Loading...
HomeMy WebLinkAbout20171025Staff 1-7 to Rickel Water.pdfBRANDON KARPEN DEPUTY ATTORNEY GENERAL IDAHO PUBLIC UTILITIES COMMISSION PO BOX 83720 BOISE, IDAHO 83720-0074 (208) 334-03s7 IDAHO BAR NO. 7956 Street Address for Express Mail: 472W. WASHINGTON BOISE, IDAHO 83702-5918 Attorney for the Commission Staff BEFORE THE IDAHO PUBLIC UTILITIES COMMISSION IN THE MATTER OF THE APPLICATION OF RICKEL WATER COMPANY TO COMBINE WITH BITTERROOT WATER COMPANY, INC. FIRST PRODUCTION REQUEST OF THE COMMISSION STAFF TO RICKEL WATER COMPANY The Staff of the Idaho Public Utilities Commission, by and through its attorney of record, Brandon Karpen, Deputy Attorney General, request that Rickel Water Company (Company; Rickel Water) provide the following documents and information as soon as possible, but no later than WEDNESDAY, NOVEMBER 15, 2017. This Production Request is continuing, and the Company is requested to provide, by way of supplementary responses, additional documents that it or any person acting on its behalf may later obtain that will augment the documents produced. Please provide answers to each question, and supporting workpapers that provide detail or are the source of information used in calculations. The Company is reminded that responses pursuant to Commission Rules of Procedure must include the name and phone number of the FIRST PRODUCTION REQUEST TO zuCKEL WATER ) ) ) ) ) ) ) ) CASE NO. RIC-W.I7.OI faf_ir.*rrrl-t\ ;;ti::;5 PFi 2:?? ocToBER 25,20171 person preparing the document, and the name, location and phone number of the record holder- and if different, the witness-who can sponsor the answer at hearing if need be. IDAPA 31.01.01.228. In addition to the written copies provided as response to the questions, please provide all Excel and electronic files on CD with formulas activated. REQUEST NO. 1: Please provide a system map showing the location of major equipment including wells, pipes, storage tanks, booster pumps, shut-off valves, meters, fire hydrants, and water treatment equipment. Please identify the components that currently are part of the Rickel system, and those that are part of the Bitterroot system. Please include the following information : a. The make, model, and rating of each well pump. b. The make, model, and rating of each well pump motor. c. The make, model, capacity, and limit switch settings of each pressurized storage tank. d. The make, model, capacity, and limit switch settings of each unpressurized storage tank/reservoir. e. The make, model, and rating of each booster pump. f. The make, model, and capacity of all water treatment equipment. REQUEST NO. 2: It is Staffs understanding that in normal operation, the Rickel well and pump are not used, and that the Bitterroot well and pump are used to pressurize both the Rickel and Bitterroot systems. Is this correct? REQUEST NO. 3: It is Staffs understanding that the Rickel well and pump can be used as a backup source for both the Rickel and Bitterroot systems, but that it does not have sufficient capacity to meet the combined peak demand from both systems. Please confirm this understanding. Under what conditions would the Rickel system be unable to meet the combined demands of both systems? FIRST PRODUCTION REQUEST TO RICKEL WATER 2 ocToBER 25,2017 REQUEST NO. 4: Please respond to the following questions: a. What is the peak demand on the Rickel system? b. What is the peak demand on the Bitterroot system? c. What is the peak capacity of the Rickel system? d. What is the peak capacity of the Bitterroot system? REQUEST NO. 5: Please provide the fire flow and storage requirements used to design the Bitterroot system. REQUEST NO. 6: Can the Rickel and Bitterroot systems be operated simultaneously? REQUEST NO. 7: Please provide total sales volume data (in gallons) by customer for a three-year period in Excel format. L#o^,Dated at Boise, Idaho, this of October 2017 Karpen Deputy Attorney General €^r Technical Staff: Michael MorrisorVl-6 John Nobbs/Bentley Erdwurm/7 i:umisc:prodreq/ricwl7. lbkbemmjn prod reql FIRST PRODUCTION REQUEST TO RICKEL WATER J ocToBER 25,2017 CERTIFICATE OF SERVICE I HEREBY CERTIFY THAT I HAVE THIS 25TH DAY OF OCTOBER 2017, SERVED THE FOREGOING FIRST PRODUCTION REQUEST OF THE COMMISSION STAFF TO RICKEL WATER COMPANY, IN CASE NO. RIC-W-17-01, BY MAILING A COPY THEREOF, POSTAGE PREPAID, TO THE FOLLOWING: KEN RICKEL OWNER & MANAGER RICKEL WATER COMPANY PO BOX 126l HAYDEN LAKE ID 83835 J,- ,,,rL SECRETART_ CERTIFICATE OF SERVICE