered by the previous Conditional Approval. The intent of this meeting was to allow for final approval to move forward with the remainder of the construction. One major issue identified by DEQ is the need for materials in contact with the water ... to be NSF approved. This will include cement and adders used with concrete as well as chemical tank materials, water softeners, and the surge tank liner. CDM is currently contacting suppliers to determine whether this criterion has been met in all cases. On May 28 Monty Marchus from DEQ visited the pilot plant at Marden to witness an integrity test and to observe how the plant is functioning. The pilot testing is required for a total of four months. Coordination with.Memcor Membrane System continued regarding submittal review, inspection plans, and delivery. Pilot unit for 4 months of required pilot testing has been provided by Memcor at no charge to UWID. pas have also been issued for most of the critical - long lead item - parts and pieces including the Pumps, Mag meters, and Static mixer. . CDM directly procured materials necessary for construction of the utility duct bank under electrical room. Construction work for the trench was done by MCI and Velocity Steel. The door frames have been procured and will arrive the first week of June so that they can be installed during the masonry. Contracting: Subcontracts and vendor contracts continued to be negotiated and signed. To date we have successfully negotiated all of the critical subcontracts (copies of each were forwarded to United Water). Team Communication: Weeldy subcontractor meetings are held on Wednesdays at 9:00. Weekly project management meetings are held by conference call on Wednesdays at 3:00. Clear Well: Painting of the clearwell continued during the month of May. On May 17 the manufacturer s representative inspected and approved the paint thickness on the tank interior. Concern was raised by the tank supplier regarding their design of the Ribbonflow adjustable inlet baffle. To address these concerns bars were welded to the operator for the baffle to hold it in pre-selected discrete positions. We expect the clearwell to be fully functional by June 14 Basins: Work continued on the basins, leveling and compacting the bottoms and sides to prepare for shotcrete and soil cement to be placed in early June. Septic System: Modifications to the septic tank supply header begun in April were completed during the beginning of May. .", Building Floor: The floor slab in the chemical rooms was poured beginning on May 4. After installation and approval of all under slab piping and electrical conduit, the process area and pump room were backfilled and compacted. Rebar was flown in and bent and pouring was completed for the process area beginning east and moving west. Approximately 75% of the floor slab in the pump room was also completed by the end of May. Considerable rain toward the latter part of the month caused concrete pours to be canceled on three occasions. Overall, the concrete work done to date has been of exceptional quality. Yard Piping: Dibble has completed the majority of the piping for the storm water system, the basins, and the other misc yard piping. All piping tested to date has passed. Mechanical: RM Mechanical completed and tested all under slab piping. A submittal was received and returned approved as noted for mechanical equipment and above grade piping. Treated water header extension spools arrived on-site and were installed and tested. The modified treated header passed the hydraulic testing on May 20. The testing was witnessed by Ted Perry and Pete Stringer of CDM. Masonry: The masonry has been delayed 10 days in order to allow the blocks to complete curing. Sommer Building is expected to begin mobilization on June 7th and start the building on June 14 Raw Water Pump Station: Work is scheduled to begin on the yard piping mid June. The road leading to the pump station has been graded and the ruts filled. There have been a few problems confmning the existing pipe locations due to different grid systems in the as-builts and the plans. The locations are being confirmed by potholing. Electrical: Installation of all under slab conduit in process area and pump room was completed and approved on May 10. Several of the electrical and instrumentation submittals have been rejected based on critical information missing from the submittals. These have included the MCC submittal, the switchgear submittal, the panel board submittal, and the instrumentation submittal. Two of these submittals were received a second time with corrections and were returned approved as noted. Delays in receiving acceptable MCC and switchgear submittals could ultimately result in project delays if the equipment cannot be received on-site prior to erection of the building roof. It should also be noted the review of the VFD submittal is being held until a harmonics study can be provided to verify critical information in the submitted design. CDM is working with the electrical subcontractor to expedite these submittals and to minimize impact on the startup schedule. End of Report ,.r United Water Idaho Columbia Water Treatment Plant Progress Report for Period through June 30, 2004 The information included in this report is from the period June 1,2004 through June 30 2004. Project Budget Contingency Included GMP: Work Authorized to Date: Billings to Date: Contingency Allocated: . - $ 16,294,498 $ 550,000 $ 16,844,498 $ 16,844,498 $ 6 372 195 $ 353 926 Original Contract Completion Date: June 1, 2004/Ameded to July 1 2005 Notice to Proceed Date: February 6,2004 Approved Changes to Schedule: 0 days Contract 30 day Facility Test Start Date: June 1,2005 Contract Substantial Completion Date: July 1, 2005 Contract Final Completion Date: August 15,2005 Current 30 day Facility Test Start Date: March 12 2005 Current Schedule Status: - 75 Days Potential Schedule Impacts: Delays in receiving several key electrical equipment submittals may prevent the ability to install this equipment prior to completion of the building roof. The equipment would then need to be brought in through the doors. This would not impact the overall schedule if the equipment arrives in time to be installed and tested prior to the initial shakedown. An additional delay in the masonry was averted by changing the block size when an issue at the block manufacturer caused a shutdown of the facility (numerous projects in the Boise area have been affected with delays up to 9 months). Project Schedule: Monthly update attached. Project Photo s: Attached are 8 representative photos. Others are available that document the project progress. Allocated Contingency: Attached is a list of the contingency items identified as an actual cost or forecasted cost. The "As Built" drawing sets continue to be maintained at the job site Submittals/RFIs from the subcontractors are being addressed. A copy of the submittal log is attached. Coordination efforts were continued to address standby power provisions forthe two sites. Modifications were made to the clearwell drain to comply with DEQ requirements. Addendum #3 was,i.ssued on June 24, revising the HV AC duct work over the treated water pumps. This modification will simplify future installation and removal of the treated water pumps. Due to potential conflicts between the new retaining wall south of the clearwell and the future 30-inch Membrane Permeate line going to the future clearwell CDM will be installing this future line between the existing tee and the future 45 degree bend. This change was approved by United Water on June 23. Work is starting, on the O&M manual this month. The microfiltration pilot unit continued running through the month of June. Pilot testing was halted on June 21 to complete a scheduled chemical cleaning using sodium hypocWorite followed by citric acid. The cleaning was successful at returning pilot operation to the initial operating