Loading...
HomeMy WebLinkAbout20220411Staff 31-46 to Teton Water.pdfRILEY NEWTON DEPUTY ATTORNEY GENERAL IDAHO PUBLIC UTILITIES COMMISSION PO BOX 83720 BOISE, IDAHO 83720-007 4 (208) 334-0318 IDAHO BAR NO. II2O2 Street Address for Express Mail: 1 1331 W CHINDEN BLVD, BLDG 8, SUITE 2OI-A BOISE,ID 83714 Attomey for the Commission Staff BEFORE THE IDAHO PUBLIC UTILITIES COMMISSION IN THE MATTER OF THE APPLICATION OF TETON WATER & SEWER COMPANY FOR AUTHORITY TO INCREASE ITS RATES AND CHARGES FOR WATER SERVICE IN THE STATE OF IDAIIO. CASE NO. TTS-W.22-02 SECOND PRODUCTION REQUEST OF THE COMMISSION STAFF TO TETON WATER AI\D SEWER COMPAII"Y The Staff of the Idaho Public Utilities Commission, by and through its attorney of record, Riley Newton, Deputy Attorney General, requests that Teton Water and Sewer Company ("Company") provide the following documents and information as soon as possible, but no later than MONDAY, MAY 2,2022. This Production Request is to be considered as continuing, and the Company is requested to provide, by way of supplementary responses, additional documents that it, or any person acting on its behalf, may later obtain that will augment the documents or information produced. Please provide answers to each question, supporting workpapers that provide detail or are the source of information used in calculations, and the name, job title, and telephone number of the person preparing the documents. Please also identiff the name, job title, location, and telephone number of the record holder. SECOND PRODUCTION REQUEST TO TETON WATER AND SEWER ) ) ) ) ) ) ) ) ) I APRIL II,2O22 In addition to the written copies provided as response to the requests, please provide all Excel spreadsheets and electronic files on CD with formulas intact and enabled. REQUEST NO.3l: Please provide a thorough and complete description of the current water system. This should include any deficiencies that can be identified that need to be addressed to maintain system integrity and to support growth, as well as any changes/investments that the Company plans to implement to address deficiencies relative to items included below. Include the costs and benefits for any investments or increases in expense. a. Processes and methods. This should include processes involved in the delivery of water and business processes (i.e., billing, maintenance, customer support, etc.); b. Manpower/staffing, including the amount of labor and the level of expertise/experience ; c. Equipment/infrastructure/software both direct (i.e., pipes, tanks, and pumps) and indirect (maintenance equipment, computers, etc.); d. Policies and standards (i.e., service level, maintenance turnaround time, etc.); and e. Materials (productive material used for water quality, spare parts inventory, etc.). REQUEST NO.32: Please provide a current system map showing the location and elevation of major equipment including wells, pipes, storage tanks, booster pumps, shut-off valves, meters, fire hydrants, and water treatment equipment. Please include the following information: a. The make, model, and rating of each well pump; b. The make, model, and rating of each well pump motor; c. The make, model, capacity, and limit switch settings of each pressurized storage tank; d. The make, model, capacity, and limit switch settings of each unpressurized storage tank/reservoir; e. The make, model, and rating of each booster pump; and f. The make, model, and capacity of all water treatment equipment. SECOND PRODUCTION REQUEST TO TETON WATER AND SEWER 2 APRIL II,2O22 REQUEST NO.33: Please provide construction installation drawings for the current water system including: a. Plan drawings; b. Section drawings; c. Detail drawings; d. Specifications (materials, components, and equipment); and e. Installation requirements. REQUEST NO. 34: Please provide a hydraulic model of the system showing the results for each of the following operating scenarios: (l) low flow condition; (2) peak hour condition; and (3) maximum day plus fire flow condition. Please include the following information for each resulting scenario: a. A distribution system graphical representation showing the primary components (i.e., pumps, wells, storage, pipe network, and users); b. Primary component parameters (elevation, size, horsepower, operating curve); c. Piping segment materials, lengths, and diameters; d. Piping nodal elevations; and e. Operating scenario parameters: i. Nodal pressures; ii. Piping segment flows; iii. Pump operating parameters; iv. Well static water level; and v. Storage tank level. REQUEST NO. 35: If the system includes a fire prevention system, please provide the following: a. The name and contact information for the fire authority who prescribes requirements for the system; and b. Fire flow and storage requirements prescribed by the fire authority. SECOND PRODUCTION REQUEST TO TETON WATER AND SEWER J APRIL II,2O22 REQUEST NO. 36: Please provide information related to the capacity and sizing of the system and the ability of the system to meet historical and future system peak demand. Information would include not only capacity/constraints of/in the system, but also consumption and consumption at peak periods. REQUEST NO.37: Please provide the most recent Idaho Division of Environmental Quality Sanitary Survey. REQUEST NO.38: Please provide the Idaho Division of Environmental Quality Licensed System Operator who will be responsible for the operation and maintenance of the system, please provide the following information: a. Name; b. License Number and Class; and c. Business Address. REQUEST NO.39: Please provide the Idaho Department of Water Resources Water Right Numbers (basin and sequence number) for each water right used by the system. REQUEST NO. 40: For each well in the water system, please provide the following: a. The Idaho Department of Water Resources Well Tag Number (D-Tag Number) currently on-file with IDWR; b. Location (Township, Range, Section, and Tract); and c. The well log. REQUEST NO. 41: Please provide all studies, reports, or regulatory requirements stating the need for a new third and fourth well. REQUEST NO. 42: Please provide all contractor bid proposals for the installation of any new well. SECOND PRODUCTION REQUEST TO TETON WATER AND SEWER 4 APRIL II,2O22 REQUEST NO. 43: Please provide monthly flow rate data for each system well pump and each booster pump during the past three years. REQUEST NO. 44: Please provide monthly electric bills for each system well pump and each booster pump during the past three years. These bills would show monthly energy use (kVfh) and peak energy demand (kW). REQUEST NO.45: Please provide information related to the capacity and sizing of the system and the ability of the system to meet historical and future system peak demand. This information should include not only capacity information, but also any constraints within the system to meet peak demand. Please also provide information on average consumption, consumption at peak periods, and future forecasted consumption. REQUEST NO. 46: Please provide details of the Company's system leaks (i.e., count, location, line size, expected cause of failure) and explain the method for repairing the leak to prevent a future leak. DATED at Boise, Idaho, this ( lfl auy of April2022 Riley Newton Deputy Attorney General i:umisc:prodreq/ttstw22.2mrk prod req 2 SECOND PRODUCTION REQUEST TO TETON WATER AND SEWER 5 APRIL II,2O22 CERTIFICATE OF SERVICE I HEREBY CERTIFY THAT I HAVE THIS I ITH DAY OF APRIL 2022, SERVED THE FOREGOING SECOND PRODUCTION REQUEST OF TIIE COMMISSION STAFF TO TETON WATER AI\D SEWER COMPAI\IY, IN CASE NO. TTS-W-22.02, BY E. MAILING A COPY THEREOF, TO THE FOLLOMNG: JON PINARDI TETON WATER & SEWER CO PO BOX 786 DRIGGS TD 83422 E-MAIL: ipinardi@silverstar.com Tetonws@ silverstar. com J. f,,Z,.r\ SECRETARY / CERTIFICATE OF SERVICE