HomeMy WebLinkAbout20210727PIC to Staff 26-35.pdf.t- a!
PICABO LIVESTOCK CO.
':it.! -:i,i'-. 27 &H tfi: fii
Box 588
Picabo, ldaho 83348
nick@purchrent.com
Nick Purdy, Owner and Operator
208-720-51s0
luly L4,2O2L
Pte'u.)' 2r-ol
REQUEST NO. 25-Provide the date for each hydrant installed and cost:
Fire Hydrants have been installed over period of 50 years and it is impossible to meet the
request.
REQUEST NO. 27-Who is responsible for maintenance of the fire hydrants?
Responsible party is the owner of the Ranch that owns the system, Nick Purdy.
REQUEST NO. 28-SHOW ANNUAL RECONCILIATION OF THE 2009 Annual report and the filed
Apptication:
We don't understand this request and don't know how to do it.
REQUEST NO. 30--Are there missing assets in QuickBooks for Picabo water system
improvements?
There are no missing assets that we are aware of.
REQUEST NO. 31-Provide information about Picabo Storage LLC:
How was the Sl00/month charge determined?
It was estimated from experience with such uses previously
The number of storage units 15
Does each storage unit have its own water connection? YES
What is the connection size? 1 inch
Does each storage unit renter pay Picabo Storage LLC for water service? Water services are
part of the S5O per month charge to cover security, taxes, insurance, water, maintenance etc.
REQUEST NO 32-Explain labor charges in reports for years 2OL4-2OLB
Most labor for the system is done by ranch help and not charged. !t just points out that we
need to get the water system broke out of the ranch books into a separate company with its
own set of books.
REQUEST NO. 33-What use do the outlets provide? Water outlets were not a good idea and
are used very seldom.
They are located in the center of the back of the units.
They are 1 inch pipe with a3l4in hose bib.
The customers use they very little.
There is a water service outside of the storage unit.
REQUEST NO.34-Please provide updates about scheduled capital improvements.
A well is being drilled and tested for an alternative for estimated cost of $50,000
A 1500 ft high voltage power line is being installed for 525,000
New pumps for new well and booster pump to be installed for 525,000
New controls for original sub pump and booster pump and new pumps for 530,000
New fencing for well site for SIO,OOO
New electricalservice for pumps and panels for 515,000
REQUEST NO. 35-- Provide loan documentation for the 590,000loan.
See above for description of need for loaned 590,000
The loan has been approved but not funded.
€I6ar:II
Ef;IE
ia ,3t ,iB ,4
to-sr I
c-,?-,
t'-l
rtamOcn'rrl s
$qrl,
iti
;i
I
'6tf
P4\f
"q^b+
ft{+
4^{d}oild
rL^p,vo
\*
,,;.i
:,4i,,tVq
o:F.a
5t
@
'.:;,
nt
a..:..
r:
@
6I
I
-l
*5!
Bi,
EatN