conditions. The next chemical cleaning is scheduled for the end of July. All relevant permits from the Ada County Building Department have been obtained. Building inspectors have been present during the pouring of building slabs and have approved all pours. On June 10 IDEQ issued an Authorization to serve the public for the clearwell and related piping. This approval was contingent on the requirement to provide as built drawings or an as-built certification letter within 30 days. . CDM continued to coordinate with IDEQ regarding final approval to construct. Previous conditional approval had been given for below grade construction. Permitting issues resolved during the month of June involved NSF approval of concrete ad mixtures , the use of double check valve assemblies, and ASTM rating for pressure tanks. Final approval for the standby power approach had not yet been resolved at the end of June. Coordination with Memcor Membrane System continued regarding submittal review, inspection plans, and delivery. Equipment testing reports were issued on June 30 by US Filter. All equipment is ready for shipment pending CDM approval of the testing reports. POs have also been issued for all of the critical-long lead item -parts and pieces including the Pumps, Mag meters, Surge Tank, and Static mixers. Automation has verbally given tentative dates for all of the major electrical equipment. The ship dates are within the schedule (by Sept 1 , 2004) except for the Type ill plant switch gear which are schedule to ship mid October. Contracting: Subcontracts and vendor contracts continued to be negotiated and signed. To date we have successfully negotiated all of the critical subcontracts (copies of each were forwarded to United Water). Team Communication: Weekly subcontractor meetings are held on Wednesdays at 10:00. Weekly project management meetings are held by conference call on Wednesdays at 3:00. Clearwell: Painting of the clearwell exterior was completed on June 6. Disinfection the clearwell was completed on June 7. The tank was filled and hydrostatically tested after completion of the disinfection. After receiving results of the bacteriological and chlorine residual tests, start-up of theclearwell was delayed several days due to electrical problems on the temporary wiring to the pressure control valve. Use of the clearwell to feed the low pressure zone began on June 15. Basins: Shotcrete was formed and placed at basins 1 and 2. A substitution in the admixtures was made based on IDEQ requirements for NSF approved materials. Remaining work on the basins is primarily related to the soil cement floors. Septic System: No modifications during June. Building Floor: The'floor slab was completed with the final pour in the electrical room and the electrical duct vault on June 9. Building Walls: Masonry work began on the building walls June 21. Door frames and block outs were installed and masonry completed to a level above the doors excluding the East and South sides. Problems occurred when it became known that the decorative block for the 10' 8" level band had not been delivered to the site and would not be available until September due to problems with the manufacturer s kiln. On June 28, the " ,... substitution of half size block (8X4X16) was accepted by the Architect to prevent delay in the construction. Yard Piping: Dibble will be installing 110 feet of 30-inch membrane permeate to the future clearwell to prevent the need to disturb the new retaining wall south of the clearwell when the plant is expanded. Mechanical: Coordination and discussions withRM Mechanical continued regarding process area piping and chemical metering pumps. The Pulsco submittal for the raw water surge tank was received .and is being reviewed. Electrical: String was blown through the underslab conduits and all but one were successful. The majority of the site lighting was installed. Delays in receiving several key equipment submittals and subsequent may prevent the ability to install some of the electrical equipment before the building roof is complete. Resubmittals are still required for the plant and raw water pump station switchgear, the PLCs, panelboards plant instrumentation, and the motor control centers. The long delayed harmonics analysis report was received June 9, and the VFD's were subsequently approved as noted with minor comments on June 25. End of Report . , United Water Idaho Columbia Water Treatment Plant Progress Report for Period through July 31 , 2004 The information included in this report is from the period July 1 2004 through July 31, 2004. 11it.itfg~ irI iK~Ji~ ! ~~.H;~ ~:. Project Budget Contingency Included GMP: Work Authorized to Date: Billings to Date: Contingency Allocated: $ 16,294,498 $ 550 000 $ 16,844,498 $ 16 844,498 $ 10,186 050 $ 346,030 ~Ii~ Ii ~ 1i if n fJ) 1 fj~ Jf ~-U~~ ~~11 IY~ 1j ~ Original Contract Completion Date: June 1 , 2004/Ameded to July 1 2005 Notice to Proceed Date: February 6, 2004 Approved Changes to Schedule: 0 days Contract 30 day Facility Test Start Date: June 1, 2005 Contract Substantial Completion Date: July 1, 2005 Contract Final Completion Date: August 15,2005 Current 30 day Facility Test Start Date: March 5, 2005 Current Schedule Status: -82 Days Potential Schedule Impacts: Delays in receiving several key electrical equipment submittals will prevent the ability to install this equipment prior to completion of the building roof. The equipment would therefore need to be brought in through the doors. This should not impact the overall schedule if the equipment arrives in time to be installed and tested prior to the initial shakedown. An additional delay in the masonry was averted by changing the block size when an issue at the block manufacturer caused a shutdown of the facility. Project Schedule: Monthly update attached. Project Photo s: Attached are 5 representative photos. Others are available that document the project progress. Allocated Contingency: Attached is a list of the contingency items identified as an actual cost or forecasted cost. ~~~~J:~~~i1~1t~ The "As Built" drawing sets continue to be maintained at the job site Submittals/RFls from the subcontractors are being addressed. A copy of the submittal log is attached. Coordination efforts were continued to address standby power provisions for the two sites. Draft loop descriptions were provided to United Water and to Automation for comment and coordination on July 6. Loop descriptions for the US Filter portion of the controls are expected in early August. Due to potential conflicts between the new retaining wall south of the c1earwell and the future 30-inch Membrane Permeate line going to the future c1earwell CDM will be installing this future line between the existing tee and the future 45 degree bend. This change was approved by United Water on June 23. . A draft O&M Manual table of contents was presented, and the possibility of providing an interactive electronic manual was discussed. A meeting will take place in August to further discuss this issue. i~4iIfit~;; ~\ i~~t:tt3ji The micro filtration pilot unit continued running through the month of July. Pilot testing was halted on July 22 to complete a scheduled chemical cleaning using sodium hypochlorite followed by citric acid. The cleaning was successful at returning pilot operation to the initial operating conditions. The flow rate of the pilot plant was increased after the cleaning to simulate full plant operation with an 8 mgd average production. Operation at this flow rate will continue until the maximum allowable transmembrane pressure is reached. ~lit7~ ItHji~, ~ ggji \ J" ~) ~ ~ t:~.tl fr~; :0 All relevant permits from the Ada County Building Department have been obtained. As built drawings for the clearwell were provided to IDEQ on July 20 in compliance with the requirements of their June' 10 letter of authorization to serve the public. IDEQ issued a conditional approval to construct for the