Loading...
HomeMy WebLinkAbout20210805Staff 4-15 to NSW.pdfStreet Address for Express Mail: I 133I W CHINDEN BLVD, BLDG 8, SUITE 2OI-A BOISE, ID 837I4 Attorney for the Commission Staff BEFORE THE IDAHO PUBLIC UTILITIES COMMISSION ERICK SHANER DEPUTY ATTORNEY GENERAL IDAHO PUBLIC UTILITIES COMMISSION PO BOX 83720 BOISE, IDAHO 83720-0074 (208) 334-03r4 TDAHO BAR NO. 5214 IN THE MATTER OF THE APPLICATION OF NORTH STAR WATER, LLC TO REQUEST THE COMMISSION TO ISSUE A CERTIFICATE OF PUBLIC CONVENIENCE AND NECESSITY (CPCN) AUTHORIZING THE NORTH STAR WATER, LLC TO OPERATE AS A PUBLIC UTILITY IN THE STATE OF IDAHO , . , ?..,I\ j:: :i.i; -I Pii l:05 CASE NO. NSW-W-21-01 SECOND PRODUCTION REQUEST OF THE COMMISSION STAFF TO NORTH STAR WATER, LLC ) ) ) ) ) ) ) ) ) The Staff of the Idaho Public Utilities Commission ("Commission"), by and through its attorney of record, Erick Shaner, Deputy Attorney General, requests that North Star Water, LLC ("Company") provide the following documents and information as soon as possible, but no later than THURSDAY, AUGUST 26,2021. This Production Request is to be considered as continuing, and the Company is requested to provide, by way of supplementary responses, additional documents that it, or any person acting on its behalf, may later obtain that will augment the documents or information produced. Please provide answers to each question, supporting workpapers that provide detail or are the source of information used in calculations, and the name, job title, and telephone SECOND PRODUCTION REQUEST TO NORTH STAR WATER AUGUST 5,2021 number of the person preparing the documents. Please also identifu the name, job title, location, and telephone number of the record holder. In addition to the written copies provided as response to the requests, please provide all Excel spreadsheets and electronic files on CD with formulas intact and enabled. REQUEST NO. 4: Please provide the Electrical Rate Schedule(s) that North Star Water, LLC will be charged for electricity to operate the water system. REQUEST NO. 5: Please provide the following information needed to calculate consumption per subdivision lot: a. An estimated average number of bathrooms, number of bedrooms, and square footage by lot; b. The amount of estimated consumption in gallons for potable water by lot for each month of the year; and c. The amount of estimated consumption in gallons for irrigation water by lot for each month of the year. REQUEST NO. 6: Is North Star Water able to provide irrigation service to North Star customers outside of the beneficial use period of 03/01 to 1ll15 stated in the Water Right No. 63-33225? Please explain. REQUEST NO. 7: The Well House Schematic provided with the Application in Appendix 3 shows a single flowmeter. Will North Star Water be able to track consumption for the Domestic system and the Irrigation system separately? If so, please explain how consumption for the two systems will be tracked separately. If not, please explain if North Star Water has any plans to add additional meter(s) to track consumption separately. REQUEST NO. 8: In Attachment 6 of North Star Water's response to Staff Production Request No. 3, there is at3,l25 hookup fee in the Water System Agreement. Please answer the following: SECOND PRODUCTION REQUEST TO NORTH STAR WATER 2 AUGUST 5,2021 a. What is the purpose for the $3,125 hookup fee paid by Elevation Partners, LLC to North Star Water? b. If the $3,125 hookup fee is for the cost to hook up a new customer, please provide a breakdown of the individual component costs for irrigation and potable water system, separately. REQUEST NO. 9: Please provide a breakdown of the cost responsibility for installing the domestic water distribution system between Elevation Partners, North Star Water, and the lot owner. Please provide the breakdown by the following sections of the domestic distribution system: l. The well house to individual corporation stops for each lot on the distribution water lines; 2. Corporation stops to the curb stops for each lot; and 3. The curb stops to final consumption points on each lot. REQUEST NO. 10: Please provide a breakdown of the cost responsibility for installing the irrigation water distribution system between Elevation Partners, North Star Water, and the lot owner. Please provide the breakdown by the following sections of the irrigation distribution system: 1. The well house to individual corporation stops for each lot on the distribution water lines; 2. Corporation stops to the curb stops for each lot; and 3. The curb stops to final consumption points on each lot. REQUEST NO. 1l: In reference to "Pressurized irrigation will be provided to the common area lots of North Star Subdivision at the cost of the irrigation service for one lot per yeff," mentioned in the Water System Agreement in Attachment 6 of North Star Water's response to Staff Production Request No. 3, please provide the estimated average monthly consumption in gallons for the common area lots of the North Star Subdivision. SECOND PRODUCTION REQUEST TO NORTH STAR WATER J AUGUST 5,2021 REQUEST NO. 12: Please provide the basis and calculations for how the $70 per month domestic service charge and the $30 per month irrigation charge were determined. Please provide any workpapers used to determine the charges in electronic format with links and formulae enabled. REQUEST NO. 13: Please provide the basis and calculations for how the $250 per month and $3,000 annual power cost in the Application (Appendix 8 - Operation & Maintenance Expenses Budget) were derived. Please provide any workpapers used to determine the power cost in electronic format with links and formulae enabled. REQUEST NO. 14: Please provide the basis and calculations for all other costs (aside from power costs) listed in Appendix 8 - Operation & Maintenance Expenses Budget. Please provide any workpapers used to determine these costs in electronic format with links and formulae enabled. REQUEST NO. 15: Please explain the discrepancies between the Operations and Maintenance Expenses in Appendix 8 in the Company Application and Exhibit I l.l in the Technical, Financial, and Managerial Capacity for a New Public Water System dated May 202t. DATED at Boise, Idaho, thi, {Aay of Augu st2O2l. 'A Erick Shaner Deputy Attorney General i:umisc:prodreq/nsww2l. lesme prod req 2 SECOND PRODUCTION REQUEST TO NORTH STAR WATER 4 AUGUST 5,2021 CERTIFICATE OF SERVICE I HEREBY CERTIFY THAT I HAvE THIS 5TH DAY oF AUGUST 2021, SERVED THE FOREGOING SECOND PRODUCTION REQI]EST OF THE CoMMISSTON STAFF TO NORTH STAR WATE& LLC, IN CASE NO. NSW-W.2I-OI, BY E-MAILING A COPY THEREOF, TO THE FOLLOWING: MIKE BLACK NORTH STAR WATER LLC PO BOX 3723 NAMPA ID 83653 E-MAIL: blackwaterllc.idaho@gmail.com .lrn ,1r2,*'- SECRETTF{ /-- / CERTIFICATE OF SERVICE