Loading...
HomeMy WebLinkAbout200501212nd Request of staff.pdfDONOVAN E. WALKER DEPUTY ATTORNEY GENERAL IDAHO PUBLIC UTILITIES COMMISSION PO BOX 83720 BOISE, IDAHO 83720-0074 (208) 334-0357 IDAHO BAR NO. 5921 Street Address for Express Mail: 472 W. WASHINGTON BOISE, IDAHO 83702-5983 Attorney for the Commission Staff RECEWEO ra F fLED 2uns JA~I 21 AM \1): In ;IC1 F' BLIC UT'L iES' COr-1M1SS1ON BEFORE THE IDAHO PUBLIC UTILITIES COMMISSION IN THE MATTER OF THE INVESTIGATION OF TERRA GRANDE WATER AND THE ISSUANCE OF RELATED CERTIFICATE OF PUBLIC CONVENIENCE AND NECESSITY NO. 429. CASE NO. TGW-04- SECOND PRODUCTION REQUEST OF THE COMMISSION STAFF TO TERRA GRANDE WATER The Staff of the Idaho Public Utilities Commission, by and through its attorney of record Donovan E. Walker, Deputy Attorney General, requests that Terra Grande Water (Terra Grande; Company) provide the following documents and information on or before FRIDAY, FEBRUARY 18, 2005. This Production Request is to be considered as continuing, and Terra Grande is requested to provide, by way of supplementary responses, additional documents that it or any person acting on its behalf may later obtain that will augment the documents produced. Please provide answers to each question; supporting workpapers that provide detail or are the source of information used in calculations; the name and telephone number of the person preparing the documents; and the name, location and telephone number of the record holder. SECOND PRODUCTION REQUEST TO TERRA GRANDE WATER JANUARY 21 2005 For each item, please indicate the name of the person(s) preparing the answers, along with the job title of such person(s). Reference IDAP A 31.01.01.228. For documents provided please include the name and phone number of the person preparing the document, and the name, location and phone number of the record holder. Request No.6: On July 8, 2004, the Company replied to Staff Production Request No.1 that the Company had retained the services of a professional engineer to assess the condition of the water company. Please provide the results of the engineer s assessment, any reports and or recommendations. If the information is still unavailable please provide the status of the assessment and the expected date of the resulting information. Request No.7: On July 8 , 2004 the Company replied to Staff Production Request No. regarding a written plan for capital investments with estimated costs and proposed timing. The response stated: "The requested plan is being developed and will be provided upon its completion. listing of capital expenditures made will be provided at that time." Please provide the written capital investment plan with estimated costs and proposed timing or provide your anticipated completion date for this plan. Request No.8: Please provide the Company s latest DEQ sanitary survey. Please report on any changes made since the survey. Request No.9: Please provide an update on the status of water quality testing and a summary of testing performed since September 2004. DATED at Boise, Idaho, this :?15 r-da y of January 2005. onovan E. Walker Deputy Attorney General Technical Staff: Michael Fuss SW:i:umisc/prodreq/tgwwO4.swprodreq2 SECOND PRODUCTION REQUEST TO TERRA GRANDE WATER JANUARY 21 2005 CERTIFICA TE OF SERVICE HEREBY CERTIFY THAT I HAVE THIS 21 sT DAY OF JANUARY 2005 SERVED THE FOREGOING SECOND PRODUCTION REQUEST OF THE COMMISSION STAFF TO TERRA GRANDE WATER, IN CASE NO. TGW-04-, BY MAILING A COpy THEREOF POSTAGE PREPAID TO THE FOLLOWING: BARBARA V CHILD TERRA GRANDE WATER 10012 ESHELMAN BOISE ID 83704 WILLIAM J BA BATT & FISHER PO BOX 1308 BOISE ID 83701 CERTIFICATE OF SERVICE