treatment plant on July 2. Remaining issues to resolve with IDEQ involve standby power and a question regarding EP A Phase n stormwater permitting. j1~tm!ij1Im~~~\ :i~li;~!t ~~~ Coordination with Memcor Membrane System continued regarding submittals of O&M Manuals and equipment delivery. Equipment testing reports were issued on June 30 by US Filter. Equipment was shipped from Australia on July 7 and is scheduled to arrive in Boise the second week of August. Major equipment has begun arriving on site, including treated water pump motors, CIP pumps, reclaimed water pumps, strainers, and US Filter control panels. Automation has given delivery dates for all of the major electrical equipment. The ship dates are within the schedule (by Sept 1,2004) except for the Type ill plant switch gear which is scheduled to ship mid October. ~l~~~!i~jliXl;Jj ~~~~ iK- ? ~. ~J.i,r~jI sf; ) ~J~1~ Contracting: We have successfully negotiated all of the critical subcontracts. We are waiting on the Fencing and the Landscaping until the final agreements are in place with the County. Team Communication: Wee1dy subcontractor meetings are held on Wednesdays at 10:00. Wee1dy project management meetings are held by conference call on Wednesdays at 3:00. Basins: Shotcrete was formed and placed at Basin 3, completing the shotcrete for the basins. Soil cement was poured for all three basins on July 27. Masonry: Building masonry was completed in July. Structural SteellBuilding Roof: East wall steel supports were installed. Began laying out roof plates, with significant progress made on the lower roof. Modifications were made to the castellated beam weld plate closers to address comments from the structural engIneer. Yard Piping: Began excavation and rock trenching for 30-inch raw water at pump station and 30-inch raw water at treatment plant. Mechanical: Coordination and discussions with RM Mechanical continued regarding process area piping and chemical metering pumps. The Pulsco submittal for the raw water surge tank was approved with comments and the equipment has been ordered. Much of the mechanical equipment, piping, and valves has been received and are being stored on site. Layout out of process piping will begin after installation of the membrane skids. Electrical: Delays in receiving several key equipment submittals and subsequent equipment acquisition will prevent the ability to install some of the electrical equipment before the building roof is complete. The conduit for the strainer will need to be relocated to allow for future expansion. The remainder of the electrical is on schedule. "'-I." Instrumentation: A preliminary instrumentation coordination meeting was held in Casper, WY on July 30 between Automation and CDM. Work has begun in developing loops and preliminary programming coordination. A follow up meeting with be held in Boise with Automation and US Filter, tentatively scheduled for August 16. Health and Safety: Tailgate safety meetings are required daily. To date 18,380 hours have been expended constructing the facility without an incident. CDM sponsors safety lunches monthly to acknowledge the safe work site. End of Report .t . United Water Idaho Columbia Water Treatment Plant Progress Report for Period through August 31 , 2004 The information included in this report is from the period August 1, 2004 through August 31 2004. Project' Budget Contingency Included GMP: Work Authorized to Date: Billings to Date: Contingency Allocated: $ 16,294,498 $ 550 000 $ 16,844,498 $ 16,844,498 $ 10,948,798 $ 401 701 Original Contract Completion Date: June 1, 2004/Ameded to July 1 2005 Notice to Proceed Date: February 6, 2004 Approved Changes to, Schedule:' 0 days Contract 30 day Facility Test Start Date: June 1 2005 Contract Substantial Completion Date: July 1, 2005 Contract Final Completion Date: August 15, 2005 Current 30 day Facility Test Start Date: March 5 , 2005 Current Schedule Status: -82 Days Potential Schedule Impacts: An initial electrical/instrumentation and startup schedule was submitted this month, which did not fit within the overall construction schedule. Coordination has been underway with the electrical subcontractor to accelerate the wiring and loop testing schedule, allowing the overall project to remain on its current schedule. Several unexpected setbacks occurred in August, including fabrication errors in the length of the low roof I-beams, missing shop prime on the roof decking, and significant rust build-up on the treated water pump spools. All of these issues were addressed and resolved in manners which avoided impacting the overall construction schedule. Project Schedule: Monthly update attached. Project Photo s: Attached are 6 representative photos. Others are available that document the project progress. Allocated Contingency: Attached is a list of the contingency items identified as an actual cost or forecasted cost. . '" The "As Built" drawing sets continues to be maintained at the job site SubmittalsIRFIs from the subcontractors are being addressed. A copy of the submittal log is attached. . A coordination meeting was held on August 12 with Idaho Power and Qwest finalizing the transfornler placement and issues related to the joint utility trench. . An I&C coordination meeting was held on August 16 between UWID, CDM, AE and USFilter. Draft loop descriptions from USFilter and CDM were discussed and modifications were discussed to prevent overlap and better integrate the two systems. Final loop descriptions will be issued in early September. Work has begun in compiling data for the O&M manuals. CDM and UWID need to discuss further the possibility of providing an interactive electronic manual. The microfiltration pilot unit continued running through the month of August operating at a higher flux rate equivalent to a ful~ plant capacity of 8 mgd. The pilot unit operated for 40 days before rising transmembrane pressure necessitated a chemical cleaning. A membrane fiber was found to be broken in the third pressure vessel causing an increase in pressure loss during the pressure decay test and registering in the water quality samples as an increase in particle counts and positive readings on the HPC results. The broken fiber was pinned after chemical cleaning was completed and the unit was restarted. . A neighborhood meeting was held on August 11, satisfying requirements for revision of the Conditional Use Permit which are necessary to comply with recommendations of the recent Vulnerability Assessment. . We have not yet received a letter from Idaho Power detailing the standby power allocated for the plant and raw water pump station. This letter is necessary prior to final plant approval by IDEQ. All major mechanical equipment has been delivered to the site, including membrane skids, strainers, air compressors, pumps, and blowers. Coordination is continuing regarding delivery of equipment O&M manuals. # " . CDM is coordinating with RM Mechanical to substitute Watson Marlow series 520 pumps for the Masterflex pumps submitted by RM. The Watson Marlow pumps will allow UWID to maintain a better level of standardization with their other facilities. Contracting: We have successfully negotiated all of the critical subcontracts. Weare waiting on the Fencing and the Landscaping until the final agreements are in place with the County. Team Communication: Weekly subcontractor meetings are held on Wednesdays at 10:00. Weekly project management meetings are held by conference call on Wednesdays at 3:00. Stormwater: The stormwater detention pond grading was completed and all bioswales were dug and lined with rip-rap. Structural Steel/Building Roof: On August 2 it was discovered that the roof beams for the low roof were alII-inch too long. Western steel began sending these back to the factory to have Y2-inch taken off each side. Installation of the corrected I-beams was completed as they arrived. On August 9 it was noted that-the galvanized roof decking did not include the required factory prime. Colorcraft submitted information on a field prime containing a 20-year warranty, which was acceptable to the engineers. Installation of decking was able to begin on August 11 without delay. Cleaning and field priming of the decking began on August 20. Architectural: Overhead doors have been installed on the north end of the building. Yard Piping and Trenching: Rock trenching was completed to the raw water pump station and laying of the 30-inch raw water line was begun. The shared utility trench at the treatment plant was dug and conduits, vaults, and gaslines were installed. Mechanical: Microfiltration skids began arriving at the site on August 11. All six skids were set into place by crane on August 17. On August 18, when the blind flanges were removed to install the treated water pumps, it was discovered that the 3-foot spool pieces provided by the pump manufacturer had not been epoxy lined, as specified, and had built up considerable levels of surface rust. On August 27 the spools were sandblasted and sprayed with two coats of NSF approved epoxy paint. Pumps were set in place on August 31. Roof drains and overflow plumbing installation has begun, as has installation of valves at the recovery basins. Electrical: Site lighting poles were installed. Excavation was completed for the main transformer pad and the secondary vault. Conduits and boxes were laid out in the walls in the office area. The conduit for the strainer will need to be relocated to avoid blocking the northeast roll-up door entryway and to allow for future expansion. Conduits were laid in the utility trench. Instrumentation: A second instrumentation coordination meeting was held on August 16 between UWID, CDM, AE and USFilter. General screen layouts were agreed on, and integration issues between various systems was discussed. A draft schedule presented by AE did not meet the overall schedule for plant startup. Continued coordination is required with AE to insure that the March 5, 2005 startup date can be met. Health and Safety: Tailgate safety meetings are required daily. To date 21 215 hours have been expended constructing the facility without an incident. CDM sponsored a safety lunch on August 25th to acknowledge the safe work site. End of Report : ,r" United Water Idaho Columbia Water Treatment Plant Progress Report for Period through September 30, 2004 The information included in this report is from the period September 1, 2004 through September , 2004. Project Budget Contingency Included GMP: Work Authorized to Date: Billings to Date: Contingency Allocated: $ 16,294,498 $ 550,000 $ 16,844 498 $ 16,844,498 $ 11 675,399 $ 449,043 Original Contract Completion Date: June 1, 2004/Ameded to July 1,2005 . Notice to Proceed Date: February 6, 2004 Approved Changes to Schedule: 0 days Contract 30 day Facility Test Start Date: June 1, 2005 Contract Substantial Completion Date: July 1, 2005 Contract Final Completion Date: August 15,2005 Current 30 day Facility Test Start Date: March 5, 2005 Current Schedule Status: -82 Days Potential Schedule Impacts: A revised electrical/instrumentation and startup schedule was submitted this month. The revised schedule confirms the March 5, 2005 startup date, however, more coordination on this schedule is necessary to ensure that adequate time is given for loop checks after completion of all of the field wiring. CDM is waiting on a number of submittals from AE regarding screen development, programming, and panel wiring. These submittals could impact overall schedule if it becomes necessary for AE to revise any of their wiring based on review comments. It is CDM's intent to complete the paving in 2004 but if weather conditions dictate we may have to complete this work in 2005. CDM also identified a problem with the pressure rating of PVC piping installed for the raw water pipeline. While replacement of this piping should not impact the overall construction schedule, it cbuld delay completion of the gas line to the plant, which will require measures for temporary heating in the building after November Project Schedule: Monthly update attached. , ,...-' Project Photo s: Attached are 8 representative photos. Others are available that document the project progress. During a review of last months report, the QNQC officer for CDM identified a potential health and safety issue with one of the photos (photo of the skid being set). After review and investigation it was established that the skid was actually set and that the crane rigging was actually a second backup with no load. This confirmed that there was not a violation or potential health and safety issue. Allocated Contingency: Attached is a list of the contingency items identified as an actual cost or forecasted cost. The previous surge analysis for the raw water pipeline was revisited in order to reduce the required number of surge relief valves based on the immediate flow conditions, rather than build-out flowrates. It is anticipated that a second surge tank may be installed near the raw water pump station in the future once the flowrate of the plant has been expanded. The recommendations of the revised surge analysis will not be complete until early October, however, it was identified that the DR41 PVC pipe currently being installed along the raw water pipeline is insufficient for the pressures which will be experienced during normal plant operation. CDM recommended that approximately 1600 feet of DR41 pipe be replaced withDR25 pipe to prevent failure of the PVC pipe. The New Pipe has been located by UWID's contractor and reinstallation is scheduled to begin the week of October 11 Coordination continued regarding the I&C programming. Final loop descriptions were issued in early September for the primary plant and the USFilter system. CDM is coordinating with Clortec to revise the I/O between the Clortec control panel and the chemical area PLC. I revised I/O was agreed on between CDM, UWID, and AE, with preliminary acceptance by Clortec. Further discussions with Clortec are necessary to coordinate control panel reprogramming. Work has begun in compiling data for the O&M manuals. The "As Built" drawing sets continues to be maintained at the job site SubmittalslRFIs from the subcontractors are being addressed. A copy of the submittal log is attached. Pilot testing was completed on September 30, after 4 months of data had been collected. The pilot testing report will be submitted to DEQ for review in early November. ""'- . We have not yet received a letter from Idaho Power detailing the standby power allocated for the plant and raw water pump station. This letter is necessary prior to final plant approval by IDEQ. All major mechanical equipment has been delivered to the site, including membrane skids, strainers, air compressors, pumps, and blowers. Coordination is continuing regarding delivery of equipment O&M manuals. CDM has substituted Watson Marlow pumps for the previously submitted Masterflex metering pumps to allow for better compatibility with the metering pumps used elsewhere in the UWID system. Contracting: We have successfully negotiated all of the critical subcontracts. We are waiting on the Fencing and the Landscaping until the final agreements are in place with the County. Team Communication: Weekly subcontractor meetings are held on Wednesdays at 10:00. Weekly project management meetings are held by conference call on Wednesdays at 3:00. Building Roof: Installation of the roof decking was completed iIJ. September. All decking was field primed and painted after installation. Field painting of the structural beams was completed in the chemical rooms and the electrical rooms and was begun in the process area. We expect the roof to be complete by the end of October. Architectural: All overhead doors have been installed. Wall partition framing has been installed in the office/control room area. The sheetrock wall between the electrical and mechanical rooms has been completed. Yard Piping and Trenching: Rock trenching was completed to the raw water pump station and laying of the 30-inch raw water line was continued. There was some difficulty maintaining the deflections necessary to match the elevations on the contract drawings. In order to matg,h the elevations, two 22.5 degree bends were added to the 30- inch RW line. - ,..,....- ' Mechanical: Installation of mechanical equipment continued during the month of September. Equipment pads were poured and installation was completed for the strainers, air compressors, and blowers. Fire protection piping was installed and painted. Installation of process piping under the skids was begun, in addition to some of the air piping and utility water piping. Changes to the design included a relocation of the water heater vent and plans for an overhead crane in the pump room. Heating and Ventilation: The air handling unit for the raw water pump station arrived ) on September 13. Installation of air handling equipment is scheduled to begin in October. Electrical: The MCCs for the treatment plant arrived on September 1. The main transformer panel was set in place on September 8. The concrete north of the raw water strainers was repaired after the conduits were relocated to the locations shown on the drawings. AE began pulling wires through some conduits in the treatment building. Instrumentation: AE s~bmitted a revised schedule, which meets the March 5, 2005 startup date. Some coordination is still necessary to ensure that sufficient time is given to completing loop checks after all field wiring has been completed. Sample screen shots were provided for review for a few of the screens. CDM is waiting on a number of submittals regarding screen development, programming, and panel wiring. AE is currently planning to complete factory acceptance testing in Casper, WY the rust week November. Health and Safety: Safety meetings are held weekly and Tailgate safety meetings are required daily. To date 24,817 hours have been expended constructing the facility without an incident. End of Report ~:' " , United Water Idaho Columbia Water Treatment Plant Progress Report for Period through October 31 , 2004 The information included in this report is from the period October 1 , 2004 through October 31 2004. Project Budget Contingency Included GMP: Work Authorized to Date: Billings to Date: Contingency Allocated: $ 16,294,498 $ 550,000 $ 16,844 498 $ 16,844,498 $ 13 127,852 $ 538 694 Original ,Contract Completion Date: June 1 , 2004/Ameded to July 1 2005 Notice to Proceed Date: February 6, 2004 Approved Changes to Schedule: 0 days Contract 30 day Facility Test Start Date: June 1, 2005 Contract Substantial Completion Date: July 1, 2005 Contract Final Completion Date: August 15, 2005 Current 30 day Facility Test Start Date: March 5, 2005 Current Schedule Status: -82 Days Potential Schedule Impacts: The Factory Acceptance Test is scheduled for the 3rd and th of November. If the test is acceptable to UW and CDM we expect that the electrical and I&C will be on schedule for the March 5 startup date. It is CDM's intent to complete the paving in 2004 but if weather conditions dictate we may have to complete this work in 2005. The addition of a Hydronumatic surge system to the Pump Station should be able to be completed in parallel to other activities and it does not appear that there will be an impact to the schedule. Project Schedule: Monthly update attached. Project Photo s: Attached are 6 representative photos. Others are available that document the project progress. --- Allocated Contingency: Attached is a list of the contingency items identified as an actual cost or forecasted cost. Coordination continued regarding the I&C programming. Final loop descriptions were issued in early September for the primary plant and the USFilter system. CDM is coordinating with Clortec to revise the I/O between the Clortec control panel and the chemical area PLC. I revised I/O was agreed on between CDM, UWID, and AE, with preliminary acceptance by Clortec. Further discussions with Clortec are necessary to coordinate control panel reprogramming. Work has begun in compiling data for the O&M manuals. The "As Built" drawing sets continues to be maintained at the job site Submittals/RFIs from the subcontractors are being addressed. A copy of the submittal log is attached. Pilot testing was completed on September 30, after 4 months of data had been collected. The pilot testing report will be submitted to DEQ for review in early November. . We have not yet received a letter from Idaho Power detailing the standby power allocated for the plant and raw water pump station. This letter is necessary prior to final plant approval by IDEQ. . We received approval to change the fencing and landscaping to conform with the vulnerability assessment. All major mechanical equipment has been delivered to the site, including membrane skids, strainers, air compressors, pumps , and blowers. Coordination is continuing regarding delivery of equipment O&M manuals. . CDM has substituted Watson Marlow pumps for the previously submitted Masterflex metering pumps to allow for better compatibility with the metering pumps used elsewhere in the UWID system. Chlortech is modifying their panel to better conform with the updated design. Contracting: We have successfully negotiated all of the critical subcontracts. Team Communication: Wee1dy subcontractor meetings are held on Wednesdays at 10:00. Weekly project management meetings are held by conference call on Wednesdays at 3 :00. Building Roof: Installation of the roof decking was completed in September. All decking was field primed and painted after installation. Field painting of the structural beams was completed in the chemical rooms and the electrical rooms and was begun in the process area. We expect the roof to be complete by November 15. Architectural: All doors have been installed. Wall partition framing has been installed in the office/control room area. The sheetrock wall between the electrical and mechanical rooms has been completed. The storefront has been installed. Stucco expected to be complete by November 15. Yard Piping and Trenching: Rock trenching was completed to the raw water pump station and laying of the 30-inch raw water line was continued. There was some difficulty maintaining the deflections necessary to match the elevations on the contract drawings. In order to match the elevations, two 22.5 degree bends were added to the 30- inch RW line. New line is being laid to accommodate the new surge tame Mechanical: Installation of mechanical equipment continued during the month of October. This activity is approximately 80% complete. Remaining equipment pads were poured and installation was completed for the surge tank and various tanks. Installation of process piping under the skids was continued, in addition to the air piping and utility water piping. Changes to the design included a relocation of the water heater vent and plans for an overhead crane in the pump room. Heating and Ventilation: Installation of air handling equipment is scheduled to be completed in November. Electrical: All the major electrical gear has been set. AE continues pulling wires through conduits in the treatment building. Instrumentation: CDM is waiting on submittals regarding screen development, programming, and panel wiring. AE is currently planning to complete factory acceptance testing in Casper, WY the flfSt week of November. Based on the success of the test, AE has indicated that they will be prepared to start shipping mid November. ... - Health and Safety: Safety meetings are held weekly and Tailgate safety meetings are required daily. To date 29,876 hours have been expended constructing the facility without an incident. End of Report United Water Idaho Columbia Water Treatment Plant Progress Report for Period through November 30, 2004 The information included in this report is from the period November 1 2004 through November 30, 2004. Project Budget Contingency Included GMP: Work Authorized to Date: Billings to Date: Contingency Allocated: $ 16,294,498 $ 550 000 $ 16,844 498 $ 16,844,498 $ 15,203 930 $ 601,759 Original Contract Completion Date: June 1, 2004/Ameded to July 1 2005 Notice to Proceed Date: February 6, 2004 Approved Changes to Schedule: 0 days Contract 30 day Facility Test Start Date: June 1 , 2005 Contract Substantial Completion Date: July 1 , 2005 Contract Final Completion Date: August 15,2005 Current 30 day Facility Test Start Date: March 5, 2005 Current Schedule Status: -82 Days Potential Schedule Impacts: Late changes to the project including the addition of a surge tank at the raw water pump station and replacement of the Clortec control panel could impact the startup if the controls for these systems cannot be integrated and tested in time for the March 5 startup date. We are currently on track to have all equipment on- site without creating delays in the testing and startup schedule, however, any delay in receiving these new equipment items could delay the plant startup. The installation of the plant electrical and gas has been delayed but is now expected" to be in place by the second week of December. This should not impact the overall schedule. Project Schedule: MontWy update attached. Project Photo s: Attached are 7 representative photos. Others are available that document the project progress. Allocated Contingency: Attached is a list of the contingency items identified as an actual cost or forecasted cost. ..- The previous surge analysis for the raw water pipeline was revisited in order to reduce the required number of surge relief valves, limiting the valves to two 4- inch valves. It was therefore necessary to add a buried 10,000 gallon surge tank at the raw water pump station, along with the associated air compressors and controls. The control panel for the sodium hypocWorite generation system provided by Clortec has been revised to incorporate Ethernet communication~ The new control panel will make use of an Allen Bradley SCL505 controller purchased previously from aD!. Compilation of the O&M manual has continued. A preliminary draft of this manual will be completed in mid-December. The "As Built" drawing sets continues to be maintained at the job site . A small number of remaining submittals and RFIs from the subcontractors are being addressed. A copy of the submittal log is attached. The draft Pilot Test Report was completed on November 30 and submitted for United Water Review. A meeting with IDEQ is scheduled for December 15 to discuss the results and recommendations of this report. . We have not yet received a letter from Idaho Power detailing the standby power allocated for the plant and raw water pump station. This letter is necessary prior to final plant approval by IDEQ. All major mechanical equipment has been delivered to and installed at the site. This excludes the new Clortec panel at the plant and the new surge tank system at the RWPS. The panel is due onsite prior to December 24th and the surge tank system is currently scheduled to arrive by the 25th of January. Coordination continuing regarding delivery of the equipment O&M manuals. .. . Contracting: We have successfully negotiated all of the subcontracts. Team Communication: Weekly subcontractor meetings are held on Wednesdays at 10:00. Weekly project management meetings are held by conference call on Wednesdays at 3 :00. Site Civil: The berms were completed in November and the fence and gates are scheduled to be installed the first of January. The roads were paved the 3rd of December. All remaining civil work will be completed in the spring of 2005. Building Roof: Installation of the roof decking was completed in September. All decking was field primed and painted after installation. Installation of the roof membrane was delayed during several rain events and there were areas that needed to be redone due to seam failure. CDM is clipping and painting the screw tails from the inside ceiling. With the exception of the screw tailings the roof was completed on December 4, 2004. Painting and Coatings: Painting and coating has progressed on schedule as the building has been erected and equipment has been installed. Architectural: All overhead doors have been installed. Wall partition framing, sheetrock, and painting has been installed in the office/control room area. The storefront has been installed. Two of the glass panels were sent incorrect but were rejected and replaced. Yard Piping and Trenching: The 30-inch raw water line to the pump station was completed. Testing of the line is currently in progress. The new surge tank will need to be installed and tested when in arrives. Mechanical: Installation of mechanical equipment continued during the month of November. The final equipment pads were poured and installation of the remaining equipment was completed. Installation of process piping under the skids was completed; in addition most of the air piping and utility water piping W~&. completed. We believe the mechanical to be approximately 85% complete and should finish the first part of January. Heating and Ventilation: The air handling unit for the raw water pump station and the plant were set. We are looking to power all the units the second week of December. Electrical: All the major electrical gear is set and AE continues to pull and terminate WIre. Instrumentation: The Fat test was completed on schedule the first week of November. During the test several issues were identified and have been worked on during the month. .,, The panels (less the PLCs) were shipped to the site and installed. Software has been exchanged between AE and Memcor and the integration between the systems is in progress. Coordination is still necessary to ensure that sufficient time is given to completing loop checks after all field wiring has been completed. Health and Safety: Tailgate safety meetings are required daily. To date 34 608 hours have been expended constructing the facility without an incident. End of Report United Water Idaho Columbia W aterTreatment Plant Progress Report for Period through December 31 , 2004 The infonnation included in this report is from the period December 1 , 2004 through December 2004. Project Budget Contingency Included GMP: Work Authorized to Date: Billings, to Date: Contingency Allocated: $ 16,294 498 $ 550,000 $ 16,844 498 $ 16,844 498 $ 15 203,930 $ 601 759 Original Contract Completion Date: June 1 , 2004/Ameded to July 1, 2005Notice to Proceed Date: February 6, 2004 Approved Changes to Schedule: 0 days Contract 30 day Facility Test Start Date: June 1 2005 Contract Substantial Completion Date: July 1 , 2005 Contract Final Completion Date: August 15,2005 Current 28 day Facility Test Start Date: March 5 , 2005 Current Schedule Status: -82 Days Potential Schedule Impacts: Late changes to the project including the addition of a surge tank at the raw water pump station and replacement of the Clortec control panel could impact the startup if the controls for these systems cannot be integrated and tested in time for the March 5 startup date. We are currently on track to have all equipment on- site without creating delays in the testing and startup schedule, however, any delay in receiving these new equipment items could delay the plant startup. During the latest contractor/subcontractor meeting, there was no one who indicated they see a problem meeting the March 5, 2005 start date at this time. The only exception to this may be the new requirements for the fire alarm system. The details of this are currently being evaluated. Project Schedule: Monthly update attached. Project Photo s: Attached are 5 representative photos. Others are available that document the project progress. Allocated Contingency: Attached is a list of the contingency items identified as an actual cost or forecasted cost. The previous surge analysis for the raw water pipeline was revisited in order to reduce the required number of surge relief valves, limiting the valves to two 4- inch valves. It was therefore necessary to add a buried 10,000 gallon surge tank at the raw water pump station, along with the associated air compressors and controls. The control panel for the sodium hypochlorite generation system provided by Clortec has been revised to incorporate Ethernet communication. The new control panel will make use of an Allen Bradley SCL505 controller purchased previously from ODI. Concern was expressed regarding the use of low pressure compressed air to blow out the PVC chemical cleaning (CIP) piping. An Evaluation of the options andissues is being conducted. Compilation of the O&M manual has continued. A draft of this manual will be completed the fITst of February. The "As Built" drawing sets continues to be maintained at the job site . A small number of remaining submittals and RFls from the subcontractors are being addressed. A copy of the submittal log is attached. All pilot testing is complete. The Final Pilot Test Report was submitted to DEQ on December 15. . A meeting was held with DEQ on December 15 to discuss the Pilot results and future meetings required for plant acceptance and start-up. It was noted by DEQ that two stamped/approved drawing sets were previously provided to UWID, and that one is required to be on-site at the treatment plant. . We have not yet received a letter from Idaho Power detailing the standby power allocated for the plant and raw water pump station. This letter is necessary prior to final plant approval by DEQ. All major mechanical equipment has been delivered to and installed at the site. This excludes the new Clortec panel internal components and the new surge tank system at the RWPS. The panel is due on site in early January and the surge tank system is currently scheduled to arrive by the 25th of January. Coordination continuing regarding delivery of the equipment O&M manuals. Contracting: We have successfully negotiated all of the subcontracts. Team Communication: Weekly subcontractor meetings are held on Wednesdays at 10:00. W eeklyproject management meetings are held by conference call on Wednesdaysat 3:00. Site Civil: Site paving was completed on December 3rd and 4 . All remaining civil work will be completed in the spring of 2005. Building Roof: Installation of the roof decking was completed in September. All decking was field primed and painted after installation. Installation of the roof membrane was delayed during several rain events and there were areas that needed to be redone due to seam failure. CDM is clipping and painting the screw tails from the inside ceiling. With the exception of the screw tailings the roof was completed on December 4, 2004. Several leaks caused by punctures of the membrane were identified in the roof. All punctures have been fixed with no leaks remaining in the roof. Painting and Coatings: Painting and coating has progressed on schedule as the building has been erected and equipment and piping have been installed. Architectural: All overhead doors have been installed. Wall partition framing, sheetrock, and painting has been installed in the office/control room area. The storefront has been installed. Two of the glass panels were sent incorrect but were rejected and replaced. Yard Piping and Trenching: Three separate leaks were identified in the 30-inch raw water line atthe raw water pump station during pressure testing. All fittings were exposed to identify the leak locations. Restraint bolts have be tightened, and thrust blocks added at two additional locations. The pipeline will be tested again in early January. The new surge tank will need to be installed and tested when it arrives in January. Mechanical: Installation of mechanical equipment continued during the month of December. The final equipment pads were poured and installation of the remaining equipment was completed. Process and utility air lines were completed and tested. Raw water and membrane permeate lines were completed and tested. Two leaks were found in the membrane permeate line, requiring replacement of fittings for the 16-inch flowmeter and repair of a pinhole leak on a 12-inch tee. Small diameter piping in the chemical rooms was begun, with the Acid Feed Room 90% complete and the Caustic Soda Room approximately 30% complete. Heating and Ventilation: .. Air handling units are installed and in operation using electricity. Modifications were made to seismic restraints based on comments from the County inspector. We are waiting for the final gas inspection to start running the systems on gas. Modifications were made to the duct work in the entry/office area to better control the air flow Electrical: All the major electrical gear is set and AE continues to pull and terminate wire. Idaho Power completed the power connection allowing the building lighting to be used. AE is following lockout-tagout procedures while installing plant wiring. A County inspector noted that the control panels for the USFilter skids do not have the proper UL stickers. USFilter will be sending out a UL inspector in January to confirm that the control panels meet all UL requirements. One of the HV AC control panels was also missing the required sticker. Hobson is working to address this concern. Instrumentation: Changes are being made to the wetwellievel indication at the RWPS after it was determined that the ultrasonic instruments were interfering with existing Micron instruments at the location where they were installed. After discussions between UWID, Micron, CDM, and AE, it was decided that these two instruments would be removed and the signals from the existing micron instruments will be used for monitoring and alarms. Initial loop checks were completed at the RWPS for control of the VFDs and RW pumps. Loop checks will begin at the treatment plant in January. Control software has been exchanged between AE and Memcor and the integration between the systems has been completed. Coordination is still necessary to ensure that sufficient time is given to completing loop checks after all field wiring has been completed. Health and Safety: Tailgate safety meetings are required daily. To date 38,945 hours have been expended constructing the facility without an incident. End of Report United Water Idaho Columbia Water Treatment Plant Progress Report for Period through January 31 20w( The information included in this report is from the period January 1, 2004 through January 31 2004. Project Budget Contingency Included GMP: Work Authorized to Date: Billings to Date: Contingency Allocated: $ 16,294,498 $ 550,000 $ 16,844,498 $ 16,844,498 $ 15,203,930 $ 409,034 Original Contract Completion Date: June 1, 2004/Ameded to July 1 , 2005 Notice to Proceed Date: February 6, 2004 Approved Changes to Schedule: 0 days Contract 30 day Facility Test Start Date: June 1 , 2005 Contract Substantial Completion Date: July 1 , 2005 Contract Final Completion Date: August 15 2005 Current 30 day Facility Test Start Date: March 7, 2005 Current Schedule Status: -80 Days Potential Schedule Impacts: Weare currently on schedule with all pre-startup and commissioning tasks. During the latest contractor/subcontractor meeting, there was no one who indicated they see a problem meeting the March 7,2005 start date at this time. The only exception to this may be the fire alarm system. The details of this are currently being worked out. The Facility 30 Test start date has been moved form March 5 to March 7 at United Water s request. Project Schedule: Monthly update attached. Project Photo s: Attached are 5 representative photos. Others are available that document the project progress. Allocated Contingency: Attached is a list of the contingency items identified as an actual cost or forecasted cost. Certain costs that were being held in contingency have been reallocated to the appropriate budget items so that the allocated contingency shows only CDM's actual contingency. *, . Compilation of the O&M manual has continued. A draft of this manual will be completed the first of February. The "As Built" drawing sets continues to be maintained at the job site . A small number of remaining submittals and RFIs from the subcontractors are being addressed at the site. A copy of the submittal log is attached. Additional modifications to the project, such as the canal intertie, fire alarm panel, pump room monorail, and building furnishings are being addressed as they come up. All pilot testing is complete. The Final Pilot Test Report was submitted to DEQ on December 15. Inspections from the County and State officials continued throughout the month of January. . We have not yet received a letter from Idaho Power detailing the standby power allocated for the plant and raw water pump station. This letter is necessary prior to final plant approval by DEQ. Weare working on getting the approval from the county and fire marshal for the fire system. All major mechanical equipment has been delivered to and installed at the site. The new Clortec panel did not have a UL listing and did not have all the required components so the panel face is being sent back and a new one sent to the site. Coordination is continuing regarding delivery of the equipment O&M manuals. Contracting: We have successfully negotiated all of the subcontracts. Team Communication: Weekly subcontractor meetings are held on Wednesdays at 10:00. Weekly project management meetings are held by conference call on Wednesdays at 3:00. ...- Site Civil: The final berm sculpting was completed and fence installation was started. We expect the fence to be completed by February 15 . All remaining civil work will be completed in the spring of 2005. Building Roof With the exception of the screw tailings, the roof was completed on December 4, 2004. Several leaks caused by punctures of the membrane were identified in the roof. All punctures have been fixed with no leaks remaining in the roof. The remaining screw tailings werec1ipped. Painting and Coatings: Painting and coating has progressed on schedule as the '. building has been erected and equipment and piping have been installed. Architectural: The cabinetry, flooring, and ceiling tile supports were completed in the entry, lab, and control room areas. Locks have been installed on the building exterior doors. Yard Piping and Trenching: Hydraulic testing of the 3~-inch raw water line at the raw water pump station identified a number of leaks. Each was fixed in turn over the past two months. The final and most significant was finally identified as an issue with the Micron installation. The bolts on the backside of the spool for the isolation valve had never been secured. After tightening the bolts the pipe held pressure. The new surge tank arrived and was installed on February 2, 2005. The tank will need to be plumbed and tested. Mechanical: Installation of mechanical equipment continued during the month of January. The final equipment pads were poured and installation of the remaining equipment was completed. Process and utility air lines were completed and tested. Raw water and membrane permeate lines were completed and tested. Small diameter piping in the chemical rooms was completed. Only miscellaneous mechanical work remains. Heating and Ventilation: The HV AC systems at the plant are operating. Modifications were made to the seismic restraints based on comments form the County inspector. Other changes were made to disconnect location based on code requirements. The testing and balancing is ongoing. Electrical: All the major electrical gear is set and AE continues to pull and terminate wire. We believe that they were 95 % complete at the end of January and expect to be 100 % complete by February 7 . They are currently working 5 X10 with a 16 person crew. AE is following lockout-tagout procedures while installing plant wiring. The control panels for the US Filter skids were UL listed by a UL inspector on February 2, 2005. The two HV AC control panels were also missing the required stickers were listed at the same time. The Chlortec panel was not compliant and could not be listed at the time. Chlortec is working to address this concern. '.. Instrumentation: Continuity and loop checks for the control wiring were completed for 95% of the Pump Area PLC. Wiring continued for the Chemical Area PLC. Various instruments were installed and ,we expect to be complete by February 15th. Coordination is still necessary to ensure that sufficient time is given to completing loop checks after all field wiring has been completed. Health and Safety: Tailgate safety meetings are required daily. To date 43878 hours have been expended constructing the facility without an incident. End of Report UNITED WATER IDAHO INC. CASE UWI-O4- FOURTH PRODUCTION REQUEST OF THE COMMISSION STAFF Preparer/Recordholder/Sponsoring Witness:Scott Rhead Telephone: 208-362-7345 Title: Managing Engineer REQUEST NO. 126: Please explain and give specific examples of how COM controls costs and stays within budget on the construction and materials/equipment procurement for the CWTP. RESPONSE NO. 126: All major equipment , supplies, and subcontractors were procured via lowest qualified bid. The costs are tracked weekly on COMs cost accounting system. All changed conditions are tracked and negotiated and contingency items are tracked monthly. No unauthorized changed conditions are allowed for payment without having the change order signed off by 2 COM senior staff. This allows a review of the plans and specifications to confirm that the change conditions are justified. COM has been able to disallow many of the requested change orders by working with the design engineers and referencing the plans and specification. Examples COM controlling costs include: During the excavation of the basins extensive rock was identified in a corner of one basin even though the area had been cleared by the geotech investigation. After initially using excavators to remove the rock, COM evaluated the cost to blast the areas and discovered that the cost could be reduced by over $40 000. The blasting option was then done thereby reducing the amount of contingency used. . COM reduced cost of offsite soil disposal by over $30,000 by negotiating with the adjacent property owner who needed the soil for fill in a previously excavated area. The soil was then transported to the nearby location and disposed of for the cost of compaction vs. paying a disposal fee. After the electrical inspector enforced newly established regulations requiring UL listing on certain electrical panels, COM held firm denying a change order for UL listing on the process panels. The panels were supplied by one of the subcontractors; COM stated that the contract required that the panels meet state and local regulations even though the specific requirement for UL listing was not contracted. This saved approximately $12,000 in costs. . COM contracted directly with the basin shotcrete subcontractor after discovering the civil subcontractor had marked the work up 200/0. The over all savings was close to $50 000 because on the cost plus fixed fee contract COM did not mark up the shotcrete subcontractor s cost. During the installation of the castellated beams, COM allowed the beam coating to take place on site saving nearly $6,000 in transportation costs. During the procurement of the pumps, COM negotiated a special price with the pump vendor by choosing one vendor for all the pumps after confirming that the vendor could supply pumps that met the requirements. This saved over $80,000 based on the original quotes from multiple vendors. In nearly every aspect of the construction there is some area where COM has valued engineered or negotiated savings for UWID during the plant construction.